These are construction drawings for road infrastructure within Everglades National Park, specifically detailing the raising of Audubon and Salem Road Tower Roads. The project involves road improvements across multiple stations, with key features including:

The construction documents cover road plan and profile details from stations -1+23 to 32+00, showing road elevation changes, culvert replacements, and road section modifications. Drawings include typical road section details with specifications for aggregate surface courses, geotextile fabric installation, drainage pipe placement, and road elevation adjustments. The project is being executed for the United States Department of the Interior's National Park Service, with a focus on infrastructure enhancement within the Everglades National Park, a World Heritage Site. Drawings are dated 06/2025 and include multiple sheets covering road cross-sections, plan profiles, and technical road construction specifications.

View the file

Other files

File Type Posted
Sol_140P5425R0018_Amd_0001.pdf PDF
Questions___Answers_0001.pdf PDF
Specifications.pdf PDF
Sol_140P5425R0018.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02 SITE REV 2025-06-06 SHEET 1

02 SITE REV 2025-06-06 SHEET 2
02 SITE REV 2025-06-06 SHEET 3
02 SITE REV 2025-06-06 SHEET 4
02 SITE REV 2025-06-06 SHEET 5
02 SITE REV 2025-06-06 SHEET 6
02 SITE REV 2025-06-06 SHEET 7
02 SITE REV 2025-06-06 SHEET 8
02 SITE REV 2025-06-06 SHEET 9
02 SITE REV 2025-06-06 SHEET 10

File details come from the government source that posted it. Updated .