SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
R-11SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
O & M
HOUSING DIV.
REVIEWED BY
UNITED STATES ARMY GARRISON DAEGU
ENGINEERING DIVISION, DESIGN & TECHNICAL REVIEW Br
DIRECTORATE OF PUBLIC WORK
HGFEDCBA
D - 20 - 13
CHON, HYON TAE
DESIGN REVIEW SIGNATURE
ORGANIZATION
USING AGENCY
36TH SIGNAL
MASTER PLN.
ENVIRONMENTAL
NAME SIGNATURE
O&M DIV.
FIRE DEPT.
SAFETY OFFICE
DPTMS(AT/FP)
188TH MP COM.
IND. HYGENIST
J1-00601-0J
UNIT #15746, APO AP 96218-5746
M - 2
DRAWING NO.
CHIEF,
DESIGN & TECH. REVIEW Br.
M - 1
YI, TONG KI
CANMP WALKER
AS SHOWN
M - 34
DATE: 22 JUN 20
M - 45
1 1 OF 1R - 1
PROJECT NO. J1-00601-0J, CAMP WALKER
MECHANICAL
TITLE SHEET
LEGEND AND ABBREVIATIONS
GENERAL NOTES, EQUIPMENT SCHEDULE AND SCOPE OF WORK
NEW HOT WATER HEATING BOILER SYSTEM PLAN
NEW HOT WATER HEATING BOILER SYSETM ISOMETRIC DIAGRAM
T I T L E S H E E T
(BARRACK)
BOILER WITH GAS TYPE AT BLDG NO. S-363
REPLACE A DEFECTIVE HOT WATER HEATING
(BARRACK)
BOILER WITH GAS TYPE AT BLDG NO. S-363
REPLACE A DEFECTIVE HOT WATER HEATING
LEGEND AND ABBREVIATIONS
SCH
SA
SAN
QTY
R12, R22
RA
RDTR
RPM
RT
PG
PH
POC
POL
PPM
PRV
QT
OA
OAIL
OD
OS&Y
Pa
NTS
BUTTERFLY
CUBIC METER PER HOUR
AIR CONDITION (-ING,-ED)
AIR CONDITION UNIT (S)
AIR COOLED CONDENSING UNIT
CHILLED/HOT WATER RETURN
CHILLED/HOT WATER SUPPLY
REFRIGERANT LIQUID
CAP CAPACITY
CUBIC METER
COMPRESSOR
CONTINUE
CONNECTION
CPRSR
CU M
CONT
CONN
COUNTER CLOCKWISE
COEFFICIENT
CIRCUIT
CAST IRON PIPE
CHILLED WATER
CKT
CMH
COEF
CHW
CCW
CIP
ALARM CHECK VALVEACV
AVG AVERAGE
BAROMETER(-TRIC)
CENTIGRADEC
BARO
AMPERE(AMP, AMPS)
ALUMINUM
APPROX
AMP
AIR COND
AHU
AL
AIR COOLED
ACU
ACLD
ACCU
CHWS
CHWR
CHR
CHS
D
RL
DRAIN
KILOCALORIE PER HOUR
KILOGRAM PER SQ. CENTIMETER
KILOGRAM
THERMAL CONDUCTIVITY
IRON PIPE SIZE
ISOMETRIC
DIAMETER, INSIDE
FACE AREA OR FRESH AIR
EXTERNAL STATIC PRESSURE
EVAPORAT (-E,-ING,-ED,-OR)
ENTERING WATER TEMP
FIRE HOSE CABINET
EXPLOSION PROOF
FHC
FA
ESP
EVAP
EWT
EFF
ENT
EQPT
EP
EFFICIENCY
ENTERING
EQUIPMENT
KG
K
IPS
ISO
ID
NIC
N.O.
NO
MPS
N.C.
N/A
MM
MPH
MIN
MAX
NOT IN CONTRACT
NORMALLY OPEN
NUMBER
NORMALLY CLOSED
METERS PER SECOND
METERS PER HOUR
MINIMUM OR MINUTE
NOT APPLICABLE
MILLIMETER
MAXIMUM
HERTZ
HOSE BIBB
HEAD
HORSEPOWER
HOUR(S)
HOT WATER
HOT WATER HEATER
HORIZONTAL
FIBERGLASS REINFORCED PLASTIC
FREQUENCY
FLUSH VALVE
FEED WATER PUMP
FIXTURE
GAGE OR GAUGE
GALVANIZED STEEL
FUEL OIL
FEMALE PIPE THREAD
CIRCULATING WATER PUMPCWP
FRP
DECIBEL OR DRY BULB
DRY BULB TEMPERATURE
ENTERING AIR TEMPERATURE
DRY PIPE VALVE
DIRECT EXPANSION
DO DIESEL OIL
EAT
DPV
DX
DIV
DIAG
DIFF
DB
DBT
DIVISION
DIAMETER
DIAGRAM
DIFFERENCE
DEGREE
HR
HZ
HW
HWH
HORIZ
HB
HD
HP
GA
GALVS
FV
FWP
FXTR
CLOCKWISE OR COLD WATERCW
PLUG VALVE
THREE WAY
FREQ
FO
FPT
GATE, GLOBE
GATE, ANGLE
GLOBE
CONTROL
GATE
M
LPS
LWT
LT
LPH
LPD
LL
LG
LBS
LAT
LAV
L
KWH
KW
LITERS PER SECOND
LITERS PER HOUR
LEAVING WATER TEMPERATURE
METERS
LAUNDRY TRAY
LITERS PER DAY
LIQUID LINE
LEAVING AIR TEMPERATURE
POUNDS
LAVATORY
LENGTH
KILOWATT HOUR
KILOWATT
LITERS
P
STRAINER, BLOW OFF
STRAINER
PUMP (INDICATE USE)
KG/ SM KILOGRAM PER SQ. METER
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
PIPE TO BE REMOVED
MEDIUM TEMPERATURE HOT WATER RETURN
MEDIUM TEMPERATURE HOT WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
RS
RD
(NAME)
(NAME)E EXISTING PIPE
HWR
HWS
MTWR
MTWS
CR
CS
PIPING
SANITARY DRAIN
CHECK, SWING
PIPE SLEEVE WITH FIRE STOPPING
VENT THRU ROOF
BFP
PLAN
HOSE BIBB
BALL
ELEV.
PIPE SLEEVE
BACKFLOW PREVENTER
FLOOR DRAIN
FLOOR CLEANOUT
FD
FCO
FLEXIBLE CONNECTOR
ANCHOR, INTERMEDIATE
ANCHOR, MAIN
EXPANSION JOINT
EXPANSION LOOP
EJ
RELIEF
SAFETY
HOSE END DRAIN
LOCK SHIELD
NEEDLE
PRESSURE REDUCING
CONTROL, PNEUMATIC-ELECTRIC
CONTROL, ELECTRIC-PNEUMATIC
CHECK, NON-SLAM
S
R
EP
PE
COLD WATER
VENT
AD FD
QUANTITY
TEMPERATURE DIFFERENCE
TONS OF REFRIGERATION
SCHEDULE
SUPPLY AIR
SANITARY
REFRIGERANT (12, 22, ETC)
RETURN AIR
REVOLUTIONS PER MINUTE
REFRIGERATION TON
RADIATOR
TYP TYPICAL
UNIT HEATER
URINAL
UH
UR
SYMBOL
TEMPERATURE
THICKNESS
TONS
THK
TEMP
SYM
TD
OUTSIDE AIR INTAKE LOUVER
PRESSURE REDUCING VALVE
PHASE (ELECTRIC)
PETROLEUM, OIL AND LUBRICANTS
POINT OF CONNECTION
PARTS PER MILLION
PERCENT/
QUART
PRESSURE GAGE
DIAMETER, OUTSIDE
OUTSIDE SCREW & YOKE
PASCAL
POLE
SPR SPRINKLER
STAINLESS STEEL
SQUARE
STEAM
STANDARD
STEEL
ST
STD
STL
SQ
SST
SPECIFICATION
SQUARE METER
STATIC PRESSURE
SPEC
SP
SM
OUTSIDE AIR
NOT TO SCALE
SECONDSEC
VAV VARIABLE AIR VOLUME
WATER CLOSET
VENTILATION
W/
WT
WC
WD
WITH
WEIGHT
WIDTH
W
WB
VOL
VEL
VENT
VERT
WATT
WET BULB
VOLUME
VELOCITY
VERTICAL
SMOKE DAMPER (PROVIDE ACCESS DOOR)
MANUAL VOLUME DAMPER
VAC
V
VACUUM
VOLT
SPLITTER DAMPER
AD
SD
VD
TEE, SINGLE SWEEP
TEE, OUTLET DOWN
REDUCER, ECCENTRIC (STRAIGHT, DOWN)
REDUCER, ECCENTRIC (STRAIGHT, INVERT)
ELBOW, TURNED DOWN
UNION, FLANGED
UNION, SCREWED
TEE, OUTLET UP
TEE
LATERAL
ELBOW, TURNED UP
CONNECTION, TOP
CONNECTION, BOTTOM
BUSHING
CAP
FIRE DAMPER (PROVIDE ACCESS DOOR)
BDD
TURNING VANES
TRANSITION
FLEXIBLE CONNECTION
FLEXIBLE DUCT
FC
DUCT WORK
A B B R E V I A T I O N S
L E G E N D
PG
TM
AAV
FOS
3-WAY VALVE (MOTORIZED)
PRESSURE GAUGE
THERMOMETER
AUTOMATIC AIR VENT
GATE VALVE
CHECK VALVE
FUEL OIL SUPPLY
FLEXIBLE JOINTFJ
& STRAINER
M
CS
SD
SHOWER DRAIN
DEG
DIA or o
CEAT CONDENSER ENTERING AIR TEMP
LCWT LEAVING CHILLED WATER TEMP
FAIL FRESH AIR INTAKE LOUVER
EXPANSION JOINTEXPJT
EXST EXISTING
A / C AIR CONDITIONING
APPROXIMATELY
ARCH ARCHITECTURAL
BLDG BUILDING
CONC CONCRETE
DWG DRAWING
EA EACH
F.C.U. FAN COIL UNIT
MECH MECHANICAL
KCAL/ HR
KG/ SQ CM
HOT WATER SUPPLY
HOT WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
V
DOMESTIC HOT WATER SUPPLY
DOMESTIC HOT WATER RETURN
AAV
ED EXHAUST DUCT
AUTOMATIC AIR VENT
AIR HANDLING UNIT
GROUND LEVELGL
REGISTER, SIDEWALL
SUPPLY AIR GRILLE OR
REGISTER, CEILING
SUPPLY AIR GRILLE OR
(200mm NECK DIAMETER)
CEILING DIFFUSER, ROUND TYPE
REGISTER, CEILING
EXHAUST AIR GRILLE OR
GRILLES, REGISTERS AND DIFFUSERS
SQUARE TYPE
CEILING DIFFUSER,
EG
ER
SG
SR
SG
SR
RG
RR
CD
200mm NCD
COWL, (GOOSENECK) AND FLASHING
(810mm WIDTH x 400mm DEPTH)
DUCT SIZES SHOWN810mm x 400mm
M
ELECTRIC MOTOR OPERATED DAMPER
S
MOTORIZED DAMPER
MD
SUPPLY AIR DUCT RISER
RETURN OR EXHAUST AIR DUCT RISER
SUPPLY AIR DUCT SECTION
RETURN AIR DUCT SECTION
GATE, GLOBE OR BALL VALVE
CHECK VALVE (FLOW)
ANGLE VALVE
STRAINER
DRIP CHECK VALVE
RESTRICTED ORIFICE
FILL CUP
PRESSURE GAUGE
SOLENOID VALVE
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLEXIBLE PIPE CONNECTION
RELAY
HOSE VALVE
TEST HEADER
SMOKE DAMPER
R
SD
S
: WATER MOTER ALARM GONG
SPRINKLER SYSTEM
: UP-RIGHT TYPE SPRINKLER
: PENDENT TYPE SPRINKLER
: SIDE WALL TYPE SPRINKLER
REMOVAL WORK
RELOCATED WORK
SUPPLY AIR DUCT
RETURN AIR DUCT
EXHAUST AIR DUCT
SA
RA
EA
DEMPERS
VALVES, SPECIAL DUTY
HEATING
AIR CONDITIONING & REFRIGERATION
PLUMBING
VALVES : (for selective actuators)
BACK DRAFT DAMPER
CIRCUIT SETTER
POINT OF CONNECTIONPOC
POR POINT OF REMOVAL
TcH THERMOSTAT HEATING/COOLING
THERMOSTAT OF HEATING
REGISTER, CEILING
RETURN AIR GRILLE OR
Th
REDUCER, CONCENTRIC
1 4
MECHANICAL
22 JUN 20
CHANG, TAE HO
NAM, TAE CHIN
J1-00601-0J
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
M-1
D - 20 - 13
G
CAMP WALKER
(BARRACK)
BOILER WITH GAS TYPE AT BLDG. NO. S-363
REPLACE A DEFECTIVE HOT WATER HEATING
ELEC. POWER
D E S C R I P T I O N
E Q U I P M E N T S C H E D U L E
Q’ TY
NO.
ITEM
WORK CLASS "K" (REPAIR / MAINTENANCE WORK)
SCOPE OF WORK
GENERAL NOTES
DUCTWORK SHALL BE PATCHED OR RESTORED TO MATCH THE ADJACENT SURFACE OR AREA.
4. ALL WALL / FLOOR / ROOF OPENINGS RESULTING FROM THE REMOVAL OF PIPING AND
AS DIRECTED BY THE CONTRACTING OFFICER.
EXISTING AREAS CAUSED BY THIS PROJECT AND TO MATCH CONDITION TO ADJACENT AREAS
5. THE CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT OR REPAIR ALL DAMAGES TO
PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.
ACCORDING TO ACTUAL FIELD CONDITIONS AND SUBMITTED TO THE CONTRACTING OFFICER
FIELD CONDITIONS. SUCH DETAILS SHALL BE PREPARED IN THE FIELD BY THE CONTRACTOR
3. SOME DETAILS SHOWN ON THIS CONTRACT DRAWINGS MAY NOT MATCH EXACTLY TO THE
CONTRACTING OFFICER’S APPROVAL.
REPRESENTATIVE ATTENTION WITH RECOMMENDATIONS FOR PROPER CORRECTIONS FOR
IF ANY DISCREPANCY IS DETECTED, IT SHOULD BE BROUGHT TO THE CONTRACTING OFFICER’S
PRIOR TO COMMENCING ANY CONSTRUCTION OR REPAIR.
EQUIPMENT, DUCTWORK, PIPING, DIMENSIONS AND ETC. UNDER THE SUPERVISION OF C.O.R
1. THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION,
FOR APPROVAL.
DESIGN & TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION
10. THE CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE
TECHNICAL REVIEW BRANCH VIA C.O.R. PRIOR TO COMMENCING CONSTRUCTION FOR APPROVAL.
CONTRACTOR SHALL SUBMIT MANUFACTURER’S INSTALLATION SHOP DRAWINGS TO THE DESIGN &
2.THIS DRAWING IS ONLY FOR GOVERNMENT COSTING PURPOSE ONLY AT CONCEPTUAL LEVEL. THE
AND SHALL BE VERIFIED AT THE JOB SITE.
15. LOCATION AND SIZES OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC, ARE APPROXIMATE
CONSTRUCTION.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF CORE DRILLING DURING
THROUGH COR.
SURVEY REPORT AND ASBESTOS REMOVAL DOCUMENTATION TO ENVIRONMENTAL OFFICE
ENVIRONMENTAL GOVERNING STANDARD (KEGS). THE CONTRACTOR SHALL PROVIDE THE NEW
TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN ACCORDANCE WITH THE KOREA
BE RESURVEYED AND ASBESTOS MATERIALS SHOULD BE REMOVED PRIOR TO ANY WORK
AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER. THE WORK AREA WILL NEED TO
CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR SHALL CASE WORK IN THE
NOT PRESENT IN THE AREA AFFECTED BY THIS WORK. HOWEVER, IF SUSPECTED ASBESTOS
VERIFYING THE PRODUCT IS ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS IS
PROVIDE A CERTIFICATE OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER
PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR WILL
19. THE CONTRACTOR IS REQUIRED TO USE "ASBESTOS FREE" MATERIALS (LESS THAN 1
SPECIFICATIONS.
CONTRACT DRAWINGS SHALL BE SUBMITTED FOR APPROVAL AS REQUIRED BY THE CONTRACT
OF THE ACTUAL PROPOSED CONTROL SYSTEM WHICH MAY DEVIATE FROM THAT SHOWN ON
SYSTEM TO SATISFY ALL FUNCTIONAL REQUIREMENTS SHOWN ON DRAWING. SHOP DRAWINGS
16. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE AND WORKABLE CONTROL
CEILING, ROOF, EQUIPMENT, PIPE, DUCT AND ELECTRICAL ITEMS.
PREVENTION SYSTEM WITH NO ADDITIONAL COST TO THE GOVERNMENT SUCH AS WALLS,
ITEMS TO MAKE WAY FOR THE INSTALLATION AND REPLACEMENT OF MECHANICAL AND FIRE
17. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE AND REINSTALL THE OBSTRUCTED
SUCH AS ANCHORS, HANGERS, SUPPORTS, ETC.
6. ALL PIPES, DRAINS AND DUCTWORK TO BE REMOVED SHALL INCLUDE ALL ITS ACCESSORIES
7. ANY PIPES THAT PENETRATE FIRE RATED WALLS (EXISTING/ NEW) SHALL BE SEALED PER SPEC.
A SHOP DRAWING SHALL NOT BE THE EXACT DUPLICATION OF THE CONTRACT DRAWING.
8. NO MECHANICAL WORK CAN BE STARTED WITHOUT AN APPROVED SHOP DRAWING.
CONTRACTOR.
THE WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS
THE EXISTING EQUIPMENT, NEW EQUIPMENT, DUCT WORK, PIPING AND ETC. DAMAGES DUE TO
9. CONNECTIONS TO EXISTING SYSTEM SHALL BE DONE IN SUCH A MANNER AS NOT DAMAGE
REVIEW BRANCH FOR APPROVAL BEFORE COMMENCING THE WORK.
11. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION TO THE DESIGN & TECHNICAL
TO ENSURE PROPER OPERATION, AS ORIGINALLY INTENDED.
EQUIPMENT. THE CONTRACTOR SHALL TEST, ADJUST AND BALANCE EQUIPMENT AS REQUIRED
12. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY START-UP AND TESTING OF THE NEW
SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)".
13. ALL EQUIPMENT AND MATERIALS SHALL MEET THE REQUIREMENTS OF "STANDARD TECHNICAL
ADDITIONAL COST TO THE PROJECT CONTRACT.
THE DETAILS WILL BE UTILIZED TO ACCOMPLISH THE MECHANICAL SCOPE OF WORK AT NO
O & MA PROJECTS, KOREA (NOVEMBER 30, 2015)" FORM AS A PART OF THIS PROJECT.
14. THE MECHANICAL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL DRAWINGS FOR
7. THE CONTRACTOR SHALL PERFORM THE TRAINING ABOUT GAS SUPPLY SYSTEM TO O&M DIVISION.
AND GAS PIPING LINES TO DESIGN & TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO CONSTRUCTION.
5. THE CONTRACTOR SHALL SUBMIT THE DETAILED SHOP DRAWING OF GAS DISTRIBUTION SYSTEM
NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION.
TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 - 20151030)" SECTION 33 51 15,
1. GAS DISTRIBUTION SYSTEM SHALL CONFORM TO KOREA GAS SAFETY CODE AS WELL AS "STANDARD
THE DESIGN & TECHNICAL REVIEW BRANCH FOR APPROVAL PRIOR TO CONSTRUCTION.
6. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL INFORMATION OF GAS DISTRIBUTION SYSTEM TO
GAS DISTRIBUTION GENERAL NOTES
ADJUSTMENTS, RELOCATIONS AND/ OR REPAIRS WILL BE MADE AT THE CONTRACTOR’S COST.
AS A RESULT OF THE CONTRACTOR’S CONSTRUCTION. ALL DAMAGE TO GAS FACILITIES REQUIRING
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES TO GAS FACILITIES DURING OR
ACCESSORIES.
8. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR THE INSTALLATIONS OF GAS PIPING AND
9. THE CONTRACTOR SHALL CONSULT GAS SUPPLIER FOR GAS PIPING SIZE.
TO D&TR BRANCH THROUGH THE COR.
10. THE CONTRACTOR SHALL PERFORM A GAS LEAKING TEST AND SUBMIT THE GAS LEAKING TEST REPORT
20151030)" SECTION 33 51 15, PART 2 PRODUCTS.
AS WELL AS "STANDARD TECHNICAL SPECIFICATIONS FOR O & MA PROJECTS, KOREA (REVISION 1 -
2. ALL MATERIALS OF GAS DISTRIBUTION SYSTEM SHALL CONFORM TO KOREA GAS SAFETY CODE
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FACILITY SHARE OF THE EXPENSES.
HOT WATER HEATING BOILER
(MBH)
INPUT
GAS
CONSUMPTION
MAXIMUM POWER
LESS THAN 12 AMPERES120 V, 60 HZ
PRESSURE
WATER
12-160 PSI
3. INSTALL GROUNDING FOR BOILER SUPPORT AND GAS PIPE LINE.
EQUAL.
SIMILAR TO "KYUNGDONG NAVIEN" MODEL NO. NFB-399C X 4 OR APPROVED
(MBH)
INPUT
HEATING
ASME AND CSA CERTIFIED PRODUCT.
REDUCER, BUILT IN TRIAN ASSEMBLY FOR GAS PIPE, STANDARD ACCESSORIES,
CASCADE SYSTEM, MODULE TYPE CONDENSING WATER BOILER WITH SCALE
PARTS. (BLDG, NO. S-363)
PIPING, INSULATION, VALVES, CONCRETE PAD, SMOKE STACKS WITH ALL NECESSARY ACCESSORIES AND
1. REPLACE EXISTING DETERIORATED HOT WATER HEATING BOILER SYSTEM WITH NEW ONE INCLUDING
AND PARTS AS INDICATED ON DRAWING. (BLDG, NO. S-363)
2. PROVIDE NEW GAS LINE FOR NEW HOT WATER HEATING BOILER WITH ALL NECESSARY ACCESSORIES
HOT WATER HEATING BOILER.
4. INSTALL JUNCTION BOX WITH ELECTRICAL LINE PROTECTOR FOR LWCO(LOW WATER CUT-OFF) OF NEW
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
G
CHANG, TAE HO
NAM, TAE CHIN
M-2
AND SCOPE OF WORK
GENERAL NOTES, EQUIPMENT SCHEDULE
CAMP WALKER
22 JUN 20
J1-00601-0J
(BARRACK)
BOILER WITH GAS TYPE AT BLDG. NO. S-363
REPLACE A DEFECTIVE HOT WATER HEATING
D - 20 - 13
2 4
N
SPECIFIC NOTES
SCALE = 1 : 50-
P-1
(S-363)
M
FD
M
M
T
T
SD
SD
T
T
1 NEW HOT WATER HEATING BOILER
NEW HOT WATER HEATING BOILER SYSTEM PLAN
M-3
J
M-17
IN EXISTING CONDUIT
WITH NEW 2-#10 "THWN" & 1-#12(G)
REPLACE EXISTING POWER LINE
22KA ON EXISTING PANEL "M"
BREAKER WITH NEW 1P-100AT-30AT,
REPLACE EXISTING BRANCH CIRCUIT
MANUFACTURER’S RECOMMENDATION AND SITE CONDITIONS.
2. SIZE AND LAYOUTS OF PIPE WORK MAY CHANGE DEPENDING ON
NEW 4500 X 1500 CONCRETE PAD
GRAPHIC SCALE
SCALE: 1 : 50
2000mm1000
THROUGH THE EXISTING CHIMNEY.
INDIVIDUAL STACKS SHALL BE COMBINED INTO DOUBLE SMOKESTACK
1. THE CASCADE TYPE OF BOILERS HAVE STACKS IN EACH UNITS. SO ALL
W/ FITTING
NEW 65mm GAS PIPE
GAS METER TO REMAIN
EXISTING GAS REGULATOR AND
EXISTING GAS LINE TO REMAIN
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
G
CHANG, TAE HO
NAM, TAE CHIN
M-3
BOILER SYSTEM PLAN
NEW HOT WATER HEATING
CAMP WALKER
22 JUN 20
J1-00601-0J
(BARRACK)
BOILER WITH GAS TYPE AT BLDG. NO. S-363
REPLACE A DEFECTIVE HOT WATER HEATING
3 4
C / H
W R
CWS
CWR
HWR
HWS
C/
HWR
C/
HWS
FO
R
CONT.
MAKE
-U
P
WAT
ER
H W
R
C/
HWS
CWR
C/ HWR
32 CHS
NOT TO SCALE (S-363)
BFP
M
EXIS
TIN
G
GAS
L
IN
E
CONNEC
T
TO
NEW HOT WATER HEATING BOILER SYSETM ISOMETRIC DIAGRAM
X
CONCRE
TE
P
AD
M-4
NOTE
N
O.
SE
E
SP
EC
IFI
C
SMOKE
ST
ACK
I-1
HEAT
IN
G
BOI
LE
R
HOTWAT
ER
3-
WAY
VAL
VE
T
O
RE
MAIN
MODULA
TIN
G
W/
FI
TT
IN
G
NEW
mm
GAS
P
IPE
H
SYMBOL BY CHK.ZONE DATE APVD.
R E V I S I O N S
DESCRIPTION
SHEET OF
DESIGNED BY
CHECKED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :SAFETY REP
SIGNAL REP
FES
FORCE PROTECTION
CHIEF,
DESIGN & TECH. REVIEW Br.
O & M
HOUSING DIV.
REVIEWED BY
EDCBA
AS SHOWN
DATE:
MECHANICAL
G
CHANG, TAE HO
NAM, TAE CHIN
M-4
SYSETM ISOMETRIC DIAGRAM
NEW HOT WATER HEATING BOILER
CAMP WALKER
22 JUN 20
J1-00601-0J
(BARRACK)
BOILER WITH GAS TYPE AT BLDG. NO. S-363
REPLACE A DEFECTIVE HOT WATER HEATING
4 4
| J1-00601-0J_T01 |
| J1-00601-0J_M01 |
| J1-00601-0J_M02 |
| J1-00601-0J_M03 |
| J1-00601-0J_M04 |