About this file

This document is a set of drawings related to the Lumpkin Center Boiler Replacement project for Columbus State University located in Columbus, Georgia. The project involves the demolition and replacement of HVAC and natural gas piping systems within the Lumpkin Center's first-floor mechanical room. The drawings provide detailed plans for new boiler installations, piping, controls, and electrical work. Bids are due by 2:00 PM on March 28, 2024 at the CSU Plant Operations Training Room. The Design Professional is NBP Engineers, Inc., and bidding documents may be obtained from their office.

The project appears to have a focus on upgrading the boiler systems, including the installation of two new 1,999 MBH condensing hot water boilers, new pumps, and a new building automation control system. The drawings indicate the work will also involve demolition and replacement of existing air handling units, ductwork, and natural gas piping. Funding and other pricing details are not provided in the drawings, but the project is being competitively bid to qualified contractors.

View the file

Other files

File Type Posted
Notice of Intent to Award.pdf PDF
Invitation to Bid.pdf PDF
SPD_AP005 NOA.pdf PDF
DESIGN_BID_BUILD Construction Contract.pdf PDF
Digial Copy of Pre_Bid for Lumpkin Center 3_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF

DRAWINGS

TITLESHEET NO.

NBP ENGINEERS, INC.

MACON, GEORGIA316 CORPORATE PARKWAY

NBP

ENGINEERS

CONSULTANTS

478-745-1691 www.nbpengineers.com

M0.1

COLUMBUS, GA

COLUMBUS STATE UNIVERSITY

M1.1 LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - DEMOLITION - HVAC

M2.1 LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - NEW WORK - HVAC

M3.1

DETAILS - HVAC

ABBREVIATIONS, LEGEND, SCHEDULES, & DETAILS - HVAC

M4.1

FLOW DIAGRAM - HVAC

E1.1 LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - DEMOLITION - POWER

E2.1 LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - NEW WORK - POWER

M1.2

M2.2

LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - DEMOLITION - NG PIPING

LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - NEW WORK - NG PIPING

PROJECT NUMBER: CSU 141-24

LUMPKIN CENTER - BOILER REPLACEMENT

02.12.24 BID SET

P:\23081\23081m01.dgn

DATE PLOTTED

DGN FILE

12-FEB-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\23081\23081m01.dgn

AS SHOWN

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

C o lu m b u s

G e o rg ia

WSH

LTF

WSH

02.12.24

L U

M P

K

IN

C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

P R

O J E

C T N

U M

B E

R C

S U

-2

23081

NBP PROJECT NUMBER:

B

ID

S E

T

COA Expiration: 6.30.2024

COA#PEF000774

NBP Engineers, Inc.

SUMMER WINTER

DESIGN CONDITIONS

OUTSIDE

75 F & 55% RH

18 F DB

INSIDE

A COMPRESSED AIR

AAV AUTOMATIC AIR VENT

AF AIR FOIL

-AFF ABOVE FINISHED FLOOR

AV ACID VENT

AVD AUTOMATIC VOLUME DAMPER

AW ACID WASTE

-AC ABOVE CEILING

AH- AIR HANDLING UNIT

BBD BOILER BLOW DOWN

BE BOTTOM ELEVATION

BOL BOTTOM OF LINE (UNINSULATED)

BOD BOTTOM OF DUCT

BP- BOOSTER PUMP

BTUH BRITISH THERMAL UNIT PER HOUR

-BF BELOW FLOOR

BFP BACK FLOW PREVENTOR

C CONDUIT

CC COOLING COIL

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSER WATER RETURN

CS CONDENSER WATER SUPPLY

CW DOMESTIC COLD WATER

CAB CABINET FAN

CF CENTRIFICAL FAN

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CHEMICAL FEED TANK

CH CABINET HEATER

CHR CHILLER

CL CENTER LINE

CO CLEANOUT

CP CHILLER PUMP

CPHB CHROME PLATED HOSE BIBB

CT COOLING TOWER

CU COPPER

CV- CONVECTOR

Cv VALVE COEFFICIENT

D DRAIN

DDC DIRECT DIGITAL CONTROL

DHW DOMESTIC HOT WATER

DN DOWN

DP DIFFERENTIAL PRESSURE

DS DOWN SPOUT

DSO DOWN SPOUT OVER FLOW

DX DIRECT EXCHANGE

EAD EXHAUST AIR DAMPER

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EWB ENTERING WET BULB

ESP END SUCTION PUMP

ESP EXTERNAL STATIC PRESSURE

ELL ELBOW

ET EXPANSION TANK

EQT EQUIPMENT TRAP SET

EWT ENTERING WATER TEMPERATURE

EX EXPANSION TANK LINE

EXT EXTERNAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

F&BP FACE & BYPASS

FC FAN COIL UNIT

BPD BYPASS DAMPER

EAL EXHAUST AIR LOUVER

ECH ELECTRIC CABINET HEATER

ABBREVIATIONS

FD FLOOR DRAIN

FF FOULING FACTOR

FF- FLY FAN

FF FINISHED FLOOR

FF FINAL FILTER

FFM FIRE FLOW METER

FLEX FLEXIBLE

FM FIRE MAIN

FMS FLOW METER STATION

FOF FUEL OIL FLOW

FOR FUEL OIL RETURN

FOV FUEL OIL VENT

FOP FUEL OIL PUMP

FP FIRE PUMP

FP- FAN POWERED

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRT FLOW RATE TRANSMITTER

FT FEET

G LOW PRESSURE GAS

GA GAUGE

GPM GALLONS PER MINUTE

GT GREASE TRAP

GTH GRAND TOTAL HEAT

H HEIGHT

HC HEATING COIL

HB HOSE BIBB

HBT HORIZONTAL BLOW THROUGH

HD HUB DRAIN

HDT HORIZONTAL DRAW THROUGH

HP HORSEPOWER/HIGH PRESSURE

HPA HIGH PRESSURE AIR

HPG HIGH PRESSURE GAS

HPS HIGH PRESSURE STEAM

HPWS HEAT PUMP WATER SUPPLY

HPWR HEAT PUMP WATER RETURN

HSC HORIZONTAL SPLIT CASE

HWG HOT WATER GENERATOR

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

ILC IN-LINE CENTRIFICAL

IT INTERVAL TIMER

IN INCHES

INV INVERT

JB JUNCTION BOX

L LENGTH

LR LONG RADIUS

LAT LEAVING AIR TEMPERATURE

LCP LOCAL CONTROL PANEL

LDB LEAVING DRY BULB

LN LIQUID NITROGEN

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM

MAV MANUAL AIR VENT

MVD MANUAL VOLUME DAMPER

MAX MAXIMUM

MBH ONE THOUSAND BTUH PER HOUR

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MH MAN HOLE

MP SUMP (MUD) PUMP

MPS MEDIUM PRESSURE STEAM

MPR MEDIUM PRESSURE RETURN

MTS MEDIUM TEMPERATURE SUPPLY

MTR MEDIUM TEMPERATURE RETURN

MUA MAKE-UP AIR

MUW MAKE-UP WATER

MZ MULTIZONE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTSIDE AIR DAMPER

ODT OUTDOOR TEMPERATURE

PC PUMP CONDENSATE

PD PRESSURE DROP

PRV PRESSURE REDUCING VALVE

PWF PROPELLER WALL FAN

R REFRIGERANT

RA RETURN AIR

RAD RETURN AIR DAMPER

RAS RELIEF AIR SUPPLY

RP RECIRCULATING PUMP

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RD ROOF DRAIN

RV RELIEF VALVE

SR SHORT RADIUS

OAL OUTSIDE AIR LOUVER

SAN SANITARY SEWER

SC SILL COCK

SCD SMOKE DAMPER

SD STORM DRAIN

SD SMOKE DETECTOR

SF SQUARE FEET

SDO STORM DRAIN OVERFLOW

SHC SENSIBLE HEAT CAPACITY

SP STAND PIPE

SP SUMP PUMP

SPS STATIC PRESSURE SENSOR

STA STATION

TR TEMPERED WATER RETURN

UG UNDERGROUND

VAC VACUUM PIPING

VDT VERTICAL DRAW THROUGH

VTR VENT THROUGH ROOF

WB WET BULB

O2 OXYGEN

?F DEGREES FAHRENHEIT

?C DEGREES CENTIGRADE

WM WATER METER

WL WATER LINE

WH WATER HEATER

WG WATER GAUGE

W WIDTH

W WASTE

VT VERTICAL TURBINE

VFD VARIABLE FREQUENCY DRIVE

VB VACUUM BREAKER

VAV VARIABLE AIR VOLUME

V VENT

UC UNDERCUT (DOOR - 3/4")

V- VALVE

TOS TOP OF STRUCTURE

TB THRUST BLOCK

T TEMPERED WATER

STR STRAINER

SP STATIC PRESSURE

SP SPRINKLER PIPE

SG SPECIALTY GAS

EUH ELECTRIC UNIT HEATER

RECIRCULATING

DHR DOMESTIC HOT WATER

TRANSMITTER

DPT DIFFERENTIAL PRESSURE

PER MINUTE

SCIM STANDARD CUBIC INCHES

TEMPERATURE

SST SATURATED SUCTION

(UNINSULATED)

TE TOP ELEVATION

(TOWER) PUMP

TP CONDENSER WATER

FSD FIRE/SMOKE DAMPER

EA EXHAUST AIR

MA MIXED AIR

AE ADJUSTABLE AIR EXTRACTOR

RAO RETURN AIR OPENING

AD AREA DRAIN/ACCESS DOOR

COMBINATION STARTER

STARTER

PIPE SLEEVE

CONCENTRIC REDUCER

PIPE ANCHOR

HVAC LEGEND

GATE VALVE WITH

3/4" HOSE END

BALANCE VALVE

THREADED & FLANGED

GLOBE VALVE

CHECK VALVE

3-WAY MIXING VALVE

GATE VALVE

BUTTERFLY VALVE

SOLENOID VALVE

CONTROL VALVE

PLAN VIEW

2-WAY MOTORIZED VALVE

RELIEF VALVE

FLANGED UNION

BRANCH OUT TOP

STRAINER

BRANCH OUT BOTTOM

ELBOW DOWN

ELBOW UP

TEE OUT TOP

BLIND FLANGE

PIPE CAP

AUTOMATIC AIR VENTAAV

FLEX. PIPE CONN.

BACKFLOW PREVENTER

THERMOMETER

TEE OUT BOTTOM

MANUAL AIR VENT

PIPE TEST PLUG

CHILLED WATER FLOW

HEATING WATER FLOW

COLD WATER DOMESTIC

NATURAL GAS

CONDENSER WATER FLOW

DRAIN

MANUAL AIR VENT

FLOW METER

CHILLED WATER RETURN

HEATING WATER RETURN

HOT WATER DOMESTIC

G

D

M.A.V.

DUCT SIZE FIRST DIMENSION

IS SIDE SHOWN

24\12

DOOR GRILLE

C.F.M.

REFERS TO DETAIL OR

PLAN ON SHEET M-1.THERMOSTAT

INTERVAL TIMER

T

I.T.

1\M-4

LINED DUCT OR PLENUM

DAMPER

FIRE DAMPER

ELBOW WITH

TURNING VANES

FLEX. DUCT CONN.

DAMPER

TURNING VANES

ELBOW WITHOUT

ADJUSTABLE AIR

EXTRACTOR

INSULATED FLEX. DUCT

INSULATED FLEX. DUCT

c

ECCENTRIC REDUCER

HWS

HWR

CHS

CHR

CONDENSER WATER RETURN

CS

CR

STATIC PRESSURE SENSOR

SMOKE DETECTOR

POINT OF CONNECTION

DUCT SPLIT

THREADED & FLANGED

THREADED & FLANGED

UNION

GAUGE TAPPING

GAUGE WITH TAPPING

THREADED & FLANGED

THREADED & FLANGED

PIPE SOCKET WELL

FLOW INDICATOR BALANCER

72 F DB

97 F DB/76 WB

M0.1

TYPE GPM

FT.H O

R.P.M.

MAX.

H.P.

MIN.

EFF.%2

PUMP SCHEDULE

MANUFACTURERS

REMARKS

DYNAMIC MIN.

HEAD

SHUT OFFMARK SERVICE

HP-1 HEATING WATER

HP-2 HEATING WATER

MARK REMARKS

CONDENSING HOT WATER BOILER SCHEDULE

MBH

INPUT

BOILER

MBH

OUTPUT

EFFICIENCY

MIN. OPERATING

PRESSURE

GPM VOLT/PHASE

BLR-2

BLR-1 1999

96.4%

96.4%

120/1

120/1

ES

ES

7.5

7.5 71.4

71.4 2.5BB

2.5BB

B&G

3x2.5x9.5

3x2.5x9.5

3x2.5x9.5

3x2.5x9.5

TACOPATTERSON

SCHEDULES - HVAC

LEGEND &

ABBREVIATIONS,

P:\23081\23081m11.dgn

DGN FILE

12-FEB-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\23081\23081m11.dgn

AS SHOWN

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

C o lu m b u s

G e o rg ia

WSH

LTF

WSH

02.12.24

L U

M P

K

IN

C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

P R

O J E

C T N

U M

B E

R C

S U

T

COA Expiration: 6.30.2024

COA#PEF000774

NBP Engineers, Inc.

6.5

H JG.4

N

SCALE:

= 1'-0

4 0 2 4 8

M1.1

4"

6"

6"

6" 6"

6"

6"

6"

8"

8"

EF-8

CP-1

EXISTING DCW

TO

BLEED LINE

EXISTING CONDENSER

F

LEAK MONITOR

EXISTING REFRIGERANT

EXISTING

EXISTING

CONCRETE PAD

EXISTING

AIR PURGE

EXISTING

INTERLOCK AVD w/SF-1

EXISTING 66"x48" AVD

18" DEEP PLENUM DOWN BACK OF LOUVER

EXISTING LOUVER w/FULLSIZE

PROVIDE SCREENED OPENING AT TERMINATION

28/20 DOWN; TERMINATE DUCT 0'-12" A.F.F.

CP-1 VFD

EXISTING

CP-2 VFD

EXISTING

PURGE SWITCH

EXISTING MANUAL

PURGE SWITCH

EXISTING MANUAL

ALARM SWITCH

REFRIGERANT LEAK

EXISTING CHILLER

ALARM SWITCH

REFRIGERANT LEAK

EXISTING CHILLER

DEMOLITION - HVAC

MECH. RM. #1230 -

FIRST FLOOR

LARGE SCALE -

LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - DEMOLITION - HVAC

HP-4

HP-3

CHR-1

MCC

ACP

BOILER-1

STARTER

CS

CS

CR

SF-1

TANKS

EXPANSION

BOILER-2

C H

R

C H S

CHS

HWS

H W

S

H W

R

UH-2

18"{

14"{

C S

T

T

VFD-CT1 VFD-CT2

T

UH-2

T

UH-1

SF-1

CR

3"

1‚"

6"

3" ƒ"

4"

3"

1•"

3"

4"

EXISTING EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

TO REMAIN

EXISTING

EXISTING EXISTING

EXISTING

24"x24" RAO

EXISTING

6"

H W

R

H W

S

C H

R

C H S

4"

6"

TO REMAIN

24"x24" EA PLENUM

EXISTING

TO REMAIN

TO REMAIN

TO REMAIN

SCREENED EA OPENING

EXISTING 24"x24"

TO REMAIN

TO REMAIN TO REMAIN

TO REMAIN

CONTACTOR

INTERIOR LTG

CONTACTOR

EXTERIOR LTG

PANEL

FIRE ALARM

W

E Q

U

IP

M E

N T

M A

IN

C O

M M

U N

IC

A T

IO

N

(2) 4"C.

ENTRANCE

TELEPHONE

G

GENERATOR PANEL

A.T.S.

EHA

MSG

T

K V

A

LIA

HIA

XIA

X2B

T 7

K V

A

X2A

T 7

K V

A

EXISTING

EF-7

N.G. METER

EXISTING

AIR PLENUM TO REMAIN

DEEP COMBUSTION

EXISTING 36"x114"x12"

6" CS

6" CS

8" CR

UH-1 TO REMAIN

EXISTING

FEEDER TO REMAIN

BYPASS CHEMICAL

EXISTING CHW

28/20

28/20

COMPRESSOR

CONTROL AIR

AIR DRYER

REFRIGERATED

EXISTING

TO REMAIN

COMBUSTION AIR DUCT

EXISTING 36/30

EXISTING FUSED DISCONNECT

EXISTING

TO REMAIN

CHR-2

M U

W

M U

W

14"{

EF-7

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

(TYPICAL)

FLOOR DRAIN

EXISTING

EXISTING WH-2

REMOVE

REMOVE

REMOVE

EXISTING

HP-1

REMOVE

EXISTING

HP-2

FEED TANK

CHEMICAL

BYPASS

EXISTING

REMOVEREMOVE

REMOVE

AIR RELEASE TANK

REMOVE EXISTING

CP-2EXISTING

8"

MUW STATION

REMOVE EXISTING

EXISTING WH FLUE

EXISTING WH FLUEEXISTING WH FLUE

EXISTING WH FLUE

E X

IS

T

G

W H

F

L U

E

E X

IS

T

F

L U

E

EXISTING WH FLUE

BAROMETRIC DRAFT CONTROL ASSEMBLY

TO REMAIN; RETURN EXISTING

EXISTING WATER HEATER WH-2

REMOVE EXISTING FLUE

TO ROOF TO REMAIN

EXISTING 24" FLUE RISER

SAFETY SHUTDOWN SWITCH

REMOVE EXISTING BOILER SWITCH

SHUTDOWN

BOILER SAFETY

REMOVE EXISTING

WATER HEATERS TO REMAIN

EXISTING CONDENSING

DRAFT CONTROL ASSEMBLY

EXISTING 10"{ FLUE & BAROMETRIC

FOR TOWER WATER TO REMAIN

EXISTING CHEMICAL FEED TANKS

TO REMAIN

VENTILATION AIR INTAKE PLENUM

EXISTING 66"x48"x16" DEEP

PAD TO REMAIN

EXISTING CONCRETE

PAD TO REMAIN (TYPICAL)

EXISTING CONCRETE

P:\23081\23081m12.dgn

DGN FILE

12-FEB-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\23081\23081m12.dgn

AS SHOWN

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

C o lu m b u s

G e o rg ia

WSH

LTF

WSH

02.12.24

L U

M P

K

IN

C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

P R

O J E

C T N

U M

B E

R C

S U

T

COA Expiration: 6.30.2024

COA#PEF000774

NBP Engineers, Inc.

6.5

H JG.4

M1.2

SCALE:

= 1'-0

N 4 0 2 4 8

EF-8

STARTER

EXISTING

EF-7

HP-4

HP-3

BOILER-1

HP-1

BOILER-2

HP-2 TO REMAIN

CHR-1EXISTING

EXISTING

TANKS

EXPANSION

EXISTING

UH-2

UH-1

EXISTING

SF-1EXISTING

EXISTING

FOR TOWER WATER

CHEMICAL FEED TANKS

N.G. METER

EXISTING

VFD-CT1

VFD-CT2MCC

ACPEXISTING

EXISTING

CONTACTOR

INTERIOR LTG

CONTACTOR

EXTERIOR LTG

PANEL

FIRE ALARM

W

E Q

U

IP

M E

N T

M

M M

U N

IC

A T

IO

TELEPHONE

G

X2B

T 7

K V

A

T 7

K V

AX2A

GENERATOR PANEL

A.T.S.

EHA

MSG

T

K V

A

LIA

HIA

XIA

CP-1 VFD

EXISTING

CP-2 VFD

EXISTING

EXISTING

EXISTING

V

(TYPICAL)

FLOOR DRAIN

EXISTING

MPG

PIPING TO GENERATOR

EXISTING N.G.

MPG

M P

G

MPG

M P

G

GAS REG. #1

GAS REG. #5

2•"

2•"

2"

2•"2•"

2"

M P

G

G R

V

LEAK MONITOR

EXISTING REFRIGERANT

AIR DRYER

REFRIGERATED

EXISTING

GAS REG. #4

GAS REG. #3

GAS REG. #2

G R

V

GRV GRV

GRV

GRV

GRV

2"

AIR COMPRESSOR

EXISTING CONTROL

2"

G R

V G

2"

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

2•"

EXISTING GAS REGULATOR RELIEF PIPING

4"FD

REGULATOR

NUMBER

REGULATOR SIZE &

MODEL NUMBER

CFH GAS

INPUT DEMAND

INLET/OUTLET

PRESSURES

ORIFICE SIZE

& VALVE SET

SPRING

COLOR

REGULATORS ARE LOCATED IN MECHANICAL ROOM. PIPE RELIEF VENT FULL SIZE TO OUTSIDE

AWAY FROM INTAKE GRILLES, ETC.

NOTES:

#1

#2

#3

#4

2"-243-8-2

2"-243-12-2

1,477

2,400

2 LBS./28"

2 LBS./14"

ƒ"/30

1"/30

GREEN

BLACK

BLACK

REGULATOR NUMBERS ARE BY EQUIMETER UNLESS NOTED OTHERWISE. OTHER ACCEPTABLE

MANUFACTURER'S ARE: AMERICAN METER. MAXON CO. , GENERAL CONTROL OR FISHER.

#5 1‚"-143-80-2 920 2 LBS./11" •"/0 GREEN

o o o o

EXISTING GAS REGULATOR SCHEDULE

REMOVE

REMOVE

REMOVE

REMOVE

TANK

FEED

CHEMICAL

BYPASS

REMOVE

REMOVE

EXISTING CP-2

EXISTING CP-1

EXISTING CHR-2

WATER HEATERS TO REMAIN

EXISTING CONDENSING

EXISTING

WH-2

HEATER WH-2 TO REMAIN

EXISTING WATER

DEMOLITION - NG PIPING

MECH. RM. #1230 -

FIRST FLOOR

LARGE SCALE -

NOTES:(THIS SHEET ONLY)

TO REPLACE TO MEET NEW DELIVERY PRESSURE REQUIREMENTS AND NEW GAS LOAD.

EXISTING REGULATOR MAY REMAIN TO BE REUSED. REMOVE EXISTING SPRING AND COORDINATE WITH MANUFACTURER

1 1

1 1

2 2

2 REMOVE EXISTING 2•" GAS PIPING FROM REGULATOR TO BOILER.

LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - DEMOLITION - NG PIPING

PAD TO REMAIN

EXISTING CONCRETE

PAD TO REMAIN (TYPICAL)

EXISTING CONCRETE

P:\23081\23081m21.dgn

DGN FILE

12-FEB-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\23081\23081m21.dgn

AS SHOWN

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

C o lu m b u s

G e o rg ia

WSH

LTF

WSH

02.12.24

L U

M P

K

IN

C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

P R

O J E

C T N

U M

B E

R C

S U

T

COA Expiration: 6.30.2024

COA#PEF000774

NBP Engineers, Inc.

4"

6"

6"

6" 6"

6"

6"

6"

8"

8"

EF-8

CP-1

EXISTING DCW

TO

BLEED LINE

EXISTING CONDENSER

F

LEAK MONITOR

EXISTING REFRIGERANT

EXISTING

EXISTING

CONCRETE PAD

EXISTING

AIR PURGE

EXISTING

INTERLOCK AVD w/SF-1

EXISTING 66"x48" AVD

18" DEEP PLENUM DOWN BACK OF LOUVER

EXISTING LOUVER w/FULLSIZE

PROVIDE SCREENED OPENING AT TERMINATION

28/20 DOWN; TERMINATE DUCT 0'-12" A.F.F.

CP-1 VFD

EXISTING

CP-2 VFD

EXISTING

PURGE SWITCH

EXISTING MANUAL

PURGE SWITCH

EXISTING MANUAL

ALARM SWITCH

REFRIGERANT LEAK

EXISTING CHILLER

ALARM SWITCH

REFRIGERANT LEAK

EXISTING CHILLER

CHR-1

MCC

ACP

STARTER

CS

CS

CR

SF-1

TANKS

EXPANSION

C H

R

C H S

CHS

H W

S

H W

R

UH-2

C S

T

T

VFD-CT1 VFD-CT2

T

UH-2

T

UH-1

SF-1

CR

1‚"

6"

1•"

EXISTING

EXISTING

EXISTING

EXISTING

TO REMAIN

EXISTING

EXISTING EXISTING

EXISTING

24"x24" RAO

EXISTING

6"

H W

R

H W

S

C H

R

C H S

4"

6"

TO REMAIN

24"x24" EA PLENUM

EXISTING

TO REMAIN

TO REMAIN

TO REMAIN

SCREENED EA OPENING

EXISTING 24"x24"

TO REMAIN

TO REMAIN TO REMAIN

TO REMAIN

CONTACTOR

INTERIOR LTG

CONTACTOR

EXTERIOR LTG

PANEL

FIRE ALARM

W

E Q

U

IP

M E

N T

M

M M

U N

IC

A T

IO

TELEPHONE

G

GENERATOR PANEL

A.T.S.

EHA

MSG

T

K V

A

LIA

HIA

XIA

X2B

T 7

K V

A

X2A

T 7

K V

A

EXISTING

EF-7

N.G. METER

EXISTING

AIR PLENUM TO REMAIN

DEEP COMBUSTION

EXISTING 36"x114"x12"

6" CS

6" CS

8" CR

UH-1 TO REMAIN

EXISTING

FEEDER TO REMAIN

BYPASS CHEMICAL

EXISTING CHW

28/20

28/20

COMPRESSOR

CONTROL AIR

AIR DRYER

REFRIGERATED

EXISTING

TO REMAIN

COMBUSTION AIR DUCT

EXISTING 36/30

EXISTING FUSED DISCONNECT

EXISTING

TO REMAIN

CHR-2

M U

W

M U

W

EF-7

(TYPICAL)

FLOOR DRAIN

EXISTING

EXISTING WH-2

CP-2EXISTING

8"

EXISTING WH FLUE

EXISTING WH FLUEEXISTING WH FLUE

EXISTING WH FLUE

E X

IS

T

F

L U

E

E X

IS

T

F

L U

E

EXISTING WH FLUE

BAROMETRIC DRAFT CONTROL ASSEMBLY

TO REMAIN; RETURN EXISTING

EXISTING WATER HEATER WH-2

WATER HEATERS TO REMAIN

EXISTING CONDENSING

DRAFT CONTROL ASSEMBLY

EXISTING 10"{ FLUE & BAROMETRIC

FOR TOWER WATER TO REMAIN

EXISTING CHEMICAL FEED TANKS

TO REMAIN

VENTILATION AIR INTAKE PLENUM

EXISTING 66"x48"x16" DEEP

PAD TO REMAIN

EXISTING CONCRETE

PAD TO REMAIN (TYPICAL)

EXISTING CONCRETE

6.5

H JG.4

N

SCALE:

= 1'-0

4 0 2 4 8

M2.1

NEW WORK - HVAC

MECH. RM. #1230 -

FIRST FLOOR

LARGE SCALE -

LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - NEW WORK - HVAC

LINE LEGEND

POINT OF CONNECTION

EXISTING TO REMAIN

NEW WORK

4"

M U

W

CHEMICAL FEEDER

NEW HW BYPASS

BLR-1 BLR-2

HP-1NEW

NEW

HP-2

NEW NEW

AIR SEPARATOR

NEW TANGENTIAL

3"

3"4"

4"

3"

4"

4"

4"

VFD

ACP

VFD

SWITCH

SHUTDOWN

SAFETY

NEW BOILER

SHUTDOWN SWITCH

NEW BOILER SAFETY

NEW 10"{ WATER HEATER FLUE

8"{ BOILER FLUE

8"{ BOILER FLUE

TERMINATE WITH WALL CAP ABOVE LOUVER

BOTH SIDES OF WALL PENETRATION (TYPICAL)

PROVIDE SS ESCUTCHEON RING ON

UNISTRUT (TYPICAL)

P:\23081\23081m22.dgn

DGN FILE

12-FEB-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\23081\23081m22.dgn

AS SHOWN

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

C o lu m b u s

G e o rg ia

WSH

LTF

WSH

02.12.24

L U

M P

K

IN

C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

P R

O J E

C T N

U M

B E

R C

S U

T

COA Expiration: 6.30.2024

COA#PEF000774

NBP Engineers, Inc.

EF-8

STARTER

EXISTING

EF-7

TO REMAIN

CHR-1EXISTING

EXISTING

TANKS

EXPANSION

EXISTING

UH-2

UH-1

EXISTING

SF-1EXISTING

EXISTING

FOR TOWER WATER

CHEMICAL FEED TANKS

N.G. METER

EXISTING

VFD-CT1

VFD-CT2MCC

ACPEXISTING

EXISTING

CONTACTOR

INTERIOR LTG

CONTACTOR

EXTERIOR LTG

PANEL

FIRE ALARM

W

E Q

U

IP

M E

N T

M

M M

U N

IC

A T

IO

TELEPHONE

G

X2B

T 7

K V

A

T 7

K V

AX2A

GENERATOR PANEL

A.T.S.

EHA

MSG

T

K V

A

LIA

HIA

XIA

CP-1 VFD

EXISTING

CP-2 VFD

EXISTING

EXISTING

EXISTING

V

(TYPICAL)

FLOOR DRAIN

EXISTING

MPG

PIPING TO GENERATOR

EXISTING N.G.

MPG

M P

G

MPG

M P

G

GAS REG. #1

GAS REG. #5

2•"

2•"

2"

2"

M P

G

G R

V

LEAK MONITOR

EXISTING REFRIGERANT

AIR DRYER

REFRIGERATED

EXISTING

GAS REG. #4

GAS REG. #3

GAS REG. #2

G R

V

GRV GRV

GRV

GRV

GRV

2"

AIR COMPRESSOR

EXISTING CONTROL

2"

G R

V G

2"

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

4"FD

2•"

EXISTING GAS REGULATOR RELIEF PIPING

4"FD

TANK

FEED

CHEMICAL

BYPASS

EXISTING CP-2

EXISTING CP-1

EXISTING CHR-2

WATER HEATERS TO REMAIN

EXISTING CONDENSING

EXISTING

WH-2

HEATER WH-2 TO REMAIN

EXISTING WATER

PAD TO REMAIN

EXISTING CONCRETE

PAD TO REMAIN (TYPICAL)

EXISTING CONCRETE

BLR-1 BLR-2

HP-1NEW

NEW

HP-2

NEW NEW

VFD

ACP

VFD

6.5

H JG.4

M2.2

SCALE:

= 1'-0

N 4 0 2 4 8

REGULATOR

NUMBER

REGULATOR SIZE &

MODEL NUMBER

CFH GAS

INPUT DEMAND

INLET/OUTLET

PRESSURES

ORIFICE SIZE

& VALVE SET

SPRING

COLOR

REGULATORS ARE LOCATED IN MECHANICAL ROOM. PIPE RELIEF VENT FULL SIZE TO OUTSIDE

AWAY FROM INTAKE GRILLES, ETC.

NOTES:

#1

#2

#3

#4

2"-243-8-2

1,477

2 LBS./14"

2 LBS./10"

2 LBS./10"

1"/30

REGULATOR NUMBERS ARE BY EQUIMETER UNLESS NOTED OTHERWISE. OTHER ACCEPTABLE

MANUFACTURER'S ARE: AMERICAN METER. MAXON CO. , GENERAL CONTROL OR FISHER.

#5 1‚"-143-80-2 920 2 LBS./11" •"/0 GREEN

o o o o

EXISTING GAS REGULATOR SCHEDULE

2•" 2•"

NEW WORK - NG PIPING

MECH. RM. #1230 -

FIRST FLOOR

LARGE SCALE -

2,000

2,000

NOTES:(THIS SHEET ONLY)

1 CONNECT NEW 2•" GAS PIPING TO OUTLET OF REGULATOR. PROVIDE NEW VALVE AND UNION ON PIPING TO BOILER.

MANUFACTUER PRIOR TO INSTALLING ANY PIPE. PROVIDE AT LEAST 6 FEET OF PIPING DOWNSTREAM FROM REGULATOR.

CONNECT NEW 2•" GAS PIPING TO BOILER. COORDINATE EXACT LOCATION AND CONNECTION DETAILS WITH BOILER

MATCH NEW LOAD AND PRESSURE.

EACH NEW BOILER REQUIRES 2,000MBH WITH A DELIVERY PRESSURE OF 10" W.C. REPLACE SPRING IN REGULATOR TO

3 3

3 3

LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - NEW WORK - NG PIPING

P:\23081\23081m31.dgn

DGN FILE

12-FEB-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\23081\23081m31.dgn

AS SHOWN

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

C o lu m b u s

G e o rg ia

WSH

LTF

WSH

02.12.24

L U

M P

K

IN

C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

P R

O J E

C T N

U M

B E

R C

S U

T

COA Expiration: 6.30.2024

COA#PEF000774

NBP Engineers, Inc.

M3.1

A.A.V.

RELIEF VALVE

SET 45 PSIG (TYP.)

CHEMICAL FEED TANK

AIR RELEASE TANK

ROUTE TO DRAIN

MAKE-UP WATER STATION

TT

TT

1"

1"

BOILER

CONTROL

HWS

HWR

1" TO DOMESTIC

WATER

HWR

HWS

BLADDER

PURGE

VALVE

PRESSURE

GAUGE

TO HEATING

EQUIPMENT COILS

DP

BYPASS VALVE

CV= 15.0

LOCATE AT AH-1

AI

AI

AI

FM

AI

VLV

TO HEATING

EQUIPMENT COILS

ANNULAR ELEMENT

FLOW STATION

BOILER SYSTEM FLOW DIAGRAM

NOT TO SCALE

RELIEF VALVE

SET 45 PSIG (TYP.)

BOILER

CONTROL

HWR

HWS

OUTPUTS INPUTS SOFTWARE

NOTES:

DDC PANEL

INPUT/OUTPUT

SUMMARIES

ACP

BOILER PLANT SYSTEM

S Y

S T

E M G

R A

P H

IC

D

IS

P L

A Y

S T

A R

T /S

T O

P

E N

A B

L E /D

IS

A B

L E

O P

E N /C

L O

S E

S T

A R

T /S

T O

P M

A K

E -U

P

S E

T P

O

IN

T A

D J

U S

T

D D

C C

O N

T R

O L

D

IF

F E

R E

N T

IA

L P

R E

S S

U R

E

P R

E S

S U

R E S

W

IT

C H

A U

X

IL

IA

R Y C

O N

T A

C T

A L

A R

M C

O N

T A

C T

T E

M P

E R

A T

U R

E

H

IG

H /L

O W L

IM

IT

R U

N T

IM

E T

O T

A L

IZ

A T

IO

N

P R

O P

O R

T

IO

N A

L

P R

O P I

N T

E G

R A

L

T

IM

E S

C H

E D

U L E S /S

O P

T

IM

U M S

T A

R T /S

T O

P

D A

Y /N

IG

H T S

E T

B A

C K

D E

M A

N D L

IM

IT

/C

Y C

L E

R E

S E

T O

P T

IM

IZ

A

T

IO

N

E C

O N

O M

IZ

E R

F A

IL

U R

E M

O D

E (S

E E N

O T

E S A

N D

N O

T E

S

DIGITAL ANALOG ANALOG ALARM DDCDIGITAL

C U

R R

E N

T R

E L

A Y

S P

E E

D I

N D

IC

A T

IO

N

S P

E E

D C

O N

T R

O L

1. FAILURE MODES:

2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF

ELECTRIC POWER TO THE DDC PANEL.

L - LAST COMMAND

O - OPEN OR ON

C - CLOSE OR OFF

TAG

P O

S

IT

IO

N I

N D

IC

A T

IO

N

O P

E R

A T

IN

G S

T A

T U

S

D

IF

F P

R E

S S

U R

E

K W

P R

E S

S U

R E

W A

T E

R F

L O

W

S T

E A

M F

L O

W

S T

A T

U S

LOW WATER LEVEL

POINT DESCRIPTION

D R

IV

E S

T A

T U

S

T R

E N

D L

O G

ENERGY MGMT. LOGS

BOILER

TT-1

TT-2

HWR - (SYSTEM)

HWS - (SYSTEM)

HEATING SYSTEM PUMP-VFD CONTROL

HEATING SYSTEM PUMP-VFD CONTROL

DP-1 DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP

O

O

FM-1 HEATING WATER FLOW METER

L

HWS - (SYSTEM)

HWS - (SYSTEM)

TT-3

TT-4

HWS - (SYSTEM)TT-5

VLV-1&2

VLV-3

CBOILER ISOLATION VALVE

BYPASS VALVE

LOW WATER LEVEL

BOILER

3"

VLV

DO AO

ISOLATION VALVE

AI

VLV

DO AO AI

ISOLATION VALVE

AO AI

BLR-1 BLR-2

BLR-1

BLR-2

HP-1

HP-2

3"

4"

4"3"

3"

4" 4"

4" 4"

4"

4"

3"

4"

3"

3" 3"

HVAC

FLOW DIAGRAM -

VFD

VSD

AI DI AO DO

DIFFUSER

SUCTION

VFD

VSD

AI DI AO DO

4"

DIFFUSER

SUCTION

4"

HP-2

HP-1

TO REMAIN

EXPANSION TANK

EXISTING

P:\23081\23081m41.dgn

DGN FILE

12-FEB-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\23081\23081m41.dgn

AS SHOWN

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

C o lu m b u s

G e o rg ia

WSH

LTF

WSH

02.12.24

L U

M P

K

IN

C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

P R

O J E

C T N

U M

B E

R C

S U

T

COA Expiration: 6.30.2024

COA#PEF000774

NBP Engineers, Inc.

M4.1

A

BC

E

TO SYSTEM

B -ƒ" TO DISCHARGE OF PUMP.

C -ƒ" TO SUCTION OF PUMP.

F - RISER CLAMP. WELD TO 2X3/4 " FLAT

OFFSET BRACKET TO WALL.

A - CHEMICAL FEEDER TANK.

D -ƒ" TO FLOOR DRAIN.

D

4"MIN.

WELD

F

BALL VALVES

E -‚" BALL VALVE FOR VENT.

BY-PASS CHEMICAL FEEDER

NOT TO SCALE

BACKFLOW PREVENTER

1"1"

MAKE - UP WATER STATION

GAUGE COCK

ƒ"

PRESSURE REDUCING

VALVE. SET AT

1"

AIR GAP DRAIN

FITTING

1" ROUTE TO WALL, DOWN TO FLOOR, AND ALONG FLOOR

TO FLOOR DRAIN. SECURE TO FLOOR WITH STRAP TYPE

CLAMPS SAME MATERIAL AS PIPE.

PSI.

GAUGE

BALL VALVE

BALL VALVE

NOT TO SCALE

TO FILL POINT

OF SYSTEM

BALL VALVE

QUICK FILL

CONNECTION

TO DOMESTIC COLD

WATER SUPPLY

HANGER ROD - SEE SPECIFICATIONS

SECTION OF RIGID INSULATION

SPECIFIED INSULATION

PIPE

• ROUND BEARING PLATE

PLATE WASHER

CUT ROD ABOVE ANGLE LEG

1" MIN.

TRAPEZE HANGER

LONG LEG VERTICAL

SEE SPECIFICATIONS

DOUBLE HEX NUTS

TRAPEZE PIPE HANGER

NOT TO SCALE

SERVICE TEE

ECCENTRIC REDUCER

•" STREET ELL.

AUTOMATIC AIR VENT

MAINS

•"X2" NIPPLE

„"MPT X ‚" FLARE ELL.

‚" COPPER TO FLOOR

DRAIN OR OUTSIDE

AS SHOWN.

AUTOMATIC AIR VENT

NOT TO SCALE

TYPICAL DRAIN VALVE CONNECTION

ELEVATION

THREADED PIPING

ELEVATION

WELDED PIPING

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

ƒ" GATE VALVE

ADAPTER TO ƒ" HOSE THREAD

PROVIDE HOSE CAP NUT

NOTES:

DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.

2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS

AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.

NOT TO SCALE

ƒ" CHAMFER

ALL SIDES UNLESS OTHERWISE NOTED

EQUIPMENT

4" MINIMUM ALL SIDES

6" X 6", 10\10 WELDED WIRE

FABRIC AT MID-DEPTH OF

PAD (UNLESS OTHERWISE NOTED)

SLAB, FLOOR, OR SUPPORTING STRUCTURE.

ROUGH UP WHERE CONCRETE DOES NOT HAVE

BROOM FINISH OR ROUGHER.

6" THICK CONCRETE

(INERTIA PAD IDENTICAL)

HOUSEKEEPING PAD DETAIL

NOT TO SCALE

WALL

AS SYSTEM PIPE.

MANUAL AIR VENT

TERMINATE DRAIN WITH HOSE END

CONNECTION 18" ABOVE FLOOR.

WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE

CEILING. LOCATE VALVE AND TERMINATE DRAIN

HERE, UNLESS NOTED OTHERWISE AND POSITION

VALVE FOR VERTICAL DOWN DISCHARGE.

•" PIPE SAME MATERIAL

2•"

VERTICAL

PIPE

SUPPORT

WELDED PIPETHREADED / BRAISED

PIPING

BALL VALVE (EXPOSED) OR

GATE VALVE (CONCEALED)

ARRANGEMENT FOR LOCATIONS

WITH LIMITED CLEARANCE

6"MAX.

NOT TO SCALE

DETAIL - HVAC

4"

4" 4"

LIQUID TIGHT,NEOPRENE COATED

FLEXIBLE CONDUIT

WATER PUMP(S) ONLY

18 GA. S.S. DRIP PAN

(CHILLED WATER PUMP(S)

ONLY)

GAUGE COCK

RIGID CONDUIT STUB

TO 3" ABOVE BASE

•" SCH. 40 TO DRAIN (CHILLED

PLAN

END SUCTION PUMP

NOT TO SCALE

HOUSEKEEPING PAD

EXISTING

FLEXIBLE CONNECTION

FLEXIBLE COUPLING AND

COUPLING GUARD

PIPE INSULATION

PRESSURE GAUGE

TEST PLUG

‚" BALL VALVE, TYPICAL

ADJUSTABLE FOOT

FULL SIZE BLOWDOWN

‚" DRAIN

TO FLOOR DRAIN

2"

1"

SUCTION DIFFUSER

WITH STRAINER

•" DRAIN TAPPING

PIPE TO FLOOR DRAIN.

18 GA. S.S. DRIP

PAN (CHILLED

WATER PUMP(S) ONLY

NOT TO SCALE

ELEVATION

EXISITNG HOUSEKEEPING PAD

8 9

TYPICAL END SUCTION PUMP

P:\23081\23081e11.dgn

DGN FILE

12-FEB-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\23081\23081e11.dgn

AS SHOWN

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

C o lu m b u s

G e o rg ia

KMS

BCO

KMS

02.12.24

L U

M P

K

IN

C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

P R

O J E

C T N

U M

B E

R C

S U

T

COA Expiration: 6.30.2024

COA#PEF000774

NBP Engineers, Inc.

6.5

H JG.4

E1.1

SCALE:

= 1'-0

N 4 0 2 4 8

NOTES:(THIS SHEET ONLY)

FOR REFRIGERANT EXHAUST

OVERHEAD IN EMT

CP-2

CHR-2

EF-8

CP-1

F

FUSED DISCONNECT

J

J

F

F

F

FF

M

F

M

PUMP

CIRC

F

M

PUMP

CIRC

3#350 KCMIL, 1#4G, 3"C

MSG-9

30A/3P

L1A-63

BLOWER

L1A-65

L1A-79,81

L1A-63,65

30A/3P

MCCA-18

MCCA-16 MCCA-15

MCCA-17

30A/3P

MCCA-8

30/2/3R

L1A-62

L1A-69,71

MCCA-9

MCCA-5

MCCA-7

MCCA-6

120V

L1A

L1A-54,61

MCCA-12

30A/3P

MCCA-14

L1A-56

120V

MCCA-4

STARTER

TANKS

FEED

CHEMICAL

BYPASS

REFRIGERATED AIR DRYER

EXISTING

EXISTING

EF-7

HP-4EXISTING

EXISTING HP-3

EXISTING

BOILER-1

EXISTING

HP-1 EXISTING

BOILER-2

EXISTING

HP-2

TO REMAIN

CHR-1EXISTING

EXISTING

TANKS

EXPANSION

EXISTING

UH-2

UH-1

EXISTING

SF-1EXISTING

EXISTING

FOR TOWER WATER

CHEMICAL FEED TANKS

N.G. METER

EXISTING

VFD-CT1

VFD-CT2MCCA

ACPEXISTING

EXISTING

CONTACTOR

INTERIOR LTG

CONTACTOR

EXTERIOR LTG

PANEL

FIRE ALARM

W

E Q

U

IP

M E

N T

M

M M

U N

IC

A T

IO

TELEPHONE

G

L1A-85

X2B

T 7

K V

A

T 7

K V

AX2A

GENERATOR PANEL

A.T.S.

EHA

MSG

T

K V

A

LIA

HIA

XIA

EXISTING 800/3/3R

CP-1 VFD

EXISTING

CP-2 VFD

EXISTING

EXISTING

EXISTING

F

EXISTING

EXISTING

TO EXISTING STARTER

LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - DEMOLITION - POWER

DEMOLITION - POWER

MECH. RM. #1230 -

FIRST FLOOR

LARGE SCALE -

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

120V BLOWER

BREAKER IN THE SAME BLANK SPACE TO SERVE THE NEW VFD.

REMOVE THE EXISTING 3HP STARTER AND PROVIDE A 30/3

1 1

2 2

WATER HEATERS TO REMAIN

EXISTING CONDENSING

HEATER WH-2 TO REMAIN

EXISTING WATER

RECEPTACLES

CIRCUITS

DUPLEX - NORMAL

GFI DUPLEX - NORMAL

QUADRAPLEX - NORMAL

ELECTRICAL LEGEND

WP

H HORIZONTALLY MOUNTED

WEATHER PROOF OUTLET

RACEWAY EXPOSED

FLEXIBLE RACEWAY

CONDUIT UP

CONDUIT DOWN

HOMERUN- ONE ARROW PER CIRCUIT

ONE CROSSMARK PER WIRE

(3 WIRE UNLESS SHOWN)

RACEWAY CONCEALED IN CEILING OR WALL

RACEWAY IN GROUND, SLAB, OR UNDER FLOOR

CAP

CONNECTION TO EQUIPMENT

GENERAL EQUIPMENT

TRANSFORMER

F

PANELBOARD-250 VAC OR LESS

SURFACE MOUNTED

PANELBOARD-250 VAC OR LESS

RECESSED

PANELBOARD-OVER 250 VAC

RECESSED

PANELBOARD-OVER 250 VAC

SURFACE MOUNTED

T

M MANUAL STARTER AND MOTOR RATED SWITCH

EMERGENCY PUSHBUTTON

EXHAUST FAN

MOTOR

JJ J

COMMUNICATIONS

ENCLOSED CIRCUIT BREAKER

JUNCTION BOX - WALL/CEILING/FLOOR

DISCONNECT SWITCH: "F" IF FUSED

FRAME AMPS/POLES/NEMA TYPE

FUSE PER MANUFACTURERS RECOMMENDATIONS

COMBINATION STARTER AND DISCONNECT

WITH A RJ45 CONNECTOR. STAINLESS STEEL COVER PLATE

DATA OUTLET WITH A SINGLE CAT 6 CABLE TERMINATED

BACK TO THE MCC. TURN STARTER OFF AND LABEL AS SPARE.

REMOVE CIRCUITS/DISCONNECTS FOR THE BLOWER MOTERS

EXISTING 208/120V PANEL TO BE USED FOR NEW WORK

TO BE USED FOR NEW WORK

EXISTING 480V/277 MOTOR CONTROL CENTER

IS REQUIRED.

REUSED FOR THE NEW PUMPS. FOR PRICING ASSUME NEW CONDUI

TO FIELD VERIFY IF THE CONDUIT PATH BACK TO THE MCC CAN BE

REMOVED. TURN STARTER OFF AND LABEL AS SPARE. CONTRACTOR

REMOVE CIRCUITNG BACK TO THE MCC FROM THE PUMPS TO BE

P:\23081\23081e21.dgn

DGN FILE

12-FEB-2024

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\23081\23081e21.dgn

AS SHOWN

C O

L U

M B

U S S

T A

T E U

N

IV

E R

S

IT

Y

C o lu m b u s

G e o rg ia

KMS

BCO

KMS

02.12.24

L U

M P

K

IN

C

E N

T E

R B

O

IL

E R R

E P

L A

C E

M E

N T

P R

O J E

C T N

U M

B E

R C

S U

T

COA Expiration: 6.30.2024

COA#PEF000774

NBP Engineers, Inc.

FOR REFRIGERANT EXHAUST

OVERHEAD IN EMT

CP-2

CHR-2

EF-8

CP-1

F

FUSED DISCONNECT

J

J

F

F

F

M

F

M

PUMP

CIRC

F

M

PUMP

CIRC

3#350 KCMIL, 1#4G, 3"C

MSG-9

30A/3P

L1A-63

BLOWER

L1A-65

L1A-79,81

L1A-63,65

MCCA-16 MCCA-15

MCCA-8

30/2/3R

L1A-62

L1A-69,71

MCCA-9

120V

L1A

L1A-54,61

MCCA-12

30A/3P

MCCA-14

L1A-56

120V

STARTER

TANKS

FEED

CHEMICAL

BYPASS

REFRIGERATED AIR DRYER

EXISTING

EXISTING

EF-7

TO REMAIN

CHR-1EXISTING

EXISTING

TANKS

EXPANSION

EXISTING

UH-2

UH-1

EXISTING

SF-1EXISTING

EXISTING

FOR TOWER WATER

CHEMICAL FEED TANKS

N.G. METER

EXISTING

VFD-CT1

VFD-CT2MCCA

ACPEXISTING

EXISTING

CONTACTOR

INTERIOR LTG

CONTACTOR

EXTERIOR LTG

PANEL

FIRE ALARM

W

E Q

U

IP

M E

N T

M

M M

U N

IC

A T

IO

TELEPHONE

G

L1A-85

X2B

T 7

K V

A

T 7

K V

AX2A

GENERATOR PANEL

A.T.S.

EHA

MSG

T

K V

A

LIA

HIA

XIA

EXISTING 800/3/3R

CP-1 VFD

EXISTING

CP-2 VFD

EXISTING

EXISTING

EXISTING

F

EXISTING

EXISTING

TO EXISTING STARTER

120V BLOWER

WATER HEATERS TO REMAIN

EXISTING CONDENSING

HEATER WH-2 TO REMAIN

EXISTING WATER

EXISTING 208/120V PANEL TO BE USED FOR NEW WORK

TO BE USED FOR NEW WORK

EXISTING 480V/277 MOTOR CONTROL CENTER

BLR-1 BLR-2

HP-1NEW

NEW

HP-2

NEW NEW

VFD

ACP

VFD

6.5

H JG.4

E2.1

SCALE:

= 1'-0

N 4 0 2 4 8

NEW WORK - POWER

MECH. RM. #1230 -

FIRST FLOOR

LARGE SCALE -

LARGE SCALE - FIRST FLOOR MECHANICAL ROOM #1230 - NEW WORK - POWER

LINE LEGEND

POINT OF CONNECTION

EXISTING TO REMAIN

NEW WORK

LA-

LA-

L1A-

MCC

MCC

NOTES:(THIS SHEET ONLY)

FOR THE BOILERS SHUNT.

OF THE EPO SWITCH AT THE DOOR, BOTH 20/1 BREAKERS

DISCONNECT WITH 3#12 IN •" EMT. UPON ACTUATION

SERVE THE NEW BOILER. ROUTE THROUGH A LOCAL LOCKABLE

PROVIDE A NEW 20/1 SHUNT TRIP BREAKER IN PANEL LA TO

NEW EPO SWITCH SHUNTS BOTH BOILERS IF PRESSED.

USE PLENUM CABLE. FOR PRICING ASSUME 150'.

ACP. ROUTE BACK TO THE EXISTING DATA RACK IN 1" EMT.

PROVIDE A NEW CAT6 DATA DROP TERMINATED AT THE NEW

RECEPTACLES

CIRCUITS

DUPLEX - NORMAL

GFI DUPLEX - NORMAL

QUADRAPLEX - NORMAL

ELECTRICAL LEGEND

WP

H HORIZONTALLY MOUNTED

WEATHER PROOF OUTLET

RACEWAY EXPOSED

FLEXIBLE RACEWAY

CONDUIT UP

CONDUIT DOWN

HOMERUN- ONE ARROW PER CIRCUIT

ONE CROSSMARK PER WIRE

(3 WIRE UNLESS SHOWN)

RACEWAY CONCEALED IN CEILING OR WALL

RACEWAY IN GROUND, SLAB, OR UNDER FLOOR

CAP

CONNECTION TO EQUIPMENT

GENERAL EQUIPMENT

TRANSFORMER

F

PANELBOARD-250 VAC OR LESS

SURFACE MOUNTED

PANELBOARD-250 VAC OR LESS

RECESSED

PANELBOARD-OVER 250 VAC

RECESSED

PANELBOARD-OVER 250 VAC

SURFACE MOUNTED

T

M MANUAL STARTER AND MOTOR RATED SWITCH

EMERGENCY PUSHBUTTON

EXHAUST FAN

MOTOR

JJ J

COMMUNICATIONS

ENCLOSED CIRCUIT BREAKER

JUNCTION BOX - WALL/CEILING/FLOOR

DISCONNECT SWITCH: "F" IF FUSED

FRAME AMPS/POLES/NEMA TYPE

FUSE PER MANUFACTURERS RECOMMENDATIONS

COMBINATION STARTER AND DISCONNECT

WITH A RJ45 CONNECTOR. STAINLESS STEEL COVER PLATE

DATA OUTLET WITH A SINGLE CAT 6 CABLE TERMINATED5

PUMP, VFD AND MCC. VFD BY MECHANICAL CONTRACTOR.

WITH 4#10 IN •" EMT MAKE ALL FINAL CONNECTIONS TO THE

WIRE NEW VFD THROUGH THE NEW 30/3 BREAKER IN THE MCC

GENERAL NOTES:(THIS SHEET ONLY)

WALL

LEXAN

NOT TO SCALE

ENGRAVED

MOUNT AT SPECIFIED

WALL SWITCH HEIGHT

PUSH FOR

EMERGENCY

STOP

" WHITE LETTERS1/2

RED FIELD

MOUNT AT 48" A.F.

IN A CLEAR ACCESS LOCATION.

INDUSTRIAL DUTY,

" DIAMETER, 1/82

SAFETY ORANGE

PUSH-TRIP, PULL RESET.

MAINTAINED CONTACTS:

20AMP DPDT CONTACTS.

OR EQUAL

(NON-ALARMED)

MINI-STOPPER

INTERNATIONAL

SAFETY TECHNOLOGY PANEL DESIGNATION

FILL IN THE

LAMICOID LABEL

EPO SWITCH DETAIL

30/3/1

NEW

30/3/1

NEW

RESET AT PANEL L1A

BUILDING LINES, TIGHT TO STRUCTURE.

USE COPPER CONDUCTORS INSIDE EMT CONDUIT ROUTED NEATLY ALONGA

B

PUMPS AND CONTROL PANEL.

THE NEW WORK INCLUDES POWERING THE NEW BOILERS, HOT WATER

MOST ALL THE WORK SHOWN ON THIS PAGE IS EXISTING TO REMAIN.

FROM A SPARE 20/1P IN PANEL L1A WITH 3#12AWG IN •" EMT.

PROVIDE A NEW 120V 5-20R RECEPTACLE AT THE NEW ACP, SERVED

23081aCover
23081m01
References
tb, 23081tb.dgn
23081m11
References
tb, 23081tb.dgn
afp, 23081a1.dgn
23081m12
References
tb, 23081tb.dgn
afp, 23081a1.dgn
23081m21
References
tb, 23081tb.dgn
afp, 23081a1.dgn
existing , 23081m11.dgn
23081m22
References
tb, 23081tb.dgn
afp, 23081a1.dgn
existing, 23081m12.dgn
Hvac new work, 23081m21.dgn
23081m31
References
tb, 23081tb.dgn
23081m41
References
tb, 23081tb.dgn
23065m002.dgn
23081e11
References
tb, 23081tb.dgn
afp, 23081a1.dgn
23081e21
References
tb, 23081tb.dgn
afp, 23081a1.dgn
existing, 23081e11.dgn
hvac equip, 23081m21.dgn

File details come from the government source that posted it. Updated .