Drawings.pdf
PDF 6 MB Posted
- Attached to
- Concrete Repairs, Drainage, and Sealant Coat on Northeast Spillway, Barre Falls Dam, Barre, MA
- Solicitation number
- W912WJ23Q0098
About this file
This set of construction drawings and specifications is for concrete repairs, drainage installation, and sealant coating on the northeast spillway at Barre Falls Dam in Barre, Massachusetts. The work includes concrete sounding and repair, installation of new weep holes, injection of existing construction joints with polyurethane resin, abrasive blasting and application of concrete sealant to the entire vertical face of the spillway wall. The solicitation is being conducted by the Department of the Army Corps of Engineers Engineering District New England. The solicitation number is W912WJ23Q0098 and has a response due date of June 30, 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ23Q0098-0001.pdf | ||
| Specifications June 2023.pdf | ||
| Solicitation W912WJ23Q0098.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE PLAN
SPILLWAY ELEVATIONS
TYPICAL REPAIR PROCEDURES AND BAR SPLICE CHART
PHOTOGRAPHS OF EXISTING CONDITIONS 1
DESIGN FILESHEET NO.
G-001
INDEX TO DRAWINGS
SHEET TITLE
C-101
S-201
S-501
S-901
CON-BF-507_G-001.dwg COVER SHEET AND INDEX TO DRAWINGS
CON-BF-507_C-101.dwg
CON-BF-507_C-201.dwg
CON-BF-507_S-501.dwg
CON-BF-507_S-901.dwg
US Army Corps of Engineers ®
SOLICITATION NO.: W912WJ23Q0098
CONTRACT NO.:
ISSUE DATE:
New England District
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL
OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET
APPROVED FOR TECHNICAL ADEQUACY BY:
TECHNICAL LEAD ENGINEER DATE
DATE
DATE
DATE
DATE
APPROVED BY:
APPROVAL RECOMMENDED BY:
CHIEF, ENGINEERING DIVISION
This project was designed by the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.
REVIEWED BY:
CHIEF, GEOTECHNICAL/WATER RESOURCES BRANCH
REVIEWED BY:
CHIEF, DESIGN BRANCH
CHIEF, GEO-ENVIRONMENTAL ENGINEERING BRANCH
CONCRETE REPAIRS
BARRE FALLS DAM
BARRE, MASSACHUSETTS
JUNE 2023
G-001
C O
VE
R
S H
EE
T
AN
D
IN
D
EX
T
O D
R
AW
IN
G
S
L.
BE
VE
R
AG
E
D .H
AS
SE
TT
J.
KE
D
ZI
ER
SK
I
J.
KE
D
ZI
ER
SK
I
AN
SI
D N
.T .S
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
C O
N C
R
ET
E R
EP
AI
R S
BA
R
R E
FA
LL
S D
AM
BA
R R
E, M
AS
SA
C H
U
SE
TT
S
W
2W J2
3Q
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
HARTFORD
PROV.
CAP
E COD
BOSTON
CONCORD
PORTLAND
AUGUSTA
BANGOR
NOT TO SCALE
NEW
HAMPSHIRE
VERMONT
MONTPELIER
PROJECT
LOCATION
MAINE
CANADA
MASSACHUSETTS
R.I.
CANADA
REGIONAL MAP
ATLANTIC
OCEAN
SPRINGFIELD
CONNECTICUT
BARRE
QUABBIN
BARRE
HUBBARDSTON
WORCESTER
122A
GARDNER
RESERVOIR
FITCHBURG
90 90
NOT TO SCALE
LOCATION MAP
SECTION NORTH SPILLWAY WALL
S-301 CON-BF-507_S-301.dwg
SPILLWAY DETAIL PLAN AND SECTIONS
SHEET
INDEX TO FOR INFORMATION DRAWINGS
SHEET TITLENO. DRAWING
NUMBER
16CT-1-3088
SPILLWAY CONCRETE DETAIL NO. 22 18CT-1-3090
PROJECT
LOCATION
PHOTOGRAPHS OF EXISTING CONDITIONS 2S-902 CON-BF-507_S-902.dwg7
6/30/2023
6/30/2023
6/30/2023
N/A N/A
N/AN/A
JK
HOLMQUIST.MICHAEL.HAYES.159
6758157
Digitally signed by
HOLMQUIST.MICHAEL.HAYES.1596758157
Date: 2023.06.30 08:42:20 -04'00'
TESSIER.MATTHEW.E.1377053
Digitally signed by
TESSIER.MATTHEW.E.1377053253
Date: 2023.06.30 09:47:44 -04'00'
MARGOLIS.DAVID.I.1228573805
2023.06.30 14:40:55 -04'00'
OFFICE
GARAGE
CONCRETE TOE
SURFACE
ACCESS
BRIDGE
EXISTING WATER STORAGE TANK
NOT FOR CONTRACTOR USE
FLAG
POLE
℄ DAM
HIGHWAY GUARD RAIL
CONTRACTOR
STORAGE
AREA
VEHICLE ACCESS ROAD FROM DAM CREST
ROAD TO STORAGE AREA
℄ SPILLWAY
PARKING LOT BY GARAGE
VEHICLE ACCESS ROAD FROM STORAGE
AREA TO WORK ZONE
SPILLWAY WEIR
CREST
SPILLWAY WEIR
UPSTREAM TOE
VEGETATIVE
GROUND SURFACE
VEGETATIVE
GROUND SURFACE
TOP OF NORTH
SPILLWAY WALL
NORTH SPILLWAY
WALL
SPILLWAY
CREST
VEHICLE ACCESS ROAD TO DAM OUTLET WORKS
NOT REQUIRED FOR COMPLETION OF WORK
C-101
SI
TE
P
LA
N
L.
BE
VE
R
AG
E
D .H
AS
SE
TT
J.
KE
D
ZI
ER
SK
I
J.
KE
D
ZI
ER
SK
I
AN
SI
D 1"
0'
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
C O
N C
R
ET
E R
EP
AI
R S
BA
R
R E
FA
LL
S D
AM
BA
R R
E, M
AS
SA
C H
U
SE
TT
S
W
2W J2
3Q
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SCALE: 1" = 20'
SITE PLANA1 20' 40'0
S-201 J1
S-301 D7 J15
S-901
J1 S-901
J8 S-901
C1 S-901
J15 S-901
A8 S-901
A15 S-901
E5 S-902
E12 S-902
JK
EL. 802.0
EL. 798.0
EL. 830.0
CREST EL. 807.0
CONSTRUCTION JOINT EL. 809.0
EL. 817.0
EL. 798.0
ST
A.
0+
ST
A.
0+
.7
ST
A.
9+
.3
℄ SLOPE = 0.005
℄ ACCESS BRIDGE
CONTRACTION JOINT
TOP OF CONCRETE LINING
CONTRACTION JOINT
CONSTRUCTION JOINT
SLOPE = 0.036
SLOPE = 0.027
ST
A.
1+
CONSTRUCTION JOINT
ASSUMED ROCK SURFACE
ORIGINAL GROUND SURFACE
CHAIN LINK FENCE
EXISTING DRAINAGE HOLES
CONSTRUCTION JOINT EL. 816.0
S-201
SP
IL
LW
AY
E
LE
VA
TI
O N
S
L.
BE
VE
R
AG
E
D .H
AS
SE
TT
J.
KE
D
ZI
ER
SK
I
J.
KE
D
ZI
ER
SK
I
AN
SI
D
AS
N O
TE
D
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
C O
N C
R
ET
E R
EP
AI
R S
BA
R
R E
FA
LL
S D
AM
BA
R R
E, M
AS
SA
C H
U
SE
TT
S
W
2W J2
3Q
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SCALE: 3/32" = 1' - 0"
NORTH SPILLWAY WALL ELEVATION VIEWJ1
0 8' 32'16'
CONCRETE REPAIR AREA
SCALE: 3/8" = 1' - 0"
NORTH SPILLWAY WALL CONCRETE REPAIR AREAA1
'-6
INSTALL WEEP HOLES, TYPICAL
SEE DETAIL H13/S-501
1. CONCRETE WORK SHALL CONFORM TO “BUILDING CODE
REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318)” AND
PROJECT SPECIFICATIONS.
2. SURFACE PREPARATION AND APPLICATION OF REPAIR
MATERIALS SHALL STRICTLY ADHERE TO THE APPROVED
PATCHING MATERIALS MANUFACTURER'S PRINTED
INSTRUCTIONS/DATA SHEETS.
3. POLYURETHANE RESIN SHALL BE INJECTED AROUND THE
INDICATED CONSTRUCTION JOINT (EL. 816) IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS.
4. SEE SPECIFICATIONS FOR REQUIRED ATTENDANCE OF
QUALIFIED TECHNICAL REPRESENTATIVE TO THE PROJECT SITE.
5. CENTER NEW WEEP HOLES ON HORIZONTAL CONSTRUCTION
JOINTS WITH SPACING FROM VERTICAL CONSTRUCTION JOINTS
AS SHOWN. SEE DETAIL H13/S-501.
6. ALL EXISTING WEEP HOLES WITHIN THE LIMITS OF WORK SHALL BE
CLEANED AND CLEARED OF ALL VEGETATION AND DEBRIS.
7. PERFORM SOUNDING AND REPAIRS OF THE CONCRETE IN
ACCORDANCE WITH SPECIFICATION SECTION 03 01 00 AND THE
CONCRETE REPAIR DETAILS SHOWN IN D1/S-501.
8. CONCRETE REPAIRS ACROSS CONSTRUCTION JOINTS SHALL
INCLUDE SHAPING CONSTRUCTION JOINTS IN THE SAME
LOCATIONS AS THE PREVIOUS CONSTRUCTION JOINTS.
9. APPLY CONCRETE PENETRATING SEALER TO THE ENTIRE
VERTICAL FACE OF THE SPILLWAY WALL BETWEEN THE UPSTREAM
AND DOWNSTREAM LIMITS SHOWN ON DRAWING A1. PREPARE
CONCRETE AND APPLY SEALER ACCORDING TO CONCRETE
SEALER MANUFACTURER'S REQUIREMENTS. SEALER SHALL ONLY
BE APPLIED TO CURED CONCRETE WITH A MOISTURE CONTENT AS
SPECIFIED.
10. DEMOLISHED CONCRETE SHALL BE PREVENTED FROM LANDING ON
GRASS OR IN THE SPILLWAY DURING DEMOLITION. ALL
CONSTRUCTION MATERIALS SHALL BE PREVENTED FROM LANDING
ON GRASS OR IN THE SPILLWAY DURING INSTALLATION.
LEGEND:
EXISTING CONDITIONS:
NEW WORK:
NEW WEEP HOLE
TO BE INSTALLED:
EXISITING WEEP HOLE
TO BE CLEANED:
2'-0"2'-0" 5'-0" 2'-0" 10'-0"2'-0"
2'-0"
5'-0" 5'-0"
5'-0"
4'0 2' 8'
STRUCTURAL NOTES:
A1 C-101
A1 S-201
UPSTREAM AND DOWNSTREAM EXTENTS
OF CLEANING AND SEALING THE WALL
15'-10"42'-2 1/2"
INJECT CONSTRUCTION
JOINT WITH POLYURETHANE RESIN
TOP LIMIT OF SOUNDING EL. 820.0
15'-6"
BOTTOM LIMIT OF SOUNDING EL. 802.5 EL. 802.5 BOTTOM LIMIT OF SOUNDING
EXISTING CONSTRUCTION JOINT ELEV. 809
EXISTING CONSTRUCTION JOINT ELEV. 816
CLEAN EXISTING WEEP HOLECLEAN EXISTING WEEP HOLES
EXISTING GROUND ELEV. 802
INJECT 52'-0" OF CONSTRUCTION JOINT WITH POLYURETHANE RESIN
DOWNSTREAM LIMIT OF
CONCRETE SURFACE SEALANT
STA. 10+43.03
UPSTREAM LIMIT OF
CONCRETE SURFACE SEALANT
STA. 9+83.83
8'-6"
25'-3 1/2"
DOWNSTREAM LIMIT OF
CONCRETE SOUNDING
STA. 10+33.24
UPSTREAM LIMIT OF SOUNDING
STA. 9+87.33
GENERAL NOTES:
1. FIELD VERIFY ALL EXISTING CONDITIONS. COORDINATE AND FIELD ADJUST
DIMENSIONS AND DETAILS SHOWN ON CONSTRUCTION DRAWINGS WITH
ACTUAL FIELD CONDITIONS. NOTIFY CONTRACTING OFFICER REPRESENTATIVE
(COR) FOR SIGNIFICANT DEVIATION CAUSING CONFLICT WITH DESIGN
DRAWINGS.
2. PROTECT ALL EXISTING STRUCTURES FROM DAMAGE DURING CONSTRUCTION.
COORDINATE WITH COR SHOULD CONSTRUCTION REQUIRE TEMPORARY
RELOCATION OR REMOVAL OF EXISTING STRUCTURES.
3. ALL ELEVATIONS SHOWN ON DRAWINGS ARE BASED ON MEAN SEA LEVEL
DATUM PER AS-BUILT DRAWINGS FROM 1956.
4. CONTRACTORS SHALL NOT CUT ANY TREES GREATER THAN OR EQUAL TO 3
INCHES DIAMETER AT BREAST HEIGHT.
5. DEMOLISHED CONCRETE SHALL BE RECYCLED TO THE GREATEST EXTENT
POSSIBLE.
DEFINITIONS:
STA.: HORIZONTAL STATIONING OF THE SPILLWAY
EL: VERTICAL ELEVATION FROM MEAN SEA LEVEL
USING NGVD27 FROM ORIGINAL PLANS
10'-0"
15'-10"42'-2 1/2"
'-1
0"
TOP OF WALL
TOP OF SEALANT AREA
EL. 830.0
BOTTOM OF WALL
BOTTOM OF SEALANT AREA
VERTICAL CONSTRUCTION JOINTS
SPILLWAY CREST LINE
6'-0"
EL.830.0 TOP OF SEALANT AREA
EL.807.0 SPILLWAY CREST
EL.797.0
1'-6"
1.33
1'-6"
CONSTRUCTION JOINT EL. 809.0
CHAIN LINK FENCE
CONSTRUCTION JOINT EL. 816.0
4" Ø @ 1'- 0"
4" Ø @ 1'- 0"
6" COVER
S-301
SE
C
TI
O
N N
O R
TH
S
PI
LL
W
AY
W
AL
L
L.
BE
VE
R
AG
E
D .H
AS
SE
TT
J.
KE
D
ZI
ER
SK
I
J.
KE
D
ZI
ER
SK
I
AN
SI
D 1/
4"
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
C O
N C
R
ET
E R
EP
AI
R S
BA
R
R E
FA
LL
S D
AM
BA
R R
E, M
AS
SA
C H
U
SE
TT
S
W
2W J2
3Q
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SCALE: 1/4" = 1' - 0"
SECTION NORTH SPILLWAY WALLD7 0 4' 8'2'
A1 C-101
H13 S-501
NEW WEEP HOLE
PIPE (TYP)
#8 ANCHORS
@ 5' EACH WAY
'-0
C
O N
C R
ET
E
SE
AL
IN
G
O
VE
R E
N
TI
R E
H
EI
G H
T O
F W
AL
L
SE
AL
AN
T
EX
TE
N D
S
TO
B O
TT
O
M O
F W
AL
L
O N
E
IT
H
ER
S
ID
E O
F
TH
E W
IE
R
S-501
TY
PI
C
AL
R
EP
AI
R
P R
O C
ED
U
R
ES
AN
D
B
AR
S
PL
IC
E
C H
AR
T
L.
BE
VE
R
AG
E
L.
BE
VE
R
AG
E
J.
KE
D
ZI
ER
SK
I
J.
KE
D
ZI
ER
SK
I
AN
SI
D N
.T .S
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
C O
N C
R
ET
E R
EP
AI
R S
BA
R
R E
FA
LL
S D
AM
BA
R R
E, M
AS
SA
C H
U
SE
TT
S
W
2W J2
3Q
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SCALE: N.T.S.
CONCRETE REPAIR DETAILSD1
1. SAWCUT PERIMETER OF REPAIR A MINIMUM OF 1 INCH DEEP.
2. REMOVE ALL DETERIORATED CONCRETE TO MINIMUM DEPTH OF 2 INCHES.
3. FOR ALL REINFORCING STEEL THAT IS EXPOSED GREATER THAN 50% OF ITS
CIRCUMFERENCE, THE CONCRETE SHALL BE UNDERCUT BY A MINIMUM OF 1 INCH.
4. PLACE STEEL PINS AT MAXIMUM OF 12 INCHES ON CENTER. PINS SHALL
HAVE A MINIMUM EMBEDDED DEPTH OF 6" INTO SOUND CONCRETE. PINS SHALL
HAVE A MINIMUM DIAMETER OF 1/4". PINS SHALL BE SECURED IN PLACE WITH
CONCRETE, EPOXIES, OR MORTARS IN ACCORDANCE WITH SPECIFICATION SECTION
03 01 00.
5. FASTEN W1.4/1.4, 2 INCH x 2 INCH WELDED WIRE FABRIC (WWF) TO STEEL
PINS. ONLY USE WWF WHEN THE REPAIR AREA EXCEEDS 1.0 SQUARE FEET.
6. REPLACE REINFORCING STEEL IF LESS THAN 75% OF THE ORIGINAL REBAR
SECTION REMAINS AT ANY POINT ALONG THE EXPOSED REBAR. PROVIDE A
NEW BAR HAVING SECTION GREATER THAN THE MAXIMUM SECTION AREA
LOSS (#3 MINIMUM).
7. PROVIDE A LAP SPLICE AS INDICATED IN THE “BAR SPLICE CHART”.
8. ABRASIVE BLAST CONCRETE SURFACE TO REMOVE ALL LOOSE CONCRETE AND
LEACHATES.
9. INSTALL FORMS.
10. ENSURE REPAIR AREA IS SATURATED SURFACE DRY.
11. APPLY CORROSION INHIBITOR/BONDING AGENT TO EXPOSED PINS, WWF, EXISTING
REINFORCEMENT, AND CONCRETE SUBSTRATE.
12. PLACE POLYMER-MODIFIED CONCRETE.
13. REFER TO DRAWING S-301 AND REFERENCE DRAWING CT-1-3090 FOR SECTION
VIEW.
2 IN CLEAR
STEEL PINS
W1.4, 2x2 WWF
NEW POLYMER-
MODIFIED CONCRETE
1" DEEP SAWCUT AROUND
EDGE OF REPAIR
EXISTING CONCRETE
TYPICAL REPAIR PATCH BETWEEN 2" AND 6" IN DEPTH
1. SAWCUT PERIMETER OF REPAIR A MINIMUM OF 1 INCH DEEP.
2. REMOVE ALL DETERIORATED CONCRETE TO MINIMUM DEPTH OF 6 INCHES OR
TO SOUND CONCRETE.
3. FOR ALL REINFORCING STEEL THAT IS EXPOSED GREATER THAN 50% OF ITS
CIRCUMFERENCE, THE CONCRETE SHALL BE UNDERCUT BY A MINIMUM OF 1
INCH.
4. DRILL AND GROUT #3 DOWELS AS SHOWN.
5. PLACE #3 BARS AS SHOWN.
6. REPLACE REINFORCING STEEL IF LESS THAN 75% OF THE ORIGINAL REBAR
SECTION REMAINS AT ANY POINT ALONG THE EXPOSED REBAR. PROVIDE A NEW
BAR HAVING SECTION GREATER THAN THE MAXIMUM SECTION AREA LOSS
(#3 MINIMUM).
7. PROVIDE A LAP SPLICE AS INDICATED IN THE “BAR SPLICE CHART”.
8. IF MORE THAN 75% OF THE ORIGINAL REBAR SECTION AREA REMAINS, THEN NO
REPLACEMENT IS REQUIRED.
9. ABRASIVE BLAST CONCRETE SURFACE TO REMOVE ALL LOOSE CONCRETE AND
LEACHATES.
10. INSTALL FORMS.
11. ENSURE REPAIR AREA IS SATURATED SURFACE DRY.
12. APPLY BONDING AGENT/CORROSION INHIBITOR TO EXPOSED REINFORCEMENT
AND CONCRETE SUBSTRATE.
13. PLACE PORTLAND CEMENT CONCRETE.
14. RE-ESTABLISH DRIP EDGE, WHEN APPLICABLE.
15. REFER TO DRAWING S-301 AND REFERENCE DRAWING CT-1-3090 FOR SECTION
VIEW.
TYPICAL REPAIR PATCH 6" OR GREATER DEPTH
NEW BAR LAP SPLICE LENGTH
#3 1'-0"
BAR SPLICE CHART
#4
#5
#6
#7
#8
1'-3"
1'-7"
1'-11"
2'-3"
2'-6"
6" OR GREATER
2" CLEAR
1" DEEP SAWCUT AROUND
EDGE OF REPAIR
#3 BARS AT 12 IN E.W. (TYP)
#3 DOWELS DRILLED
AND GROUTED
6" INTO SOUND
CONCRETE (TYP.)
NEW PORTLAND CEMENT
EXISTING CONCRETE
6"
SCALE: N.T.S.
WEEP HOLE INSTALLATION DETAILH13
NEW WEEP HOLES TO BE INSTALLED
1. ENSURE ALL WEEP HOLE LOCATIONS DO NOT PASS THROUGH OR EXPOSE CONCRETE
REINFORCEMENT OR #8 ANCHORS, REFER TO DRAWING S-301 AND REFERENCE DRAWING
CT-1-3090 FOR SECTION VIEW. INSTALL PIPES WITH A MINIMUM COVER OF 2 INCHES FROM
EXISTING REBAR. HORIZONTAL VARIATION IS AUTHORIZED FROM MARKED LOCATIONS FOR
NEW WEEP HOLES UP TO 3" ALONG HORIZONTAL CONSTRUCTION JOINTS.
2. CORING FOR WEEPHOLE SHALL EXTEND A MINIMUM OF 2 INCHES PAST THE SOIL FACING SIDE
OF THE NORTH SPILLWAY WALL IN ORDER TO ALLOW ROOM FOR GEOTEXTILE FABRIC SOCK
AND CRUSHED STONE MATERIAL.
3. PROVIDE 3" PVC PIPE INSTALLED AT WEEP HOLE LOCATIONS. PIPE SHALL MEET THE
REQUIREMENTS OF ASTM D1784. PROVIDE A FILTER AT THE END OF THE PIPE INSERTED
INTO THE SPILLWAY WALL WITH FILTER OPENINGS SMALLER THAN 34".
4. PROVIDE 34" CRUSHED STONE MATERIAL CONFORMING TO THE REQUIREMENTS OF SECTION
M2.01.0 OF THE MASSDOT STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES, LATEST
EDITION. PROVIDE GRADATION OF THE MATERIAL AS SPECIFIED FOR CRUSHED STONE UNDER
TABLE DESIGNATION M2.01.4 IN SECTION M2.01.0 OF THE STATE SPECIFICATIONS. CRUSHED
GRAVEL STONE WILL NOT BE PERMITTED.
5. PROVIDE GEOTEXTILE FABRIC (ON THE SOIL FACING SIDE) FOR SEDIMENT CAPTURE AND
MAINTENANCE. GEOTEXTILE FABRIC WRAPPED AROUND FILTER STONE SHALL BE AASHTO
M 288 CLASS 2 NON-WOVEN FOR SEPARATION.
6. INJECT POLYURETHANE RESIN AROUND THE WEEP HOLE PIPE FOLLOWING INSTALLATION TO
SEAL PIPE IN PLACE. POLYURETHANE RESIN SHALL BE INJECTED SUFFICIENT TO ENSURE PIPE
SURFACE OR POLYURETHANE RESIN ARE FULLY IN CONTACT WITH SURROUNDING PIPE BORE
HOLE. VERIFY THAT POLYURETHANE RESIN DOES NOT PLUG WEEP HOLE FOLLOWING
INJECTION AND CORRECT IF POLYURETHANE RESIN DOES PLUG WEEP HOLE.
3/4" CRUSHED STONE
MATERIAL POCKET FILTER
2'
MINIMUM 2%PIPE SLOPE
D7 S-301
GEOTEXTILE FABRIC SOCK
3" DIA PVC PIPE
VERTICAL EXISTING REBAR
3/4" Ø @ 1' - 0"
6" CLEAR COVER
TO EXISTING REINFORCEMENT
HORIZONTAL EXISTING REBAR
3/4" Ø @ 1' - 0"
HORIZONTAL EXISTING REBAR
3/4" Ø @ 1' - 0"
6" CLEAR COVER
TO EXISTING REINFORCEMENT
VERTICAL EXISTING REBAR
3/4" Ø @ 1' - 0"
S-901
PH
O
TO
G
R
AP
H S
O F
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
L.
BE
VE
R
AG
E
L.
BE
VE
R
AG
E
J.
KE
D
ZI
ER
SK
I
J.
KE
D
ZI
ER
SK
I
AN
SI
D N
.T .S
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
C O
N C
R
ET
E R
EP
AI
R S
BA
R
R E
FA
LL
S D
AM
BA
R R
E, M
AS
SA
C H
U
SE
TT
S
W
2W J2
3Q
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
NTS
SPILLWAY WALL CONDITION - DOWNSTREAM OF OGEE WEIRJ1 NTS
SPILLWAY WALL CONDITION - ABOVE OGEE WEIRJ8 NTS
SPILLWAY WALL CONDITION - UPSTREAM OF OGEE WEIRJ15
NTS
SPILLWAY WALL CONDITION - OVERALL VIEWC1
NTS
SPILLWAY WALL CONDITION - UPSTREAM OF WEIRA8 NTS
SPILLWAY WALL CONDITION - DOWNSTREAM OF WEIRA15
A1 C-101
A1 C-101
A1 C-101
A1 C-101
A1 C-101
A1 C-101
APPROXIMATE EXTENT OF
CLEANING AND SEALING
S-902
PH
O
TO
G
R
AP
H S
O F
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
L.
BE
VE
R
AG
E
L.
BE
VE
R
AG
E
J.
KE
D
ZI
ER
SK
I
J.
KE
D
ZI
ER
SK
I
AN
SI
D N
.T .S
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
C O
N C
R
ET
E R
EP
AI
R S
BA
R
R E
FA
LL
S D
AM
BA
R R
E, M
AS
SA
C H
U
SE
TT
S
W
2W J2
3Q
C O
N -B
F-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
NTS
SPILLWAY ACCESS ROAD TYPICAL CONDITIONE5 NTS
SPILLWAY ACCESS ROAD TYPICAL CONDITIONE12A1
C-101
A1 C-101
File details come from the government source that posted it. Updated .