Drawings.pdf
PDF 4 MB Posted
- Attached to
- Maintain Airfield Markings and Rubber Removal Federal contract opportunity
- Solicitation number
- FA489720B0001
About this file
This document provides details regarding a presolicitation notice for airfield pavement marking and rubber removal services at Mountain Home Air Force Base. The 366th Financial Acquisition Squadron is seeking qualified contractors to design and install new airfield markings in compliance with established standards, remove existing runway markings, repaint taxiway edges, and remove rubber from runway ends. All runway work must occur during non-flying hours and be approved by the Contracting Officer and Airfield Manager, with opportunities for night work after flying ceases. Other airfield work requires coordination at least seven days in advance with the Airfield Manager. Accompanying drawings show the project scope and area. Interested parties should monitor the beta.SAM website for any subsequent solicitation under the Department of the Air Force Air Combat Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW Maintain Airfield Markings and Rubber Removal - Draft.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Airfield Paint Mountain Home AFB
Department of the Air Force Prepared By: 366 CES/CENME
Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N
0 600 1,200300 Feet
Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking
Paint Not in Project Pavement Buildings
DRAFT
Mountain Home AFB
Department of the Air Force Prepared By: 366 CES/CENME
Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N
0 775 1,550387.5 Feet
Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking
Paint Not in Project Pavement
Mountain Home AFB
Department of the Air Force Prepared By: 366 CES/CENME
Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N
0 980 1,960490 Feet
Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking
Paint Not in Project Pavement
Mountain Home AFB
Department of the Air Force Prepared By: 366 CES/CENME
Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N
0 930 1,860465 Feet
Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking
Paint Not in Project Pavement
Mountain Home AFB
Department of the Air Force Prepared By: 366 CES/CENME
Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N
0 890 1,780445 Feet
Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking
Paint Not in Project Pavement
Mountain Home AFB
Department of the Air Force Prepared By: 366 CES/CENME
Date: 5/15/2020 Coordinate System: WGS 1984 UTM Zone 11N
0 710 1,420355 Feet
Project_Area Existing Markings to be Removed and Repainted Taxiway/Apron Edge Marking
Paint Not in Project Pavement
File details come from the government source that posted it. Updated .