Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25021B0041
About this file
This is a pre-solicitation notice for a planned invitation for bid to renovate seven restrooms at the John D. Dingell VA Medical Center in Detroit, Michigan. The project scope includes furnishing all labor, materials, equipment and supervision to complete the renovations. The period of performance is 80 calendar days. The estimated cost is between $500,000 and $1 million. The NAICS code is 236220 for commercial and institutional building construction. The acquisition is a 100% set-aside for qualified SDVOSBs. The IFB is expected to be issued on May 5, 2021 via SAM.gov. Responses are due by the date specified in the solicitation. The government intends to award a firm fixed price contract within 120 days of bid opening. Prospective contractors must be registered in SAM.gov and VIP and have a current VETS-4212 report on file, if applicable. Questions should be directed to the contracting officer via email only.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25021B0041.docx | DOCX document | |
| Wage Determination.pdf | ||
| 553-21-203 Renovate First Floor Restrooms SOW.pdf | ||
| Specifications.pdf | ||
| RFI Form Solicitation.doc | DOC document | |
| Contractor EMR Certification Form 2021.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOHN D.
DINGELL
VAMC
JOHN R. STREET
E. H
ANCOCK STREET
W
OODW
ARD AVENUE
BRUSH STREET
E. C
ANFIEL
D STREET
WARREN AVENUE
INTER
STATE-
INTERSTATE-75
W
OODW
ARD AVENUE
INTER
STATE-7
GRAND RIVER AVENUE
LOCATION OF JOHN
D. DINGELL VAMC
LIST OF BID ALTERNATES
DEDUCT ALTERNATE #1: PROVIDE DEDUCT PRICING TO LEAVE EXISTING HOLLOW METAL FRAMES IN PLACE, TO BE RE-USED FOR NEW DOOR SLABS.
EXISTING FRAMES SHALL BE PREPARED FOR NEW HARDWARE, PRIMED AND PAINTED.
DEDUCT ALTERNATE #2: PROVIDE DEDUCT PRICING TO OMIT FLOOR DRAINS AND ASSOCIATED SANITARY PIPING SHOWN ON PL301, PLAN NOTE 2.
DEDUCT ALTERNATE #3: PROVIDE DEDUCT PRICING TO OMIT SPRINKLER PIPING AND HEAD REPLACEMENT, SHOWN ON AD301 AND AS301.
DEDUCT ALTERNATE #4: PROVIDE DEDUCT PRICING TO OMIT THE 3RD TOILET LOCATED IN THE SOUTH ALCOVE OF WOMEN'S TOILET B1232. THIS ALTERNATE SHALL ALSO CONTAIN ITEMS RELATED TO THE ADDITION OF THE THRID TOILET, INCLUDING:
1.) OMISSION OF SANITARY PIPING, TOILET PARTITIONS AND TOILET ACCESSORIES ASSOCIATED WITH THIS TOILET.
2.) OMISSION OF THE SOUTHERNMOST LAVATORY IN THIS RESTROOM.
3.) EXISTING WING WALL ADJACENT TO LAVATORIES SHALL REMAIN.
DEDUCT ALTERNATE #5: PROVIDE DEDUCT PRICING TO OMIT ACCENT WALL TILE GWT-1. ACCENT BAND SHALL BE CREATED USING PFT-1. SEE
SAMPLE ELEVATION ON AS1001.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design, Inc. and shall not be used for any purpose without prior expressed written consent.
The Owner shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.net
NORTH
REFERENCE
PROJECT # SIGNATURE DATE
Director
Associate Director
Chief, FMS
Chief, Engineering Section
Infectious Control Officer
Safety Specialist
Contracting Officer Representative
JOHN D. DINGELL VETERANS AFFAIRS MEDICAL CENTER
JOHN D. DINGELL
VA MEDICAL CENTER
4646 John R. Street Detroit, Michigan 48201
VA PROJECT NO.:
FINAL BID
DOCUMENTS
01 17OF
Z:
\V iri di an \P ro je ct s\
\0
D R
AW
IN
G S\
R
EV
IT
\L
O C
AL
F
IL
ES
\0
7_ D et ro it_
VA
_F irs t_ Fl oo r_
R es tro om s_ R
_C
EN
TR
AL
_d ro an
.rv t
/4
/2
2:
:0
PM
GI001
COVER SHEET RENOVATE FIRST FLOOR
RESTROOMS
553-21-203
12/15/2020 TWT DSR
RENOVATE FIRST FLOOR RESTROOMS
553-21-203
553-21-203
DETROIT, MICHIGAN
INDEX OF DRAWINGS
SHEET NO DRAWING TITLE DRAWING N0
GENERAL
GI001 COVER SHEET 01
GI002 ARCHITECTURAL - ABBREVATIONS AND SYMBOLS 02
GI003 INFECTION CONTROL AND PHASING PLAN 03
GI004 INFECTION CONTROL AND ENLARGED PHASING PLANS 04
GI005 INFECTION CONTROL DETAILS 05
DEMOLITION
AD101 DEMOLITION - KEY PLAN 06
AD301 DEMOLITION - ENLARGED PLANS 07
ARCHITECTURAL
AS101 ARCHITECTURAL - KEY PLAN 08
AS301 ARCHITECTURAL - ENLARGED PLANS 09
AS701 ARCHITECTURAL - DOOR AND SIGNAGE SCHEDULE AND DETAILS 10
AS1001 ARCHITECTURAL - CASEWORK, INTERIOR ELEVATIONS, AND MILLWORK 11
AS1101 ARCHITECTURAL - FIRST FLOOR FINISH PLANS 12
PLUMBING
PL301 ENLARGED PLUMBING PLANS 13
ELECTRICAL
ED101 ELECTRICAL - DEMOLITION PLAN 14
ED301 ELECTRICAL - ENLARGED DEMOLITION PLANS 15
ES101 ELECTRICAL - NEW ELECTRICAL PLANS 16
ES301 ELECTRICAL - ENLARGED PLANS 17
LOCATION MAP VICINITY MAP
Revisions: Date:
vhadetsteiskf Cross-Out
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWPA AMERICAN WOOD PRESERVERS' ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CERTIFICATE OF OCCUPANCY,
CLEANOUT, OR COMPANY
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM,
OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR
FIBERGLASS REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FV FIELD VERIFY
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
HQ HEADQUARTERS
HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER, OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHR LEFT HAND REVERSE LATENT HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM
MED MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE
MIN MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OUTSIDE DIMENSION
OD OUTSIDE DIMENSION OUTSIDE DIAMETER
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCA PORTLAND CEMENT ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PO POST OFFICE PURCHASE ORDER
PO PURCHASE ORDER POST OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION
REFR REFRIGERATION REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR, OR SOAP DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SJI STEEL JOIST INSTITUTE
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL TEMPERATURE CONTROL PANEL;
TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH OR TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
W WIDE OR WEST
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
YD YARD
YR YEAR
ARCHITECTURAL ABBREVIATIONS GENERAL NOTES
1. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE
DRAWINGS TO BE THE FOLLOWING: THE DOCUMENTS (DRAWINGS, SPECIFICATIONS,
ADDENDUM, ETC.) INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF
ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSION OF THE BUILDING, THE MAJOR
ARCHITECTURAL ELEMENTS, THE MAJOR STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS.
THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE ALL THE WORK
REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE
CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE
TRADE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND
COMPLETION OF THE WORK.
2. GENERAL CONTRACTOR IS TO FOLLOW AND OBEY THE LATEST VERSION OF ALL FEDERAL, STATE
AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
INCLUDING OSHA, NFPA 101 LIFE SAFETY CODE AND NEC.
3. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
4. ALL DIMENSIONS ARE TO FACE OF CONCRETE, FACE OF MASONRY, FACE OF METAL STUDS, OR
COLUMN CENTERLINE, UNLESS NOTED OTHERWISE.
5. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN EACH BUILDING COMPONENT
LOCATION. BRING ANY DISCREPANCIES TO THE CONTRACTING OFFICER REPRESENTATIVE'S
(COR) ATTENTION IN WRITING IMMEDIATELY.
REFERENCE SYMBOLOGY
Room Name
A101
DETAIL IDENTIFICATION NUMBER
AREA OF DETAIL
NUMBER OF SHEET ON WHICH
SECITON IS DRAWN
SYMBOL WHERE SECTION IS TAKEN
1 VIEW NAME
SCALE: 1/8" = 1'-0"
SCALE AT WHICH SECTION
IS DRAWN
SECTION IDENTIFICATION
NUMBER
SUBTITLE FOR SECTION DRAWNG
SYMBOL WHERE DETAIL IS TAKEN
A101
SIM
SUBTITLE FOR DETAIL DRAWNG
A001
SHEET REFERENCE NUMBER
SHEET SEQUENCE NUMBER
DISCIPLINE CODE NORTH
NORTH ARROW
P5-3
PARTITION TYPE DOOR NUMBER
DOOR REFERENCE NUMBER
ROOM NAME & NUMBER
PARTITION TYPE
NUMBER
ROOM NUMBER
SHEET NOTE
NOTE REFERENCE NUMBER
SYMBOL WHERE ELEVATION IS TAKEN ELEVATION TAG
A101 Name
Elevation
ELEVATION IDENTIFICATION
ELEVATION HEIGHT
A101
1 Ref
R ef
1 Ref
R ef
NUMBER OF SHEET ON WHICH
ELEVATION IS DRAWN
ELEVATION IDENTIFICATION
NUMBER
1 VIEW NAME
SCALE: 1/8" = 1'-0"
SCALE AT WHICH DETAIL IS
DRAWN
DETAIL IDENTIFICATION NUMBER
NUMBER OF SHEET ON WHICH DETAIL IS DRAWN
WOOD (ROUGH)
PLYWOOD
STEEL OR METAL
ALUMINUM
FIRE SAFING INSULATION
BLANKET, BATT OR LOOSE FILL INSULATION
GRANULAR/GRAVEL FILL
BRICK
CMU
EARTH
CONCRETE
GROUT/GYPSUM BOARD
RIGID/FOAM INSULATION
MATERIAL LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural
Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.net
FINAL BID
DOCUMENTS
OF02 17
Z:
\V iri di an \P ro je ct s\
\0
D R
AW
IN
G S\
R
EV
IT
\L
O C
AL
F
IL
ES
\0
7_ D et ro it_
VA
_F irs t_ Fl oo r_
R es tro om s_ R
_C
EN
TR
AL
_d ro an
.rv t
/4
/2
2:
:2
PM
GI002
ARCHITECTURAL - ABBREVATIONS AND
SYMBOLS
RENOVATE FIRST FLOOR
RESTROOMS
DETROIT, MICHIGAN
553-21-203
12/15/2020 TWT DSR
Revisions: Date:
WOMEN'S
STAFF
TOILET
B1232
MEN'S
TOILET
B1301
WOMEN'S
TOILET
B1300
MEN'S
TOILET
C1589
WOMEN'S
TOILET
C1581
MEN'S
TOILET
C1824
WOMEN'S
TOILET
C1823
ELECTRICAL
B1230
ELECTRICAL
C1671
ELECTRICAL
C1772
GI004
PHASE IPHASE II
PHASE III
GI004
GI004
GI004
TO LOWER LEVEL
LOADING DOCK.
COORDINATE EXACT
PATH WITH COR.
PATH OF DEMOLITION / TRASH REMOVAL. TYP.
SEE GI004 FOR ADDITIONAL INFORMATION.
PHASE III
GENERAL CONSTRUCTION AND PHASING NOTES
APPLICABILITY OF GENERAL CONSTRUCTION NOTES:
1. EXISTING BUILDING UTILITIES: PRIOR TO THE COMMENCEMENT OF ANY / ALL WORK, VERIFY THE LOCATION AND ENSURE THE OBVIOUS MARKING OF ALL EXISTING UTILITIES AND RELATED EQUIPMENT ON, ABOVE OR BENEATH THE ADJACENT WORK AREA, WHETHER INDICATED TO REMAIN TO BE MODIFIED, OR TO BE REMOVED. COORDINATE
ALL VERIFICATION AND MARKING WORK WITH COR.
2. BUILDING DUST AND INFECTION CONTROL: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING ALL PHASES OF THE WORK. THEREFORE, PROVIDE, INSTALL AND MAINTAIN ALL CONSTRUCTION DUST, DEBRIS AND INFECTION CONTROL MEASURES OUTLINED. SEE INFECTION CONTROL PLAN AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION. COORDINATE SPECIFIC INFORMATION WITH THE COR.
3. BUILDING ACCESS AND SECURITY: THE BUILDING WILL REMIAN FULLY OCCUPIED DURING ALL PHASES OF THE WORK. THEREFORE, PROVIDE, INSTALL AND MAINTAIN ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN ACCESS AND SECURITY OF THE EXISTING BUILDING AND THE WORK AREA FOR THE DURATION OF THE
CONSTRUCTION PROJECT. COORDINATE SPECIFIC INFORMATION WITH THE COR.
4. EXISTING WORK AREA AND BUILDING CONDITION: PROVIDE, INSTALL AND MAINTAIN PROTECTIVE MEASURES TO KEEP THE EXISTING BUILDING ADJACENT TO THE WORK AREA AND PATH OF DEMOLITION TRAVEL FROM CONSTRUCTION DAMAGE DURING WORK. RESTORE ANY PORTION OF THE EXISTING BUILDING OR ADJACENT SITE INADVERTENTLY DAMAGED BY, OR AS A RESULT OF THIS WORK AT NO ADDITIONAL COST TO THE VA. SEE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. EXITS TO BE MAINTAINTED: MAINTAIN ONE (1) EXIT FROM ALL AREAS OF THE WORK AT ALL TIMES FOR THE
DURATION OF CONSTRUCTION.
6. GENERAL DEMOLITION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR GENERAL DEMOLITION NOTES AND INFORMATION INCLUDING DISPOSAL AND / OR SALVAGE OF DEMOLISHED MATERIALS.
COORDINATE SPECIFIC INFORMATION WITH THE COR.
7. GENERAL CONSTRUCTION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR GENERAL CONSTRUCTION NOTES AND INFORMATION INCLUDING STORAGE AND STAGING OF CONSTRUCTION
MATERIALS. COORDINATE SPECIFIC INFORMATION WITH THE COR.
8. EXISTING ELECTRICAL POWER SUPPLIES AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING POWER SUPPLIES AND EQUIPMENT WITH COR. SEE DEMOLITION, ARCHITECTURAL
AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
9. PROJECT PHASING: ALL WORK FOR THIS PROJECT SHALL BE PHASED TO LIMIT DISRUPTIONS TO DAILY
OPERATIONS, CONTRACTOR SHALL COORDINATE FINAL SCHEDULE WITH COR.
ORDER OF CONSTRUCTION:
THE FOLLOWING ORDER OF PHASING SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. ALL WORK ASSOCIATED WITH ONE AREA SHALL BE COMPLETED AND FULLY FUNCTIONAL PRIOR TO MOVING TO THE NEXT
PHASE. APPROVAL WILL BE GIVEN BY THE COR.
AT THE COMPLETION OF EACH PHASE, NOTICE SHALL BE GIVEN TO THE CONTRACTOR BY THE COR TO PROCEED TO
THE NEXT PHASE.
PHASING SHALL BE COMPLETED IN THE ORDER LISTED BELOW AND COORDINATED WITH THE COR:
PHASE I: RESTROOMS C1823 AND C1824.
PHASE II: RESTROOMS C1581 AND C1589.
PHASE III: RESTROOMS B1232, B1300 AND B1301.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural
Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.net
FINAL BID
DOCUMENTS
OF03 17
Z:
\V iri di an \P ro je ct s\
\0
D R
AW
IN
G S\
R
EV
IT
\L
O C
AL
F
IL
ES
\0
7_ D et ro it_
VA
_F irs t_ Fl oo r_
R es tro om s_ R
_C
EN
TR
AL
_d ro an
.rv t
/4
/2
2:
:3
PM
GI003
INFECTION CONTROL AND PHASING
PLAN
RENOVATE FIRST FLOOR
RESTROOMS
DETROIT, MICHIGAN
553-21-203
12/15/2020 TWT DSR
SCALE: 3/64" = 1'-0"
GI003
INFECTION CONTROL AND PHASING PLAN
NORTH
COORDINATE WITH VAMC CONTRACTING OFFICER'S REPRESENTATIVE (COR) TO COMPLETE AN
INFECTION CONTROL RISK ASSESSMENT MATRIX AND OBTAIN AN INFECTION CONTROL CONSTRUCTION
PERMIT FOR EACH PHASE OF WORK OUTLINED IN THESE DOCUMENTS PRIOR TO THE START OF
DEMOLITION AND CONSTRUCTION. COMPLY WITH ALL INFECTION CONTROL REQUIREMENTS FOR THE DURATION OF THE CONSTRUCTION PROJECT. SEE ITEMS LISTED BELOW AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
1. REFER TO SPECIFICATIONS FOR MEDICAL CENTER "INFECTION CONTROL RISK
ASSESSMENT MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION" FOR INFECTION
CONTROL INFORMATION AND REQUIREMENTS.
2. USING THE "INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION & RENOVATION" COORDINATE WITH COR TO DETERMINE THE FOLLOWING
PROJECT CONDITIONS:
· PATIENT RISK GROUPS (LOW, MEDIUM, HIGH, HIGHEST)
· TYPE OF CONSTRUCTION PROJECT ACTIVITY (A, B, C, OR D)
· CLASS OF PRECAUTION/ LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED (CLASS II
REQUIRED)
3. ONCE THE "CLASS OF PRECAUTION" HAS BEEN DETERMINED IN COORDINATION WITH THE COR, COMPLETE THE "INFECTION CONTROL CONSTRUCTION PERMIT." PROCEED WITH DEMOLITION
AND CONSTRUCTION WORK ONLY AFTER THE PERMIT HAS BEEN AUTHORIZED BY THE COR.
ONCE THE PERMIT IS AUTHORIZED, POST THE PERMIT AS DIRECTED BY THE COR.
4. USING THE "DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS" AS
OUTLINED BELOW, COORDINATE WITH THE COR TO DETERMINE THE SPECIFIC EXTENT AND
APPLICATION METHODS OF THE REQUIRED INFECTION CONTROL PRECAUTIONS. PRECAUTIONS
LISTED BELOW ARE TO BE CONFIRMED WITH THE COR:
1.1. DURING CONSTRUCTION PROJECT PHASE:
1.1.1. ISOLATE THE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
1.1.2. COMPLETE ALL CRITICAL BARRIERS TO SEAL WORK AREA FROM NON-WORK AREA BEFORE DEMOLITION OR
CONSTRUCTION BEGINS.
1.1.3. MAINTAIN NEGATIVE AIR PRESSURE OF -0.01" W.C. WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
CONTRACTOR SHALL PROVIDE MAGNOMETER TO MEASURE AIR PRESSURE.
1.1.4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
1.1.5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED
USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT
ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
1.1.6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE EXCHANGED
EACH TIME WORKER EXITS THE WORK AREA.
INFECTION CONTROL PLAN GENERAL NOTES
INFECTION CONTROL PLAN GENERAL NOTES (CONT.) INFECTION CONTROL PLAN GENERAL NOTES (CONT.)
1.1.7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE SAFETY OFFICE AND
INFECTION CONTROL AND THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICE.
1.2. UPON COMPLETION OF PROJECT PHASE:
1.2.1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
1.2.2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS
1.2.3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
1.2.4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
1.2.5. WET MOP AREA WITH DISINFECTANT.
1.2.6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK HAS BEEN PERFORMED.
2. DURING THE CONSTRUCTION PROJECT PHASE, PROVIDE, INSTALL, & MAINTAIN THE SPECIFIC INFECTION CONTROL PRECAUTIONS
AS DETERMINED BY COORDINATION WITH COR.
NOTE:
CONTRACTOR SHALL MOP AS NECESSARY TO
PREVENT TRACKS LEAVING CONSTRUCTION AREA
AND PROVIDE NECESSARY SIGNAGE FOR WET AREAS.
NOTE:
CONTRACTOR SHALL PROTECT CEILING, FLOOR AND
WALLS FROM DAMAGE DURING CONSTRUCTION AND
IMPLEMENTATION OF INFECTION AND DUST CONTROL
BARRIERS. TOUCH UP PAINT ON CEILINGS AND
WALLS AS NEEDED AS A RESULT OF CONSTRUCTION
TO SHOW NO EVIDENCE OF CONSTRUCTION.
NOTE:APPLICABLE PROJECT ACRONYMS & ABBREVIATIONS:
1. ICRA = INFECTION CONTROL RISK ASSESSMENT
2. ILSM = INTERIM LIFE SAFETY MEASURES
NOTE:
AFTER COMPLETION OF WORK, CONTRACTOR SHALL
CLEAN THOROUGHLY AND REQUIRE INSPECTION BY
COR.
MEN'S
TOILET
C1824
WOMEN'S
TOILET
C1823
3 3
MEN'S
TOILET
C1589
WOMEN'S
TOILET
C1581
3 3
WOMEN'S
TOILET
B1300
MEN'S
TOILET
B1301
WOMEN'S
STAFF
TOILET
B1232
GENERAL CONSTRUCTION AND PHASING NOTES
APPLICABILITY OF GENERAL CONSTRUCTION NOTES:
1. EXISTING BUILDING UTILITIES: PRIOR TO THE COMMENCEMENT OF ANY / ALL WORK, VERIFY THE LOCATION AND ENSURE THE OBVIOUS MARKING OF ALL EXISTING UTILITIES AND RELATED EQUIPMENT ON, ABOVE OR BENEATH THE ADJACENT WORK AREA, WHETHER INDICATED TO REMAIN TO BE MODIFIED, OR TO BE REMOVED. COORDINATE
ALL VERIFICATION AND MARKING WORK WITH COR.
2. BUILDING DUST AND INFECTION CONTROL: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING ALL PHASES OF THE WORK. THEREFORE, PROVIDE, INSTALL AND MAINTAIN ALL CONSTRUCTION DUST, DEBRIS AND INFECTION CONTROL MEASURES OUTLINED. SEE INFECTION CONTROL PLAN AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION. COORDINATE SPECIFIC INFORMATION WITH THE COR.
3. BUILDING ACCESS AND SECURITY: THE BUILDING WILL REMIAN FULLY OCCUPIED DURING ALL PHASES OF THE WORK. THEREFORE, PROVIDE, INSTALL AND MAINTAIN ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN ACCESS AND SECURITY OF THE EXISTING BUILDING AND THE WORK AREA FOR THE DURATION OF THE
CONSTRUCTION PROJECT. COORDINATE SPECIFIC INFORMATION WITH THE COR.
4. EXISTING WORK AREA AND BUILDING CONDITION: PROVIDE, INSTALL AND MAINTAIN PROTECTIVE MEASURES TO KEEP THE EXISTING BUILDING ADJACENT TO THE WORK AREA AND PATH OF DEMOLITION TRAVEL FROM CONSTRUCTION DAMAGE DURING WORK. RESTORE ANY PORTION OF THE EXISTING BUILDING OR ADJACENT SITE INADVERTENTLY DAMAGED BY, OR AS A RESULT OF THIS WORK AT NO ADDITIONAL COST TO THE VA. SEE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. EXITS TO BE MAINTAINTED: MAINTAIN ONE (1) EXIT FROM ALL AREAS OF THE WORK AT ALL TIMES FOR THE
DURATION OF CONSTRUCTION.
6. GENERAL DEMOLITION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR GENERAL DEMOLITION NOTES AND INFORMATION INCLUDING DISPOSAL AND / OR SALVAGE OF DEMOLISHED MATERIALS.
COORDINATE SPECIFIC INFORMATION WITH THE COR.
7. GENERAL CONSTRUCTION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS AND SPECIFICATIONS FOR GENERAL CONSTRUCTION NOTES AND INFORMATION INCLUDING STORAGE AND STAGING OF CONSTRUCTION
MATERIALS. COORDINATE SPECIFIC INFORMATION WITH THE COR.
8. EXISTING ELECTRICAL POWER SUPPLIES AND EQUIPMENT: THE BUILDING WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING POWER SUPPLIES AND EQUIPMENT WITH COR. SEE DEMOLITION, ARCHITECTURAL
AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
9. PROJECT PHASING: ALL WORK FOR THIS PROJECT SHALL BE PHASED TO LIMIT DISRUPTIONS TO DAILY
OPERATIONS, CONTRACTOR SHALL COORDINATE FINAL SCHEDULE WITH COR.
ORDER OF CONSTRUCTION:
THE FOLLOWING ORDER OF PHASING SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. ALL WORK ASSOCIATED WITH ONE AREA SHALL BE COMPLETED AND FULLY FUNCTIONAL PRIOR TO MOVING TO THE NEXT
PHASE. APPROVAL WILL BE GIVEN BY THE COR.
AT THE COMPLETION OF EACH PHASE, NOTICE SHALL BE GIVEN TO THE CONTRACTOR BY THE COR TO PROCEED TO
THE NEXT PHASE.
PHASING SHALL BE COMPLETED IN THE ORDER LISTED BELOW AND COORDINATED WITH THE COR:
PHASE I: RESTROOMS C1823 AND C1824.
PHASE II: RESTROOMS C1581 AND C1589.
PHASE III: RESTROOMS B1232, B1300 AND B1301.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural
Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.net
FINAL BID
DOCUMENTS
OF04 17
Z:
\V iri di an \P ro je ct s\
\0
D R
AW
IN
G S\
R
EV
IT
\L
O C
AL
F
IL
ES
\0
7_ D et ro it_
VA
_F irs t_ Fl oo r_
R es tro om s_ R
_C
EN
TR
AL
_d ro an
.rv t
/4
/2
2:
:5
PM
GI004
INFECTION CONTROL AND ENLARGED
PHASING PLANS
RENOVATE FIRST FLOOR
RESTROOMS
DETROIT, MICHIGAN
553-21-203
12/15/2020 TWT DSR
SCALE: 3/16" = 1'-0"
GI004
INFECTION CONTROL & PHASING PLAN - PHASE I
SCALE: 3/16" = 1'-0"
GI004
INFECTION CONTROL & PHASING PLAN - PHASE II
SCALE: 3/16" = 1'-0"
GI004
INFECTION CONTROL & PHASING PLAN - PHASE III
SCALE: 3/16" = 1'-0"
GI004
INFECTION CONTROL & PHASING PLAN - PHASE III
INFECTION CONTROL PLAN NOTES
1 PROVIDE AND INSTALL INFECTION / DUST CONTROL "ZIP WALL" PARTITION WITH 2-PLY
FIRE-RETARDANT PLASTIC AND ZIPPERED EGRESS DOOR. EGRESS DOOR SHALL BE
SECURED, SEALED AND PROTECTED FOR DURATION OF CONSTRUCTION.
COORDINATE INFECTION CONTROL RISK ASSESSMENT (ICRA) AND SPECIFIC
REQUIREMENTS WITH COR. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2 PROVIDE AND INSTALL "STICKY" MAT FLOOR PADS IMMEDIATELY OUTSIDE ALL
INFECTION / DUST CONTROL PARTITIONS TO ENSURE FLOOR CLEANLINESS IS
MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION.
3 PATH OF DEMOLITION / TRASH REMOVAL TRAVEL FROM RENOVATED AREA. ALL
CONSTRUCTION DEBRIS REMOVED AS PART OF DEMOLITION SHALL BE REMOVED IN
ENCLOSED / SEALED CONTAINERS AND FOLLOW THE INFECTION CONTROL RISK
ASSESSMENT (ICRA) REQUIREMENTS AS COORDINATED WITH THE COR. SEE GI003
FOR FULL PATH.
COORDINATE WITH VAMC CONTRACTING OFFICER'S REPRESENTATIVE (COR) TO COMPLETE AN
INFECTION CONTROL RISK ASSESSMENT MATRIX AND OBTAIN AN INFECTION CONTROL CONSTRUCTION
PERMIT FOR EACH PHASE OF WORK OUTLINED IN THESE DOCUMENTS PRIOR TO THE START OF
DEMOLITION AND CONSTRUCTION. COMPLY WITH ALL INFECTION CONTROL REQUIREMENTS FOR THE DURATION OF THE CONSTRUCTION PROJECT. SEE ITEMS LISTED BELOW AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
1. REFER TO SPECIFICATIONS FOR MEDICAL CENTER "INFECTION CONTROL RISK
ASSESSMENT MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION" FOR INFECTION
CONTROL INFORMATION AND REQUIREMENTS.
2. USING THE "INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION & RENOVATION" COORDINATE WITH COR TO DETERMINE THE FOLLOWING
PROJECT CONDITIONS:
· PATIENT RISK GROUPS (LOW, MEDIUM, HIGH, HIGHEST)
· TYPE OF CONSTRUCTION PROJECT ACTIVITY (A, B, C, OR D)
· CLASS OF PRECAUTION/ LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED (CLASS II
REQUIRED)
3. ONCE THE "CLASS OF PRECAUTION" HAS BEEN DETERMINED IN COORDINATION WITH THE COR, COMPLETE THE "INFECTION CONTROL CONSTRUCTION PERMIT." PROCEED WITH DEMOLITION
AND CONSTRUCTION WORK ONLY AFTER THE PERMIT HAS BEEN AUTHORIZED BY THE COR.
ONCE THE PERMIT IS AUTHORIZED, POST THE PERMIT AS DIRECTED BY THE COR.
4. USING THE "DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS" AS
OUTLINED BELOW, COORDINATE WITH THE COR TO DETERMINE THE SPECIFIC EXTENT AND
APPLICATION METHODS OF THE REQUIRED INFECTION CONTROL PRECAUTIONS. PRECAUTIONS
LISTED BELOW ARE TO BE CONFIRMED WITH THE COR:
1.1. DURING CONSTRUCTION PROJECT PHASE:
1.1.1. ISOLATE THE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
1.1.2. COMPLETE ALL CRITICAL BARRIERS TO SEAL WORK AREA FROM NON-WORK AREA
BEFORE DEMOLITION OR CONSTRUCTION BEGINS.
1.1.3. MAINTAIN NEGATIVE AIR PRESSURE OF -0.01" W.C. WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS. CONTRACTOR SHALL PROVIDE MAGNOMETER TO
MEASURE AIR PRESSURE.
1.1.4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
1.1.5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM
SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME
THEY LEAVE THE WORK SITE.
1.1.6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE EXCHANGED EACH TIME WORKER EXITS THE WORK AREA.
1.1.7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE SAFETY OFFICE AND INFECTION CONTROL AND THOROUGHLY
CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICE.
1.2. UPON COMPLETION OF PROJECT PHASE:
1.2.1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
1.2.2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS
1.2.3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
1.2.4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
1.2.5. WET MOP AREA WITH DISINFECTANT.
1.2.6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK HAS BEEN PERFORMED.
2. DURING THE CONSTRUCTION PROJECT PHASE, PROVIDE, INSTALL, & MAINTAIN THE SPECIFIC
INFECTION CONTROL PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.
INFECTION CONTROL PLAN GENERAL NOTES
NOTE:
CONTRACTOR SHALL MOP AS NECESSARY TO
PREVENT TRACKS LEAVING CONSTRUCTION AREA
AND PROVIDE NECESSARY SIGNAGE FOR WET AREAS.
NOTE:
CONTRACTOR SHALL PROTECT CEILING, FLOOR AND
WALLS FROM DAMAGE DURING CONSTRUCTION AND
IMPLEMENTATION OF INFECTION AND DUST CONTROL
BARRIERS. TOUCH UP PAINT ON CEILINGS AND
WALLS AS NEEDED AS A RESULT OF CONSTRUCTION
TO SHOW NO EVIDENCE OF CONSTRUCTION.
NOTE:APPLICABLE PROJECT ACRONYMS & ABBREVIATIONS:
1. ICRA = INFECTION CONTROL RISK ASSESSMENT
2. ILSM = INTERIM LIFE SAFETY MEASURES
NOTE:
AFTER COMPLETION OF WORK, CONTRACTOR SHALL
CLEAN THOROUGHLY AND REQUIRE INSPECTION BY
COR.
TEMP. ANTE ROOM
A
O
V
MONTHLY CHANGED HEPA
FILTER
FL
EX
D
UC
T
E
OUTSIDE OF BUILDING
PROVIDE STICKY
MATS (CHANGED
END OF SHIFT OR
MORE IF NECESSARY
TO MAINTAIN
CLEANLINESS)
POST ICRA, ILSM,
FIRE INSPECTION
SHEETS VISIBLE TO
PUBLIC
INDICATOR MUST BE AT -0.01 OR MORE
NEGATIVE DAILY, IF NOT VERIFY ALL OPENING
SUCH AS DOORS ARE CLOSED AND/OR
CHANGE OUT NEGATIVE AIR PRE-FILTER.
ABC TYPE FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET (ISLM MAY
REQ. MORE THAN ONE OR WALL MOUNTED)
NEED INSPECTION TAG AND MONTHLY
INSPECTION; INITIALS AND DATED.
TAPE ALL SERVICES
TO PROTECT
AGAINST
CONTAMINATION
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE
DIFFUSERS).
COVER ALL RETURNS AT
THE GRATE / DIFFUSERS
WITH FIRE RATED PLASTIC
SHEETING AND SECURE
WITH DUCT TAPE.
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WITH
FIRE RATED PLASTIC
SHEETING AND SECURE
WITH DUCT TAPE TO KEEP
DUST OUT.
HEPA NEGATIVE AIR UNIT
WEEKLY CHANGED (OR
MORE AS NEEDED PRE-
FILTER)
EXHAUST DUCT
AA
WORK AREA
2-PLY FIRE-RETARDANT
PLASTIC AND ZIPPERED
EGRESS DOOR.
2-PLY FIRE-RETARDANT
PLASTIC "ZIP" WALL
ASSEMBLY.
EXISTING CONCRETE SLAB FLOORING
FIRE / U.L. RATED PLASTIC
TO PREVENT DUST (INSTALL
PRIOR TO CONSTRUCTION).
FIRE / U.L. RATED PLASTIC
TO PREVENT DUST (INSTALL
PRIOR TO CONSTRUCTION).
EXISTING WALL
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING
REPLACED SHALL BE PROTECTED
OR COVERED WITH ROSEN PAPER /
FIRE TREATED PLYWOOD.
HEPA NEGATIVE AIR UNIT.
EXISTING WALL
EXISTING FIRE
SPRINKLER SYSTEM
EXHAUST DUCT
AREA UNDER
CONSTRUCTION
RESTRICTED AREA
THIS IS A
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
COMING SOON!!!
PERSONNEL ENTERING MUST HAVE: HARD HAT,
SAFETY GLASSES AND PROPER I.D.
-DESCRIPTION OF NEWLY PROPOSED OCCUPANCY-
XXXXX
XXXXX
XXXXX
XXXXX
POST ICRA, ILSM,
FIRE INSPECTION
SHEETS VISIBLE
TO PUBLIC
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
321 4 5 6 7 8 9 10
All Concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural
Design, Inc. and shall not be used for any purpose without prior expressed written consent. The Owner shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.net
FINAL BID
DOCUMENTS
OF05 17
Z:
\V iri di an \P ro je ct s\
\0
D R
AW
IN
G S\
R
EV
IT
\L
O C
AL
F
IL
ES
\0
7_ D et ro it_
VA
_F irs t_ Fl oo r_
R es tro om s_ R
_C
EN
TR
AL
_d ro an
.rv t
/4
/2
2:
:0
PM
GI005
INFECTION CONTROL DETAILS RENOVATE FIRST FLOOR
RESTROOMS
DETROIT, MICHIGAN
553-21-203
12/15/2020 TWT DSR
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
• OFFICE AREAS • CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCROPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY / MRI
• RESPIRATORY THERAPY
• CCU
• EMERGENCY ROOM
• LABOR AND DELIVERY
• LABORATORY (SPECIMEN)
• NEWBORN NURSEY
• OUTPATIENT SURGERY
• PEDIATRICS
• PHARMACY
• POST ANESTHESIA CARE UNIT
• SURGICAL UNITS
• ANY AREA CARING FOR
IMMUNOCOMPROMISED PATIENTS
• BURN UNIT
• CARDIAC CATH LAB
• CENTRAL STERILE SUPPLY
• INTENSIVE CARE UNITS
• MEDICAL UNIT
• NEGATIVE PRESSURE ISOLATION ROOMS
• ONCOLOGY
• OPERATING ROOMS INCLUDING
C-SECTION ROOMS
PATIENT RISK GROUPS
TYPE A
INCLUDES, BUT IS NOT LIMITED TO:
• REMOVABLE OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET.
• PAINTING (BUT NOT SANDING).
• WALL COVERING, ELECTRICAL TRIM, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE DUST OR
REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
MATRIX OF PRECAUTIONS FOR
CONSTRUCTION & RENOVATION
INSPECTION AND NON-INVASIVE ACTIVITIES
TYPE B
INCLUDES, BUT IS NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
• ACCESS TO CHASE SPACES.
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
SMALL SCALE, SHORT DURATION ACTIVITIES
WHICH CREATES MINIMAL DUST
TYPE C INCLUDES, BUT IS NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING.
• REMOVAL OF FLOOR COVERINGS, CEILING TILES OR CASEWORK.
• NEW WALL CONSTRUCTION.
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.
• MAJOR CABLING ACTIVITIES.
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.
WORK THAT GENERATES A MODERATE TO HIGH LEVEL
OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF
ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
TYPE D INCLUDES, BUT IS NOT LIMITED TO:
• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.
• REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING SYSTEM.
• NEW CONSTRUCTION.
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
RISK RELATED GROUP
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
TYPE A
I
I
I
II
TYPE B
II
II
II
III / IV
TYPE C
II
III
III / IV
III / IV
TYPE D
III / IV
IV
IV
IV
CONTRUCTION PROJECT TYPE
NOTE:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACITIVITY AND RISK LEVEL
INDICATE THAT CLASS OR CLASS CONTROL PROCEDURES ARE NECESSARY.
IC MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK
III IV
CL
AS
S
IV
CLASS IV WORK ITEMS NOTES:
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTE ROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING HEPA
VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER OVERALLS THAT ARE REMOVED EACH TIME
THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA SITE OR THEY CAN WEAR CLOTH OR PAPER OVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE
THE WORK SITE.
7. DO NOT REMOVE BARRIERS FROM WORK UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER’S SAFETY DEPARTMENT AND
INFECTION CONTROL.
PRIOR TO ANY CONSTRUCTION:
1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
8. ROOM AND / OR SHALL BE THOROUGHLY CLEANED BY THE OWNER’S ENVIRONMENTAL SERVICES DEPARTMENT.
POST CONSTRUCTION:
SCALE: 3/8" = 1'-0"
GI005
TYPICAL CONSTRUCTION LAYOUT
SCALE: 3/8" = 1'-0"
GI005
TYPICAL CONSTRUCTION CROSS SECTION "A-A"
INFECTION CONTROL GENERAL NOTES
1. ALL PERSONNELL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT AND
SAFETY GLASSES ALONG WITH ANY OTHER PPE REQUIRED IN THAT AREA.
2. ALL APPLICABLE FORMS TO BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.
3. PERMITS TO INCLUDE:
ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, MEDICAL GASES, UTILITY
SHUTDOWN, FIRE / SMOKE WALL, FIRE ALARM SYSTEM.
4. THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION. NEGATIVE
PRESSURE MACHINES MUST BE ON AND OPERATIONAL 24 / 7. NEGATIVE AIR UNIT TO BE
MAINTAINED WITH FILTER(S) REPLACED PER SPECIFICATIONS. (WEEKLY REPLACEMENT OF PRE-
FILTER OR MORE AS NECESSARY. HEPA FILTER REPLACED MONTHLY. CLEAN ALL EXTERIOR
SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT. MONITOR NEGATIVE PRESSURE
AND POST LOG AT THE END OF EACH SHIFT.
5. CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMMITTEE.
6. DURING CONSTRUCTION BE CERTAIN THAT:
BARRIERS ARE INTACT AND MAINTAINED.
PARTICLE COUNT METER IS AVAILABLE.
NEGATIVE INDICATOR IS AVAILABLE.
ICRA REQUIREMENTS ARE INTACT AND
VERIFY ARE BEING MAINTAINED.
CL
AS
S
II
CLASS II WORK ITEMS NOTES:
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT WORK AREAS.
6. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
PRIOR TO ANY CONSTRUCTION:
1. WIPE WORK SURFACES TO CONTROL DUST WHILE CUTTING.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP AND / OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
4. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
POST CONSTRUCTION:
CL
AS
S
III
CLASS III WORK ITEMS NOTES:
1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS, SUCH AS SHEET ROCK, PLYWOOD, PLASTIC, TO SEAL AREAS FROM NON-WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM
FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS IF INDICATED.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN…
This is the start of the file's text. The full file is on GovTribe.