DRAWINGS- DNR_PipeDrop-(LATEST).pdf

PDF 2 MB Posted

Attached to
MARTINUK EROSION STABILIZATION @ ELK NECK STATE FOREST
Solicitation number
BPM042550
Issued by
Cecil County, Elkridge CDP, Maryland

About this file

This document contains engineering drawings and specifications for a Grade Stabilization Structure project to be constructed at the Elk Neck State Forest in Cecil County, Maryland. The project, which is being overseen by the United States Department of Agriculture Natural Resources Conservation Service and the Cecil Soil Conservation District, involves the installation of a 350-foot grassed waterway, a 113-foot 18-inch HDPE pipe drop structure, and associated swales, berms, and rock outlets. The drawings provide detailed design specifications, materials requirements, construction methods, and inspection/approval processes. The contract opportunity, titled "MARTINUK EROSION STABILIZATION @ ELK NECK STATE FOREST", requires the selected contractor to provide all necessary labor, equipment, materials, and insurance to complete the work in accordance with the plans and specifications. No bid due date, award date, or contract term is provided in the document.

The drawings do not contain information about pricing, set-asides, incumbent contractors, funding sources, or other commercial terms. The project appears to be funded through government conservation programs, but the specific funding mechanisms are not detailed. The document focuses solely on the technical and construction requirements for the proposed erosion and stormwater management improvements at the Elk Neck State Forest site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JZ JZ

8/ 7/

8/ 7/

D es ig ne d D at e

C he ck ed

Ap pr ov ed

D ra w n

MD_0044

DNR_PipeDrop.dwg

Drawing No.

Sheet of

File Name

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re C

EC

IL

S oi l C on se rv at io n D is tri ct

JO

B C

LA

SS

II

TR

AC

T

El kt on

, M ar yl an d

DEPT. OF NATURAL

RESOURCES- MARTINUK

410 GRADE STABILIZATION STRUCTURE

LOCATION MAP

0200 200 400

SITE

GENERAL NOTES:

· PLEASE CONTACT THE SOIL CONSERVATION DISTRICT AT 410-398-4411 Ext.3

AT LEAST 3 DAYS PRIOR TO CONSTRUCTION TO ARRANGE A PRE-CONSTRUCTION MEETING

· A CONSERVATION TECHNICIAN SHALL SET CUT/GRADE STAKES AT THE CONTRACTORS

REQUEST

· A CONSERVATION TECHNICIAN MUST BE PRESENT AT THE TIME OF PIPE INSTALLATION, IF

REQUIRED

N

Scale in Feet

In de x

SAFETY REGULATIONS

ALL EXCAVATION AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE

MARYLAND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (MOSHA) STANDARDS AS

SET FORTH IN THE LATEST VERSION OF THE CODE OF MARYLAND REGULATIONS

The Contractor/Owner is to notify the SOIL CONSERVATION DISTRICT at least 72 hours prior to construction to facilitate any scheduling, layout, or preliminary mobilization necessary to ensure proper construction inspection to enable appropriate certification of the project.

It is the Landowner's responsibility to obtain all County, State, and Federal permits that may be needed, and to maintain this structure and related regulations.

CONSTRUCTION NOTIFICATION

Cecil

THERE WILL BE NO CHANGES IN SPECIFICATION, DIMENSIONS, OR

MATERIALS UNLESS APPROVED BY THE ENGINEER RESPONSIBLE FOR

THIS DRAWING. THE DRAWINGS ARE PREPARED COOPERATIVELY BY THE

NATURAL RESOURCE CONSERVATION SERVICE FOR THE NAMED

LANDOWNER.

CONSTRUCTION FOUND NOT IN ACCORDANCE WITH THESE DRAWINGS

AND SPECIFICATIONS SHALL VIOLATE THE COOPERATIVE AGREEMENT

AND ALL DRAWINGS, SPECIFICATIONS, AND QUANTITIES ESTIMATE SHALL

IMMEDIATELY BE RETURNED TO THE LOCAL NRCS OFFICE.

I CERTIFY THAT THIS DESIGN HAS BEEN EXPLAINED TO ME

BY A REPRESENTATIVE OF THE CECIL

SOIL CONSERVATION DISTRICT, AND I UNDERSTAND THE

CONTENTS, ALL CONSTRUCTION WILL BE DONE ACCORDING

TO THESE PLANS AND SPECIFICATIONS, I FURTHER

UNDERSTAND THAT ALL CONSTRUCTION WILL BE UNDER THE

INSPECTION OF THIS OFFICE.

OWNER/OPERATOR SIGNATURE DATE

CONTRACTOR'S SIGNATURE DATE

OWNER/CONTRACTOR STATEMENT

THE CONSERVATION PRACTICE(S) MEETS OR EXCEEDS

NRCS STANDARDS AND SPECIFICATIONS

SIGNATURE DATE

AS-BUILT STATEMENT

INSPECTED BY

CONSTRUCTION APPROVAL

VERIFIED DISTRICT

CONSERVATIONIST

SIGNATURE DATE

SIGNATURE DATE

Sheet List Table Sheet Number Sheet Title

1 Index 2 Plan Map & Grassed Waterway Details 3 Grassed Waterway Profile-Cross Sections-Details 4 Swale & Berm Profile- Drop Pipe Profile & Details

ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST NRCS SPECIFICATIONS FOR

EACH CONSERVATION PRACTICE LISTED ON THE PLANS. IF NOT PROVIDED IN THE PLANS AND

SPECIFICATIONS, THE SPECIFICATIONS FOR EACH CONSERVATION PRACTICE CAN BE FOUND IN SECTION IV OF THE MARYLAND ELECTRONIC FIELD OFFICE TECHNICAL GUIDE (eFOTG) LOCATED AT:

https://efotg.sc.egov.usda.gov/#/state/MW UNDER ‘Conservation Practice Standards & Support Documents’.

AutoCAD SHX Text

DEPT. OF NATURAL RESOURCES- MARTINUK

https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/ https://efotg.sc.egov.usda.gov/

EFLD

EFLD

EFLD

EF

LD

EF

LD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EF

LD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLDEFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EF

LD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

EFLD

+1

+3

+4 00

+4 50.01

.9

+0

+1

+2

+1

+1 44.52 è è è è è è è è è è è ð ð ð ð ð ð ð ð ð ð ð ð ð ð ð ð

Proposed Rock Outlet 5' (l) x 5' (w) x 0.5'(d) (See details on Sheet 3)

JZ JZ

8/ 7/

8/ 7/

D es ig ne d D at e

C he ck ed

Ap pr ov ed

D ra w n

MD_0044

DNR_PipeDrop.dwg

Drawing No.

Sheet of

File Name

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re C

EC

IL

S oi l C on se rv at io n D is tri ct

JO

B C

TR

AC

T

El kt on

, M ar yl an d

PLAN VIEW

030 30 60

Scale in Feet

N

Pl an

M ap

G ra ss ed W at er w ay

D et ai ls

BENCH MARK DESCRIPTIONS

TBM #1 (IP-HUB 1): Elev = 67.12 Top of 2" X 2" wooden hub, marked by witness lath, along driveway.

TBM #2 (IP-HUB 2): Elev = 56.17 Top of 2" X 2" wooden hub, marked by witness lath, along Northern Treeline.

TBM #3 (IP-HUB 3): Elev = 54.05 Top of 2" X 2" wooden hub, marked by witness lath, along Southern Treeline.

TBM #4 (IP-HUB 4): Elev = 48.52 Top of 2" X 2" wooden hub, marked by witness lath, Northern TB of gully.

TBM #5 (TBM Nail in Tree): Elev = 73.90

ISOMETRIC VIEW

FL

OW

CONSTRUCTION SPECIFICATIONS

1. USE MATTING THAT HAS A DESIGN VALUE FOR SHEAR STRESS EQUAL TO OR HIGHER THAN THE SHEAR STRESS

DESIGNATED ON APPROVED PLANS.

2. USE TEMPORARY SOIL STABILIZATION MATTING MADE OF DEGRADABLE (LASTS 6 MONTHS MINIMUM) NATURAL OR MAN-MADE FIBERS (MOSTLY ORGANIC). MAT MUST HAVE UNIFORM THICKNESS AND DISTRIBUTION OF FIBERS THROUGHOUT AND BE SMOLDER RESISTANT. CHEMICALS USED IN THE MAT MUST BE NON-LEACHING AND NON-TOXIC TO VEGETATION AND SEED GERMINATION AND NON-INJURIOUS TO THE SKIN. IF PRESENT, NETTING MUST BE EXTRUDED PLASTIC WITH A MAXIMUM MESH OPENING OF 2x2 INCHES AND SUFFICIENTLY BONDED OR SEWN ON 2 INCH CENTERS ALONG LONGITUDINAL AXIS OF THE MATERIAL TO PREVENT SEPARATION OF THE NET FROM THE

PARENT MATERIAL.

3. SECURE MATTING USING STEEL STAPLES, WOOD STAKES, OR BIODEGRADABLE EQUIVALENT. STAPLES MUST BE "U" OR "T" SHAPED STEEL WIRE HAVING A MINIMUM GAUGE OF NO. 11 AND NO. 8 RESPECTIVELY. "U" SHAPED STAPLES

MUST AVERAGE 1 TO 112 INCHES WIDE AND BE A MINIMUM OF

6 INCHES LONG. "T" SHAPED STAPLES MUST HAVE A MINIMUM 8 INCH MAIN LEG, A MINIMUM 1 INCH SECONDARY LEG, AND A MINIMUM 4 INCH HEAD. WOOD STAKES MUST BE ROUGH-SAWN HARDWOOD, 12 TO 24 INCHES IN LENGTH, 1x3

INCH IN CROSS SECTION, AND WEDGE SHAPED AT THE BOTTOM.

4. PERFORM FINAL GRADING, TOPSOIL APPLICATION, SEEDBED PREPARATION, AND PERMANENT SEEDING IN ACCORDANCE WITH SPECIFICATIONS. PLACE MATTING WITHIN 48 HOURS OF COMPLETING SEEDING OPERATIONS UNLESS END OF WORKDAY STABILIZATION IS SPECIFIED ON THE APPROVED EROSION AND SEDIMENT CONTROL

PLAN.

5. UNROLL MATTING IN DIRECTION OF WATER FLOW, CENTERING THE FIRST ROLL ON THE CHANNEL CENTERLINE.

WORK FROM CENTER OF CHANNEL OUTWARD WHEN PLACING ROLLS. LAY MAT SMOOTHLY AND FIRMLY ON THE

SEEDED SURFACE. AVOID STRETCHING THE MATTING.

6. KEY-IN UPSTREAM END OF EACH MAT ROLL BY DIGGING A 6 INCH (MINIMUM) TRENCH AT THE UPSTREAM END OF THE MATTING, PLACING THE ROLL END IN THE TRENCH, STAPLING THE MAT IN PLACE, REPLACING THE EXCAVATED

MATERIAL, AND TAMPING TO SECURE THE MAT END.

7. OVERLAP OR ABUT THE ROLL EDGES PER MANUFACTURER RECOMMENDATIONS. OVERLAP ROLL ENDS BY 6 INCHES

(MINIMUM), WITH THE UPSTREAM MAT OVERLAPPING ON TOP OF THE NEXT DOWNSTREAM MAT.

8. STAPLE/STAKE MAT IN A STAGGERED PATTERN ON 4 FOOT (MAXIMUM) CENTERS THROUGHOUT AND

2 FOOT (MAXIMUM) CENTERS ALONG SEAMS, JOINTS, AND ROLL ENDS.

9. ESTABLISH AND MAINTAIN VEGETATION SO THAT REQUIREMENTS FOR ADEQUATE VEGETATIVE ESTABLISHMENT ARE

CONTINUOUSLY MET IN ACCORDANCE WITH SECTION B-4 VEGETATIVE STABILIZATION.

STANDARD SYMBOLDETAIL B-4-6-A TEMPORARY SOIL

STABILIZATION MATTING

CHANNEL APPLICATION

Existing ground

Existing grade to slope towards waterway

General notes:

· Remove topsoil prior to grading and stockpile outside limits of waterway construction

· Install excelsior type erosion control matting according to manufacture's recommendations. Matting shall meet minimum shear stress of 1.75 lb/ft² and maximum velocities of 7ft/s (see erosion control matting detail sheet for installation instructions)

· Erosion control matting width shall be a minimum of 2/3 of the waterway width or shown as above

· A minimum of 4" of topsoil shall be placed along entire length and width of constructed waterway

· Lime, fertilizer and seed shall be placed in waterway prior to installing erosion control matting (see seeding details)

· Waterway shall be maintained as needed to minimize erosion throughout the required maintenance life of 10 years

Depth

Width

Erosion control matting width

Proposed grassed waterway

TYPICAL CROSS SECTION

NOT TO SCALE

GRASSED WATERWAY DETAIL

20'

13' min.

Varies

Existing Driveway

4+50 A'

0+

A

B0+00

B' 2+84

C'1+45

C0+00

Edge of FieldEFLD

Existing Driveway

Existing Tree Line

Legend

Existing 12" Culvert to remain

Proposed 350' Grassed Waterway 20' (w) x Depth Varies

(See details on Sheet 3)

Proposed Rock Plunge Pool 13' (l) x 13' (w) (See details on Sheet 4)

Proposed 113' of 18" HDPE Solid Pipe.

(See details on Sheet 4)

Proposed 266' Swale 10'(w) x 1' (d)

(See details on Sheet 4)

Proposed 266' (l) x 6' (w) Berm (See details on Sheet 4)

Note:

When installing barrel of pipe drop, there needs to be a minimum of 2ft of cover over pipe. Contractor to grade slopes of fill over pipe back into existing ground. Slopes steeper than a 3:1, erosion control matting shall be installed.

Proposed 4' Riser (See details on Sheet 4)

AutoCAD SHX Text

DEPT. OF NATURAL RESOURCES- MARTINUK

AutoCAD SHX Text

PREPARED SURFACE WITH SEED IN PLACE

AutoCAD SHX Text

OVERLAP OR ABUT ROLL EDGE (TYP.)

AutoCAD SHX Text

6 IN MIN. DEPTH KEY TRENCHFOR ROLL END (TYP.)

AutoCAD SHX Text

6 IN MIN. DEPTH KEY TRENCH FOR UPPER END OF DOWNSLOPE ROLL (TYP.)

AutoCAD SHX Text

6 IN MIN. OVERLAP AT ROLL END (TYP.)

AutoCAD SHX Text TSSMC - lb/ft² *lb/ft² (* INCLUDE SHEAR STRESS)* INCLUDE SHEAR STRESS) INCLUDE SHEAR STRESS)

AutoCAD SHX Text

MARYLAND DEPARTMENT OF ENVIRONMENT WATER MANAGEMENT ADMINISTRATION

AutoCAD SHX Text

MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL

AutoCAD SHX Text 20111

AutoCAD SHX Text

U.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCES CONSERVATION SERVICE

PROPOSED GRASSED WATERWAY (A-A')

H:20 V:4

0+

0+

0+

0+

0+

1+

1+

1+

1+

1+

2+

2+

2+

2+

2+

3+

3+

3+

3+

3+

4+

4+

4+

4+

5.2%

3.2%

2.2%

3+

.4

2+

.6

1+

.4

1+

.6

Existing Ground

Existing 12" Culvert Invert Sta. 3+90 EL. 63.5

Proposed Lined Rock Outlet Tie-in 5' (w) x 5' (l) x 0.5' (d)

Sta. 3+85 EL. 63.4 (See details on Sheet 3)

Proposed Lined Rock Outlet

6' (l) x 4' (w) x 1.5 (d) (See details on Sheet 3)

Existing 12" Culvert

350' Proposed Grassed Waterway 20' (w) x depths vary

(See details on this Sheet)

Proposed tie-in at Riser Sta. 0+35 EL. 52.6

Existing Driveway

3+66 H:10 V:2

0 10 2001020

2+80 H:10 V:2

0 10 2001020

1+80 H:10 V:2

0 10 2001020

1+26 H:10 V:2

0 10 2001020

5:1

5:1

5:1

20.0'

Existing Ground

0.7'

0.8'

20.0'

Existing Ground

EL. 54.6

EL. 59.6

EL. 62.4

20.0'

0.7'

Existing Ground

20.0'

0.7'

0+60 H:10 V:2

0 10 20 30 4001020

EL. 56.4

5:1 20.0'

0.8'

EL. 53.3

Proposed Fill

Existing Ground

Existing Ground Existing Gully to be filled and compacted in 4-6" lifts using proper equipment

JZ JZ

8/ 7/

8/ 7/

D es ig ne d D at e

C he ck ed

Ap pr ov ed

D ra w n

MD_0044

DNR_PipeDrop.dwg

Drawing No.

Sheet of

File Name

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re C

EC

IL

S oi l C on se rv at io n D is tri ct

JO

B C

TR

AC

T

El kt on

, M ar yl an d

G ra ss ed

W at er w ay P ro fil e- C ro ss

S ec tio ns

-D et ai ls

PROFILE

CROSS SECTION

FTDepth of Plunge

Distance to CL of plunge

Riprap

Rock " to " d50 = "

Riprap Thickness

Geotextile

Clearing

FT

TONS

FT

FT²

AC

CROSS SECTION

PROFILE

Design Specifications:

:1

:1

:1

:1 FT (L) X FT (W)

FT (L) X FT (W)

FT

EL

FT

FT

Geotextile

FT FT FT

Outlet EL.

Rock thickness

FT

DRAWING NOT TO SCALE

Pipe Dia.

Outside dimensions

Inside dimensions Pipe

ROCK PLUNGE POOL DETAIL

0.5

2.5

3 12 8

1.5

2.5

2.5

0.563.4

1.5

63.4

5 5

EXISTING CULVERT ROCK PLUNGE POOL

DEPT. OF NATURAL RESOURCES- MARTINUK

PROPOSED SWALE & BERM (B-B')

H:20 V:4

0+

0+

0+

0+

0+

1+

1+

1+

1+

1+

2+

2+

2+

2+

2+

2+

Existing Ground

Proposed Top of Berm EL. 54.6

Proposed Berm Tie-in Sta. 0+02 EL. 55.0

Proposed Berm Tie-in Sta. 2+68 EL. 55.8

4.0% 1.2% 1.2%

4.7%0+

.6

2+

.8

Proposed CL 4' Riser Sta. 1+22 EL. 52.6

Proposed Bottom of Swale

PROPOSED PIPE DROP (C-C')

H:20 V:4

0+

0+

0+

0+

0+

1+

1+

1+

1+

Proposed 113' of 18" HDPE Solid Pipe

(See Pipe and Backfill Details on this Sheet)

Existing Ground

20'

20'

20'

20'

20' 13'

4.0'

Subgrade

EL. 48.1

Inlet EL. 48.6

Slope: 0.084

95°

1+

.7

Proposed Rock Plunge Pool (See details on Sheet 4)

Proposed Precast Concrete Catch Basin with Trash Rack 3'(l) x 3'(w) x 4'(d) Sta. 0+13 EL. 52.6 (See detail on Sheet 4)

Proposed Outlet Inv.

Sta. 1+28

EL. 39.1

Proposed Berm 6' wide EL. 54.6

Proposed waterway (see Sheet 3)

3:1

3:1

Proposed Excavation (2' min.

above pipe)

JZ JZ

8/ 7/

8/ 7/

D es ig ne d D at e

C he ck ed

Ap pr ov ed

D ra w n

MD_0044

DNR_PipeDrop.dwg

Drawing No.

Sheet of

File Name

Na tu ra l R es ou rc es

Co ns er va tio n

Se rv ice

U ni te d

St at es D ep ar tm en t of

Ag ric ul tu re C

EC

IL

S oi l C on se rv at io n D is tri ct

JO

B C

TR

AC

T

El kt on

, M ar yl an d

Sw al e

Be rm

P ro fil e-

D ro p Pi pe P ro fil e

D et ai ls

PROFILE

FTDepth of Plunge

Distance to CL of plunge

Riprap

Rock " to " d50 = "

Riprap Thickness

Geotextile

Clearing

FT

TONS

FT

FT²

AC

CROSS SECTION

PROFILE

Design Specifications:

:1

:1

:1

:1 FT (L) X FT (W)

FT (L) X FT (W)

FT

EL

FT

FT

Geotextile

FT FT FT

Outlet EL.

Rock thickness

FT

DRAWING NOT TO SCALE

Pipe Dia.

Outside dimensions

Inside dimensions Pipe

ROCK PLUNGE POOL DETAIL

2.4

5.4

3 12 8

1.7

0.1

5.4

5.4

2.439.1

1.7

37.9

27.5 3.5

13 13

2 2

Note: Geotextile to meet the following Maryland State Highway Administration requirements:

PLAN VIEW

ISOMETRIC VIEW

SECTION A-A

SECTION B-B

A-AA-A

B-B

B-B

NOTES:

1. Please see MD_0913 or MD_0914 drawings for specifications on barrel and trash rack.

2. Structure to be reinforced with rebar and meet ASTM C913 "Standard Specifications for Precast Concrete Water and Wastewater Structures."

Design Specifications:

' X ' Concrete Riser (Inside Dimensions)

' X ' Concrete Riser (Outside Dimensions)

' Riser Inside Height

" Barrel Size

Barrel Material

Barrel Inlet El. (ft)' Riser Total Height

' Wall Thickness

' Base Thickness

CONCRETE RISER PIPE DROP DETAIL

NOT TO SCALE

3 3

4 4

4.5

0.5

0.5

HDPE

48.60

4.5

0.5 0.5

0.5

0.5

PROFILE

Note:

When installing barrel of pipe drop, there needs to be a minimum of 2ft of cover over pipe. Contractor to grade slopes of fill over pipe back into existing ground. Slopes steeper than a 3:1, erosion control matting shall be installed.

Existing ground

Existing grade to slope towards waterway

General notes:

· Remove topsoil prior to grading and stockpile outside limits of waterway construction

· Install excelsior type erosion control matting according to manufacture's recommendations. Matting shall meet minimum shear stress of 1.75 lb/ft² and maximum velocities of 7ft/s (see erosion control matting detail sheet for installation instructions)

· Erosion control matting width shall be a minimum of 2/3 of the waterway width or shown as above

· A minimum of 4" of topsoil shall be placed along entire length and width of constructed waterway

· Lime, fertilizer and seed shall be placed in waterway prior to installing erosion control matting (see seeding details)

· Waterway shall be maintained as needed to minimize erosion throughout the required maintenance life of 10 years

Depth

Width

Erosion control matting width

Proposed grassed waterway

TYPICAL CROSS SECTION

NOT TO SCALE

SWALE DETAIL

10'

8'

1'

" HDPE PIPE IN

ACCORDANCE WITH

(ASTM F449)

" Wide

Mound backfill to allow for settling

Soil backfill (backfill with machine)

Min. 2' depth over pipe

Backfill to min 6" over pipe using #57 stone or equal.

Ground

CONSTRUCTION NOTES

· ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321, "STANDARD

PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND

OTHER GRAVITY FLOW APPLICATIONS", LATEST ADDITION.

· PIPE SHALL BE BACKFILLED IN MINIMUM 6-8" LIFTS USING PROPER COMPACTION EQUIPMENT.

CROSS SECTION

NTS

HDPE PIPE BACKFILL DETAIL

4" FOR 12"-24" PIPE

6" FOR 30"-60" PIPE

39 MIN

CONCRETE RISER TRASH RACK DETAIL

Trash rack may be purchased as a unit or fabricated. If fabricated, openings shall be a minimum of 6" x 6" and a maximum of 10" x 10" in size.

DEPT. OF NATURAL RESOURCES- MARTINUK

Sheets and Views
DNR_PipeDrop-Index
DNR_PipeDrop-Plan Map & Grassed Waterway Details
DNR_PipeDrop-Grassed Waterway Profile-Cross Sections-Details
DNR_PipeDrop-Swale & Berm Profile- Drop Pipe Profile & Details
2023-09-29T15:05:44-0400
DANIEL POLITE (Affiliate)
2023-09-29T15:08:52-0400
DANIEL POLITE (Affiliate)
2023-09-29T15:09:50-0400
DANIEL POLITE (Affiliate)
2023-09-29T15:11:02-0400
DANIEL POLITE (Affiliate)

File details come from the government source that posted it. Updated .