Drawings_C26863016.pdf
PDF 8 MB Posted
- Solicitation number
- 0000040461
- Issued by
- San Luis Obispo County, San Luis Obispo City, California
About this file
Reservoir #3 Water Treatment Plant Upgrade at Hearst San Simeon State Historic Monument
This document is a set of architectural and engineering drawings prepared for the California Department of Parks and Recreation, Facilities and Development Division, for the Reservoir #3 Water Treatment Plant Upgrade project located at Hearst San Simeon State Historic Monument in San Simeon, California. The project involves upgrading water treatment infrastructure including mechanical, electrical, and structural improvements to the existing water treatment plant. The scope includes installation of new filtration panels, filter control systems, a variable frequency drive (VFD) for a booster pump, electrical panel modifications, and integration of new water quality analyzers and turbidity controllers. The project is in the Bid Set phase of design, with fire and panic approval dated August 14, 2026. The drawings indicate that contractors must conduct site visits to verify existing conditions and coordinate with the State Representative throughout construction. The site is accessed through and surrounded by a working ranch, requiring contractors to maintain gate security at all times.
The contract documents specify compliance with current California codes including Title 19 CCR for fire safety, the 2025 California Building Code, Electrical Code, Mechanical Code, Plumbing Code, Energy Code, and Green Building Standards, as well as The Secretary of the Interior's Standards for the Treatment of Historic Properties. No new, additional, or relocated quantities of hazardous materials are stored or used on site, eliminating the need for a Hazardous Materials Management Program. All contractors must prepare and submit fire prevention programs and emergency fire action plans prior to work commencement and maintain temporary fire protection measures throughout the project. Construction activities and equipment must be confined to designated staging and construction areas, with all disturbed surfaces restored to original conditions and positive drainage maintained. The contractor is responsible for obtaining deferred submittals, programming of the programmable logic controller (PLC), and coordinating with a system integrator for complete configuration of the operational water treatment system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Forms_C26863016.pdf | ||
| Project_Manual_C26863016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20 20
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T
Fi le
\w oo dr od ge rs .lo c\ Pr od uc tio nD at a\
Jo bs
\J ob s\
.0
_s ta te
_p ar ks _h ea rs t_ ca st le
_w tp
\G en
\D w g\ G
-0
TI
TL
E
SH
EE
T_
.d w g La yo ut
: L O
C
AT
IO
N
V
IC
IN
IT
Y
M
AP
S A
N D
S H
EE
T
IN
D
EX
D at e:
J ul y
- 2
:4 pm U se r:
lg ut ie rre z
CALIFORNIA DEPARTMENT OF PARKS AND RECREATION
FACILITIES AND DEVELOPMENT DIVISION
SITE ADDRESS
SHEET INDEX
LOCATION MAP
N
S
W E
DEFERRED SUBMITTALS
SCOPE OF WORK
PREPARED BY
WOOD RODGERS, INC.
3301 C STREET, BUILDING 100B
SACRAMENTO, CA 95816
VICINITY MAP
N
S
W E
1- ALL MATERIALS SHOWN OR NOTED ON THE PLANS ARE NEW UNLESS CALLED OUT OTHERWISE.
2- THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL EXISTING CONDITIONS SHOWN OR
DIMENSIONED HERE. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE STATE
REPRESENTATIVE FOR RESOLUTION BEFORE PROCEEDING WITH THAT PORTION OF THE WORK.
3- ALL WORK SHALL COMPLY WITH THE CURRENT EDITION OF THE FOLLOWING LISTED CODES, AND ALL
OTHERS HAVING JURISDICTION OVER THE WORK.
TITLE 19, CCR, PUBLIC SAFETY, SFM REGULATIONS.
2025 CA ADMINISTRATIVE CODE TITLE 24, PT 1.
2025 CA BUILDLING CODE (CBC) TITLE 24, PT 2.
2025 CA ELECTRICAL CODE (CEC) TITLE 24, PT 3.
2025 CA MECHANICAL CODE (CMC) TITLE 24, PT 4
2025 CA PLUMBING CODE (CPC) TITLE 24, PT 5.
2025 CA ENERGY CODE CCR TITLE 24, PT 6.
2025 CA GREEN BUILDING STANDARDS TITLE 24, PT 11.
2025 CA REFERENCED STANDARDS TITLE 24, PT 12.
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES.
4- CONDUCT ALL WORK IN ACCORDANCE WITH THE LATEST SAFETY RULES AND REGULATIONS OF ALL
AUTHORITIES AND AGENCIES HAVING JURISDICTION OVER THE WORK.
5- ALL WORK SHALL BE IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS. WHERE DETAILED INFORMATION OR CLARIFICATION IS REQUIRED, THE MATTER SHALL BE REFERRED TO THE STATE
REPRESENTATIVE FOR WRITTEN RESOLUTION.
6- THE CONTRACTOR SHALL NOT SCALE THE DRAWINGS, BUT SHALL RELY ONLY ON THE WRITTEN DIMENSIONS GIVEN. IF A DISCREPANCY OCCURS OR NO DIMENSION IS GIVEN, THE CONTRACTOR SHALL NOTIFY THE STATE REPRESENTATIVE FOR WRITTEN CLARIFICATION BEFORE PROCEEDING WITH THAT
PORTION OF THE WORK.
7. THE OFFICIAL CONTRACT DRAWINGS ARE 36" x 24" PRINTED IN GRAYSCALE TO SHOW THE LINE WORK OF EXISTING AND/OR FUTURE IMPROVEMENTS DRAWN IN GRAY. SCALES LISTED ON THE DRAWINGS ARE APPLICABLE TO 36" x 24" AND MUST BE ADJUSTED ACCORDINGLY WHERE REDUCED SIZE DRAWINGS ARE REFERENCED. USE OF DRAWINGS PRINTED TO NON-STANDARD SCALES OR IN PURE BLACK & WHITE IS
DONE AT-RISK.
8. UNLESS NOTED OTHERWISE, STANDARD DETAILS ARE TO BE USED WHERE THEY APPLY REGARDLESS AS
TO WHETHER THEY ARE SPECIFICALLY CALLED OUT.
9. ALL WORK TO CONSTRUCT THE IMPROVEMENTS SHOWN IN THE CONTRACT DOCUMENTS AND THAT
WHICH IS NOT SHOWN BUT NECESSARY TO CONSTRUCT THE IMPROVEMENTS SHOWN IS TO BE
PERFORMED BY THE CONTRACTOR UNLESS OTHERWISE NOTED.
10. ABSENCE OF A SPECIFICATION SECTION FOR A MATERIAL, EQUIPMENT, PRODUCT, ETC. SHOWN ON THE DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO PREPARE A SUBMITTAL AND PROVIDE SUCH ITEM AND DOES NOT CONSTITUTE A CHANGE ORDER. CONTACT THE STATE'S REPRESENTATIVE FOR CLARIFICATION BEFORE PREPARING THE SUBMITTAL, ORDERING THE ITEM, AND
PROCEEDING WITH THE AFFECTED WORK.
11.THE IMPROVEMENTS SHOWN ON THE DRAWINGS ILLUSTRATE THE GENERAL PLACEMENT OF THE WORK.
NOT ALL APPURTENANT PARTS OR ACCESSORIES REQUIRED BY THE MANUFACTURERS, THE
SPECIFICATIONS, OR BY APPLICABLE CODES ARE SHOWN. FURNISH AND INSTALL ALL SUCH ITEMS FOR A
PROPER, COMPLETE, AND FULLY FUNCTIONAL INSTALLATION IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS, THE APPLICABLE SPECIFICATION SECTIONS, AND THAT ARE REQUIRED
FOR CODE COMPLIANCE.
12. WORK PERFORMED MUST COMPLY WITH NFPA 241 AND CFC CHAPTER 33. PREPARE AND SUBMIT FIRE PREVENTION PROGRAM AND EMERGENCY FIRE ACTION PLANS AND PLACE TEMPORARY FIRE CONTROL MEASURES PRIOR TO THE START OF WORK AND MAINTAIN THEM FOR THE DURATION OF THE PROJECT.
SEE SECTION 015116 - TEMPORARY FIRE PROTECTION FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
13.CONFINE EQUIPMENT AND CONSTRUCTION ACTIVITIES TO THE STAGING AND CONSTRUCTION AREA
SHOWN ON THE DRAWINGS. PROMPTLY REPAIR DAMAGE TO EXISTING FACILITIES CAUSED BY
CONSTRUCTION ACTIVITY INCLUDING UNDERGROUND UTILITIES, AND CLEAN UP SPILLS AND STAINS
FROM EQUIPMENT LEAKS.
14.UNLESS OTHERWISE SHOWN, RESTORE ALL SURFACE AREAS DISTURBED BY CONSTRUCTION ACTIVITY IN KIND TO ORIGINAL LINE AND GRADE. ADJUST AS REQUIRED TO PROVIDE POSITIVE DRAINAGE AWAY FOR
NEW AND EXISTING IMPROVEMENTS. RESTORE PAVED AND CONCRETE SURFACES TO EXISTING
THICKNESS AND GRADE.
15.MAINTAIN THE JOB SITE AND AREAS ACCESSIBLE OR VISIBLE TO THE PUBLIC IN A CLEAN, SAFE, AND USABLE CONDITION. COLLECT AND CONTAIN ALL CONSTRUCTION DEBRIS, TRASH, AND WASTE MATERIAL DAILY. PROMPTLY REMOVE SPILLS OF FLUIDS, SOIL, AND ROCK. CONTAIN CONSTRUCTION DEBRIS, TRASH, AND WASTE MATERIAL WITHIN THE CONSTRUCTION AREA UNTIL DISPOSED OFF-SITE.
16.MAINTAIN SECURITY OF THE PROJECT SITE AND STAGING AREA AT ALL TIMES. PROVIDE TEMPORARY FENCING, GATE(S), BARRICADES, ETC., AS REQUIRED TO SECURE THE PERIMETERS AND TO PREVENT UNAUTHORIZED ENTRY. SECURE ALL GATES AT THE END OF EACH WORKDAY. SEE SPECIFICATION
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS FOR ADDITIONAL INFORMATION.
17.THE SITE IS ACCESSED THROUGH AND IS SURROUND BY A WORKING RANCH. KEEP GATES CLOSED AT
ALL TIMES.
RESERVOIR #3 WATER TREATMENT PLANT UPGRADE
HEARST SAN SIMEON STATE HISTORIC MONUMENT
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T
HEARST CASTLE
SUMMIT RD.
CABRILLO HWY
PROJECT
LOCATION
PROJECT LOCATION
RESERVOIR #3
HEARST CASTLE VISITOR CENTER
L. GUTIERREZ
K. GUSTORF
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T
E. GOSSE
G-01
LO
C
AT
IO
N
V
IC
IN
IT
Y M
AP
S, AN
D
S H
EE
T
IN
D
EX
7/28/2026
MECHANICAL EQUIPMENT ANCHORAGE TO CONCRETE
ELECTRICAL EQUIPMENT ANCHORAGE TO CONCRETE
HEARST SAN SIMEON STATE HISTORICAL MONUMENT
750 HEARST CASTLE ROAD
SAN SIMEON, CA 93452
NO NEW, ADDITIONAL, OR RELOCATED QUANTITIES OF HAZARDOUS
MATERIALS ARE STORED OR USED ON ANY SITE FOR THIS PROJECT.
THEREFORE, AND HAZARDOUS MATERIALS MANAGEMENT PROGRAM
(HMMP) OR UPDATES TO THE STATE'S EXISTING HMMP ARE NOT
REQUIRED FOR THIS PROJECT.
HAZARDOUS MATERIALS
IN STORAGE AND IN USE
CSFM #26-S-2887-C-AC
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
26-2887 mpatrick Text Box
EXEMPT
mpatrick Text Box mpatrick Text Box 8.10.26
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T
Fi le
\w oo dr od ge rs .lo c\ Pr od uc tio nD at a\
Jo bs
\J ob s\
.0
_s ta te
_p ar ks _h ea rs t_ ca st le
_w tp
\G en
\D w g\ G
-0
G
EN
ER
AL
N O
TE
S.
dw g
La yo ut : G
EN
ER
AL
N
O
TE
S D at e:
J ul y
- 2
:5 pm U se r:
lg ut ie rre z
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T
G-02
G
EN
ER
AL
N O
TE
S
7/28/2026
L. GUTIERREZ
K. GUSTORF
E. GOSSE
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
26-2887
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
Fi le
: J :\J ob s\
.0
_S ta te _P ar ks
_H ea rs t_
C as tle _W
TP
\G en \D w g\
G -0
G
EN
ER
AL
S
YM
BO
LS
A
N D
A
BB
R
EV
IA
TI
O N
S.
dw g La yo ut
: G
EN
ER
AL
S
YM
BO
LS
A N
D A
BB
R
EV
IA
TI
O
N S
D at e:
J ul y
- 4 :3 pm
U se r:
eg os se
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
G-03
G
EN
ER
AL
S
YM
BO
LS
A N
D
AB
BR
EV
IA
TI
O N
S
6/25/2026
L. GUTIERREZ
K. GUSTORF
E. GOSSE
7/9/2026
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
Fi le
: J :\J ob s\
.0
_S ta te _P ar ks
_H ea rs t_
C as tle _W
TP
\C iv il\
D w g\ C
-0
Ex is tin g
Si te
.d w g La yo ut
: S
IT
E
PL
AN
D at e:
J ul y
- 4
:5 pm U se r:
eg os se
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
MAINTENANCE ACCESS ROAD
(E) OPEN RESERVOIR
5/15/2026
L. GUTIERREZ
K. GUSTORF
E. GOSSE
(E) RESERVOIR #3
G-04
SI
TE
P
LA
N
7/9/2026
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
----8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
3' -0
" M
IN
4" 4"
3' -0
" M
IN
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
Fi le
\w oo dr od ge rs .lo c\ Pr od uc tio nD at a\
Jo bs
\J ob s\
.0
_s ta te
_p ar ks _h ea rs t_ ca st le
_w tp
\M ec h\ D w g\
G M
-0
M
EC
H
AN
IC
AL
D
ET
AI
LS
.d w g La yo ut
: M
EC
H
AN
IC
AL
D
ET
AI
LS
D at e:
J ul y
- 5 :5 pm
U se r:
eg os se
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
7/9/2026
L. GUTIERREZ
E. GOSSE
E. GOSSE
M
EC
H
AN
IC
AL
D
ET
AI
LS
GM-01
7/9/2026
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
2" 41
2"
8"
1'-3"
13'-6"3'-3"
MODELNUMBERTRADENAMEPRODUCTMATERIAL
MATERIALPRODUCTTRADENAMEMODELNUMBER
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
Fi le
: J :\J ob s\
.0
_S ta te _P ar ks
_H ea rs t_
C as tle _W
TP
\M ec h\
D w g\ M
-0
T R
EA
TM
EN
T
BU
IL
D
IN
G .d w g
La yo ut : T
R
EA
TM
EN
T
BU
IL
D
IN
G
IM
PR
O
VE
M
EN
TS
D at e:
J ul y
- 6
:0 pm U se r:
eg os se
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
M-01
TR
EA
TM
EN
T
BU
IL
D
IN
G
IM
PR
O
VE
M
EN
TS
7/9/2026
L. GUTIERREZ
E. GOSSE
E. GOSSE
7/9/2026
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
Fi le
: J :\J ob s\
.0
_S ta te _P ar ks
_H ea rs t_
C as tle _W
TP
\M ec h\
D w g\ M
-0
AN
AL
YZ
ER
P
AN
EL
.d w g
La yo ut : F
IL
TE
R S
YS
TE
M D
ET
AI
LS
D at e:
J ul y
- 6
:4 pm U se r:
eg os se
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: BID SET
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
M-02
FI
LT
ER
S
YS
TE
M D
ET
AI
LS
7/10/2026
L. GUTIERREZ
E. GOSSE
E. GOSSE
7/9/2026
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
SCALE:
POST BASE PLATE
1 1/2" = 1'-0"
S-01
SCALE:
FILTRATION PANEL FRAMING ELEVATION
1" = 1'-0"
B
S-01
SCALE:
FILTRATION PANEL ELEVATION
1" = 1'-0"
A
S-01
SOUTH ELEVATION SHOWN.
NORTH ELEVATION SIMILAR.
REFER TO MECH DWGS FOR LAYOUTS.
SCALE:
STRUT CONNECTIONS
AT BOTTOM OF POST
3" = 1'-0"
S-01
SCALE:
STRUT CONNECTIONS AT TOP OF POST
3" = 1'-0"
S-01
STRUCTURAL SHEET NOTES:
SCALE:
FRP PANEL CONNECTION
AT CHANNEL STRUT
3" = 1'-0"
S-01
FRONT VIEW SIDE VIEW
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE: 90% DESIGN
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
Fi le
\w oo dr od ge rs .lo c\ Pr od uc tio nD at a\
Jo bs
\J ob s\
.0
_S ta te
_P ar ks _H ea rs t_ C as tle
_W
TP
\S tru ct ur al \0
4_ D ra w in gs
\C ur re nt
S tru ct ur al D
W G s\ S-
.d w g
La yo ut : S tru ct ur al
D at e:
J un e
- 4 :5 pm
U se r:
ffr as ie r
8691.011
S-01 X15
FI
LT
ER
S
YS
TE
M
F. FRASIER
A. JOHNSON
D. SLAVIN
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
ST
R
U C
TU
R
AL
N
O
TE
S
AN
D D
ET
AI
LS
6/30/26
100%
7/9/2026
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
LE
TCE
JO
HN C. CALTON
LACIR
Fi le
: C :\U se rs
\k cn am \D oc um en ts
\C al to n
Pr oj ec ts
\H ea rs t C as tle
W
TP
\G E-
1_
E- 1_
.d w g
La yo ut : G
E-
D at e:
J un e
- 5 :1 pm
U se r:
kc na m
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE:
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
BID SET
6/12/2026
K. CHUNG
J. CALTON
J. CALTON
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
(D)
(RS)
(E)
EXISTING TO BE DEMOLISHED.
EXISTING TO BE REMOVED AND SALVAGED.
EXISTING TO REMAIN
GROUND FAULT RELAYGFR
CONTACT ACTION RETARDED ON DE-ENERGIZATION
TIME CONTACT
CONTACT ACTION RETARDED ON ENERGIZATION
TIME CONTACT
OR CONTROL PANEL
ELECTRICAL SYMBOLS - SCHEMATIC DIAGRAMS
NORMALLY
OPEN
NORMALLY
CLOSED DEVICE
CONTACT
PUSH BUTTON SINGLE CIRCUIT
LOCK-OUT
PUSH BUTTON SINGLE CIRCUIT
MOMENTARY CONTACT
LIQUID FLOAT LEVEL SWITCH
PRESSURE OR VACUUM SWITCH
FLOW SWITCH
TEMPERATURE SWITCH
SELECTOR SWITCH (H-O-A)
MOTOR OVERLOAD RELAY CONTACT
MOTOR OVERLOAD HEATER
PILOT LIGHT R=RED, W=WHITE
G=GREEN, A=AMBER
PILOT LIGHT-PUSH TO TEST
RELAY
TIME DELAY RELAY
STARTER COIL
SOLENOID OPERATED VALVE
MOTOR
BELL OR BUZZER
FUSE
CONTROL POWER TRANSFORMER
GROUND
WIRING IN MOTOR STARTER
OR CONTROL PANEL
FIELD WIRING
WIRE TERMINAL IN MOTOR STARTER
WIRE TERMINAL IN PLC
PHASE/POWER FAILURE RELAY
SPACE HEATER
RESISTOR
O.L.
A
R
R
TD
M
S
CIRCUIT BREAKER
F
MCP
100A
M
GW
GW
J
G
G
J
GROUND
MOTOR, 15 HORSEPOWER
"F" INDICATES FUSED, SEE PLANS FOR RATING
DISCONNECT SWITCH
FUSE
SWITCH
2S, 2W = 2 SPEED, 2 WINDING
FVNR=FULL-VOLTAGE NON-REVERSING
MAGNETIC MOTOR STARTER, NEMA SIZE INDICATED
3 POLE UNLESS NOTED
CIRCUIT BREAKER,
POWER TRANSFORMER
CURRENT TRANSFORMER, QUANTITY INDICATED
UTILITY METERING
WITH GROUND WELL. SEE DETAIL,
GW NEXT TO SYMBOL INDICATES GROUND ROD
GROUND ROD, 3/4" x 10'-0"
MOTOR CONNECTION
CONDUIT SEAL (HAZARDOUS LOCATION)
FLEXIBLE CONDUIT CONNECTION
CONDUIT STUB-OUT AND CAPPED
CONDUIT BENDS AWAY FROM OBSERVER
CONDUIT BENDS TOWARD OBSERVER
EXOTHERMIC WELD CONNECTION
GROUNDING CONDUCTOR 30" BELOW GRADE, #4/0 U.O.N.
CONDUIT EXPOSED
CAP, THREE CONDUITS OR LESS
CONDUIT IN SLAB OR UNDER CONCRETE
OR ONE LINE DIAGRAM FOR SIZE
FEEDER DESIGNATION SEE SCHEDULE
ELECTRICAL SYMBOLS - SINGLE LINE DIAGRAM
JUNCTION BOX
DUPLEX RECEPTACLE
AREA FLOOD LIGHT AND POLE
SYMBOLS DESCRIPTIONFLR.WALLCLG.
ELECTRICAL SYMBOLS - PLANS
POWER FAILURE RELAY
FLUORESCENT LIGHT FIXTURE
DISC DISCONNECT
AWG AMERICAN WIRE GAUGE
UNLESS OTHERWISE NOTEDUON
XFMR TRANSFORMER
CB CIRCUIT BREAKER
OVERLOADSO/L'S
MOUNTEDMT'D
GROUND FAULT CURRENT INTERUPTINGGFCI
PRESSURE TRANSDUCERPT
ELECTRICAL ABBREVIATIONS
VOLTV
TYPICALTYP
SACRAMENTO MUNICIPAL UTILITY DISTRICTSMUD
POLYVINYL CHLORIDEPVC
L
KILOVOLT AMPERESKVA
HAND OFF AUTOMATICHOA
DIRECT CURRENTDC
CONDUIT ONLYCO
CONDUITC
A AMPERES
G, GND GROUND
RVSS REDUCED VOLTAGE SOLID STATE
P POLE
UTILITY SERVICE
GRS GALVANIZED RIGID STEEL
HH HANDHOLE
PFR
PFR
X
E-Y Y- SHEET WHERE DETAIL IS DRAWN
DETAIL CALLOUT- X, DETAIL IDENTIFIER.
JUNCTION BOX OR PULLBOX
ALTERNATING CURRENTAC
AMPERES INTERRUPTING CAPACITY, SYMMETRICALAICS
BC BARE COPPER
CKT CIRCUIT
CURRENT TRANSFORMERCT
CPT CONTROL POWER TRANSFORMER
DWG DRAWING
EXISTINGE
ELEV ELEVATION
LIGHTING ARRESTORLA
LIGHTINGLTG
KILOWATTKW
MOTOR CONTROL CENTERMCC
MAIN CIRCUIT BREAKERMCB
MILLIAMPEREMA
MIN MINIMUM
N NEUTRAL
NO NORMAL OPEN
NC NORMAL CLOSED
PB PULL BOX, PUSH BUTTON
PH, Ø PHASE
RECP RECEPTACLE
SW SWITCH
TERMINAL BOARDTB
TSP TWISTED SHIELDED PAIR
W/ WITH
WEATHERPROOFWP
PS PRESSURE SWITCH
PROGRAMMABLE LOGIC CONTROLLERPLC
HP HORSEPOWER
HR HOUR
HERTZHz
RIGID STEEL CONDUITRGS
POWER QUALITY METERSHARK
FOUR CONDUITS OR MORE
CONCRETE ENCASED DUCT BANK
SS STAINLESS STEEL
HDG HOT DIPPED GALVANIZED
CAT CATEGORY 6 CABLE
FCP FILTER CONTROL PANEL
LONG
MOTOR CIRCUIT PROTECTORMCP
MS MOISTURE SENSOR
NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
SURGE PROTECTIVE DEVICESPD
PFR POWER FAIL RELAY
TEMPERATURE SWITCHTS
VOLTS ACVAC
YELLOWFOREIGN VOLTAGE
TERMINAL BLOCK COLOR CODE TABLE
DESCRIPTION TERMINAL BLOCK COLOR
WIRE COLOR CODE TABLE
PHASE/CODE LETTER
A480V, 3P
240V OR 208V, 3P
240/120V, 1P
AC CONTROL
DC CONTROL
NEUTRAL
GROUND
SHIELDED PAIR
N G
L1 L2
B C
C A
B
DESCRIPTION
BROWN
BLUE
RED
CLEAR (WHITE)
BLACK
GREEN
WHITE
RED
BLACK
BLUE
RED
BLACK
YELLOW
ORANGE
WIRE OR TAPE COLOR
AC WIRING
DC WIRING
BEIGE
PVC COATED GALVANIZED STEELPVC-GRS
GE-01
MODIFYM
SY
M
BO
LS
A N
D
AB
BR
EV
IA
TI
O N
S
AIR COMPRESSORA/C
FLA FULL LOAD AMPS
FT FLOW TRANSDUCER
LIGHTING PANELBOARDLP
PCP PLANT CONTROL PANEL
SV SOLENOID VALVE
VARIABLE FREQUENCY DRIVEVFD
X159
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
JO
HN C. CALTON
LACIR
Fi le
: C :\U se rs
\k cn am \D oc um en ts
\C al to n
Pr oj ec ts
\H ea rs t C as tle
W
TP
\G E-
1_
E- 1_
.d w g
La yo ut : G
E-
D at e:
J un e
- 5 :1 pm
U se r:
kc na m
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE:
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
BID SET
6/12/2026
K. CHUNG
J. CALTON
J. CALTON
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
A (E)PANELBOARD LP MODEL
GE-02
EX
IS
TI
N
G E
Q U
IP
M
EN
T
B SPACE FOR SUB PANEL LP-2 C (E)BUILDING CEILING
F (E)PCP BACK PANELD (E)PLANT CONTROL PANEL (PCP)
KEY NOTES:
EX PANELBOARD “LP”, WESTINGHOUSE B10 1224RT.
EX PLANT CONTROL PANEL (PCP).
COORDINATE LOCATION OF SUBPANEL “LP-2” WITH STATE
REPRESENTATIVE.
CONTRACTOR TO PROGRAM PLC AND CONFIGURE OIT FOR
ADDITIONAL PUMP AND FILTERS AND ANALYZERS FOR COMPLETE AND
OPERABLE WATER TREATMENT PLANT; WORK TO BE DONE BY SYSTEM
INTEGRATOR.
CONTRACTOR TO REPLACE ETHERNET SWITCH IN PCP WITH NEW ONE;
PROVIDE NEW RS-485 COMMUNICATION NETWORK FROM PLC TO NEW
WATER QUALITY CONTROLLERS, AND TIE IN EXISTING RS-485
NETWORKS. ADD 24V DC POWER SUPPLY FOR NEW FILTER CONTROL
PANELS, ADD TERMINAL BLOCKS AS REQUIRED. WORK TO BE DONE BY
SYSTEM INTEGRATOR.
LOCATION OF NEW CHEMICAL METERING PUMP.
ROUTE CONDUITS FROM "LP-2" AND FROM FCP ABOVE EXISTING
LIGHTING, SECURE TO BUILDING TRUSSES ON UNISTRUT SYSTEM.
LP-2
4 4
E (E)PCP SWING PANEL
X1510
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
GE-03
EX
IS
TI
N
G E
Q U
IP
M
EN
T
LE
TCE
JO
HN C. CALTON
LACIR
Fi le
: C :\U se rs
\k cn am \D oc um en ts
\C al to n
Pr oj ec ts
\H ea rs t C as tle
W
TP
\G E-
1_
E- 1_
.d w g
La yo ut : G
E-
D at e:
J un e
- 5 :1 pm
U se r:
kc na m
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE:
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
BID SET
6/12/2026
K. CHUNG
J. CALTON
J. CALTON
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
A (E)VFD AND (E)INFLUENT PUMP B TYPICAL (E)FILTERS C TYPICAL (E)FILTER CONTROL PANEL (FCP)
D TYPICAL (E)FCP BACK PANEL
KEY NOTES:
REMOVE EXISTING VFD AND REPLACE WITH NEW VFD. PROVIDE
EXISTING VFD TO STATE REPRESENTATIVE RECONNECT CABLES TO
PCP AND PRESSURE TRANSDUCER. CONNECT NEW LINE SIDE
CONDUIT AND CABLE FROM SUBPANEL LP-2. PROVIDE NEW CONDUIT
AND CABLE TO NEW BP-1 MOTOR TERMINATION BOX. CONFIGURE VFD
FOR PRESSURE SETPOINT AND CONTROL. ADJUST CONDUITS TO FIT
NEW VFD.
PICTURES OF EXISTING EQUIPMENT FOR INFORMATION ONLY.
CONTRACTOR RESPONSIBLE TO FIELD VERIFY EXISTING EQUIPMENT
FOR NEW FILTER EQUIPMENT, AND PROVIDE NEW FILTER CONTROL
PANELS (FCP) AND EQUIPMENT BASED ON APPROVED SUBMITTALS.
PICTURES OF EXISTING EQUIPMENT FOR INFORMATION ONLY.
PROVIDE ALL REQUIRED ELECTRICAL CONDUITS AND CABLES AND
EQUIPMENT AND ANALYZERS FOR COMPLETE AND OPERABLE FILTER
SYSTEM, TYPICAL OF NEW EQUIPMENT.
PICTURES OF EXISTING EQUIPMENT FOR INFORMATION ONLY.
CONTRACTOR TO PROVIDE AND INSTALL FILTER CONTROL PANELS,
COMPLETE WITH PROGRAMMING AND COMMUNICATIONS BACK TO
PCP. FILTER CONTROL PANELS, PROGRAMMING, AND COMMUNICATION
CONFIGURATION WORK, ALL TO BE DONE BY SYSTEM INTEGRATOR VIA
CONTRACTOR. CONDUITS AND CABLES BY CONTRACTOR.
REMOVE (E)20A/2P BREAKER AND INSTALL 60A/2P EATON #BRX260.
PROVIDE BLANK PLATES WHERE EXISTING TAPE IS LOCATED.
PROVIDE NEW NAMEPLATE WHERE "VFD" IS, INSCRIBED "SUBPANEL
LP-2".
E TYPICAL (E)FILTER COMPRESSOR
3 4
3 4
F (E)PANELBOARD "LP"
X1511
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
JO
HN C. CALTON
LACIR
Fi le
: C :\U se rs
\k cn am \D oc um en ts
\C al to n
Pr oj ec ts
\H ea rs t C as tle
W
TP
\G E-
1_
E- 1_
.d w g
La yo ut : E
-0
D at e:
J un e
- 5 :1 pm
U se r:
kc na m
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE:
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
BID SET
6/12/2026
K. CHUNG
J. CALTON
J. CALTON
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
E-01
NOTES:
1. EXISTING PANELBOARD "LP" SCHEDULE FOR INFORMATION
ONLY.
2. MAKE MODIFICATIONS TO "LP" AS SHOWN IN MODIFIED
SCHEDULE. COORDINATE SHUTDOWN OF VFD WITH STATE
REPRESENTATIVE.
3. VFD SIZED FOR SINGLE PHASE TO THREE PHASE CONVERSION.
PROVIDE AMPACITY SHOWN. VFD TO BE WIRED AND
CONFIGURED FOR CONSTANT PRESSURE CONTROL. PROVIDE
CAPACITORS AT VFD AS REQUIRED. SI
N G
LE
L
IN
E
AN
D
PA
N
EL
BO
AR
D
S C
H
ED
U
LE
S
SINGLE LINE DIAGRAM
50A 2P
VFD
18A
BP-1
240V, 3 PH
11 FLA
3/4"(3#12, #12G)
3/4"(2#6, #8G)
60A 2P
SPD
SEE MODIFIED SUB-PANEL LP
SCHEDULE TO LEFT
SUB -PANEL "LP-2"
(E)PANELBOARD "LP"
100A, 120/240VAC, 1PH, 3W
100A, 120/240VAC, 1PH, 3W
100A 2P
(E)15KVA TRANSFORMER
480-120/240VAC, 1PH, 3W
(E)100A DISC SWITCH
(E)480VAC, 1PH
NOTE 1
NOTE 2
(E)120/240VAC, 1PH, 3W
SEE SUB-PANEL LP-2 SCHEDULE BELOW
60A 2P
NOTE 3
1" (2#4, #4N, #8G)
PT
(E)PRESSURE
TRANSDUCER
X1512
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
JO
HN C. CALTON
LACIR
Fi le
: C :\U se rs
\k cn am \D oc um en ts
\C al to n
Pr oj ec ts
\H ea rs t C as tle
W
TP
\G E-
1_
E- 1_
.d w g
La yo ut : E
-0
D at e:
J un e
- 5 :1 pm
U se r:
kc na m
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE:
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
BID SET
6/12/2026
K. CHUNG
J. CALTON
J. CALTON
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
E-02
TREATMENT BUILDING
TR
EA
TM
EN
T
BU
IL
D
IN
G
PO
W
ER
A
N D
C O
N
TR
O L
PL
AN
SCALE: 3/4" = 1'-0"
GENERAL NOTES:
1. LOCATIONS OF EQUIPMENT AND CONDUIT ROUTINGS ARE APPROXIMATE. FINAL
LOCATIONS AND ROUTINGS SHALL BE APPROVED IN FIELD WITH STATE
REPRESENTATIVE.
2. ALL EXPOSED CONDUITS AND FITTINGS TO BE PVC SCH 40, UNLESS SHOWN
OTHERWISE, OR WHERE FLEXIBLE METAL SEALTIGHT CONDUIT REQUIRED.
3. ALL HARDWARE, STRUT, STRAPS, AND ANCHORS SHALL BE 316 STAINLESS STEEL.
4. ALL CONDUITS AND CABLES SHALL BE LABELED AT BOTH ENDS. PROVIDE
NAMEPLATES ON ALL EQUIPMENT AND INSTRUMENTS. PROVIDE LABELS ON ALL
WIRES.
5. ALL DETAILS APPLY EVEN IF NOT CALLED OUT.
6. MAXIMUM LENGTH OF FLEXIBLE METAL SEALTIGHT CONDUIT IS 18” UNLESS NOTED
OTHERWISE.
7. CONTRACTOR MAY COMBINE CABLES IN SINGLE CONDUIT; SIZED PER NEC.
KEY NOTES:
PROVIDE NEW BREAKER IN EX PANELBOARD LP. REFER TO SINGLE LINE DIAGRAM, DWG
E-01. COORDINATE SHUTDOWN WITH STATE REPRESENTATIVE.
INSTALL SUBPANEL “LP-2” SO TOP OF PANEL IS 72” AFF, WITH FINAL LOCATION PER
STATE REPRESENTATIVE.
FIELD ROUTE CONDUITS OVERHEAD AND ATTACH TO EXISTING TRUSSES WITH
UNISTRUT SYSTEM.
PROVIDE AND INSTALL NEW VFD FOR BOOSTER PUMP BP-1. CONFIGURE VFD BASED ON
MOTOR NAMEPLATE DATA, AND FOR PRESSURE SETPOINT AND CONTROL. VFD SHALL
CONVERT SINGLE PHASE TO THREE PHASE.
ADJUST EXISTING CONDUITS TO ALLOW FOR WALL MOUNT VFD. CONDUITS TO ENTER
BOTTOM OF VFD ENCLOSURE.
REFER TO EXISTING EQUIPMENT DWG GE-02 FOR ADDITIONAL WORK.
REFER TO EXISTING EQUIPMENT DWG GE-03 FOR ADDITIONAL WORK.
DEMOLISH EXISTING VFD AND INFLUENT PUMP AND MOTOR, PROVIDE TO STATE
REPRESENTATIVE. INSTALL NEW VFD AND PUMP.
REFER TO DWG E-03 FOR TYPICAL FILTER INTERCONNECTIONS.
COORDINATE CONFIGURATION OF TURBIDITY CONTROLLER AND CHLORINE ANALYZER
WITH STATE REPRESENTATIVE AND SYSTEM INTEGRATOR.
PROVIDE “T” CONDULET AND CONTINUE 3/4" (#12, #12N, #12G) TO TURBIDITY
CONTROLLER AND TO CHLORINE ANALYZER.
USE EXISTING CONDUIT AND CABLE BETWEEN PCP AND VFD FOR BP-1. MODIFY ENDS
OF CONDUITS AS REQUIRED TO CONNECT TO VFD.
RECONNECT PRESSURE TRANSDUCER TO NEW VFD FOR BP-1.
PROVIDE “T” CONDULET AND CONTINUE 3/4" (2-RS-485, #14G) TO TURBIDITY
CONTROLLER AND 3/4" (2-RS-485, #14G) TO CHLORINE ANALYZER FROM PCP.
PROVIDE CONDUIT AND CABLE SHOWN TO (E)J-BOX BELOW PLANT CONTROL PANEL.
MAY USE (E)CONDUITS IF CAPACITY PER CEC. REFER TO NAOCL INJECTION PUMP
INTERCONNECIONS ON DWG E-04. CONTINUE SPEED COMMAND SIGNAL TO NAOCL
PUMP #2 LOCATED NEXT TO (E)NAOCL PUMP BELOW PCP.
A E-
B E-
M
J
J
3/4"(2#12, 2#12N, #12G)
1"(2#4, #4N, #8G)
3/4"(2#6, #8G)
(TYP)
3/4"(#12, #12N, #12G)
(TYP)
TO PCP
BP-1 VFD,
WALL MOUNT
74 8
BP-1
3/4"(3#12, #12G)
FCP
#9 & #10
FCP
#5 & #6
FCP
#7 & #8
7 9
7 9
TO BP-1 VFD
TYPICAL FILTER
CONTROL PANEL
(FCP)
3/4"(CAT6, 4#14, #14G)3/4"(CAT6, 4#14, #14G)
3/4"(CAT6, 4 #14, #14G)
3/4"(2-RS-485, #14G)
(E)PANELBOARD "LP"
SEE DWG E-01 FOR
SCHEDULE
(E)PLANT
CONTROL
PANEL (PCP) 6
SUBPANEL "LP-2"
SEE DWG E-01
FOR SCHEDULE 2 6
CHLORINE
ANALYZER
TURBIDITY
CONTROLLER
(E)PRESSURE
TRANSDUCER
3/4"(EXIST MANU
CABLE)
3/4"(2#16 TWSP, 2#12, #14G) 15
M
CHEMICAL
METERING PUMP
(BELOW PCP)
X1513
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
JO
HN C. CALTON
LACIR
Fi le
: C :\U se rs
\k cn am \D oc um en ts
\C al to n
Pr oj ec ts
\H ea rs t C as tle
W
TP
\G E-
1_
E- 1_
.d w g
La yo ut : E
-0
D at e:
J un e
- 5 :1 pm
U se r:
kc na m
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE:
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
BID SET
6/12/2026
K. CHUNG
J. CALTON
J. CALTON
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
E-03
TYPICAL FILTER "FCP" INTERCONNECTION DIAGRAM
TR
EA
TM
EN
T
BU
IL
D
IN
G
SE
C
TI
O
N A
N D
D
ET
AI
LS
SV
SV
SV
SV
SV
SV
SV
PT
PT
FT
SV
SV
SV
SV
SV
SV
SV
PT
PT
FT
A/C
#12, #12N, #12G, 6#14
TYP FILTER EQUIPMENT,
REFER TO DWG M-02 FOR
ACTUAL FILTER LAYOUT
FCP
FILTER
J-BOX
FILTER
J-BOX
2#14, #14G
(TYP)
MANU CABLE
MANU CABLE
MANU CABLE
FILTER TOP
FILTER BOTTOM
BACKWASH
2#14, #14G
(TYP)
AIR
COMPRESSOR,
1 A/C PER
FILTER PAIR
#12, #12N, #12G
TYP FILTER EQUIPMENT,
REFER TO DWG M-02 FOR
ACTUAL FILTER LAYOUT
#12, #12N, #12G, 6#14
2#14, #14G
(TYP)
MANU CABLE
MANU CABLE
MANU CABLE
FILTER TOP
FILTER BOTTOM
BACKWASH
2#14, #14G
(TYP)
120VAC
FROM LP-2
COMMS
TO PCP
PANEL BY SYSTEM
INTEGRATOR, PART
OF WORK
CAT6, 4#14, #14G#12, #12N, #12G
NOTES:
1. PROVIDE CONDUITS AND CONDULETS AS REQUIRED, NOT SHOWN
FOR CLARITY. SIZE CONDUITS PER CEC.
2. FINAL WIRE SIZES AND QUANTITIES SHALL BE BASED ON
APPROVED SUBMITTALS.
3. SOLENOID VALVES SHALL BE SIMILAR MAKE AND MODELS AS
EXISTING FILTERS 1-4.
SCALE: 1" = 1'-0"
FILTRATION PANEL NORTH ELEVATION VIEW - FILTERS 8, 9, & 10A
SCALE: 1" = 1'-0"
FILTRATION PANEL SOUTH ELEVATION VIEW - FILTERS 5, 6, & 7B
FCP
#9 & #10
FCP
#7 & #8
FCP
#5 & #6
A/CA/C
J
J
"T" CONDULET
(TYP)
FILTER
J-BOX
FILTER
J-BOX
A/C
F #9
F #10
F #8
F #7
F #6
F #5
CHLORINE
ANALYZER
TURBIDIMETER
CONTROLLER
FILTER
J-BOX
(TYP)
TYPICAL WELLSPRING
UNITS, SEE DWG
M-02 FOR DETAIL
FILTER
J-BOX
FILTER
J-BOX
FILTER
J-BOX
FILTER
J-BOX
PRESSURE
TRANSDUCER
(TYP)
FLOW
TRANSMITTER
(TYP)
X1514
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
JO
HN C. CALTON
LACIR
Fi le
: C :\U se rs
\k cn am \D oc um en ts
\C al to n
Pr oj ec ts
\H ea rs t C as tle
W
TP
\G E-
1_
E- 1_
.d w g
La yo ut : E
-0
D at e:
J un e
- 5 :1 pm
U se r:
kc na m
SHEET NO.
OF
DRAWN:
REVISIONS
CHECKED:
DATE
DESIGNED:
DATE:
FACILITIES AND
DEVELOPMENT DIVISION
PROJECT MILESTONE:
DPR ACCESSIBILITY COMPLIANCE REVIEW
ACCESSIBILITY COMPLIANCE AND SFM SIGNED
ORIGINALS ARE ON FILE AT THE DEPARTMENT OF
PARKS & RECREATION, NORTHERN SERVICE CENTER
Certification #
Reviewed by
DateCASp#
BID SET
6/12/2026
K. CHUNG
J. CALTON
J. CALTON
W
AT
ER
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
H
EA
R
ST
C
AS
TL
E
ST
AT
E
PA
R K
E-04
IN
TE
R C
O N
N
EC
TI
O
N D
IA
G
R
AM
S
DIGITAL
INPUTS
(N)ETHERNET
SWITCH
G
DI
DI
DI
DO
COM
DIGITAL
OUTPUTS
RS-485
SIGNALS
ON PLC
(E)PLC I/O
24VDC
POWER
SUPPLY
PT
1327 18
U
G
Y
R
G
L2
L1
G
G
N
L
G
N
L
S1+
S1-
S2+
S2-
PLC
G
N
L
N
G
15A/1P
FILTER CONTROL
PANEL (TYP OF 3)
CAT6
#14 24VDC
#14 COM
#14 GND
50A/2P
N
G
15A/1P
N
G
15A/1P
#14 2 SPARES
24VDC
INPUT
#12 L
#12 N
#12 GND
CKTS 3, 5 , 7 (TYP)
REFER TO SCHEDULE
ON DWG E-001
CKTS 10
REFER TO SCHEDULE
ON DWG E-001
CKT 1
REFER TO SCHEDULE
ON DWG E-001
CKT 2/4
REFER TO SCHEDULE
ON DWG E-001
#12 L
#12 N
#12 GND
#12 L
#12 N
#12 GND
#6 L1
#6 L2
#8 GND
FIELD LP-2PLANT CONTROL PANEL
(N)FUSE BLOCKS AND
TERMINAL BLOCKS
TO (E)TURBIDITY
CONTROLLER
AND ANALYZER
COIL END
+24VDC
(E)PRESSURE
TRANSDUCER
JUMPERS
(TYP)
HAND
AUTO
RUN
VFD
CHLORINE
ANALYZER
TURBIDITY
CONTROLLER
RS-485
RS-485
RS-485
RS-485
RS-485
"T" CONDULET
AT FILTRATION
PANEL
"T" CONDULET
AT FILTRATION
PANEL
CALL TO
START #12 T1
#12 T2
#12 T3
#12 GND
M
5HP
BOOSTER
PUMP "BP-1"
120VAC
INPUT
120VAC
INPUT
120VAC
INPUT
120VAC
INPUT
(E)CABLES
(E)MANU
CABLE
USE (E)I/O OR NEW,
PER STATE
REPRESENTATIVE
KEY NOTES:
PROVIDE NEW DUPLEX RECEPTACLE NEAR EXISTING. LABEL EACH
RECEPTACLE SAME AS EXISTING. PROVIDE WHILE IN USE COVER.
CURRENT SWITCH VERTIS H300 OR EQUAL.
REFER TO MECHANICAL DRAWINGS FOR LOCATION.
CAPACITORS, AS REQUIRED, NOT SHOWN. COORDINATE WITH VFD
SUPPLIER.
ANALOG
OUTPUT
SH
TS3
DIGITAL
INPUT
TS4
DIGITAL
OUTPUT
RELAY
TS4
NAOCL
PUMP 2
SPEED
NAOCL
PUMP 2
RUNNING
NAOCL
PUMP 2
CALL
#16 TWSP
#16 TWSP
#12 AWG
#12 AWG
NAOCL
PUMP 2
(SPEED
COMMAND)
(E)120V IN J-BOX
(AUTO) H
(HAND) H
N
HAND
AUTO
SPLICE
SPLICE
H N
ON SHELF NEXT
TO (E)NAOCL PUMP
(E)J-BOX
BELOW PCP,
MODIFY AS
SHOWN
CORD GRIP
FITTING
X1515
R
ES
ER
VO
IR
W
AT
ER
T R
EA
TM
EN
T
PL
AN
T U
PG
R
AD
E
H
EA
R
ST
S
AN
S
IM
EO
N
S
TA
TE
H
IS
TO
R
IC
M O
N U
M
EN
T R
ES
ER
VO
IR
W
AT
ER
T
R
EA
TM
EN
T
PL
AN
T
U
PG
R
AD
E H
EA
R
ST
S
AN
S
IM
EO
N S
TA
TE
H
IS
TO
R
IC
M
O N
U M
EN
T
8691.011
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
8/14/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject
| 02-0001-G-01-TITLE SHEET |
| 02-0002-G-02-GENERAL NOTES |
| 02-0003-G-03-GENERAL SYMBOLS |
| 02-0004-G-04-SITE PLAN |
| 02-0005-GM01-MECHANICAL DETAILS |
| 02-0006-M-01-TREATMENT BUILDING IMPROVEMENTS |
| 02-0007-M-02-FILTER SYTEM DETAILS |
| 02-0008-S-01-STRUCTURAL NOTES AND DETAILS |
| 02-0009-GE-01-SYMBOLS AND ABBREVIATIONS |
| 02-0010-GE-02-EXISTING EQUIPMENT 1 |
| 02-0011-GE-03-EXISTING EQUIPMENT 2 |
| 02-0012-E-01-SINGLE LINE AND PANELBOARD SCHEDULES |
| 02-0013-E-02-TREATMENT BUILDING POWER AND CONTROL PLAN |
| 02-0014-E-03-TREATMENT BUILDING SECTION AND DETAILS |
| 02-0015-E-04-INTERCONNECTION DIAGRAMS |
File details come from the government source that posted it. Updated .