Drawings_B664 Harney Gym_Phase II 07.30.25.pdf
PDF 9 MB Posted
- Attached to
- Harney Gym Renovations Ft Leavenworth
- Solicitation number
- W91QF425BA012
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A0 Title Sheet, Code Information A1 Demolition - Floor Plan & Notes A2 Demolition - Reflected Ceiling Plan A3 Wall Typies, Millwork Elevation, Section A4 Construction Floor Plans A5 Construction - Reflected Ceiling Plan A6 Enlarged Plans, Interior Elevations, Sections A7 Floor Finish Plan A8 Wall Finish Plan A9 Roof Finish and Door Schedules A10 Architectural Specifications A11 Architectural Specifications A12 Construction Phasing and Access Plan S1 Structural - Construction Plan S2 Structural - Details and Notes M1 Mechanical Symbols & Notes M2 General Specifications M3 Mechanical Specifications M4 Mechanical Plans M5 Mechanical Schedule P1 Plumbing Notes and Specs P2 Plumbing Specifications P3 Plumbing Demolition P4 Construction - New Sewer Floor Plan P5 Construction - New Domestic Water Floor Plan P6 Plumbing Details E1 Electrical General Notes, Symbols & Abbreviations E2 Electrical Demolition Plan E3 Power Plan E4 Lighting Demolition Plan E5 Lighting and Ceiling Devices Plan E6 Electrical Specifications E7 Electrical Panel Schedules E8 CLIN 2- Main Distribution Panel Replacement F1 Fire Alarm Demo F2 Fire Alarm Plan T1 Telecommunications - Floor Plan T2 Telecommunications - Room Plan & Elevations T3 Telecommunications - Rack Elevations T4 Telecommunications - Specifications
Harney Gym (Sports Complex) 185 4th Street Fort Leavenworth, KS 66027
G ra nt A ve
Cody Rd.
Iowa Ave.
4th Street
Bowling Center
Dining Facility
Hotel
Commissary
Occupancy Types:
A-4 Swiming Pools - No Change A-4 Gymnasium (with spectator seating) - No Change A-3 Gymnasium (without spectator seating) - No Change (only changes are to the Core areas with locker rooms small storage, common corridors, etc.)
Construction Type: IIB - non-protected, non-combustible
A - 15,500 SF allowable + separation B - 9,500 SF allowable + separation
Allowable Fire Areas:
Aa = [ At + (NS * lf) ] * Sa= [9500+(9500*0.75)]*1=16,625 SF
Fire Areas: West Gymnasium 9,680 SF Central Commons 7,481 SF Central Level 2 8,006 SF
East Gymnasium 9,277 SF Natatorium (Pool) 11,135 SF
Fire Areas Separation: 2-hour with 90 min. openings Stair: 2018 Life Safety Code, Section 713 Shaft Enclosures 1023
1023.2 - 1 hour where connecting less than four stories.
Existing doors are rated. New Doors to match.
Project Scope Area: 2,253 SF
Code: WBDG - Whole Building Design Guide UFC 1-200-01 09-01-2022, Change Date 02-24-2023
2021 IBC, 2021 IEBC
except 2018 Life Safety Code in lieu of Chapter 10 except 2010 ABA in lieu of Chapter 11
Occupancy Load:
1st Pool Water surface 4,820 SF @ 50sf/p 97 p.
Deck 3,832 SF @ 30sf/p 128 p.
Storage (pool corridor) 191 SF@300/sf/p 2p Lobby Desk area 238 SF @ 150sf/p 2p Pool Break Rm 199 SF@ 15sf/p 14p Corridors 1,395 SF @ 150sf/p 10p ABA Shower 90 SF @ 50sf/p 2p Total Pool Fire Area (10,764 SF) 255 p
Gymnasium NW 8,099 SF @ 50sf/p 162 p Gymnasium NE 9,244 SF @ 185 p Core1 Locker & Toilet Rooms 4,521 SF @ 50sf/p 91p
Storage/Boiler 1,027 SF @ 300sf/p 4p Corridors 1,663 SF @ 50sf/p 33p Offices 242 SF @ 150sf/p 2p Total Core 1st Floor 7,453SF 130p
Total 1st Floor 732 p
2nd Exercise 3,192 SF @ 50sf/p 64 p.
Mechanical 2,000 SF @ 500sf/p 4 p.
Racquetball Rooms 2 @ 4p 8 p.
Total 2nd Floor 76 p
3rd Total 3rd Flr. Gallery/Hall 433 SF @ 15sf/ 29 p Total Occpant Load 837 p
Area First Floor: 37,542 SF Second Floor: 9,150 SF Mezzanine: 725 SF Total Area: 47,417 SF
Areas with One Exit: 39.2.4.2, 39.2.5.3.2&3 - 30p./ 75 Ft.max Egress from modified pool locker rooms Women's Pool Locker Area 1,058 SF @ 50sf/p = 23 p.
Men's Pool Locker/Unisex 767 SF @ 50sf/p = 16 p.
Common Path of Travel - Life Safety Code - 13.2.5.1.2 Allowable for up to 50 people 75 FT Actual common path of travel 63 FT
Dead End Corridor - 20 FT Max. for non-sprinkled building.
PLUMBING COUNTS 837p. (25% Women: 207p., 75% Men 630p.)
REQUIRED
Pool Area: 255p: 64 Women (25%), 191 Men (75%)
Toilets 1/40p Women x 64p = 1.6 1/75p Men x 191p = 2.6
Lavatories 1/150p Women = 0.4 1/200p Men 1.0
Gymnasiums: 582p: 146 Women (25%), 436 Men (75%) Toilets 1/65 Women x 146p = 2.3
1/125 Men x 436p = 3.5 Lavatories 1/200 Women x 146p = 0.8
1/200 Men x 436p = 2.2 Total Required: Provided (after Phase II):
Toilets Women = 4 (3.9) 5 Men = 7 (6.1) 12 = 7 toilets + 5 urinals Unisex = 3
Lavatories Women = 2 (1.2) 7 Men = 4 (3.2) 8 Unisex = 3
Corridor Walls = 1 hour in non-sprinkled building Doors in Corridor Walls 1/3 hour (20 min.) "maximum size tested in accordance with ASTM E119 in accordance with 2018 IBC Section 716.1.2.3
Building is NOT sprinklered Plans were prepared in accordance with the Designer's understanding of the Architectural Barriers Act (ABA).
Pool Corridor
2-Hour Fire Barrier
1-Hour Fire Barrier
2-Hour Fire Barrier
1-Hour Fire Barrier
CODE PLAN KEY
Building Area Separation
Corridors
Project Area
2,253 SF
Central Common Spaces
7,481 SF
East Gym
9,277 SF
West Gym
9,680 SF
Natatorium (Pool)
11,135 SF
Project Scope Area
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R A
TE
O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
A N
C H
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
M ar qu ar dt
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
C on str uc tio n D ra wi ng s
M cC
LE
LL
A N
A
VE
FO
R T
LE
A
VE
N
W O
R
TH
, K S
7-
A0
Ti tle
S he et , C od e
In fo rm at io n
H ar ne y
Sp or ts C om pl ex
Fo ut h
St re et Fo rt Le av en w or th , K an sa s
C O
M M
O N
A R
EA
S
D es ig ne r
Au th or
C he ck er
J ul y
FORT LEAVENWORTH
DIRECTORATE OF PUBLIC WORKS
BUILDING 664 Harney Gym 185 Fourth Street
Code Information Summary
Sheet List
1 : 1
B5 Drawing Index
1 : 1
C4 Location Map
100% CONSTRUCTION DRAWINGS - 25 July 2025
3/64" = 1'-0"
A1 Floor 1 - Partial Code Plan
M
AR
K D
ES
C
R
IP
TI
O
N D
E
Storage, Area not in contract
Storage, Area not in contract
Women's Pool Locker Room not in contract
Men's Pool Locker Room not in contract
Admin. Office not in contractMen's Sauna not in contract
Men's Locker Room not in contract
Men's Locker Room not in contract
Stair not in contract
Storage, Area not in contract
Remove floor tile and 2" to 3" +/- thick "mud" cap on concrete floor in locker room to be new Storage and Comm. Rooms.
Re: Construction Plan.
D-13Existing lockers and attached bench to west of new wall to remain.
Re: Construction Floor PLan.
Re: Construction Floor plan for new closer pieces/trim to existing lockers and seat trim Contractor to be careful so as not to damage extra floor tile in existing locker room to remain
These portions of Women's Locker Room not in contract
Remove all finishes throughout Area of Work including but not limited to quarry tile with "mud "cap" setting bed, VCT, ceilings, etc.
Set Steel lintel in place before removal of masonry, Re: Structural
Structural Note: Shore-up, remove and replace structural masonry wall for door and frame installation with overhead matching masonry lintel. Tooth-in masonry at door jambs to match existing adjacent construction at door frames. Re: Construction Plan.
Re: Structural Drawings.
Structural Note: Remove concrete to make space for new windows. Re: Construction Plan.
Re: Structural Notes.
Remove 6" CMU wall 8" past new corners Re: Construction Plan for toothing in new bull-nosed half lap CMU outside corners to match existing nearby detail.
3'
- 8
8'
- 9
3'
- 8
3'
- 4
D-01
D-02
D-03
D-11
4' - 0" 3' - 4"
D-05
Structural wall to remain. DO
NOT REMOVE
Structural wall to remain.
DO NOT REMOVE
D-11
4'
- 0
7'
- 3
Structural Note: Remove concrete to make space for new window. Re: Construction Plan.
Re: Structural Notes.
D-04
D-11
D-21
D-21
D-21
D-06
D-06
D-21Existing doors and walls to remain unless noted otherwise
D-21
D-21D-21 Existing doors and walls to remain unless noted otherwise. Paint Mens alcove three walls P-6, except not 8" by corners
Existing doors and walls to remain unless noted otherwise Existing walls and doors to remain, unless noted otherwise
Existing walls to remain, unless noted otherwise
Existing walls to remain, unless noted otherwise
D-22
D-07
D-07
D-07
D-08
D-08
D-08
D-09
D-10
Paint Women's alcove three walls P-6, except not 8" by outside corners.
Verify all with COR
DEMOLITION PLAN - KEY NOTES
D-01 Remove toilets (Re: Plumbing) along with all related toilet partitions and related piping, toilet paper dispensers, etc.
D-02 Remove urinals (Re: Plumbing) along with all related toilet partitions and related piping.
D-03 Remove lavatories and related counter, faucets. Re: Plumbing.
D-04 Remove Trophy case and related CMU walls.
D-05 RE: STRUCTURAL DRAWINGS. Once lintel is in place, Remove Load- Bearing CMU wall.
D-06 Remove existing drinking fountain. Re: PLumbing.
D-07 Remove all 6" quarry floor tile in Lobby and 2" ceramic floor tile in Men's Room to be removed, along with all related 2" +/- setting mortar (Mud) bed throughout.
D-08 Remove all quarry wall tile, including wall base, in Lobby and 2" ceramic wall tile, including wall base, in Men's Room throught each.
D-09 Remove existing janitor's floor sink. Re: Plumbing.
D-10 Relocate existing plumbing behind CMU wall to be removed. Re: Plumbing D-11 Remove CMU wall, doors, frames and related finishes up to structural deck above. Verify wall is not a structural wall and is not supporting any other elements prior to removal. Re: Construction Plan. Re: Electrical.
D-21 Remove existing door, frame and all related hardware.
D-22 Remove restroom partitions at toilets and urinals, typical throughout room.
D-31 Remove 2x2 ceramic floor tiles, wall tiles and coved wall base tiles, including horizontal and vertical setting beds throughout room (Re: note on removal of "mud" mortar base below tile). Make smooth and prepare for new work. Re: Construction Plan and Finish Schedule.
D-32 Remove VCT flooring and related rubber base throughout space, including any transitions strips.
D-33 D-34 Remove orange-red quarry tile flooring and base where required for new walls for expanded Office. Salvage quarry tile to patch in where corriodor double door frame and jambs/wall removed.
D-35 Remove door threshold and related appurtenances.
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R A
TE
O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
A N
C H
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
M ar qu ar dt
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
C on str uc tio n D ra wi ng s
M cC
LE
LL
A N
A
VE
FO
R T
LE
A
VE
N
W O
R
TH
, K S
7-
A1
D em ol iti on
Fl oo r P la n
N ot es
H ar ne y
Sp or ts C om pl ex
Fo ut h
St re et Fo rt Le av en w or th , K an sa s
C O
M M
O N
A R
EA
S
D es ig ne r
Au th or
C he ck er
J ul y
3/16" = 1'-0"
A1 Floor 1 - Demolition - Architectural
DEMOLITION - General Notes:
1. Contractor to remove all 1 ½” to 2” (verify) thickset mortar bed throughout work area (approximately 3,000 SF), mostly under quarry and ceramic tile.
2. Carefully remove all toilet paper, paper towel and soap dispensors prior to work. Store a secure location for re-installation at end of project.
3. Replace floor drains and clean-outs, typical, unless noted otherwise.
Re: Plumbing.
Not to Scale Architectural Demolition - Key Notes
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
C4
Storage, Area not in contract
Exit
FA
D
Women's Pool Locker Room not in contract
Men's Pool Locker Room not in contract
Admin. Office not in contractMen's Sauna not in contract
Men's Locker Room not in contract
Men's Locker Room not in contract
Stair not in contract
Storage, Area not in contract
These portions of Women's Locker Room not in contract
FA
LS
Ann.Smk
Spkr
Spkr
Exit
Exit
Smk Smk
Ex it
Ex it
FA
Smk
Ann.
Spkr Smk Ann.
FA
FA
Ex it
Ann. H
LS
LS
LS
LS
Ann. H
Smk
Ann.
HSpkr
Existing Ceiling and Lights to Remain
C3
D D D D D R
D
D
D
D
E EE
DR
D
D
D D
D
D D
D DD D D
D
DDD
D
D
D
D
D
D D D
E
D
DD
E
Shift/alter grid and panels from Harney I project to align with new grid in this Harney renovation project. Relocate light and diffuser in newly shifted grid.
Re: RCP Construction Plan
Throughout project area, unless noted otherwise: Remove existing 2x4 layin ceiling panels (tile) and grid. Remove lights, sensors, detectors, alarms, speakers, annunciators, etc. and demolish, protect and reinstall or store on site as directed on Electrical drawings. Demolish or protect and reinstall diffusers, returns and exhaust grilles as shown on Mechanical drawings. Typical.
Contractor to be careful in removal of ceiling panels (tile) and grid so as not to damage existing to remain in existing locker room.
2 x 4 Light Fixture to be demolished, Re: Electrical 2 x 4 Light Fixture to remain, Re: Electrical
2 x 4 Diffuser to be demolished, Re: Mechanical
2 x 4 Return or Exhaust to be demolished, Re: Mechanical
Smk
V
LS
FA
Exit Light, Re: Electrical
Spkr Speaker, Re: Electrical
Smoke Detector, Re: Electrical
Fire Alarm Annunciator, Re: Electrical
Wall-mounted Fire Alarm, Re: Electrical
Emergency Light Fixture, Re: Electrical
Lighter fixture Motion Sensor, Re: Electrical
Existing ceiling panels (tile), grid, lights, sensors, detectors, alarms, notification devices, speakers, etc. to remain
Ceiling Fixture, Diffuser and Grill Notation Key D Demolish and remove or relocate as noted by Mechanical and Electrical.
E Existing to remain R Remove, store and protect for reinstallation in new or revised ceiling
* Refer to and Verify with Mechanical and Electrical Drawings
Reflected Ceiling Plan KEY : VERIFY ALL on MECHANICAL and ELECTRICAL drawings for FINAL DETERMINATION. Contractor to verify with COR if any discrepancies. Where there may be a conflict, the Contractor is to clarify in a bid question RFI, or assume the more costly alternative for the bid .
Ceiling Grids/Panels
2 x 4 Diffuser to remain, Re: Mechanical
2 x 2 Light Fixture to remain; relocate in shifted grid. Re: Electrical
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R A
TE
O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
A N
C H
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
M ar qu ar dt
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
C on str uc tio n D ra wi ng s
M cC
LE
LL
A N
A
VE
FO
R T
LE
A
VE
N
W O
R
TH
, K S
7-
A2
D em ol iti on
R ef le ct ed C ei lin g Pl an
H ar ne y
Sp or ts C om pl ex
Fo ut h
St re et Fo rt Le av en w or th , K an sa s
C O
M M
O N
A R
EA
S
D es ig ne r
Au th or
C he ck er
J ul y
3/16" = 1'-0"
A1 Floor 1 - RCP - Demolition
R
FP
-0
M
AR
K
D
ES
C R
IP
TI
O N
D
CMU, prime and paint where exposed
Concrete Masonry Unit
(CMU)
Acoustical tile ceiling
Finish Floor
Finish Ceiling
Description 7 5/8" Concrete Masonry Unit (CMU) wall, match existing adjacent masonry, grout. Tooth-in 1/2 lap where possible.
Match existing bullnose corners were exposed.
WALL TYPE "A", "A1"
Interior Non-Load Bearing Partition to Deck
A1Wall Type "A1" As noted above, 8" nom.
Existing Structure above
Note: Prime and Paint, Re: Finish Schedule
A2Wall Type "A2" As noted above, 6" nom.
(1-Hr. Fire-Rated at Restroom)
(Up to 8'-8" above floor)
Structure above3 1/2" x 16" sound batt insulation
Acoustical sealant at bottom track
One layer 5/8" gyp. bd. each side. Concrete board behind epoxy terrazzo. Re: spec.
for mold and mildew resist.
Suspended acoustical ceiling system @ C1, Re: Reflected Ceiling Plan
3-5/8" metal studs at 16" o.c. with top and bottom tracks secured to slab set in full bed of sealant.
WALL TYPE "C" (Non-Rated) Interior Non-Load Bearing Partition
Description: 3 5/8" metal stud (20 ga.) at 16" on center (o.c.) maximum to underside of structural deck. Four foot wide, 5/8" gypsum board on either side of stud to 1'-0" below structural deck. Acoustical batt insulation between studs, full height of wall. Use acoustical sealant to seal around openings and penetrations. Slip joint shall be installed at bottom of joist or to bottom of deck.
C1As stated above
Slip joint metal stud top track, set in bed of sealant
Baseboard on all exposed sides
C2 As state, with 5 5/8" studs, and gypsum one side to structure, one side 6" above clg.
Sound batt insulation 4'-0" each side of Break Room wall
Sealant, typ. both sides
As stated above with gypsum 6" above structure no insulation at Vending C3
Existing structure above
Wall base, Re: Finish Schedule
One layer 5/8" gyp. bd.
Prime and paint, Re:
Finsih Schedule
Suspended acoustical or gypsum ceiling, Verify Re: Reflected Ceiling Plan
3-5/8" metal studs at 16" o.c.
WALL TYPE "D" (Non-Rated) Interior Non-Load Bearing Partition
Description: 3 5/8" Metal studs (25 ga.) at 16" on center (o.c.) maximum, to just above finished ceiling. Brace to structure w/ 3 5/8" metal studs at 4'-0" o.c. alternating sides. Four foot wide, 5/8" gypsum board on each side of studs. Acoustical batt insulation between studs.
Existing wall to remain
D1Wall Type "D1" As noted above, 3 5/8" studs
D2Wall Type "D2" As noted above, 6" studs
D3Wall Type "D3" As noted above, 1 5/8" furring
6"
Characters, symbols, border and Braille shall be raised 1/16" from background and shall be duplicated below in ABA approved Braille. All to be the integral solid surface dark brown/gray color to match flooring wall base. Typical.
Background to be routered out and have a raised pebbled finish, painted contrasting finish. Color to be a darker beige "sand" to match recent Pool lockers project, typical.
Notes:
1. Sign to be fully and securely adhered to walls
2. Final color to be selected from manufacturer's full range of colors. Pre-selection:
Solid surface border & characters: Corian "Sorrel" Background: SW 7529 "Sand Beach"
3. Edges to be fully finished smooth to match face with all eased edges.
4. All signs to be mounted spaced 3" from side of sign to latch side outside edge of door frame or corner if wall not available.
5. All signs to be mounted 4' - 6" above finish floor to the bottom of each sign.
Braille to below letter characters to match written, typical
1" 3/8
1 1
/8" 1/2
" FAMILY
9 1/2"
FAMILY
8"1/2" 7" 1/2"
1/2
1/2
1/ 2"
1"
STAIR
8"
Match unique stair graphic blending into sign boarder at both ends BREAK ROOM
8"
5 1
/2"CONFERENCE/
1/2
1 1 /8"3/4
3/8
3/4
1 1
/2" 1/2
"ACCESSIBLE No Braille on directional sign
5" 1/2
3/4
4' -6
" t o
Fi n.
F lo or
4' -6
" t o
Fi n.
F lo or
4' -6
" t o
Fi n.
F lo or
4' -6
" t o
Fi n.
F lo or
"MENS LOCKER ROOM"
Signs similar
LOCKER ROOM
WOMENS
1/2
1 1 /2"
3/4
3/8 " 3/4
7 3
/8" 1/2
3/
4"
8"
Structure above full widthand length of stud wall void sound batt insulation -full height of wall
Acoustical sealant at bottom track
One layer 5/8" Type "X" Gyp. bd. each side, verify as allowed by UL Listing
Suspended acoustical ceiling system per schedule, Re: Reflected Ceiling Plan and Finish Schedule
3-5/8" metal studs at 16" o.c. with top and bottom tracks secured to slab set in full bed of sealant.
Re: RCP Plan
WALL TYPE "B"
1-HOUR FIRE-RATED Interior Non-Load Bearing Partition
Description:
1. Floor and Ceiling Runners - For use with item 2 - Channel shaped, fabricated from min 25 MSG corrosion protected steel, min. depth to accommodate stud size, with min. 1-1/4 in. long legs, attached to floor and ceiling with fasteners 24 in. OC max.
(Note: Proprietary Framing Member Options per Official UL Listing)
2. Steel Studs - Channel Shaped, fabricated from min 25 MSG corrosion-protected steel, min.
depth as indicated under Item 5, spaced a max. of 24 in. O.C. Studs to be cut 3/8 to 3/4 in. less than assembly height.
(Note: Proprietary Framing Member Options per Official UL Listing)
3. Wood Structural Panel Sheathing (not used in Harney Gym project)
4. Batts and Blankets - (Required as indicated under Item 5) - Mineral wool batts, friction fitted between studs and runners. Min. nom. thickness as indicated under Item 5.
(Note: Proprietary Options per Official UL Listing)
5. Gypsum Board - Gypsum panels with beveled, square or tapered edges, applied vertically or horizontally. Vertical joints centered over studs and staggered one stud cavity on opposite sides of studs. Horizontal joints need not bwe backed by steel framing. Horizontal edge joints and horizontal butt joints on opposite sides of studs need not be staggered. For 1-hour fire-rating, gypsum to be 5/8 in. thick.
(Note: Proprietary Option Requirements per Official UL Listing)
6. Fasteners - For use with Items 2 and 2F - Type S or S-12 steel screws used to attach panels to stud (Item2) or furring channels (Item 7). 1 in. long for 5/8 in. thick panels spaced 8 in.
O.C. when panels are applied horizontally, or 8 in. O.C. along vertical and bottom edges and 12 in. O.C. in the firel when panels are applied vertically. System with Type ULIX: 1 in. long, spaced 12 in. O.C. in the field and perimeter, when panels are applied horizontally or vertically.
7. Furring Channels - (Not used in Harney Gym Project)
8. Joint Tape and Compound - Vinel or casein, dry or premixed joint compound applied in two coats to joints and screw heads of outer layer. Paper tape, no 2 in. wide over all joints of outer layer panels. Paper tape and joint compound may be ommitted when gypsum panels are supplied with a square edge.
9. Siding, Bridck or Stucco - (Not used in Harney Gym Project)
10 Caulking and Sealants - A bead of acoustical sealant applied around the partition perimeter for sound control. B As stated above
Slip joint metal stud top track
4 2 5
8 5
Fire rated sealant, typical both sides
Baseboard, Re:
Finish Schedule
7 7/8"
3'
- 5
3/ 4"
5 5/8" Structural studs
Wall base, Re: Finish Schedule
5/8" Gypsum board, prime & paint, Re: Finish Schedule and Plan
Solid surface, SS-2, with 1/4" radiused top edges and outside corners, Re: Finish Schedule
1/2"
5/8" 5 5/8"
5/8"
1/2" re ve al, pa int w hit e
1/2 " p re for me d
EAs stated above
6 7/8"
WALL TYPE "E" (Non-Rated)
NOTE: Stand alone half walls to have 3"x38" high +/- tube steel support with base welded plate bolted to concrete floor, or similar.
1 1 /2"
3614 3614 30143918
3918 3618 3618 3018 4 adjustable shelves, Adjustable to full height No adjustable shelves on east half of cabinet
Refrigerator by Tenant Re: Electrical Re: Plumbing
Fi ni sh ed
E nd
Fi ni sh ed
E nd
1/2"
1"
Adjustable melamine shelves, typical.
Wall base, typical, Re: Finish Schedule
Stainless Steel bar sink, Re: Plumbing
Adjustable melamine shelves, typical.Gypsum soffits, prime and paint.
Re: Reflected Ceiling Plan
Plastic Laminate upper cabinets, typical.
Plastic laminate lower shelves, typical. Re: Finish Schedule
Matching filler panel, typical
Denotes 30" width, 14" depth, typical
Fi ni sh ed
E nd
18 1/2" deep Solid surface counter with integral cover side and back splashes
B4
A3
Coffee Maker by Tenant
Microwave by Tenant
Notes:
1) Cabinet construction to be 3/4" plywood with plastic laminate on all exposed surfaces. Interior surfaces may be white melamine.
Doors to be plastic laminate both sides and all edges. Use concealed hinges on all cabinet doors.
2) Fasten cabinets through back, near top, bottom and at ends and not more than 16" o.c. with No. 8 wafer head sheet metal screws through metal backing or metal framing behind wall finish.
Adjustable melamine shelf, typical
Rubber base over wood blocking, Re: Finish Schedule
Accessible pulls, finish to be selected, full extension drawer glides
Matching continuous light valence
4" integral, matching backsplash
Provide 20 ga. sheet metal backing, full width of upper cabinets
Accessible pulls, finish to be selected
Adjustable melamine shelves, Re: Elevation
4"
3'
- 0
1'
- 1 0"
2'
- 9
1/ 2"
1' - 6"
1/2"
1"
7'
- 7
1/ 2"
Lay-in ceiling, Re: Finish Schedule
Gypsum Bd. over metal framing, Prime and paint wall color. Re: Finish Schedule.
6"
MEN'S LOCKERS WOMEN'S LOCKERS
2' - 0" 2' - 0" 8"
6" 6"
Lay-in ceiling, Re: Finish Schedule Gypsum Soffit, Re: Refl. Ceiling Plan
East side of North-south Corridor Wall on approach
2" 2 1
/2" 1 1
/2"
2"
2 1 /2"
1 1 /2"
Notes:
1) Level 5 finish on soffit gypsum.
2) Re: Finish Schedule. Finalize colors in submittals.
"Arial Narrow - Bold" Font, typical "Men's..."
North side of East-west Corridor Wall on approach
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R A
TE
O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
A N
C H
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
M ar qu ar dt
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
C on str uc tio n D ra wi ng s
M cC
LE
LL
A N
A
VE
FO
R T
LE
A
VE
N
W O
R
TH
, K S
7-
A3
W al l T yp es , M illw or k El ev at io n, S ec tio n
H ar ne y
Sp or ts C om pl ex
Fo ut h
St re et Fo rt Le av en w or th , K an sa s
C O
M M
O N
A R
EA
S
St ar r, Tu rre nt in e, T ru on g
JM
/T
S/ M
T/ D
T
SR
, D
PW
J ul y
1" = 1'-0"
C1 Wall Type - A1, A2
1 1/2" = 1'-0"
C3 Wall Type C1, C2, C3 1 1/2" = 1'-0"
C4 Wall Type D
3" = 1'-0"
A1 ABA Sign Details
1 1/2" = 1'-0"
B2 Wall Type - B - 1-Hour F.R.
1 1/2" = 1'-0"
B1 Wall Type E - Half Wall
1/2" = 1'-0"A6
B3 Elevation - Break Room
3/4" = 1'-0"A3
B4 Millwork Section
1 1/2" = 1'-0"
A4 Men's, Women's Hall Soffit Graphics
M
AR
K D
ES
C
R
IP
TI
O
N D
Existing wall to remain New Wall (Re: Wall Types)
Wall Key
EX
NOTES:
1. MAINTAIN USER SAFE PASSAGE/ACCESS TO EAST GYM, WEST GYM, ALL
LOCKER ROOMS AND ALL REQUIRED PATHS OF EGRESS AT ALL TIMES.
Re: Specifications and Statement of Work (SOW).
2. Where flooring mortar/"mud" base removed, replace all 1 1/2" to 2" of concrete toping concrete over existing slab to remain per finish flooring manufacturer recommendations for new finishes, typical at quarry tile in Lobby/Corridor and tile flooring in Men's Room.
3. See underlined structural notes: Re: Structural Drawings and Notes on Sheets S1 and S2
Boiler Room
78 SF
Comm Room
42" high wall with solid surface cap, Re: Wall Type Detail
Storage, Area not in contract
Women's Pool Locker Room not in contract
Men's Pool Locker Room not in contract
Admin. Office not in contract
Men's Sauna not in contract
Men's Locker Room not in contract
Men's Locker Room not in contract
Stair not in contract
Storage, Area not in contract
These portions of Women's Locker Room not in contract
1380 SF
Corridor
224 SF
Break Room
Family Restroom
Family Restroom
ABA
Lounge
116 SF
Vending
125 SF
Laundry
B
D
B
B
E-01
Laundry Washer/Dryer by User. Power, plumbing and vent, Re: Mechanical, Electrical and Plumbing.
Furniture supplied and installed by Tenant, typical
E-04
4'
- 0
5' - 4"
C-06
W
D
New walls shown solid.
Re: Wall Types, typical
Contractor to install new overhead Structural Lintel to be concealed above ceiling where wall removed.
Re: Structural Sheets S1 and S2.
Contractor to cut new window openings as shown in existing concrete wall. Re: Structural Sheets S1 and S2.
New 7'-4" x 3'-4" rough openings for new "man" door in existing 8" CMU structural wall. Re: Structural Sheet S1.4' - 0" +/- 3' - 4"
9' - 0"
E
E E
C2
C2
C1
West Gym Not in Contract
East Gym Area Not in Contract
A
3'
- 0
4'
- 0
7'
- 3
A6 C1
AA
AA
B2 A6
C1
C1 B
B
A3
A1
D1
C1
D2
D3
D1 D1
D1 Ref.
This side of wall gypsum up to structure
D2
D1 D1
6"
- v er ify 4'
- 0
3'
- 8
1'
- 4
D1
5' - 4" near vertical joint 1' - 10"+/-
D1
C-07
B1 A6
Align 4' - 5 1/8" 15' - 11 1/8" 1' - 0 3/4"
1'
- 7
P-05
Face of gypsum set 2" behind CMU, typical both sides of opening
A6 B3
New framed gypsum on metal framed wall over existing CMU.
Prime and paint.
Align C2
A6
A4
C3
Conceal 4" waste vent in new 6" stud wall.
Re: Plumbing.
D2
D1D1
C1C1
Ex
E
2' - 8"
Align
Al ig n
Laminate one layer 5/8" gypsum each side of refrigerator nook, prime and paint
A9 D5
Contractor to cut new window openings as shown in existing concrete wall. Re: Structural Sheets S1 and S2. Gypsum window jamb details similar to header, typical of all 3 windows.
C-01
P-02
C-03
P-02
C-03
BB
Align"Stair" sign
D3
5/8" gypsum board adhered to existing CMU (where quarry tile removed), typical. Prime and paint. Build-out corners for high-impact vinyl corner guard 2" x 2" x 48" with 1/8" reveals all around. Basis of design:
Inpro or equal.
B2 A6
Sim. at window sill and concrete 45-degree conc.
chamfer
P-01 P-01
P-03
P-04
C-02 C-02
C-04
C-04
C-04
C-05
A
E-02
C
Existing
Existing
Existing
Existing
Existing
Existing
Existing
Existing
E-03
C-01
Sim.
Opp.
"WEST GYM" graphic painted on double doors, Re. Detail: A3/A9. D3
D3
D3
D3
See painted Wall Graphic Detail
C-04
C-04 See painted Wall Graphic Detail
CONSTRUCTION PLAN - KEY NOTES
C-01 Provide and install solid surface counter with 4" back and side splashes. Re: Elevation.
C-02 Provide and install new 18", 36" and 42" ABA and ANSI grab bars.
Re: Enlarged Plans, Elevations and specifications.
C-03 Provide and install new baby changing station.
C-04 Provide and install new ABA signs at Toilet Room Entries (one with directional sign), Conference/Break Room and Stair. Typical of 5. Re: Sign Elevation details.
C-05 Provide new painted "Stair" wall graphic. Re: Elevation Detail A4/A4.
C-06 New matching bullnosed (rounded) CMU block on all three exposed outside corners, full height C-07 New matching bullnosed (rounded) CMU block for 2 outside corners of each side of wall opening.
Tooth new CMU into existing both sides.
P-01 Provide and install new ABA toilet, Re: Plumbing.
P-02 Provide and install new ABA Lavatory and faucet, Re: Plumbing.
P-03 Provide and install new ABA hi-low drinking fountains. Re: Plumbing.
P-04 Provide and install new Janitor's Sink. Re: Plumbing.
P-05 Provide and install accessible "bar" sink. Re: Plumbing.
E-01 Existing, wall-mounted "Altonix" and "Simplex" fire alarm boxes to remain.
E-02 New Electrical Panel. Re: Electrical.
E-03 Communication Room equipment and connections, Re: Electrical.
E-04 Vending power by Contractor Re: Electrical. Vending Machines supplied and installed by Tenant.
ST
AI
R
Notes:
1. South wall similar opposite. Contractor to submit elevation of both for verifycation prior to work
2. West wall of stair door nook around door frame to be painted same color as below stair graphic.
"STAIR" Letters to be Arial Font, Paint Color P-2. Sim. opposite, "Stair" written downward opp. wall
Wall Paint Color P-1
"Under Steps" on North and South Walls, along with full West Wall.
Paint Color P-3. Tape color change at corners for crisp color transitiontyp
7"
7" typ.
11" 2"
1 7 /8"
2 3/8"
1' - 6" 9"
8" 4'
- 1 0"
Rubber base - RB-1
N O
TE
W es t w al l o f S ta ir En try n oo k (w al l o f d oo r) to b e sa m e co lo r a s w al l u nd er s te ps gr ap hi c on a dj ac en t w al ls
1 7 /8"
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R A
TE
O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
A N
C H
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
M ar qu ar dt
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
C on str uc tio n D ra wi ng s
M cC
LE
LL
A N
A
VE
FO
R T
LE
A
VE
N
W O
R
TH
, K S
7-
A4
C on st ru ct io n Fl oo r P la n
H ar ne y
Sp or ts C om pl ex
Fo ut h
St re et Fo rt Le av en w or th , K an sa s
C O
M M
O N
A R
EA
S
D es ig ne r
Au th or
C he ck er
J ul y
3/16" = 1'-0"
A1 Floor 1 - Construction - Architectural 1/2" = 1'-0"
A4 Stair Graphic Elevation - North Wall (South Wall, Sim. Opp.)
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
R ev is io n
- P re -B id A ns w er s
M od ifi ca tio ns
XX
M M
M
Area not in Contract
Existing light fixture and diffuser to remain, Relocate in new ceiling. Re: Mechanical and Electrical
Smk
V
LS
FA
New 2 x 2 Light Fixture, Verify, Re: Electrical
Existing 2 x 4 Light Fixture to remain, Re: Electrical
2 x 4 Diffuser, Re: Mechanical.
2 x 4 return or Exhaust Grill, Re: Mechanical
Exit light, Re: Electrical
Spkr Speaker, Re: Electrical
Smoke Detector, Re: Electrical
Fire Alarm Annunciator, Re: Electrical
Wall-mounted Fire Alarm, Re: Electrical
Emergency Light Fixture, Re: Electrical
Downlight "Can" light fixture, Re: Electrical
Reflected Ceiling Plan KEY
Lighter fixture motion sensor, Re: Electrical
Return or exhaust grill, Re: Mechanical
Ceiling Fixture, Diffuser and Grill Notation Key E Existing to remain N New fixture, furnishing or device R Relocated in new or revised ceiling or wall
* Refer to and Verify with Mechanical and Electrical Drawings
Exhaust Grill, Re: Mechanical
New framed soffit above drinking fountains, recess 2" from face of corridor CMU
Heat Heat Detector, Re: Electrical
Storage, Area not in contract
Women's Pool Locker Room not in contract
Men's Pool Locker Room not in contract
Admin. Office not in contractMen's Sauna not in contract
Men's Locker Room not in contract
Men's Locker Room not in contract
Stair not in contract
Storage Area not in contract
These portions of Women's Locker Room not in contract
Open to Structure Above
Re: Electrical for pendant light fixtures
Existing ceiling panels (tile), grid, lighting diffuser, etc. to remain. Re: Electrical, Re: Mechanical.
7' - 7" 8' - 0"
7' - 0"
7' - 11"
8' - 8"
7' - 11"
Paint walls above ceiling color "black" over to 4 feet min. beyond soffit opening, except west wall
4'
- 2
7' - 10"
8' - 0"
C5 A5
D5 A5
New gypsum soffits up to structure above (west wall of Lounge), paint wall color
A5 A5
2'
- 0
B2 A6
B1 A6Recessed can light, Re: Electrical
7' - 2" re ce ss 2"
3' - 0" 6' - 5 1/4"+/- 2' - 0"
Eq ua l Eq ua l
Exit
+/- existing
Ex it
Ann.
FA
Reinstall new edge ceiling grid and modify existing ceiling panels (tile), or relocate and adjust to make ceiling whole in existing locker room to remain
7' - 6"
7' - 6"
Eq
Eq
Eq
Eq centered
4' led strip light fixture, Re: Electrical
Prior to painting, contractor to remove all electrical and data not housed in a conduit to a point 4'-0" outside of the edge of the open to structure ceiling above the Lounge.
In addition to walls, paint all elements black above new ceiling, including but not limited to steel structure elements, floor "pan" between joist, pipes, conduits, ducts, etc.
Ceiling-Mount Light Fixture above Vending, Lights above Lounge not shown), Re: Electrical.
7' - 11"
7' - 11"7' - 11"
7' - 5"
"MEN'S LOCKERS" painted on face of soffit, Re. Detail: A4/A3
"WOMEN'S LOCKERS"
painted on face of soffit, Re. Detail: A4/A3
5"2' - 8" 2'
- 0
6"6"
Gypsum board soffit typ.
1' - 3"
Ex it
Exit
Exit
Architectural shows preliminary. Re: Electrical Drawings for ALL FINAL PLACEMENTS and SELECTIONS
4"
Soffit ceiling; prime and paint ceiling white
5/8" Gypsum soffit face, prime and paint, Re: Finish Schedule
Lay-in ceiling, Re: Finish Schedule
Lay-in ceiling, Re: Finish Schedule
1"
1'
- 3
4"
2' - 7"
6 1 /2"
Soffit wall beyond between Lounge and Vending up to structure, paint color to match wall below (outside east wall of Vending)
Structure above, paint black out to 6 feet horizontally beyond opening
Soffit ceiling; prime and paint ceiling white
5/8" Gypsum soffit face, prime and paint, Re: Finish Schedule
Lay-in ceiling, Re: Finish Schedule
5/8" Gypsum soffit face, prime and paint, Re: Finish Schedule
Build soffit wall up to structure above, prime and paint color to match wall below
Structure above, paint black out to 6 feet horizontally beyond opening
Soffit ceiling; prime and paint ceiling white
Lay-in ceiling, Re: Finish Schedule
5/8" Gypsum soffit recessed face, prime and paint, Re: Finish Schedule
2"
LOUNGEVENDING
End of Vending wall beyond, prime and paint.
Re: Finish Schedule.
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R A
TE
O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
A N
C H
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
M ar qu ar dt
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
C on str uc tio n D ra wi ng s
M cC
LE
LL
A N
A
VE
FO
R T
LE
A
VE
N
W O
R
TH
, K S
7-
A5
C on st ru ct io n
- R ef le ct ed
C ei lin g
Pl an
H ar ne y
Sp or ts C om pl ex
Fo ut h
St re et Fo rt Le av en w or th , K an sa s
C O
M M
O N
A R
EA
S
D es ig ne r
Au th or
C he ck er
J ul y
3/16" = 1'-0"
A1 Floor 1 - RCP - Construction
R
FP
-0
3/4" = 1'-0"A5
D5 Soffit Detail - Corridor
3/4" = 1'-0"A5
C5 Soffit Detail - Lounge
3/4" = 1'-0"A5
A5 Soffit Detail - Lounge-Vending
M
AR
K D
ES
C
R
IP
TI
O
N D
ABA/ANSI-compliant hi-low drinking fountains centered in wall, Re: Plumbing Drawings
High fountain to have mat hing prefabricated cane-detectable skirt by drinking fountain manufacturer
Wall base Note: Verify and provide carrier or blocking support requirements
" m in.
, 4
3" m ax
3'
- 4 sp ou t o utl et ma x.
for ca ne mi n.
cle ar ro ll-u nd er
2'
- 3 ab so lut e de tec tio n
Wall beyond, prime and paint
5' - 8"gypsum wall behind 5' - 4"Bullnose CMU opening
2'-3" AFF
absolute clearmin. roll-under max. cane-detection
2'-10" AFF
max.
Frameless mirror, Re: Elevation
Integral solid surface lavatory bowl, side and back splashes
Accessible lever or automatic controls. Re: Plumbing
Insulate all pipes and sharp edges below lavatory
3/4" radiused edge, eased outside edges all other
Verify lavatory support and necessary blocking in wall
6" wall base Re: Finish Schedule
Accessible toilet, Re: Plumbing
ABA-compliant grab bars
1 1/2"
2' - 0" 1' - 0"
2'
- 1
0" top of se at
"to
Flush operator on open side of toilet cle ar an ce
1 1 /2"
M in.
Toilet paper dispenser
24" x 36" frameless mirror fully adhered to wall, centered above lavatory
Accessible lavatory; insulate all pipes and sharp edges below. Re: Plumbing.
27" min. for roll-under 27" max. cane-detection re fle cti ve su rfa ce ab so lut e
2'
- 3
" c lea r4'
- 0
3'
- 4
Note: Toilet paper, paper towel and soap dispensers Owner-supplied, Contractor installed
1'-6" 5' - 0 1/2" minimum
Electrical outlet
2'
- 1
0" m ax . to to p
Solid surface counter cantilevered from wall on concealed brackets.
Paper towel dispensers provided by Owner, installed by Contractor
(2
3" cl ea r m in.
(4 0" m ax
. to
3'
- 2
(4
8" m ax . to op er ab le pa rts min.
3' - 6"
2'
- 1
0" max.
1' - 0"
(3 9" m in.
, 4 1" m ax
3'
- 4 mi n.
1'
- 6 pa pe r o utl et 1'
- 8
6" wall base Re: Finish Schedule
Toilet paper dispenser
Accessible toilet, Re: Plumbing
ADA accessible grab bars cle ar un de r b ar
1 1 /2" m in.
7"to9" 8"
(39" min., 41" max.)
3' - 4"
4' - 6" max.
mi nim um 1 1
/2" cl ea r
Note: All paint on walls to be epoxy.
2'
- 8
4'
- 0
8'
- 8
B2 A6
1' - 10 1/2" rough opening
3' - 8" 1' - 0" 4" 6' - 1 1/4"+/- 4" 1' - 0" rough opening
3' - 8" 10 3/4" 7"
2'
- 8 ro ug h o pe nin g 4'
- 0 1/
8"
4" wide, 5 5/8" deep gypsum recess. Laminate 5/8" gypsum board on existing concrete wall in recess, typical around. Back wall of recess paint black, side walls of recess and face of wall to be dark charcoal gray. Re: Finish Schedule
Equal 2' - 0" Equal
Lay-in ceiling, Re: Reflected Ceiling Plan, Finish Schedule
AA AA
4" 3'
- 3 3/
8" 4"
12" x 12", 5 5/8" deep gypsum recess for power and date outlets on side of gypsum wall opening (72" TV/Monitor by Tenant). Coordinate electrical and data to be recessed in build-out. (final TV selection to be 4" max. off wall). Re: Electrical
Electrical and data for TV/Monitor to come up through "closed" framing at base gypsum build-out. Re: Electrical
B1 A6
Gypsum board, prime and paint, Re: Finish Schedule
Solid surface sill at base of window, full width of rough opening, typical. Re: Section.
Wall base, Re: Finish Schedule
Gypsum on sides and tops of window recesses to be bright orange to match sides of letter graphic on north wall, typical of 2 at Lounge area
East wall of Lounge, side of wall build-out and all three sides of half-wall to be dark charcoal gray
1' - 0"
1'
- 0
Existing East GymNew Lounge
8'
- 0
1'
- 4
5/ 8"
4" 3'
- 3 3/
8" 4"
2'
- 8
Gypsum recess in framed wall for TV/Monitor electrical and data outlets, verify. Re: Elevation.
Existing Concrete Wall to remain
TV/Monitor by Tenant
Add treated wood blocking in wall for TV/Monitor mounting support
5/8" gypsum board over 5 5/8" metal framing, prime and paint
Gypsum board soffit, prime and paint
Open to structure above
5/8" gypsum board over 5 5/8" metal studs again existing concrete wall
Existing concrete wall to remain
Existing East GymNew Lounge
1'
- 4
4'
- 0 "ro ug h o pe nin g 2'
- 8
1/2"
8'
- 0
Backer rod and sealant, typical around all 4 sides
One piece 3/4" solid surface with 1/4" radiused outer edge and side extensions, and 1/2" overhang, prime and paint.
Re: Elevation. Typ. 3 windows
Gypsum board soffit, wall and three surfaces around window opening
Open to structure above
Existing concrete wall to remain
1", 45-degree concrete chamfer at opening, typical around all 4 sides.
DO NOT OVERCUT
THE CONCRETE
CORNERS
Align window with inside edge of chamfer
Flush, dry gypsum joint where backing transition from metal framing to concrete on 3 sides
Backer rod and sealant 4 sides
Ty p.1"
Fire rated glazing in hollow metal frame
4"
6" 2"
9' - 5 1/2" 6" 7' - 5 3/4" 5" 4' - 0 3/4"
5'
- 9
2"
8"
1' - 5"1' - 5"
4'
- 0
" m in.
4'
- 2
New wall-hung lavatory, typical.
Re: Plumbing
New wall-hung ABA toilet, Re: Plumbing
"Family Restroom" non- ABA, directional sign, and "Conference/Break Room" sign, Re:
Elevation, Sheet A3.
Existing block wall, painted, typical.
Re: Elevation
New door and frame, Re:
Door Schedule, typical.
Baby Changing Station, typical
Grab Bars, Re: Elevations & specs., Typical
New wall-hung toilet, Re: Plumbing
Built-in Lay-off table Re: Details.
Refrigerator with ice-maker, supplied and installed by User. Re: Plumbing
"Family Restroom" ABA sign, Re: Elevation
Bar Sink, Re:
Plumbing. Basis of design: Elkay Dayton Stainless Steel 15" x 15" x 5-3/16" 1-Hole Single Bowl Drop-in Bar Sink with 2" Drain Opening, or equal
A3
B3
Laminate one layer 5/8" gypsum each side, prime and paint
4 1/2"+/-
4 1/8"
22' - 1"+/-
5' - 1 1/2"
Monitor, by User. Contractor to provide power, data to Office, etc.
Typ. 2. Re: Electrical
1' - 6"1' - 6"
A6A2 A6A2
A3 A3
Gypsum soffit wall up to structure above, prime and paint bright orange up to structure
Prime and paint ceiling, ductwork, conduit, piping (except not Fire Protection) and wall black above soffit, except not on west wall
Gypsum soffit, prime and paint bottom (ceiling) white, face of soffit, Re: Finish Schedule
Paint face of door dark charcoal gray to match wall, door frame to be black to match window frames and wall recess around TV/monitor. Re: Construction Plan and Door Schedule.
Furniture by DPW
Base wall paint, P-9, by Contractor, Logo or Graphic by DPW
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R A
TE
O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
A N
C H
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
M ar qu ar dt
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
C on str uc tio n D ra wi ng s
M cC
LE
LL
A N
A
VE
FO
R T
LE
A
VE
N
W O
R
TH
, K S
7-
A6
En la rg ed
P la ns , I nt er io r E le va tio ns
, S ec tio ns
H ar ne y
Sp or ts C om pl ex
Fo ut h
St re et Fo rt Le av en w or th , K an sa s
C O
M M
O N
A R
EA
S
D es ig ne r
Au th or
C he ck er
J ul y
1/2" = 1'-0"A4
A4 ABA Drinking Fountain - Elevation 1" = 1'-0"
A1 Lavatory Section 1/2" = 1'-0"A6
A3 ABA Toilet - Plumbing Wall Elevation 1/2" = 1'-0"A6
A2 ABA Toilet - Side Elevation
1/2" = 1'-0"A4
C1 Elevation - Lounge East
3/4" = 1'-0"A4
B1 Section - TV/Monitor 3/4" = 1'-0"A4
B2 Section - Window
1/4" = 1'-0"A4
B3 Enlarged Break Rm. & Toilets Plan
1/2" = 1'-0"A2
C3 Elevation - Lounge North
M
AR
K D
ES
C
R
IP
TI
O
N D
F-1 - LVT Flooring Re: Finish Legend
F-3 - LVT Flooring Re: Finish Schedule
F-6 - LVT Flooring Re: Finish Schedule
F-1 - LVT Flooring Re: Finish Schedule
F-7 - LVT Flooring Re: Finish Schedule
F-4 - LVT Flooring Re: Finish Schedule
F-5 - LVT Flooring Re: Finish Legend
F-3 - LVT Flooring Re: Finish Legend
F-3 - LVT Flooring Re: Finish Legend
F-4 - LVT Flooring Re: Finish Legend
F-6 - LVT Flooring Re: Finish Schedule
1/
2"
4'
- 6
4' - 0" 7' - 11 1/8"+/- 4' - 6"
4'
- 0
F-3 - LVT Flooring Re: Finish Legend
F-1 - LVT Flooring Re: Finish Legend Orient East-West
F-1 - LVT Flooring Re: Finish Legend (Orient East-West)
F-2 - LVT Flooring, typical Re: Finish Legend
F-3 - LVT Flooring Re: Finish Legend
F-2 - LVT Flooring Re: Finish Legend
F-1 - LVT Flooring Re: Finish Legend (Orient North-South)
F-2 - LVT Flooring Re: Finish Legend
1'
- 0
1'
- 6
2' - 3"
1'
- 1
0"
6" typical
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R A
TE
O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
A N
C H
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
M ar qu ar dt
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
C on str uc tio n D ra wi ng s
M cC
LE
LL
A N
A
VE
FO
R T
LE
A
VE
N
W O
R
TH
, K S
7-
A7
Fl oo r F in is he s Pl an
H ar ne y
Sp or ts C om pl ex
Fo ut h
St re et Fo rt Le av en w or th , K an sa s
C O
M M
O N
A R
EA
S
D es ig ne r
Au th or
C he ck er
J ul y
1/4" = 1'-0"
A1 Floor Finish Plan
M
AR
K D
ES
C
R
IP
TI
O
N D
Paint wall to match interior office color
P-3 P-1,2,3 Re: Elev. sim
P-1,2,3 Re: Elev.
P-1 P-4, both sides to inside corners
P-5, back wall to inside corners
P-1
P-12, typical
P-2, 8 Doors, Re: West Doors Elevation P-9 Door Frames
P-1, Door, P-9 Door Frames
P-1
P-9
P-
P-1
P-1
P-6, Re: Graphics Detail Womens Locker Room
P-6, Re: Graphics Detail, Re: Mens Locker Room
P-
P-
P-13
P-
P-13
Re: Finish Schedule
Re: Finish Schedule
Re: Finish Schedule
7'
- 1
1"
Paint color of corriodor, P-1
2' - 0"+/-
6"
4' - 6"
6"
1'
- 3
5'
- 0
1'
- 3
5'
- 0
Paint accent color, P-6
Notes:
1. Paint walls of doors accent color P-6 to match side wall background color, typical both entry alcoves.
2. Paint mirror gender graphic on both sides of each alcove.
Complete west female graphic (+11") on north wall of alcove.
Verify all with COR prior to work
2 1/8"
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R A
TE
O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
A N
C H
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
M ar qu ar dt
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
C on str uc tio n D ra wi ng s
M cC
LE
LL
A N
A
VE
FO
R T
LE
A
VE
N
W O
R
TH
, K S
7-
A8
W al l F in is h
Pl an
H ar ne y
Sp or ts C om pl ex
Fo ut h
St re et Fo rt Le av en w or th , K an sa s
C O
M M
O N
A R
EA
S
D es ig ne r
Au th or
C he ck er
J ul y
3/16" = 1'-0"
A1 Wall Finish Plan
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1/2" = 1'-0"
A4 Wall Graphics Men/Women Locker Room Entry Alcoves
Finish Schedule Comments:
1. Existing ceiling to remain in back Women's Locker Corridor.
2. Remove existing threshold and reapply to cover edge of new flooring.
3. Take special care in verifying new ductwork to accomodate raised ceiling in pool corridor.
Solid Surface::
SS-1 Conference/Break Room Millwork Counter
Manufacturer: Corian Selection: "Savana"
SS-2 Three (3) Window Sills & 1/2 Wall Caps Manufacturer: Corian Selection: "Deep Night Sky"
SS-3 Wall Signs, Re: Sign Details Manufacturer: Corian Selection: "Sorrel"
General Notes:
1. All ceiling soffits - paint ceiling white.
2. Verify ALL ceiling heights prior to order or start of work.
3. Paint all metal door frames and framed openings P4.
Flooring: Note: All LVT Flooring to be "High-Performance"
F-0 Existing/New Concrete, polished
F-1 General Location: Open Common and Corridors Manufacturer: Armstrong Type: Luxury Vinyl Tile (LVT - Plank)
- High Performance Thickness: 0.098 in.
Size: 6 in. x 48 in. - random lap laid Selection: J5240 - "Long Beach Oak Golden Sand"
(Match existing in Main Reception Lobby)
F-2 General Location: Corridor Manufacturer: Armstrong Type: Luxury Vinyl Tile (LVT - Plank)
- High Performance Thickness: 0.098 Size: 6 in. x 48 in. - Intermittant strips laid as shown on Floor Finish Plan.
Color Selection: J5202 - "Glen Brook Oak
- Evening Shadow" Notes: (Match existing in Office, Phase I)
F-3 General Location: Lounge, Door Entry Corridor Highlights Manufacturer: Armstrong Type: Luxury Vinyl Tile (LVT - Plank)
- High Performance Thickness: 0.125 in.
Color Selection: "Starry Night" Notes: ________________________________
F-4 General Location: Vending Area Manufacturer: ShawContract Type: Luxury Vinyl Tile (LVT - Plank) Thickness: 0.098 in.
Size: 12" x 24" Color Selection: Inspire "Lime 84325" Lay Pattern: "Ashlar"
F-5 General Location: Lounge Center Area Manufacturer: ShawContract Type: Luxury Vinyl Tile (LVT - Plank) Thickness: 0.098 in.
Size: 12" x 24" Color Selection: Inspire "Orange 84668" Lay Pattern: "Ashlar"
Ceilings:
C-1 Manufacturer: Armstrong Ceilings
Type: 2x2 Lay-In Ceiling Panel 15/16" Grid
Selection: DUNE
C-2 Type: Soffits: 5/8" Gypsum Board Notes: Prime and paint
Paint - Note: Only Epoxy paint in Both Toilet Rooms Note: Doors, Frames, Trim: high-gloss paint
Walls, Ceilings: semi-gloss
P-1 SW 6140 "Moderate White" (Corridor Walls)
P-2 SW 6629 "Jalepeno" ("Stair" letter graphic, Gym doors)
P-3 SW 6627 "Emberglow" (Stair Graphic)
P-4 SW 6430 "Great Green" (Sides of Drinking Fount. nook)
P-5 SW 6432 "Garden Spot" (Break Rm, Accent, back Drink. Fount.)
P-6 SW 6795 "Major Blue" (Restroom Accent)
P-7 SW 7102 "White Flour" (Restroom Primary Color)
P-8 SW 7043 "Worldly Gray" (Break Room Primary)
P-9 SW 7067 "Cityscape" (Lounge Dark Gray)
P-10 SW 7006 "Extra White" (White Door Paint, Ceilings)
P-11 SW 7076 "Cyberspace" (Black Ceilings, Monitor Recess)
P-12 SW 7048 "Urban Bronze" (Door Frames - Dark Brown)
P-13 SW 6896 "Sole" (Vending)
Wall Base:
R-1 General Location: Lobby & Vestibule
Manufacturer: Tarket Type: Rubber - Cove type - 4" high Selection: #167 "Fudge" (Dark Brown)
FINISH LEGEND - Basis of Design
Cabinet Laminate:
L-1 General Location: Conference/Break Room
Manufacturer: Wilsonart Type: Standard Laminate Selection: Ebony Recon, 7997-38 Finish: Fine Velvet
F-6 General Location: Conference/Break Room - Perimeter Type: Luxury Vinyl Tile (LVT - Plank) Manufacturer: Armstrong - Amer. Personality Pro P1009
"Homespun Impression" Selection: P1009 - "Thunderbolt" Notes:
F-7 General Location: Conference/Break Room - Light Stripe Type: Luxury Vinyl Tile (LVT - Plank) Manufacturer: Armstrong - American Charm U5039
"Charlestown Oak" Selection: "Linen Breeze" Notes:
Pe r S ch ed ule typical 2" Per Schedule
Pe r S ch ed ule
Pe r S ch ed ule
Per Schedule
2"
Hollow Metal Frame
Prime and Paint D
Hollow Metal Heavy-Duty Frame Prime and Paint
(West Gym, 2 Sets in East Gym)
B Two Light Hardwood
Style & Rail (Conf./Break Room)
A Solid Core Wood (Restroom Doors)
Per Schedule Equal
Category II, 90-Min.
Fire-Protected Ceramic Glazing
"2'- 0"
8" 2'-
9"
2'-0" Per Schedule
Note: All glazing to be clear Fire-Rated Ceramic, Re: Spec.
Insulated door
AB
A ma x.
ht.
3'
- 6
C One Light Heavy-Duty
Metal Style & Rail (Stair Door)
3'- 6"
2'- 9"
2'-0" Per Schedule
AB
A ma x.
ht.
3'
- 6
2'- 9"
AB
A ma x.
ht.
3'-
6"
2'-0"
Category II, 20-Min. Fire- Protected Ceramic Glazing
Notes:
1. No exposed frame or jamb fasteners or seams
2. Fully welded frames, grind smooth, prime and paint.
3. Re: Jamb Details where shown.
4. Verify fire rating per Door Schedule.
GENERAL NOTES:
A. New door hardware to be brushed aluminum.
Lever handles to be curved, not bent style.
B. Doors to be keyed per building standard. Verify all door functions with COR prior to order.
C. Doors to function as exits without special knowledge, keys, etc. required.
D. All interior doors to meet the ABA requirement of 5-lbs. of force or less to open to 90 degrees.
E. Prime and Paint existing and new door(s) and frames, typical all in project area, unless noted otherwise
HARDWARE GROUPS
Group 1 Existing to remain
Group 2 (Gyms - double doors, Stair - Single) Match Existing. VERIFY ALL.
Group 3 (Laundry x 2, Communications Rm) 3 Ea. Hinges 1 Ea. Lock Set - "Storeroom" function 3 Ea. Silencers 1 Ea. Wall Stop (Note: egress out without special knowledge)
Group 4 (Latrines) 3 Ea. Hinges 1 Ea. Closer (limiting arm) 1 Ea. Privacy Lock Set with Occupancy Indicator 3 Ea. Silencers 1 Ea. Wall Stop
Group 5 (Conference/Break Room) 3 Ea. Hinges 1 Ea. Closer (limiting arm) 1 Ea. Latchset function 3 Ea. Silencers 1 Ea. Wall Stop
SCHEDULE COMMENTS:
1. Door(s) Primary Color P-10. Re: Graphics Elevations
2. Door Primary Color P-2
3. Existing door and frame paint to remain
4. Door paint graphics, Re: Elevations and notes.
5. One accessible solid surface door sign to match new signs in Pool Locker Rooms Corridor
Hollow Metal Frame (1 1/2-Hour Fire-Rated System)
(BB 4'-0"wide)
AA - 3'-8"
4'- 0 1
/4" ro ug h
4'- 0"
2'- 8"
2" 2"
AA
2" 2"
Category II, 90-Min.
Fire-Protected Ceramic Glazing op en ing
Re: See Structural Notes for cutting new window openings in structural concrete wall.
Similar to AA Glazing, except with a 4'-0" wide window
BB
Notes:
1. No exposed frame fasteners allowed
2. Fully welded frames, grind smooth, prime and paint
Hollow metal frame, factory prime, paint
Tooth-in new CMU into existing structural CMU wall to remain
New factory primed steel frame, paint, typ.
Sealant, typical, all sides of each new frame, backer rod where possible
Existing CMU to remain, new toothed-in CMU
Note: Install new lintel…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .