Drawings 554-21-132 Install DI Water.pdf

PDF 4 MB Posted

Attached to
Z1DA--554-21-132 Install DI Water Drops For Lab Analyzer and Sinks (VA-21-00047723)
Solicitation number
36C25921Q0366
Issued by

View the file

Other files

File Type Posted
S04- Site Visit Meeting Doc.docx DOCX document
S04- Site Visit Meeting Attendance_proj 554-21-132.pdf PDF
36C25921Q0366 0002.docx DOCX document
36C25921Q0366 0001.docx DOCX document
36C25921Q0366_1.docx DOCX document
Specifications 554-21-132 Install DI Water.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Drawings

Project Number: 554-21-132

Project Title:

Install DI Water Drops for Lab Analyzer and Sinks

Project Location:

Rocky Mountain Regional Veterans Affairs Medical Center

1700 N. Wheeling St., Aurora, CO 80045

Date: February 5, 2021

LIST OF DRAWINGS

Drawing No. Title

SITE PLAN

1 Site Map and Project Location

ARCHITECTURAL

2 Room Names, Room Numbers, Work locations, Phasing

PLUMBING

3 New Work - Notes 1., 2., and 3.

4 New Work - Notes 4., 5., and 6.

5 New Work - Note 7.

6 Detail 1 DI Valving – Core Drilling Detail

7 Detail 2 DI Water Branch To Under Sink Detail

8 Detail 3 DI Water Branch In Ceiling Plenum With

Existing Isolation Valves Detail

9 Detail 4 Wall Mounted Water Treatment Unit Detail

PHASING

10 Example Project Phasing

Rocky Mountain Regional Veterans Affairs Medical Center RMR VAMC 1700 N. Wheeling St., Aurora, CO 80045_

Buildings Legend

• Building A—South Clinic

• Building B– Research

• Building C—Concourse

• Building D—Diagnostic & Treatment S

• Building E—Central Clinic

• Building F—Diagnostic & Treatment N

• Building G—North Clinic

• Building H—Inpatient South

• Building K—Inpatient North

• Building L—Energy Center

Parking Lots

• PSN—Parking Visitor South

• PVN—Parking Visitor North

• PSN—Parking Staff North

Drawing No.: 1 Drawing Title: Site Map and Project Location Project Number: 554-21-132 Project Title: Install DI Water Drops for Lab Analyzer and Sinks Date: Feb. 5, 2021 By: SPM Scale: Not to Scale

PSN PVN

GSA VEHICLE

PARKING

L K H

G E

D

A

B

PVS

C

F

SOUTH ENTRANCE NORTH ENTRANCE

CO

LFAX EN

TRAN

CE

N WHEELING STREET

EMERGENCY ENTRANCE

N FITZSIMONS PARKWAY

NORTH

Project Location

Rocky Mountain Regional Veterans Affairs Medical Center 1700 N Wheeling St Aurora, CO 80045

UP DN

D2-222

ELEC

03-02-G8-E6

D2-200

DATA /

TELECOMM

03-02-D10-T4

D2-202

ELEC

03-02-D10-E7

D2-ST2

STAIR

03-02-ST5

D2-215

REAGENT PREP

PREAMP

03-02-E10-01

D2-216

SPEC PREAMP

03-02-E9-02

D2-217

AMPLIFICATION/INSTRUMENT

03-02-E9-01

D2-214

ANTEROOM

03-02-E10-03

D2-214A

BSL3 LAB

03-02-E10-02

D2-212

MICROSCOPY

03-02-F10-05

D2-228A

FLAMM STOR

03-02-D8-03

D2-230

BLOOD STOR

03-02-D7-02

D2-224

STAFF

LOUNGE/LOCKERS

03-02-G10-01 D2-213

CONTROLLED

TEMP ROOM

03-02-F10-01

D2-220

SCOPE READ

03-02-G7-02

D2-221

SCOPE READ

03-02-G7-01

D2-228

BULK STOR

03-02-D8-01

D1-C11

D2-231

MALE TLT

03-02-E8-02

D2-232

FEMALE TLT

03-02-E8-01

D2-226

STOR

03-02-D10-01

03-02-E7-01

COAG LAB

03-02-F7-01

HEME LAB

03-02-F10-03

MEDIA PREP

03-02-F9-01

CLIN MICRO

D2-211

STERILIZ AND

SOL PREP

03-02-F10-04

03-02-F9-04

MYCOLOGY

03-02-F9-03

MYCOBACTERIO

03-02-F9-02

MICRO/SEROLOGY

D2-218

OPEN OFFICE

03-02-G9-01

D2-210

CIRC

03-02-F10-02

D2-C02

STAFF CORRIDOR

03-02-F11-01

D2-228B

CONTROLLED

TEMP ROOM

03-02-D8-02

D2-219

SCOPE READING

03-02-G7-03

D2-206

DRUG TEST TLT

03-02-E10-05

D2-204

CONF

03-02-E10-04

03-02-E7-03

CIRC

D2-C08

CORRIDOR

03-02-D9-01

D2-208

HAC

03-02-F10-06

F2-236

ELEC

03-02-F6-E4

D2-234

ACCESSIONING

03-02-D6-01

F2-239

HISTO LAB

03-02-E5-01

D2-239

CYTOLOGY

03-02-D5-02

D2-238

GROSSING/FROZEN

SECT

03-02-D5-03

F2-240

TOXICOLOGY

03-02-F4-02

D1-C11

STAFF CORRIDOR

03-02-D7-01

03-02-F6-01

CLIN CHEM

03-02-F5-03

SPECIAL CHEM

03-02-E6-01

URINALYSIS

03-02-F5-04

IMMUNOPATH

03-02-F5-02

OFFICE

03-02-F4-06

OFFICE

F2-235

DI WATER

CLOSET

03-02-F6-02

RG

RF

RE

NORTH

PHASE 2

PHASE 1

PHASE

PHASE

D2-234

D2-234

D2-234

D2-210

D2-210

D2-210

PHASE

PHASE

RG

RF

RE

Approximate work zone. Construct an ICRA class III barrier.

Coordinate location with COR.

Approximate work zone. Construct an ICRA class III barrier. Coordinate location with COR.

Approximate work zone. Utilize a portable one/two person (or construct an) ICRA class III barrier.

Coordinate location with COR.

Rocky Mountain Regional Veterans Affairs Medical Center 1700 N Wheeling St Aurora, CO 80045

Drawing No.: 2 Drawing Title: Building D/F, Partial Second Floor Plan

Room Names, Room Numbers, Work Locations, Phasing Project Number: 554-21-132 Project Title: Install DI Water Drops for Lab Analyzer and Sinks Date: Feb. 5, 2021 Scale: NTS By: SPM

Note 1. Special Chemistry Lab (room 03-02-F5-03) the new tie-in location is in the Interstitial Space above. Concrete core drilling is required. Install DI water drops on existing power poles as shown. Phase 1. See Detail 1.

Drawing No.: 3 Drawing Title: Building D/F, Partial Second Floor Plan

New Work Notes 1., 2., and 3.

Project Number: 554-21-132 Project Title: Install DI Water Drops for Lab Analyzer and Sinks Date: Jan. 25, 2021 By: SPM Scale: Not to Scale

Note 3. For Clinical Laboratory (room 03-02-F6-01) the new tie-in location is in the ceiling plenum.

Concrete core drilling is not required. The location of two new, VA installed, power poles is yet to be determined. Install new DI water drops on new power poles. Phase 2. See Detail 3.

NORTH

Rocky Mountain Regional

Veterans Affairs Medical

Center 1700 N Wheeling St

Aurora, CO 80045

Note 2. Immunopath Lab (room 03-02-F5-04) the new tie-in location is in the Interstitial Space above.

Concrete core drilling may be required if existing core drilled holes are not available. Install DI water drop in the wall for new sink spigot. Phase 1. See Detail 2.

5.5

6.5

RF

RG

Special Chemistry Lab (room 03-02-F5-03) is below.

Drawing No.: 4 Drawing Title: Bldg. D/F, Partial Second Floor Interstitial Plan

New Work Notes 4., 5., and 6.

Project Number: 554-21-132 Project Title: Install DI Water Drops for Lab Analyzer and Sinks Date: Feb. 5, 2021 By: SPM Scale: Not to Scale

Clinical Lab (room 03- 02-F6-01) is below.

NORTH

Note 4. Select the core drilling and the tie-in locations along DI piping path to minimize length of new pipe. Phase 1. See Detail 1.

Note 6. Tie-in location is in ceiling plenum below.

Phase 2. See Detail 3.

Rocky Mountain Regional

Veterans Affairs Medical

Center 1700 N Wheeling St

Aurora, CO 80045

Note 5. Core drill as needed or utilize existing core drilled openings to provide new DI piping in wall to sink below. Phase 1. See Detail 2.

RF

RG

5.5

6.5

UP DN

3/4" DCW/DHW DN

TO LEVEL

BELOW.

3"DCW

2 1/2"DHW

1 1/4"DHWR

3"DCW

2 1/2"DHW

1"DHWR

1"CO2

3/4"CO2

3/4"CO2

CO2

1 1/4"DI

1"DI

1 1/4"DI

1/2"

3"DCW

2 1/2"DHW

1"DHWR

3/4"DHWR1 1/4"DHWR

3/4"DHWR

1"DI DN TO

BELOW

3/4"LA

1/2"LA

1/2"LA

1-1/4" HW/CW TO

TMV, 1-1/4"TW DN3/4"CO2

RF

RF.5

RG

RG.5

Rocky Mountain Regional Veterans Affairs Medical Center 1700 N Wheeling St Aurora, CO 80045

Drawing No.: 5 Drawing Title: Building D/F, Partial Second Floor Interstitial Plan

New Work Note 7.

Project Number: 554-21-132 Project Title: Install DI Water Drops for Lab Analyzer and Sinks Date: Feb. 5, 2021 Scale: NTS By: SPM

Phase 1 WORK IN FIVE LAB AREAS AND INTERSTITIAL SPACE Room Number (A/E room no.)

Room Name Reference

Drawing no.

Reference Detail no. Monday Tuesday Wednesday Thursday Friday Saturday

Task 1 Mount and connect, VA owned, DI water cartridge conditioner system. Use 1 or 2 person ICRA 3 barrier.

D2-214A (03-02-E10-02) BSL3 Lab 2 4

Task 2 Mount and connect, VA owned, DI water cartridge conditioner system. Use 1 or 2 person ICRA 3 barrier.

D2-210 (03-02-F9-01) Clin Micro 2 4

Task 3 Mount and connect, VA owned, DI water cartridge conditioner system. Use 1 or 2 person ICRA 3 barrier.

D2-210 (03-02-F9-04) Mycology 2 4

Task 4 Install dust containment barrier/negative air D2-234 (03-02-F5-03) Special Chem 2 Task 5 Install dust containment barrier/negative air D2-210 (03-02-F10-03) Media Prep 2 Task 6 Construct piping/valving/bleed port arrangement 2nd floor Interstitial above Special Chem 3, 4 1 Task 7 Construct piping/valving/bleed port arrangement 2nd floor Interstitial above Special Chem 3, 4 2 Task 8 Construct piping/valving/bleed port arrangement 2nd floor Interstitial above Media Prep 5 2 Task 9 Core drill - two holes for equipment drops 2nd floor Interstitial above Special Chem 4 1

Task 10 Core drill - two holes for new sink faucet 2nd floor Interstitial above Special Chem 4 2 Task 11 Core drill - two holes for new sink faucet 2nd floor Interstitial above Media Prep 5 2 Task 12 Install polypropylene piping - 3 drops - sink, equipment D2-234 (03-02-F5-03) Special Chem 3 1, 2 Task 13 Install polypropylene piping - 1 drop - sink D2-210 (03-02-F10-03) Media Prep 2 Task 14 Firestop - 6 openings 2nd floor Interstitial above Special Chem 4 1, 2 Task 15 Firestop - 2 openings 2nd floor Interstitial above Media Prep 5 2

Task 16 Allow for the instalation of other utilities and lighting modifications by the VA

D2-234 (03-02-F5-03) Special Chem

Task 17 Install faucet D2-234 (03-02-F5-03) Special Chem Task 18 Install faucet D2-210 (03-02-F10-03) Media Prep Task 19 Drywall patch and paint D2-234 (03-02-F5-03) Special Chem Task 20 Drywall patch and paint D2-210 (03-02-F10-03) Media Prep Task 21 Ceiling Tile repair/replacement D2-234 (03-02-F5-03) Special Chem 3 Task 22 Shut down and drain DI water system (03-02-F6-02) DI Water Closet Task 23 Tie in new piping and valving for equipment 2nd floor Interstitial above Special Chem 1 Task 24 Tie in new piping and valving for sink faucet 2nd floor Interstitial above Special Chem 2 Task 25 Tie in new piping and valving for sink faucet 2nd floor Interstitial above Media Prep 2

Task 26 Clean/disinfect/validate/refill and restart the entire DI water system entire 2nd floor lab, F3-257, and D3-227 entire 2nd floor lab, F3- 257, and D3-227

Task 27 Remove dust containment barrier D2-234 (03-02-F5-03) Special Chem 2 Task 28 Remove dust containment barrier D2-210 (03-02-F10-03) Media Prep 2

Phase 2 WORK IN CLIN CHEM AREA Room Number (A/E room no.)

Room Name Reference

Drawing no.

Reference Detail no. Monday Tuesday Wednesday Thursday Friday Saturday

Task 1 Install dust containment barrier/negative air D2-234 (03-02-F6-01) Clin Chem 2 Task 2 Construct piping/valving/bleed port arrangement D2-234 (03-02-F6-01) Clin Chem 3 3 Task 3 Install polypropylene piping - 2 drops - equipment D2-234 (03-02-F6-01) Clin Chem 3 3

Task 4 Allow for the instalation of other utilities and lighting modifications by the VA

D2-234 (03-02-F6-01) Clin Chem

Task 5 Ceiling Tile repair/replacement D2-234 (03-02-F6-01) Clin Chem 3 Task 6 Tie in new piping and valving D2-234 (03-02-F6-01) Clin Chem 3 Task 7 Clean/disinfect/validate the DI water system D2-234 (03-02-F6-01) Clin Chem Task 8 Remove dust containment barrier D2-234 (03-02-F6-01) Clin Chem 2

Project 554-21-132 Install DI Water Drops For Lab Analyzer and Sinks Example Project Phasing Date: 01/29/2021 By: SPM

RMR VAMC 1700 N Wheeling St, Aurora, CO 80045 Buildings D/F, 2nd floor

List of Drawings
Dwg 1 - Site Map
Dwg 2 - Room Names_Numbers
Dwg 3 - New Work Notes_1_2_3
Dwg 4 - New Work Notes_4_5_6
Dwg 5 - New Work Note_7
Detail 1 - Valving Core Drill
Detail 2 - Branch to Sink
Detail 3 - Branch Ceiling
Detail 4 - Wall Mounted Unit
Example Project Phasing

File details come from the government source that posted it. Updated .