Drawings 554-21-132 Install DI Water.pdf
PDF 4 MB Posted
- Solicitation number
- 36C25921Q0366
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04- Site Visit Meeting Doc.docx | DOCX document | |
| S04- Site Visit Meeting Attendance_proj 554-21-132.pdf | ||
| 36C25921Q0366 0002.docx | DOCX document | |
| 36C25921Q0366 0001.docx | DOCX document | |
| 36C25921Q0366_1.docx | DOCX document | |
| Specifications 554-21-132 Install DI Water.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Drawings
Project Number: 554-21-132
Project Title:
Install DI Water Drops for Lab Analyzer and Sinks
Project Location:
Rocky Mountain Regional Veterans Affairs Medical Center
1700 N. Wheeling St., Aurora, CO 80045
Date: February 5, 2021
LIST OF DRAWINGS
Drawing No. Title
SITE PLAN
1 Site Map and Project Location
ARCHITECTURAL
2 Room Names, Room Numbers, Work locations, Phasing
PLUMBING
3 New Work - Notes 1., 2., and 3.
4 New Work - Notes 4., 5., and 6.
5 New Work - Note 7.
6 Detail 1 DI Valving – Core Drilling Detail
7 Detail 2 DI Water Branch To Under Sink Detail
8 Detail 3 DI Water Branch In Ceiling Plenum With
Existing Isolation Valves Detail
9 Detail 4 Wall Mounted Water Treatment Unit Detail
PHASING
10 Example Project Phasing
Rocky Mountain Regional Veterans Affairs Medical Center RMR VAMC 1700 N. Wheeling St., Aurora, CO 80045_
Buildings Legend
• Building A—South Clinic
• Building B– Research
• Building C—Concourse
• Building D—Diagnostic & Treatment S
• Building E—Central Clinic
• Building F—Diagnostic & Treatment N
• Building G—North Clinic
• Building H—Inpatient South
• Building K—Inpatient North
• Building L—Energy Center
Parking Lots
• PSN—Parking Visitor South
• PVN—Parking Visitor North
• PSN—Parking Staff North
Drawing No.: 1 Drawing Title: Site Map and Project Location Project Number: 554-21-132 Project Title: Install DI Water Drops for Lab Analyzer and Sinks Date: Feb. 5, 2021 By: SPM Scale: Not to Scale
PSN PVN
GSA VEHICLE
PARKING
L K H
G E
D
A
B
PVS
C
F
SOUTH ENTRANCE NORTH ENTRANCE
CO
LFAX EN
TRAN
CE
N WHEELING STREET
EMERGENCY ENTRANCE
N FITZSIMONS PARKWAY
NORTH
Project Location
Rocky Mountain Regional Veterans Affairs Medical Center 1700 N Wheeling St Aurora, CO 80045
UP DN
D2-222
ELEC
03-02-G8-E6
D2-200
DATA /
TELECOMM
03-02-D10-T4
D2-202
ELEC
03-02-D10-E7
D2-ST2
STAIR
03-02-ST5
D2-215
REAGENT PREP
PREAMP
03-02-E10-01
D2-216
SPEC PREAMP
03-02-E9-02
D2-217
AMPLIFICATION/INSTRUMENT
03-02-E9-01
D2-214
ANTEROOM
03-02-E10-03
D2-214A
BSL3 LAB
03-02-E10-02
D2-212
MICROSCOPY
03-02-F10-05
D2-228A
FLAMM STOR
03-02-D8-03
D2-230
BLOOD STOR
03-02-D7-02
D2-224
STAFF
LOUNGE/LOCKERS
03-02-G10-01 D2-213
CONTROLLED
TEMP ROOM
03-02-F10-01
D2-220
SCOPE READ
03-02-G7-02
D2-221
SCOPE READ
03-02-G7-01
D2-228
BULK STOR
03-02-D8-01
D1-C11
D2-231
MALE TLT
03-02-E8-02
D2-232
FEMALE TLT
03-02-E8-01
D2-226
STOR
03-02-D10-01
03-02-E7-01
COAG LAB
03-02-F7-01
HEME LAB
03-02-F10-03
MEDIA PREP
03-02-F9-01
CLIN MICRO
D2-211
STERILIZ AND
SOL PREP
03-02-F10-04
03-02-F9-04
MYCOLOGY
03-02-F9-03
MYCOBACTERIO
03-02-F9-02
MICRO/SEROLOGY
D2-218
OPEN OFFICE
03-02-G9-01
D2-210
CIRC
03-02-F10-02
D2-C02
STAFF CORRIDOR
03-02-F11-01
D2-228B
CONTROLLED
TEMP ROOM
03-02-D8-02
D2-219
SCOPE READING
03-02-G7-03
D2-206
DRUG TEST TLT
03-02-E10-05
D2-204
CONF
03-02-E10-04
03-02-E7-03
CIRC
D2-C08
CORRIDOR
03-02-D9-01
D2-208
HAC
03-02-F10-06
F2-236
ELEC
03-02-F6-E4
D2-234
ACCESSIONING
03-02-D6-01
F2-239
HISTO LAB
03-02-E5-01
D2-239
CYTOLOGY
03-02-D5-02
D2-238
GROSSING/FROZEN
SECT
03-02-D5-03
F2-240
TOXICOLOGY
03-02-F4-02
D1-C11
STAFF CORRIDOR
03-02-D7-01
03-02-F6-01
CLIN CHEM
03-02-F5-03
SPECIAL CHEM
03-02-E6-01
URINALYSIS
03-02-F5-04
IMMUNOPATH
03-02-F5-02
OFFICE
03-02-F4-06
OFFICE
F2-235
DI WATER
CLOSET
03-02-F6-02
RG
RF
RE
NORTH
PHASE 2
PHASE 1
PHASE
PHASE
D2-234
D2-234
D2-234
D2-210
D2-210
D2-210
PHASE
PHASE
RG
RF
RE
Approximate work zone. Construct an ICRA class III barrier.
Coordinate location with COR.
Approximate work zone. Construct an ICRA class III barrier. Coordinate location with COR.
Approximate work zone. Utilize a portable one/two person (or construct an) ICRA class III barrier.
Coordinate location with COR.
Rocky Mountain Regional Veterans Affairs Medical Center 1700 N Wheeling St Aurora, CO 80045
Drawing No.: 2 Drawing Title: Building D/F, Partial Second Floor Plan
Room Names, Room Numbers, Work Locations, Phasing Project Number: 554-21-132 Project Title: Install DI Water Drops for Lab Analyzer and Sinks Date: Feb. 5, 2021 Scale: NTS By: SPM
Note 1. Special Chemistry Lab (room 03-02-F5-03) the new tie-in location is in the Interstitial Space above. Concrete core drilling is required. Install DI water drops on existing power poles as shown. Phase 1. See Detail 1.
Drawing No.: 3 Drawing Title: Building D/F, Partial Second Floor Plan
New Work Notes 1., 2., and 3.
Project Number: 554-21-132 Project Title: Install DI Water Drops for Lab Analyzer and Sinks Date: Jan. 25, 2021 By: SPM Scale: Not to Scale
Note 3. For Clinical Laboratory (room 03-02-F6-01) the new tie-in location is in the ceiling plenum.
Concrete core drilling is not required. The location of two new, VA installed, power poles is yet to be determined. Install new DI water drops on new power poles. Phase 2. See Detail 3.
NORTH
Rocky Mountain Regional
Veterans Affairs Medical
Center 1700 N Wheeling St
Aurora, CO 80045
Note 2. Immunopath Lab (room 03-02-F5-04) the new tie-in location is in the Interstitial Space above.
Concrete core drilling may be required if existing core drilled holes are not available. Install DI water drop in the wall for new sink spigot. Phase 1. See Detail 2.
5.5
6.5
RF
RG
Special Chemistry Lab (room 03-02-F5-03) is below.
Drawing No.: 4 Drawing Title: Bldg. D/F, Partial Second Floor Interstitial Plan
New Work Notes 4., 5., and 6.
Project Number: 554-21-132 Project Title: Install DI Water Drops for Lab Analyzer and Sinks Date: Feb. 5, 2021 By: SPM Scale: Not to Scale
Clinical Lab (room 03- 02-F6-01) is below.
NORTH
Note 4. Select the core drilling and the tie-in locations along DI piping path to minimize length of new pipe. Phase 1. See Detail 1.
Note 6. Tie-in location is in ceiling plenum below.
Phase 2. See Detail 3.
Rocky Mountain Regional
Veterans Affairs Medical
Center 1700 N Wheeling St
Aurora, CO 80045
Note 5. Core drill as needed or utilize existing core drilled openings to provide new DI piping in wall to sink below. Phase 1. See Detail 2.
RF
RG
5.5
6.5
UP DN
3/4" DCW/DHW DN
TO LEVEL
BELOW.
3"DCW
2 1/2"DHW
1 1/4"DHWR
3"DCW
2 1/2"DHW
1"DHWR
1"CO2
3/4"CO2
3/4"CO2
CO2
1 1/4"DI
1"DI
1 1/4"DI
1/2"
3"DCW
2 1/2"DHW
1"DHWR
3/4"DHWR1 1/4"DHWR
3/4"DHWR
1"DI DN TO
BELOW
3/4"LA
1/2"LA
1/2"LA
1-1/4" HW/CW TO
TMV, 1-1/4"TW DN3/4"CO2
RF
RF.5
RG
RG.5
Rocky Mountain Regional Veterans Affairs Medical Center 1700 N Wheeling St Aurora, CO 80045
Drawing No.: 5 Drawing Title: Building D/F, Partial Second Floor Interstitial Plan
New Work Note 7.
Project Number: 554-21-132 Project Title: Install DI Water Drops for Lab Analyzer and Sinks Date: Feb. 5, 2021 Scale: NTS By: SPM
Phase 1 WORK IN FIVE LAB AREAS AND INTERSTITIAL SPACE Room Number (A/E room no.)
Room Name Reference
Drawing no.
Reference Detail no. Monday Tuesday Wednesday Thursday Friday Saturday
Task 1 Mount and connect, VA owned, DI water cartridge conditioner system. Use 1 or 2 person ICRA 3 barrier.
D2-214A (03-02-E10-02) BSL3 Lab 2 4
Task 2 Mount and connect, VA owned, DI water cartridge conditioner system. Use 1 or 2 person ICRA 3 barrier.
D2-210 (03-02-F9-01) Clin Micro 2 4
Task 3 Mount and connect, VA owned, DI water cartridge conditioner system. Use 1 or 2 person ICRA 3 barrier.
D2-210 (03-02-F9-04) Mycology 2 4
Task 4 Install dust containment barrier/negative air D2-234 (03-02-F5-03) Special Chem 2 Task 5 Install dust containment barrier/negative air D2-210 (03-02-F10-03) Media Prep 2 Task 6 Construct piping/valving/bleed port arrangement 2nd floor Interstitial above Special Chem 3, 4 1 Task 7 Construct piping/valving/bleed port arrangement 2nd floor Interstitial above Special Chem 3, 4 2 Task 8 Construct piping/valving/bleed port arrangement 2nd floor Interstitial above Media Prep 5 2 Task 9 Core drill - two holes for equipment drops 2nd floor Interstitial above Special Chem 4 1
Task 10 Core drill - two holes for new sink faucet 2nd floor Interstitial above Special Chem 4 2 Task 11 Core drill - two holes for new sink faucet 2nd floor Interstitial above Media Prep 5 2 Task 12 Install polypropylene piping - 3 drops - sink, equipment D2-234 (03-02-F5-03) Special Chem 3 1, 2 Task 13 Install polypropylene piping - 1 drop - sink D2-210 (03-02-F10-03) Media Prep 2 Task 14 Firestop - 6 openings 2nd floor Interstitial above Special Chem 4 1, 2 Task 15 Firestop - 2 openings 2nd floor Interstitial above Media Prep 5 2
Task 16 Allow for the instalation of other utilities and lighting modifications by the VA
D2-234 (03-02-F5-03) Special Chem
Task 17 Install faucet D2-234 (03-02-F5-03) Special Chem Task 18 Install faucet D2-210 (03-02-F10-03) Media Prep Task 19 Drywall patch and paint D2-234 (03-02-F5-03) Special Chem Task 20 Drywall patch and paint D2-210 (03-02-F10-03) Media Prep Task 21 Ceiling Tile repair/replacement D2-234 (03-02-F5-03) Special Chem 3 Task 22 Shut down and drain DI water system (03-02-F6-02) DI Water Closet Task 23 Tie in new piping and valving for equipment 2nd floor Interstitial above Special Chem 1 Task 24 Tie in new piping and valving for sink faucet 2nd floor Interstitial above Special Chem 2 Task 25 Tie in new piping and valving for sink faucet 2nd floor Interstitial above Media Prep 2
Task 26 Clean/disinfect/validate/refill and restart the entire DI water system entire 2nd floor lab, F3-257, and D3-227 entire 2nd floor lab, F3- 257, and D3-227
Task 27 Remove dust containment barrier D2-234 (03-02-F5-03) Special Chem 2 Task 28 Remove dust containment barrier D2-210 (03-02-F10-03) Media Prep 2
Phase 2 WORK IN CLIN CHEM AREA Room Number (A/E room no.)
Room Name Reference
Drawing no.
Reference Detail no. Monday Tuesday Wednesday Thursday Friday Saturday
Task 1 Install dust containment barrier/negative air D2-234 (03-02-F6-01) Clin Chem 2 Task 2 Construct piping/valving/bleed port arrangement D2-234 (03-02-F6-01) Clin Chem 3 3 Task 3 Install polypropylene piping - 2 drops - equipment D2-234 (03-02-F6-01) Clin Chem 3 3
Task 4 Allow for the instalation of other utilities and lighting modifications by the VA
D2-234 (03-02-F6-01) Clin Chem
Task 5 Ceiling Tile repair/replacement D2-234 (03-02-F6-01) Clin Chem 3 Task 6 Tie in new piping and valving D2-234 (03-02-F6-01) Clin Chem 3 Task 7 Clean/disinfect/validate the DI water system D2-234 (03-02-F6-01) Clin Chem Task 8 Remove dust containment barrier D2-234 (03-02-F6-01) Clin Chem 2
Project 554-21-132 Install DI Water Drops For Lab Analyzer and Sinks Example Project Phasing Date: 01/29/2021 By: SPM
RMR VAMC 1700 N Wheeling St, Aurora, CO 80045 Buildings D/F, 2nd floor
| List of Drawings |
| Dwg 1 - Site Map |
| Dwg 2 - Room Names_Numbers |
| Dwg 3 - New Work Notes_1_2_3 |
| Dwg 4 - New Work Notes_4_5_6 |
| Dwg 5 - New Work Note_7 |
| Detail 1 - Valving Core Drill |
| Detail 2 - Branch to Sink |
| Detail 3 - Branch Ceiling |
| Detail 4 - Wall Mounted Unit |
| Example Project Phasing |