Drawings 506-CSI-114.pdf
PDF 7 MB Posted
- Attached to
- Z1DA--Site Prep Cardiology EP Labs 506-CSI-114
- Solicitation number
- 36C25021B0046
About this file
This pre-solicitation announcement provides notice of an upcoming Invitation for Bid for site preparation work for Cardiology EP Labs at the Ann Arbor VA Medical Center. The project scope includes reconfiguring space, walls, floors, utilities, and support systems to accommodate new medical equipment. The contractor must coordinate installation with the equipment provider and order materials in advance. The solicitation will be issued on Contract Opportunities on May 25, 2021 as a 100% set-aside for SDVOSBs. The contractor will have 120 days to complete the work. The NAICS code is 236220 and size standard is $39.5 million. The government intends to award a firm fixed price contract within 180 days of bid receipt. Prospective offerors must register in SAM and VetBiz, and have a current VETS-4212 report on file (if applicable).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EP Labs Barrier Blueprint - ICRA drawing.pdf | ||
| RFI17_36C25021B0046 - RB Construction RFI 010_Response_210629.pdf | ||
| 36C25021B0046 0005.docx | DOCX document | |
| 36C25021B0046 0004.docx | DOCX document | |
| S04 - Pre-Bid Site Visit Meeting Agenda 506-CSI-114.pdf | ||
| S05 - RFIs - Answers to Vendor Questions.pdf | ||
| 36C25021B0046 0003.docx | DOCX document | |
| S04 - Pre-Bid Site Visit Attendance Log 506-CSI-114.pdf | ||
| 36C25021B0046 0002.docx | DOCX document | |
| 36C25021B0046 0001.docx | DOCX document | |
| Specifications 506-CSI-114.pdf | ||
| Wage Determination MI20210100 2-26-2021.pdf | ||
| Contractor EMR Certification Form 2021 - 506-CSI-114.pdf | ||
| REQUEST FOR INFORMATION (RFI) Form 506-CSI-114.pdf | ||
| 36C25021B0046_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO SCALE
N
EW
S
NO SCALE
N
E
W
S
MECHANICAL SEAL
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
STAMP Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
Approved : Project Director
Building Number
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
9 10
ANN ARBOR, MICHIGAN
ARCHITECT / ENGINEER OF RECORDCONSULTANT
CSI-114 CARDIOLOGY EP LABS
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER
2215 FULLER RD ANN ARBOR MI 48105
VA ANN ARBOR
100% BID DOCUMENTS
506-CSI-114
TPM MRB
COVER SHEET 100% BID DOCUMENTS CSI-114 CARDIOLOGY EP
LABS
G-001
1E
03/29/2021
SHEET LIST
SHEET
NO. SHEET NAME
GENERAL
G-001 COVER SHEET
STRUCTURAL
S-101 PARTIAL FRAMING PLANS (EXISTING)
S-102 DETAILS
ARCHITECTURAL
A-001 ARCHITECTURAL LEGENDS AND SYMBOLS
A-002 PARTITION TYPES
AD107 PARTIAL SEVENTH FLOOR DEMOLITION PLAN
A-107 PARTIAL SEVENTH FLOOR FLOOR PLAN
A-117 PARTIAL SEVENTH FLOOR REFLECTED CEILING PLAN
A-127 PARTIAL SEVENTH FLOOR EQUIPMENT PLAN
A-137 PARTIAL SEVENTH FLOOR FINISH PLAN
A-201 INTERIOR ELEVATIONS
A-601 SCHEDULES & DIAGRAMS
FIRE PROTECTION
FP107 PARTIAL SEVENTH FLOOR FIRE PROTECTION PLAN
PLUMBING
P-007 PLUMBING LEGENDS & SCHEDULES
PD107 PARTIAL SEVENTH FLOOR PLUMBING DEMOLITION PLAN
MGD107 PARTIAL SEVENTH FLOOR MEDICAL GAS DEMOLITION PLAN
MG107 PARTIAL SEVENTH FLOOR MEDICAL GAS PLAN
MECHANICAL
M-007 MECHANICAL LEGENDS
MD107 SEVENTH FLOOR MECHANICAL DEMOLITION PLAN
MD108 EIGHTH FLOOR MECHANICAL DEMOLITION PLAN
M-107 SEVENTH FLOOR MECHANICAL PLAN
M-108 EIGHTH FLOOR MECHANICAL PLAN
M-607 MECHANICAL SCHEDULES & DETAILS
ELECTRICAL
E-001 ELECTRICAL GENERAL INFORMATION
E-107 SEVENTH FLOOR PARTIAL COMPOSITE PLAN
ED-107 ELECTRICAL DEMOLITION - SEVENTH FLOOR
EL-107 LIGHTING PLAN - SEVENTH FLOOR
EP-107 POWER PLAN - SEVENTH FLOOR
Grand total: 28
REVISIONS: DATE:
3/29/2021
3/29/2021
3/29/2021
T
HP
T
E-M E-N
ISOCENTER
GANTRY BASE
PLATE
TABLE BASE
PLATE
9"ø FLOOR CORE
S-102
FLOOR OPENING
S-102
0"
25' - 0"
CONCRETE AND METAL DECK ON STEEL FRAMING
VE
RI
FY
W
/ M
AN
U F
8 3 /8"
W/ MANUF.
7' - 0 1/8" VERIFY
S-102
6 SIM.
S-102
6 SIM.
ROUND BAR
REINFORCEMENT, SEE
DETAIL, TYP.
EXISTING W16x31, FIELD VERIFY
EQ
0" T
YP
EQ
TYP.
CONCRETE:
1. ALL CONCRETE WORK TO BE PERFORMED IN CONFORMANCE WITH THE MOST RECENT
EDITION OF ACI 301 & ACI 318 CODE REQUIREMENTS AND DETAILING STANDARDS.
2. ALL CONCRETE SHALL DEVELOP THE FOLLOWING COMPRESSIVE STRENGTHS AT
28 DAYS (F`c) UNLESS NOTED OTHERWISE:
A. FLOOR SLAB CONCRETE F'c = 4000 PSI
3. ALL REINFORCING BARS, DOWELS, ANCHOR BOLTS AND OTHER INSERTS SHALL BE
SECURED IN POSITION PRIOR TO PLACING OF THE CONCRETE.
4. DETAILING BENDING AND PLACING OF REINFORCING STEEL SHALL BE IN ACCORDANCE
WITH THE MOST RECENT EDITION OF THE ACI CODE.
5. REFER TO ARCHITECTURAL DRAWINGS FOR MOLDS, GROOVES, ORNAMENTS, OR
ACCESSORIES REQUIRED TO BE CAST INTO CONCRETE, AND FOR LOCATIONS OF FLOOR
FINISHES AND SLAB DEPRESSIONS.
6. LOCATE ALL SLEEVES, OPENINGS, EMBEDDED ITEMS, ETC. WHICH ARE INDICATED
ON DESIGN DRAWINGS. CHECK WITH OTHER TRADES TO VERIFY THAT ALL SLEEVES,
OPENINGS, AND EMBEDDED ITEMS ARE IN PLACE AND LOCATED CORRECTLY PRIOR
TO PLACEMENT OF CONCRETE.
7. ALL EMBEDDED ITEMS SHALL BE PLACED IN THE FORMWORK PRIOR TO PLACING
CONCRETE. DRILLING AND GROUTING IS ACCEPTABLE SUBJECT TO ENGINEER
APPROVAL.
REINFORCING STEEL:
1. ALL REINFORCING STEEL SHALL BE HIGH STRENGTH DEFORMED BARS, GRADE 60,
ASTM A615, WITH 60,000 PSI MINIMUM YIELD STRENGTH, UNLESS NOTED OTHERWISE.
2. REINFORCEMENT PROTECTION: (U.N.O.)
A. CONCRETE POURED AGAINST EARTH = 3"
B. CONCRETE POURED IN FORMS BUT EXPOSED = 2"
TO WEATHER, EARTH OR LIQUID
C. SLABS AND WALLS NOT EXPOSED TO WEATHER OR EARTH = 1 1/2"
D. BEAMS, GIRDERS, AND COLUMNS NOT EXPOSED TO
WEATHER, OR IN CONTACT WITH EARTH = 1 1/2"
3. WELDING OF REINFORCING BARS IS NOT PERMITTED, UNLESS NOTED OTHERWISE.
STRUCTURAL DESIGN INFORMATION:
DESIGN DATA BASED ON ASCE 7-10
RISK CATEGORY: IV
1. SNOW LOAD:
SNOW EXPOSURE FACTOR (Ce) 1.0 THERMAL FACTOR (Ct) 1.0 SNOW IMPORTANCE FACTOR (Is) 1.2 GROUND SNOW LOAD (Pg) 20 PSF
2. LIVE LOAD:
INTERSITITAL 25 PSF (PER EXISTING DRAWINGS)
7TH FLOOR 100 PSF (PER EXISTING DRAWINGS
3. SEISMIC LOADS:
SEISMIC IMPORTANCE FACTOR (Ie) 1.50
SITE CLASS 'D'
SEISMIC DESIGN CATEGORY 'C'
STRUCTURAL STEEL:
1. STRUCTURAL AND MISC. STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN
ACCORDANCE WITH THE MOST RECENT EDITION OF AISC STEEL CONSTRUCTION
MANUAL AND CODE OF STANDARD PRACTICE. STEEL JOISTS SHALL CONFORM TO THE
MOST RECENT EDITION OF STANDARD SPECIFICATIONS OF THE STEEL JOIST INSTITUTE.
METAL DECK SHALL CONFORM TO THE MOST RECENT EDITION OF THE STANDARD
SPECIFICATION OF THE STEEL DECK INSTITUTE.
2. WELDING SHALL BE DONE IN ACCORDANCE WITH THE "AMERICAN WELDING SOCIETY"
(AWS) D1.1, USING E70 ELECTRODES. WELDING SHALL BE PERFORMED BY AN
APPROVED CERTIFIED WELDER.
3. NO CHANGES SHALL BE MADE IN THE STEEL STRUCTURE NOR ANY MATERIAL CUT IN THE
FIELD (UNLESS NOTED AS "FIELD CUT OR TRIM" ON DRAWINGS), WITHOUT THE
WRITTEN PERMISSION OF THE ENGINEER.
4. NO CUTTING, BURNING, OR HOLES OTHER THAN THOSE SPECIFICALLY DETAILED SHALL
BE ALLOWED THROUGH STRUCTURAL STEEL MEMBERS WITHOUT THE PRIOR CONSENT
OF THE ENGINEER. BOLT HOLES SHALL CONFORM WITH THE GOVERNING AISC
SPECIFICATION, AND SHALL BE STANDARD HOLES UNLESS NOTED OTHERWISE.
5. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES BETWEEN
THE DESIGN AND ACTUAL CONDITIONS NOTED IN THE FIELD.
6. CONTRACTOR SHALL PROVIDE NECESSARY LABOR, MATERIAL, AND EQUIPMENT TO
ERECT ALL MISCELLANEOUS IRON AND STEEL AS DETAILED ON THESE DRAWINGS.
7. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION.
GENERAL STRUCTURAL NOTES
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL DIMENSIONS AND CONDITIONS
AT THE JOB SITE AND TO CROSS-CHECK DETAILS AND DIMENSIONS ON THE STRUCTURAL
DRAWINGS WITH THE RELATED REQUIREMENTS ON THE ARCHITECTURAL, MECHANICAL,
ELECTRICAL, AND PLUMBING PLANS. FLOOR AND WALL OPENINGS, SLEEVES AND OTHER
ARCH., MECH., ELEC., REQUIREMENTS MUST BE COORDINATED BEFORE THE CONTRACTOR
PROCEEDS WITH CONSTRUCTION.
2. ALL ENGINEERING DESIGN, CONSTRUCTION, AND TESTING SHALL CONFORM TO THE
REQUIREMENTS OF THE MOST RECENT EDITION OF THE INTERNATIONAL BUILDING CODE.
3. ALL STRUCUTRAL WORK MUST BE TEMPORARILY BRACED AND SUPPORTED UNTIL THE
STRUCTURE IS SUFFICIENTLY COMPLETED AND CAN SAFELY CARRY THE DESIGN AND
CONSTRUCTION LOADS.
4. REFER TO THE ARCHITECTURAL DRAWINGS FOR DIMENSIONS NOT SHOWN ON
THE STRUCTURAL DRAWINGS.
5. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING
DRAWINGS AND/OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE
ENGINEER BEFORE PROCEEDING WITH ANY WORK THAT IS INVOLVED IN THE CONFLICT.
ABBREVIATIONS
TYPE DESCRIPTION
A.B. ANCHOR BOLT
ALT. ALTERNATE
ARCH. ARCHITECTURAL
AVG. AVERAGE
AFF ABOVE FINISH FLOOR
BFF BELOW FINISH FLOOR
BLDG. BUILDING
BM. BEAM
B.O. BOTTOM OF
BRG. BEARING
C.J. CONTROL JOINT
CMU CONCRETE MASONRY UNIT
CONC. CONCRETE
CONST. JT. CONSTRUCTION JOINT
CONT. CONTINUOUS
D DEPTH
DET. DETAIL
DTL. DETAIL
DIA. DIAMETER
EA. EACH
ELEV. ELEVATION
EQ. EQUAL
E.W. EACH WAY
EXIST. EXISTING
EXST. EXISTING
E.F. EACH FACE
F.F. FINISH FLOOR
FLR. FLOOR
FND. FOUNDATION
FNDTN. FOUNDATION
FTG. FOOTING
F.S. FAR SIDE
GA. GAUGE
GALV. GALVANIZED
HDG HOT DIPPED GALVANIZED
HORIZ. HORIZONTAL
HORZ. HORIZONTAL
H.P. HIGH POINT
INSUL. INSULATION
I.F. INSIDE FACE
TYPE DESCRIPTION
L LENGTH
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG. LONGITUDINAL
L.P. LOW POINT
MAX. MAXIMUM
MECH. MECHANICAL
MEZZ. MEZZANINE
MANUF. MANUFACTURER
MNF. MANUFACTURER
MIN. MINIMUM
MISC. MISCELLANEOUS
N.S. NEAR SIDE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F OUTSIDE FACE
O.H. OVERHEAD
OHD OVERHEAD DOOR
O/O OUT TO OUT
PSF POUNDS PER SQUARE FT.
PSI POUNDS PER SQUARE IN.
R RADIUS
REINF. REINFORCING
SIM. SIMILAR
T&B TOP AND BOTTOM
T.O. TOP OF
T.O.B.L. TOP OF BRICK LEDGE
T.O.F TOP OF FOOTING
T.O.F.W. TOP OF FOUNDATION WALL
T.O.P. TOP OF PIER
T.O.S TOP OF STEEL
TRANS. TRANSVERSE
TYP. TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VERT. VERTICAL
V.S.C VERTICAL SLOTTED CONN.
V.B.F. VERTICAL BRACED FRAME
WWF WELDED WIRE FABRIC
W WIDTH
W/ WITH
REINFORCEMENT INSTALLATION NOTES
1. EXISTING COMPOSITE BEAMS MARKED ON THIS SHEET REQUIRE
REINFORCEMENT TO SUPPORT NEW FLOOR MOUNTED EQUIPMENT
LOADS. SEE TYPICAL DETAIL PER PLAN.
2. COMPOSITE BEAMS ANALYZED PER LOADING INFORMATION ON EXISTING
DRAWINGS DATED 11/22/95.
3. REINFORCEMENT BARS (MIN. 5'-0" LENGTHS) TO BE SPLICED ALONG
BEAM WITH 6" FILLET WELD AT ENDS, BOTH SIDES OF BAR, TYPICAL.
4. PROTECT EXISTING UTILITIES ON INTERSTITIAL LEVEL WHEN INSTALLING
REINFORCEMENT. PROTECT HANGER RODS ON BOTTOM FLANGE OF
COMPOSITE BEAMS. FIFTH FLOOR SPACES DIRECTLY ABOVE AREA OF
CONSTRUCTION MUST BE UNOCCUPIED DURING WELDING.
5. NOTIFY THE ENGINEER OF RECORD IF CONFLICTS OCCUR OR EXISTING
CONDITIONS DO NOT ALLOW FOR INSTALLATION OF REINFORCING BAR.
6. REINFORCEMENT ON THIS SHEET MUST BE IN PLACE PRIOR TO
INSTALLING FLOOR MOUNTED EQUIPMENT.
FLOOR INSTALLATION NOTES
1. EXISTING 3" CONCRETE & 2" COMPOSITE DECK ON STEEL FRAMING,
FIELD VERIFY. EXISTING #3 BAR @ 18" ON CENTER, EACH WAY. UTILIZE
GROUND PENETRATING RADAR TO LOCATE EXISTING REINFORCEMENT
PRIOR TO PLACEMENT OF FLOOR PLATES. NOTIFY ENGINEER OF
RECORD OF EXISTING REINFORCEMENT PLACEMENT PRIOR TO
INSTALLATION OF FLOOR PLATES.
2. DO NOT CUT EXISTING SHEAR STUDS LOCATED WITHIN THE SLAB ON
TOP OF ALL EXISTING BEAMS.
E-M E-N
1'
- 1
1/ 4"
1'
- 4
2'
- 2
2'
- 2
2'
- 2
2'
- 2
2'
- 2
2'
- 2
2'
- 2
2'
- 2
16' - 0"
S-102
MATCH EXISTING SPACING NO GREATER THAN 5'-0" O.C.
FIELD VERIFY LOCATIONS OF EXISTING UPPER SLOTTED CHANNEL LOCATION.
UTILIZE GPR TO LOCATE EXISTING SLAB
REINFORCEMENT PRIOR TO CORING
CONCRETE. DO NOT CUT EXISTING
REINFORCEMENT.
S-102
6 SIM.
S-102
6 SIM.
S-102
S-102
AC/CU ABOVE, SEE
PLATFORM DETAIL
S-102
EXISTING CONCRETE DECK ON STEEL BEAM FRAMING
SLOTTED CHANNEL GRID SYSTEM,
SEE DETAIL
0"
25' - 0"
S-102
EXTEND TO FACE OF WALLS
16' - 7" ±
EXTEND TO FACE OF WALLS
4' - 9" ±
S-102
6 SIM.
S-102 architecture · engineering
W E
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
GE HEALTHCARE CONTACT: JASON WRIGHT, JASON.WRIGHT@GE.COM, 313.236.4684
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH GE AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH GE, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL
AFFECT THE OVERALL COMPLETION DATE.
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
100% BID DOCUMENTS
03/29/2021 S-101
PARTIAL FRAMING PLANS
(EXISTING)
506-CSI-114CSI-114 CARDIOLOGY EP
LABS
ALM SJT
1E
1/4" = 1'-0"
PARTIAL 7TH FLOOR FRAMING PLAN (EXISTING)
REVISIONS: DATE:
1/4" = 1'-0"
PARTIAL 8TH FLOOR FRAMING PLAN (EXISTING)
VARIES
1 1/4" MIN. MODIFY PLATE SIZE AS REQUIRED FOR
ANCHORS TO BE PLACED MIN. 1 1/4" FROM
EDGE OF UNCUT DECK FLUTES, TYP.
3/8" STEEL PLATE ANCHORED TO BOTTOM OF
EXISTING CONCRETE FLOOR USING (4) 1/2" x 3"
LG. HILTI KH-EZ SCREW ANCHORS (OR EQUAL).
FILL OPENING WITH LIGHTWEIGHT CONCRETE
OR NON-SHRINK GROUT TO MATCH ADJACENT
CONSTRUCTION.
FOR OPENINGS LARGER THAN 12", ADHESIVE
SET #4 x 12" LG. AT 12" O.C. AROUND
PERIMETER. ADHESIVE TO BE HILTI HIT-HY 200
OR APPROVED EQUAL.
6"
EXISTING INTERSTITIAL
BEAMS & FLOOR
P5000 SLOTTED CHANNEL FASTENED
TO INTERSTITIAL FLOOR
CEILING
P1001 SLOTTED
CHANNEL FOR
EQUIPMENT TRACK
SEE PLAN SEE PLAN
L4x4x1/4 CONNECTOR TO
INSTERSTICE FRAMING FOR
BRACING. BOLT OR WELD TO
SLOTTED CHANNEL.
REQUIRED CLEARANCE
9'-9 5/16" (±3/16") FROM
TOP OF CLEA PLATE
3/16
TYP. 3/16
2"
1/8 3
1/8 3 TYP.
FI
EL
D
VE
RI
FY
1'
- 6
5/ 8"
BRACE EACH SLOTTED CHANNEL AT
10'-0" O.C., STAGGERED
L4x4x1/4"
L4x4x1/4"
L4 x4 x1 /4"
L4 x4 x1 /4"
3/16
3/16 TYP.
OPENING TO MEET MECH.
EQUIPMENT AND OPENING
REQUIREMENTS. VERIFY ALL
LOCATIONS W/ MECH. AND ARCH.
PLANS
STEEL BEAM PER FRAMING
PLAN, TYP.
NOTE:
THIS FRAMING IS FOR STEEL JOIST
SPACING OF 8'-4" O.C. (SPANS OF
GREATER THAN 8'-4" O.C. REQUIRE
SPECIAL DESIGN)
A
A
NOTES:
1. PROVIDE AND INSTALL FLOOR SUPPORT FRAMING AS
SHOWN IN THIS DETAIL FOR NEW MECHANICAL DUCT
PENETRATIONS GREATER THAN 6" DIAMETER.
2. REFER TO MECHANICAL AND ARCHITECTURAL DRAWINGS
FOR ADDITIONAL INFORMATION ON FLOOR PENETRATIONS
AND INFILL LOCATIONS.
3. REMOVE EXISTING FIREPROOFING FOR INSTALLATION OF
OPENING FRAMING. REPLACE FIREPROOFING IN KIND.
FLOOR OPENING
SHIM FLUSH WITH EXISTING
METAL DECK
3/16 3
3/16 3 TYP.
EXISTING FLOOR FRAMING
WITH FIREPROOFING
STEEL ANGLE TO SUPPORT
EXISTING METAL DECK AT OPENING
3/16 3
3/16 3 TYP.
SECTION A-A
TY
P.6"
EXTEND REINFORCEMENT PLATE
(2) FLUTES BEYOND OPENING
1/8 1
TYP.
EACH
FLUTE
OPENING DIAMETER GREATER
THAN 6", LESS THAN 18"
EXISTING CONCRETE ON METAL DECK
EXISTING FLOOR
FRAMING BELOW
NOTES:
1. PROVIDE AND INSTALL FLOOR SUPPORT FRAMING AS SHOWN IN THIS DETAIL
FOR NEW MECHANICAL DUCT PENETRATIONS GREATER THAN 6" DIAMETER.
2. REFER TO MECHANICAL AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL
INFORMATION ON FLOOR PENETRATIONS AND INFILL LOCATIONS.
3. REMOVE EXISTING FIREPROOFING FOR INSTALLATION OF OPENING FRAMING.
REPLACE FIREPROOFING IN KIND.
3/8" STEEL PLATE BELOW
MOUNTING PLATE PER SUPPLIER
SPECIFICATIONS
1" THICK STEEL PLATE. COORDINATE DIAMETER WITH
BOOM SUPPLIER MOUNTING PLATE SPECIFICATIONS.
L4x4x3/8" ANGLES, SEE
PLAN
CEILING, SEE PLANS
L4x4x1/4 ANGLES (WELDED)ALIGNED WITH
EQUIPMENT SUPPORT POINTS
AC/CU EQUIPMENT PER
MECHANICAL DRAWINGS
EXISTING CONCRETE AND METAL DECK ON STEEL FRAMING (9TH
FLOOR). REMOVE FIREPROOFING TO PERFORM WORK. REPLACE
IN KIND.
3/16 2 3/16 2 TYP. L4x4x3/8, TYP.
1/4" WEB STIFFENER
BEYOND, TYP. EACH BRG.
POINT
SEE EQUIPMENT DRAWINGS
DR
AW
IN
GS
SE
E
EQ
UI
P.
3"
2"
EXISTING SLAB REINFORCEMENT
FLOOR PLATE BY EQUIPMENT MANUF.
EXISTING CONCRETE SLAB ON METAL DECK
1/2" THICK STEEL PLATE. TACK WELD TO
EXISTING DECK.
3/4"ø THROUGH BOLT COUNTER SUNK WITH
TOP AND BOTTOM WASHER. TACK WELD
BOTTOM NUT OR DESTROY THREADS. SEE
EQUIPMENT DRAWINGS FOR ADDITIONAL
INFORMATION.
SEVENTH FLOOR
896' - 8 1/4"
EXISTING CONCRETE SLAB ON METAL DECK
W/ SHEAR STUDS
EXISTING STEEL BEAM
1.25"ø CONT. ROUND BAR REINFORCEMENT, SEE FRAMING
PLAN FOR LENGTH
NOTE:
STAGGER WELDS SUCH THAT WELDS ON EACH
SIDE OF WEB DO NOT ALIGN
3/16 3-126" T&B AT
ENDS,
TYP. 3/16 3-12
architecture · engineering
W E
R
EC
YC
LE
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
GE HEALTHCARE CONTACT: JASON WRIGHT, JASON.WRIGHT@GE.COM, 313.236.4684
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH GE AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH GE, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL
AFFECT THE OVERALL COMPLETION DATE.
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
100% BID DOCUMENTS
03/29/2021 S-102
DETAILS 506-CSI-114CSI-114 CARDIOLOGY EP
LABS
ALM SJT
1E
REVISIONS: DATE:
1 1/2" = 1'-0"3 TYPICAL FLOOR INFILL DETAIL
1 1/2" = 1'-0"7 SLOTTED CHANNEL GRID SUPPORT DETAIL
3/4" = 1'-0"6 TYPICAL FLOOR OPENING FRAMING DETAIL
1" = 1'-0"8 INTERSTITIAL FLOOR OPENING REINFORCEMENT DETAIL
3/4" = 1'-0"5 BOOM SUPPORT DETAIL
3/4" = 1'-0"4 AC/CU PLATFORM DETAIL
1 1/2" = 1'-0"1 FLOOR PLATE DETAIL
1 1/2" = 1'-0"2 BEAM REINFORCEMENT DETAIL
MOUNTING HEIGHT
COORDINATION
ARCHITECTURAL, MECHANICAL & ELECTRICAL
TRADES SHALL COORDINATE LOCATIONS OF
WALL MOUNTED ITEMS TO ALIGN EITHER
VERTICALLY OR HORIZONTALLY.
FINISH FLOOR LINE
DRAWING REFERENCE SYMBOLS
DETAIL REFERENCE
ENLARGED DETAIL
WALL SECTION
EXTERIOR ELEVATION
INTERIOR ELEVATION
EXISTING COLUMN LINE
NEW COLUMN LINE
VIEWNUMBER
SHEETNUMBER
VIEWNUMBER
SHEETNUMBER
A-201
A
H
F
DTL./ELEV./SECTION
REFERENCE
DETAIL/ELEV./SECTION #
SHEET ORIGIN
BUILDING SECTION2
A-200
A-200
A-200
A-200
MAX.
REACH
DEPTH
MAX.
REACH
HEIGHT
0.5"
48"
2"
46"
5"
42"
6"
40"
9"
36"
11"
34"
GENERAL MAXIMUM REACH DEPTH AND HEIGHT
FOR HAND DRYERS / TOWEL DISPENSERS
MAX. REACH DEPTH
F O
R R
E A
C H
D E
P T
H M
A X
H
E
IG
H T
M
IR
R O
R O
R
M
IR
R O
R
S H
E
LF
U
.N .O
(M
A X
(M
IN
.) U
.N .O
T O
W E
L D
IS
P
E N
S E
M U
LT
I- P
U R
P O
S
U
IT
T O
W E
L D
IS
P
E N
S
E C
E P
T A
C
LE
W A
S
C
E P
T A
C
LE
T A
C K
B D
W H
IT
E
B D
U
.N .O
W A
LL
C
A B
IN
E
T
C O
A T H
O O
K S
S A
N
IT
A R
Y N
A P
K
IN
V
N
D O
R
S O
A P
D
IS
P
E N
S E
R
2'
6"
M A
X
12"
M O
P S
T R
IP
E
LF
A D
A S
H E
LF
C
A
T R
O D
12"
S T A
N D
A
E
LF
A T R
O D
M A
X
24"
BOTTOM OF
OUTLET
BOTTOM OF
LIGHT FIXTURE
M
A X
24" MIN.
36" MAX.
M
IN
M
IN
24" MIN.
42" MAX.
M
A X
36" MAX.
M
IN
24" MIN.
42" MAX.
/2
M
IN
P R
O T R
U D
G
IL
E
T P
A P
P
E N
S
LO
A T
IO
N
R E
C E
S S
IL
E
T P
A P
P
E N
S
A T
IO
N
P R
O T R
U D
IL
E
T P
A P
P
E N
S
A T
IO
N
M
IN
7"-9"
M
A X
S A
N
IT
A
Y
P K
P O
S A
L
22"
/2
M
IN
P R
O T R
U D
IL
E
T P
A P
P
E N
S
A T
IO
N
S
3"
DOOR
FRAME
DOOR
FRAME
EXIT
T Y
P
IC
A L
LI
G
W
IT
A
T
IO
N
E X
IT
L
IG
H
B O
V E
D O
O R
S
E
LE
V A
T O
R W
LL
B
T
T O
N S
(M
IN
" S E
E E
L E
C T
U
.N .O
E
LE
C T R
IC
N E
L C
A B
IN
E
T
P O
W E
R P
A N
E L
E
LE
C T R
IC
T E
LE
P
H O
N E
O R
T
LE
T
S W
IT
C
H
P U
S H
B U
T T O
N
F
IR
E A
LA
R
M B
O X
T H
E R
M O
S T A
T
C A
R D
R E
A D
E R
M E
C H
A N
IC
A
L P
A N
E
LS
I
F
IS
H
E D
S P
A C
E S
S E
LE
C
T O
R S
W
IT
C H
R
S
S W
IT
C
H O
R W
LL
T
LE
T
A B
O
B
IN
E T
DOORSS
M
A X
M
A X
B A
R R
IE
E E
S
IG
N
IN
T E
R
IO
R
T A
C T
IL
E B
R A
IL
LE
IG
N
A G
E
LA
Q U
E
M
IN
O R
U
.N .O
V A
R
IE
S S
E E
I N
T E
R
IO
R E
L E
V A
T
IO
N
F
IR
E A
LA
M
R N
R
O B
E
C
LO
C K
SEE PLAN
12" 12"
H A
N D
R A
IL
R A
M P
M
A X
T O
T O
P O
F
C A
B
IN
E T
H A
N D
L E
T
O
F
IR
E E
X T
IN
G
U
IS
H E
R
F
IR
E E
X T
IN
G U
IS
H
B
IN
E
T F
IR
E H
O S
E
O R
C O
M B
IN
A
T
IO
B
IN
E T
54" MIN.
18" GRAB BAR
42" GRAB BAR
M A
X
6" MAX. 36"
(MIN.)
18"
36" GRAB
BAR
40"
13" MAX.
42" 42"
W A
T E
R C
LO
S
E T
W A
T E
R C
LO
S
E T
(M A
X
(M
A X
B .F
U
R
IN
A L
S T D
. U R
IN
A
L
L-SHAPED
GRAB BAR
18"
T R
A N
S F E
R
T Y
P E
S H
O W
E R
FOLDING
SHOWER SEAT
R O
LL
-I N
-T Y
O
W E
R
M
IN
T R
A N
S F E
R
T Y
P E
S H
O W
E R
(M
IN
(M A
X
T O
P S
P O
U T
M A
X
S
IN
K D
E P
T H
11"
(MIN.)
17"
3" (MAX.)
WALL
SPACE
AVAILABLE
U.N.O.
NOTE:
WATER SUPPLY & DRAIN
PIPES BELOW LAVATORIES
AND SINKS MUST BE
INSULATED OR OTHERWISE
CONFIGURED TO PROTECT
AGAINST CONTACT.
E W
C
IN
K
U N
T A
IN
W A
LL
H
U N
G L
A V
B A
R R
IE
E E
L A
U
N T E
R
M
IN
MAX.
4"
6" MAX.
ALIGN WITH EDGE OF SEAT
M
IN
M
IN
E X
T
IN
G U
IS
H
E R
A N
D /O
R C
E N
T E
R O
F H
O S
E V
A
LV
E architecture · engineering
W E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
GE HEALTHCARE CONTACT: JASON WRIGHT, JASON.WRIGHT@GE.COM, 313.236.4684
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH GE AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH GE, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL
AFFECT THE OVERALL COMPLETION DATE.
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
100% BID DOCUMENTS
03/29/2021 A-001
ARCHITECTURAL LEGENDS AND
SYMBOLS
506-CSI-114CSI-114 CARDIOLOGY EP
LABS
TPM MRB
1E
ABBREVIATIONS
ABBREVIATION FULL TEXT
S
S SOUTH
SA SUPPLY AIR
SAB SOUND ATTENUATION BLANKETS
SC SOLID CORE
SCH SCHEDULE
SCONC SEALED CONCRETE
SCWD SOLID CORE WOOD
SECT SECTION
SER.RECPT SERVICE RECEPTOR
SH SHELF
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SLR CONCRETE SEALER
SLS SOLID SURFACE
SLV SHORT LEG VERTICAL
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
SSK SERVICE SINK
SSM SOLID SURFACING MATERIAL
STD STANDARD
STDW STANDARD WEIGHT (STEEL PIPE)
STL STEEL
STOR STORAGE
STRL STRUCTURAL
SUPP SUPPORT
SUSP SUSPENDED
SYM SUSPENSION SYMMETRICAL
T
T TREAD
T&G TONGUE AND GROOVE
T.O.C. OR T/C TOP OF CONCRETE
T.O.F. OR T/F TOP OF FOOTING
T.O.M. OR T/M TOP OF MASONRY
T.O.P. OR T/P TOP OF PAVEMENT
T.O.S. OR T/S TOP OF STEEL
T.O.W. OR T/W TOP OF WALL
T/ TOP OF
TB TRUSS BEARING
TG TEMPERED GLASS
THK THICK
THRESH THRESHOLD
TLT TOILET
TP TOILET PARTITION
TR TRANSITION TRIM
TYP TYPICAL
TYP TYPICAL
U
UNF UNFINISHED
UNO UNLESS NOTED OTHERWISE
UR URINAL
V
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
W
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WCO WALL CLEAN OUT
WCVR WALLCOVERING
WD WOOD
WP WATERPROOFING
WP WORKPOINT
WS WINDOW SHADE
WSCT WAINSCOT
WT WEIGHT
ABBREVIATIONS
ABBREVIATION FULL TEXT
H
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD
HDPB HIGH DENSITY PARTICLEBOARD
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HT HEIGHT
HWD HARDWARE
I
I.D. OR ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IG INSULATING GLASS
IN INCHES
INCL INCLUDING, INCLUSIVE
INSUL INSULATION
INT INTERIOR
IPS INTERIOR PAINT SYSTEM
J
JAN JANITOR
JT JOINT
K kW KILOWATTS kWh KILOWATT HOURS
L
LAD LADDER
LAM LAMINATED
LAV LAVATORY
LF LINEAR FEET
LGTH LENGTH
LH LEFT HAND
LKR LOCKER
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LO LOUVER OPENING
LP LIGHTING PANEL
LPG LIQUID PETROLEUM GAS
LPS LOW PRESSURE STEAM
LT LIGHT
LWT LEAVING WATER TEMPERATURE
M
MA MEDICAL AIR
MANUF MANUFACTURER
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MBH THOUSAND BTU/HR
MC MEDICINE CABINET
MCA MINIMUM CIRCUIT AMPACITY
MCC MULTI-COLOR COATING
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MEMBWP MEMBRANE WATERPROOFING
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MFS MAXIMUM FUSE SIZE
MG MEDICAL GAS
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN. MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MM MISCELLANEOUS METALS
MO MASONRY OPENING
MOCP MAXIMUM OVERCRRENT PROTECTION
MPC MICHIGAN PLUMBING CODE
MR MANUFACTURER'S RECOMMENDATIONS
MT MARBLE TILE
MTD MOUNTED
MUL. MULLION
N
N NORTH
N.S. NEAR SIDE
NF NO FINISH
NIC NOT IN CONTRACT
NO NUMBER
NPSH NET POSITIVE SUCTION HEAD
NSNS NON SHRINK NON STAIN GROUT
NTS NOT TO SCALE
NTS NOT TO SCALE
O
O.C. OR OC ON CENTER
OBSGL OBSCURE GLASS
OD OUTSIDE DIAMETER
OHDR SECTIONAL OVERHEAD DOOR
OPNG OPENING
OPP OPPOSITE
P
P PAINT
PART PARTITION
PB PARTICLE BOARD
PC PRECAST
PCS PIECES
PERM PERMANENT
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLY PLYWOOD
PT PORCELAIN TILE
PTB PORCELAIN TILE BASE
Q
QT QUARRY TILE
QTB QUARTZ TILE BASE
QTZ QUARTZ
R
R RISER
RA RETURN AIR
RB RUBBER BASE
RC ROOF CONDUCTOR
RD ROOF DRAIN
RD ROUND
RECVG RECEIVING
REF REFRIGERATOR
REINF REINFORCED
REQ'D REQUIRED
RF RESILIENT FLOORING
RH RIGHT HAND
RL ROOF LADDER
RM ROOM
RO ROUGH OPENING
RS ROOF SUMP
RWD REDWOOD
ABBREVIATIONS
ABBREVIATION FULL TEXT
A
AB ANCHOR BOLT
ABI ADDITIVE BID ITEM
AC ACOUSTICAL
ACP ACOUSTICAL CEILING PANEL
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ALUM ALUMINUM
AP ACCESS DOORS
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AWP ACOUSTICAL WALL PANEL
B
B/ BOTTOM OF
BD BOARD
BF BARRIER FREE
BIT BITUMINOUS
BL BUILDING LINE
BLDG BUILDING
BLKHD BULKHEAD
BOTT BOTTOM
BP BASE PLATE
BS BOTH SIDES
BUR BUILT UP ROOFING
C
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CG CORNER GUARD
CH CHANNEL
CHKDPL CHECKERED PLATE
CJ CONTROL JOINT
CL CENTERLINE
CL TO CL CENTERLINE TO CENTERLINE
CLG CEILING
CLK CAULKING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CASED OPENING OR CLEAN OUT
COL COLUMN
COMP COMPRESSIBLE
COMPO COMPOSITION
CONC CONCRETE
CONN CONNECT, CONNECTION
CONST CONSTRUCTION
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
CONTR CONTRACTOR
CPT CARPET TILE
CTR COUNTER
CTSK COUNTERSINK
D
DEXS DOUBLE EXTRA STRONG (STEEL PIPE)
DF DRINKING FOUNTAIN
DIA DIAMETER
DIFF DIFFUSER
DN DOWN
DO DOOR OPENING
DR DOOR
DS DOWN SPOUT
DT DRAIN TILE
DWG DRAWING
DWR DRAWER
E
E EAST
EA EACH
EIFS EXTERIOR INSULATION AND FINISH
SYSTEMS
EJ EXPANSION JOINT
EL ELEVATION
ELECT ELECTRICAL
ELEV ELEVATOR OR ELEVATION
ENCL ENCLOSURE
EP EPOXY PAINT
EPS EXTERIOR PAINT SYSTEM
EQ EQUAL
EQUIP EQUIPMENT
ES EXPOSED STRUCTURE
EW EACH WAY
EWC ELECTRICAL WATER COOLER
EX EXISTING
EXGR EXISTING GRADE
EXP EXPANSION
EXS EXTRA STRONG (STEEL PIPE)
EXT EXTERIOR
F
FA FIRE ALARM
FAB FABRIC/UPHOLSTERY
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FIN FINISH
FL FLOOR
FLL FLOOR LINE
FLUOR FLUORESCENT
FOC FACE OF COLUMN
FOCONC FACE OF CONCRETE
FRC FIBER REINFORCED CONCRETE
FRP FIELD REINFORCED PANEL
FRPFG FIREPROOFING
FS FULL SIZE
FT FOOT, FEET
FTG FOOTING
FUR FURRING
FV FIELD VERIFY
G
G.B. GRAB BAR, GRADE BEAM
G.O. GRILL OPENING
GA GAUGE
GALV GALVANIZED
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GL GLASS
GND. GROUND
GR. GRADE
GRTG. GRATING
GSCFT GLAZED STRUCTURAL CLAY FACING TILE
GT GROUT
GYP. BD. GYPSUM BOARD
REVISIONS: DATE:
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE.
2 1/2" DEEP SLOTTED
METAL DEFLECTION
TRACK FASTENED TO
DECK @ 2'-0" O.C.
CEILING - SEE ROOM
FINISH SCHEDULE.
METAL STUDS @ 16" O.C.
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE
METAL RUNNER CHANNEL
SECURE TO FLOOR
SOUND ATTENUATION BATT
INSULATION
GYPSUM BOARD
NOTE: EXTEND GYPSUM
BOARD AND FINISHES TO
UNDERSIDE OF DECK (DO
NOT SECURE GYP. BD TO
TRACK)
UNDERSIDE OF DECK ABOVE
PARTITION TYPE '1A'
(NON-RATED/3 5/8" METAL STUDS/INSULATED)
WALL BASE, SEE ROOM
FINISH SCHEDULE
1B, 1E, 1F - 1/16" LEAD LINED
SHEET UP TO 7'-0", SEE PLAN
FOR SIDE OF STUD LOCATION
PARTITION TYPE '1B'
(NON-RATED/3 5/8" METAL STUDS/INSULATED/LEAD LINED)
PARTITION TYPE '1C' (NOT USED)
(NON-RATED/3 5/8" METAL STUDS/UNINSULATED)
PARTITION TYPE '1D' (NOT USED)
(NON-RATED/6" METAL STUDS/UNINSULATED)
PARTITION TYPE '1E'
(NON-RATED/6" METAL STUDS/INSULATED/LEAD LINED)
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE.
2 1/2" DEEP SLOTTED METAL
DEFLECTION TRACK FASTENED
TO DECK @ 2'-0" O.C.
METAL STUDS @ 16" O.C.
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE
METAL RUNNER CHANNEL
SECURE TO FLOOR
2B - SOUND ATTENUATION
BATT INSULATION
GYPSUM BOARD
NOTE: EXTEND GYPSUM
BOARD AND FINISHES TO
UNDERSIDE OF DECK (DO
NOT SECURE GYP. BD TO
TRACK)
UNDERSIDE OF DECK ABOVE
PARTITION TYPE '2A'
(NON-RATED/3 5/8" METAL STUDS/UNINSULATED)
WALL BASE, SEE ROOM
FINISH SCHEDULE
2B - 1/16" LEAD LINED SHEET
UP TO 7'-0" A.F.F., SEE PLAN
FOR SIDE OF STUD LOCATION
PARTITION TYPE '2B'
(NON-RATED/3 5/8" METAL STUDS/INSULATED/LEAD LINED)
PARTITION TYPE '2C' (NOT USED)
(NON-RATED/2 1/2" METAL STUDS/UNINSULATED)
EXISTING SEALANT
EXISTING DEFLECTION
TRACK
CEILING - SEE ROOM
FINISH SCHEDULE
EXISTING METAL STUDS
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE METAL RUNNER CHANNEL
SECURE TO FLOOR
SOUND ATTENUATION BATT INSULATION
3A & 3B - NEW 5/8" GYPSUM BOARD
NOTE: EXTEND GYPSUM BOARD
AND FINISHES TO UNDERSIDE
OF DECK (DO NOT SECURE
GYP. BD TO TRACK)
UNDERSIDE OF EXISTING DECK
ABOVE
PARTITION TYPE '3A'
(NON-RATED/EXISTING CONSTRUCTION/EXISTING INSULATION)
EXISTING WALL BASE 3B & 3C - 1/16" LEAD LINED SHEET
UP TO 7'-0" A.F.F., SEE PLAN FOR
SIDE OF STUD LOCATION
PARTITION TYPE '3B'
(NON-RATED/EXISTING CONSTRUCTION/EXISTING INSULATION/LEAD LINED)
3C & 3D - NEW 5/8" GYPSUM BOARD
EXISTING GYP. BD. TO REMAIN
U.N.O.
PARTITION TYPE '3C'
(NON-RATED/EXISTING CONSTRUCTION/NEW INSULATION/LEAD LINED)
PARTITION TYPE '3D'
(NON-RATED/EXISTING CONSTRUCTION/NEW INSULATION)
PARTITION TYPE '3E'
(NON-RATED/EXISTING CONSTRUCTION/EXISTING INSULATION/LEAD LINED)
3E - NEW LEAD LINED GYPSUM
BOARD TO MATCH EXISTING
CEILING - SEE ROOM
FINISH SCHEDULE
5A,C - METAL STUDS @ 16" O.C.
5B - EXISTING METAL STUD
CONTINUOUS
ACOUSTIC SEALANT
EACH SIDE
METAL RUNNER
CHANNEL SECURE
TO FLOOR
SOUND ATTENUATION
BATT INSULATION
GYPSUM BOARD
PARTITION TYPE '5A'
(1-HR RATED/3 5/8" METAL STUDS/INSULATED/DESIGN UL-U419)
METAL STUD
FIRESTOPPING @ CEILING
FILL VOIDS W/ SAFING
INSULATION
UNDERSIDE OF METAL
DECK ABOVE
FIRESTOPPING & SEALANT
SYSTEM
GYP. BD. CLOSURE CUT
TO DECK PROFILE
2 1/2" DEEP SLOTTED
METAL DEFLECTION &
FIRESTOP TRACK
FASTENED TO DECK @
2'-0" O.C.
WALL BASE
PARTITION TYPE '5B'
(1-HR RATED/EXISTING METAL STUDS/INSULATED/DESIGN UL-U419)
PARTITION TYPE '5C'
(1-HR RATED/8" METAL STUDS/INSULATED/LEAD LINED/DESIGN UL-U419)
5C - 1/16" LEAD LINED SHEET
UP TO 7'-0", SEE PLAN FOR
SIDE OF STUD LOCATION
CONTINUOUS ACOUSTIC
SEALANT EACH SIDE.
2 1/2" DEEP SLOTTED
METAL DEFLECTION
TRACK FASTENED TO
DECK @ 2'-0" O.C.
CEILING - SEE ROOM
FINISH SCHEDULE.
CONTINUOUS
ACOUSTIC SEALANT
EACH SIDE.
METAL RUNNER
CHANNEL SECURE
TO FLOOR
SOUND ATTENUATION
GYPSUM BOARD
NOTE: EXTEND GYPSUM BOARD
AND FINISHES TO UNDERSIDE OF
DECK (DO NOT SECURE GYP. BD
TO TRACK)
UNDERSIDE OF DECK
ABOVE
PARTITION TYPE '6A'
WALL BASE, SEE
ROOM FINISH
SCHEDULE
(NON-RATED/ 3 5/8" METAL STUDS w/ 3 5/8" METAL STUDS/INSULATED) (LEAD LINED)
LEAD-LINED
(SHOWN DASHED)
HEIGHT TO BE 7'-0" A.F.F. -
WHERE OCCURS
THICKNESS
SEE PLAN FOR
T1 - TYPICAL TEMPORARY
CONSTRUCTION PARTITION
NOT TO SCALE
UNDERSIDE OF EXISTING
DECK
1 HR RATED TEMPORARY
PARTITION. HI-IMPACT 5/8"
GYP. BOARD ON 4" METAL
STUDS. FINISH OCCUPIED
SIDE PER ROOM FINISH
SCHEDULE
PLASTER TAPE ALL GYP. BD.
JOINTS. SECURE ALL TAPE
WITH RAM-TACK HIGH TACK
SPRAY OR EQUAL.
OCCUPIED SIDE
RENOVATION SIDE
2 1/2" DEEP SLOTTED
METAL DEFLECTION
TRACK FASTENED TO
DECK @ 2'-0" O.C.
COMPRESSIBLE
INSULATION
SEAL PERIMETER
COMPRESSIBLE
INSULATION
SEAL PERIMETER
MECHANICALLY FASTEN
BOTTOM TRACK TO FLOOR
PARTITION TYPE GENERAL NOTES
1. PROVIDE 5/8" TYPE 'X' GYPSUM BOARD UNLESS NOTED OTHERWISE.
2. PROVIDE CEMENTITIOUS BACKER BOARD AT ALL SHOWER WALLS, TYP.
3. PROVIDE GLASS MAT WATER RESISTANT BACKER BOARD AT ALL WALLS WITH
TILE FINISH, EXCEPT SHOWER WALLS, TYP.
4. IF NOT SHOWN ON DRAWINGS, PROVIDE CONTROL JOINTS IN GYPSUM BOARD
ASSEMBLIES AS DESCRIBED IN ASTM C 840-08 OR GA-216-2013.
5. PROVIDE FIRE RATED WOOD NAILERS AND BLOCKING - 5/8" PLYWOOD OR 18
GAUGE PLATE AS REQUIRED FOR INSTALLATION OF WALL SUPPORTED
EQUIPMENT.
architecture · engineering
W E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
GE HEALTHCARE CONTACT: JASON WRIGHT, JASON.WRIGHT@GE.COM, 313.236.4684
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH GE AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH GE, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL
AFFECT THE OVERALL COMPLETION DATE.
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
100% BID DOCUMENTS
03/29/2021 A-002
PARTITION TYPES 506-CSI-114CSI-114 CARDIOLOGY EP
LABS
TPM MRB
1E
REVISIONS: DATE:
COR TO COORDINATE A MEETING BETWEEN
CONTRACTOR AND CARDIOLOGY NURSE
MANAGER TO ESTABLISH A CONSTRUCTION PLAN.
THE PLAN SHOULD ADDRESS ACCESSIBILITY
CONCERNS THROUGH SHARED CORRIDORS AND
TAVR LAB CONTROL ROOM E747A ALONG WITH
TEMPORARY PARTITION LOCATIONS.
DEMO PLAN LEGEND:
EXISTING WALL OR PARTITION
TO REMAIN
EXISTING DOOR TO REMAIN
EXISTING BUILDING COMPONENT
& STRUCTURE TO REMAIN
EXISTING WALL/PARTITION OR
EXISTING ITEMS TO BE REMOVED
EXISTING DOOR & FRAME TO BE
REMOVED
EXISTING ASSEMBLY TO BE
REMOVED
NOTE: ALL ITEMS SHOWN DARK
AND DASHED ARE TO BE
DEMOLISHED- U.N.O.
GENERAL DEMOLITION NOTES:
1. ALL EXISTING LOOSE MATERIALS, FURNITURE, PORTABLE ELECTRONIC
DEVICES AND EQUIPMENT TO BE RETAINED BY THE OWNER WILL BE MOVED
PRIOR TO DEMOLITION.
2. REFER TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING,
ELECTRICAL, FIRE PROTECTION DRAWINGS, AND SPECIFICATION SECTION
017000 (EXECUTION REQUIREMENTS) FOR OTHER DEMOLITION NOTES AND
INFORMATION.
3. SHORE AND BRACE ALL WORK REQUIRED TO REMAIN.
4. THE CONTRACTOR SHALL FIELD VERIFY EXACT DIMENSIONS AND
CONDITIONS IN FIELD PRIOR TO START OF WORK.
5. DOCUMENTS ARE BASED ON OWNER'S RECORD DRAWINGS AND ARE SHOWN
TO ASSIST THE BIDDERS ONLY. CONTRACTOR AND SUBCONTRACTORS SHALL
VISIT THE SITE PRIOR TO SUBMITTING BID AND BECOME FAMILIAR WITH ALL
CONDITIONS AND NEW WORK. NOTIFY ARCHITECT IMMEDIATELY OF
DISCREPANCIES PRIOR TO COMMENCEMENT OF WORK.
6. ALL DISTURBED SURFACES TO BE PATCHED/ REPAIRED TO RECEIVE NEW
FINISHES IN A LIKE-NEW CONDITION TO MATCH ADJACENT FINISH.
7. ALL EXISTING ATTACHED ITEMS (WALL GUARDS, SWITCHES, ETC.) AND
EQUIPMENT TO BE RETAINED ARE TO BE REMOVED AND REINSTALLED BY
CONTRACTOR UPON COMPLETION OF FINISHING WORK.
8. ANY ITEMS LEFT IN DEMOLITION AREAS WILL BECOME THE PROPERTY OF
DEMOLITION CONTRACTOR FOR THEIR OFF-SITE DISPOSAL AT THE
CONTRACTOR'S EXPENSE. CONSTRUCTION MANAGER TO COORDINATE
DEMOLITION WORK WITH OWNER AND CONTRACTOR PRIOR TO START OF
WORK.
9. CONDUITS, CONDUCTORS AND FEEDERS TO ALL ELECTRICAL LOADS BEING
DEMOLISHED ARE TO BE REMOVED BACK TO THEIR SOURCE IN ACCORDANCE
WITH THE N.E.C. THIS IS TO INCLUDE POWER, LIGHTING CONTROLS, AND ALL
COMMUNICATION SYSTEMS.
10. COORDINATE WITH PLUMBING AND MED. GAS CONTRACTORS IN SELECTIVE
REMOVAL OF VENTS, WASTE PIPING, RAIN WATER CONDUCTORS AND MED.
GAS PIPING IN AREA AFFECTED BY THE WORK. REFER ALSO TO PLUMBING
DEMO DRAWINGS.
11. PATCH/REPAIR/REPLACE ALL MATERIALS AFFECTED BY RENOVATION TO
MATCH ORIGINAL EXISTING MATERIAL, FINISH, COLOR, ETC., U.N.O.
12. PATCH, REPAIR, REPLACE EXISTING MATERIALS AS REQUIRED TO RECEIVE
NEW FINISHES.
13. REFER TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING,
ELECTRICAL, FIRE PROTECTION DRAWINGS, AND SPECIFICATION SECTION
017000 (EXECUTION REQUIREMENTS) FOR OTHER DEMOLITION NOTES AND
INFORMATION.
14. REFER TO FLOOR PLAN FOR DIMENSIONS AND OTHER INFORMATION NOT
SHOWN HERE.
15. SOME FOUNDATION WALLS & FOOTINGS MAY BE ALLOWED TO REMAIN
(BELOW GRADE.) COORDINATE WITH UTILITIES AND ALL TRADES. --
A. WHERE FOUNDATION WALLS AND FOOTINGS ARE ALLOWED TO
REMAIN, REMOVE FOUNDATION TO 8" BELOW SLAB AS REQUIRED TO PROVIDE
FOR NEW SLAB.
16. ALL ITEMS TO BE REMOVED ARE SHOWN DARKER AND DASHED, U.N.O.
E-M E-N E-P
(ABOVE) (ABOVE)
ELECTROPHYSIOLOGY
E741
ELECTROPHYSIOLOGY
E744
CONTROL
E742
CLEAN UTILITY
E740
CORRIDOR
C7-23
EQUIPMENT
E743
CORRIDOR
C7-22
CONTROL LAB
E747A
ELEC.
EQUIPMENT
E747B
SOILED UTILITY
E??
PATIENT
ENTRY
E??
ECHO ROOM
E??
TAVR / CATH
LAB
E747
EXISTING CEILING
TO REMAIN
EXISTING FLOORING
TO REMAIN
(UP TO 7'-10")
E X
IS
T
IN
G C
E
IL
R E
M A
IN
D3 D16
D6 D15
D15
D15
D15
D15 D15
D15D15
D6
D1
D3
D3
D3
D3
D4
D5
D4
D4
D4
D3
D16
D1
D1 D1D2D5 D29
D29
D1
D29
D1
D1
D29
D2
D2
D1
D30 D30
D1
D15
D1
D30
D30
D1
D15
D15
D1 D2
D2 D1
D5
D30
D2
D1D2
D2
D2
D15
D30
D7 D9
D25
D7 D9
D13
D13
D20 D20
D20
D20
D21
D23
D22
D20
D20
D13
D21
D21
D21
D21
E X
IS
T
IN
G F
LO
R E
M A
IN
E X
IS
T
IN
G C
E
IL
R E
M A
IN
D9 D7
D7 D9
D7 D9
D7 D9
D21
D21D21
D21
D7
D9
D18
D17
D10
D10D10
D10 D10
D10
D7
D9
D27
D27
D27 D27
D31
D31
D31
D31
CONTRACTOR TO COORDINATE WITH
VA COR FOR ACCESS TO CONTROL
LAB E747A AND MEANS AND METHODS
FOR WORK ALONG SOUTH WALL
D9 architecture · engineering
W E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
GE HEALTHCARE CONTACT: JASON WRIGHT, JASON.WRIGHT@GE.COM, 313.236.4684
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH GE AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH GE, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL
AFFECT THE OVERALL COMPLETION DATE.
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
100% BID DOCUMENTS
03/29/2021
AD107
PARTIAL SEVENTH FLOOR
DEMOLITION PLAN
506-CSI-114CSI-114 CARDIOLOGY EP
LABS
TPM MRB
1E
DEMOLITION KEY
KEY VALUE KEYNOTE TEXT
D1 REMOVE EXISTING WALL, BASE TRIM, ALL ATTACHED/EMBEDDED ITEMS, AND ALL OTHER
ASSOCIATED WALL MATERIALS FROM FLOOR TO DECK ABOVE. PATCH AND REPAIR ADJACENT
WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR
PROPER INSTALLATION OF NEW FINISHES. STEEL STRUCTURE TO REMAIN.
D2 REMOVE EXISTING LEAD LINED WALL, BASE TRIM, ALL ATTACHED/EMBEDDED ITEMS, AND ALL
OTHER ASSOCIATED WALL MATERIALS FROM FLOOR TO DECK ABOVE. PATCH AND REPAIR
ADJACENT WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS
REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES. STEEL STRUCTURE TO REMAIN.
D3 REMOVE EXISTING DOOR ASSEMBLY INCLUDING DOOR(S), SIDELIGHTS, GROUT FILLED FRAMES, THRESHOLD, HARDWARE, ANCHORS, AND TRIM (ON BOTH SIDES OF EACH DOOR). PATCH AND
REPAIR ADJACENT WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR
AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
D4 REMOVE EXISTING LEAD LINED DOOR ASSEMBLY INCLUDING DOOR(S), SIDELIGHTS, GROUT
FILLED FRAMES, THRESHOLD, HARDWARE, ANCHORS, AND TRIM (ON BOTH SIDES OF EACH
DOOR). PATCH AND REPAIR ADJACENT WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO
MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
D5 REMOVE EXISTING LEAD LINED WINDOW INCLUDING FRAME AND ALL HARDWARE ASSOCIATED
WITH EXISTING WINDOW.
D6 SAW CUT WALL FOR NEW DOOR/WINDOW. PATCH AND REPAIR ADJACENT SURFACES AT AREAS
OF REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW
FINISHES.
D7 REMOVE EXISTING CEILING INCLUDING ALL BRACKETS, ANCHORS & SUPPORTS. PATCH AND
REPAIR ADJACENT SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS
REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES. PROVIDE NEW CEILING TILES FOR
ANY ADJACENT TILES THAT ARE TO REMAIN, THAT ARE DAMAGED DURING DEMOLITION.
D9 REMOVE EXISTING FINISH FLOOR MATERIALS AND WALL BASE AND ADHESIVE/MORTAR AS
REQUIRED FOR PROPER INSTALLATION OF NEW FLOOR FINISH. PATCH AND REPAIR ADJACENT
WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED FOR
PROPER INSTALLATION OF NEW FINISHES.
D10 REMOVE EXISTING CORNER GUARD. PATCH AND REPAIR AREA OF REMOVAL AS REQ'D.
CONTRACTOR TO VERIFY QUANTITIES AND LENGTHS IN FIELD.
D13 REMOVE EXISTING MILLWORK AND/OR WALL MOUNTED SHELVING INCLUDING ANY ASSOCIATED
BRACING SUPPORTS, BRACKETS, AND ANCHORS AS NECESSARY FOR INSTALLATION OF NEW
FINISHES OR CASEWORK. PATCH AND REPAIR ADJACENT SURFACES AT AREAS OF REMOVAL TO
MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES OR
CASEWORK. ETC.
D15 REMOVE AND SALVAGE FOR REINSTALLATION ALL EXISTING HANDRAIL & BUMPER RAILS. PATCH
AND REPAIR AREA OF REMOVAL AS REQ'D. CONTRACTOR TO VERIFY QUANTITIES AND LENGTHS
IN FIELD. RETURN TO OWNER ALL UNUSED.
D16 REMOVE AND SALVAGE EXISTING DOOR HARDWARE, COORDINATE REUSE WITH DOOR
HARDWARE LOCATED WITHIN THE SPECIFICATIONS.
D17 REMOVE AND SALVAGE EXISTING TOILET ACCESSORIES, PREPARE FOR REINSTALLATION,
RETURN TO OWNER ANY UNUSED TOILET ACCESSORIES. (INCLUDING, BUT NOT LIMITED TO,
MIRRORS, PAPER TOWEL DISPENSER, SOAP DISPENSER, GRAB BARS, TOILET TISSUE DISPENSER, SANITARY NAPKIN DISPENSER, SANITARY NAPKIN DISPOSAL). PATCH AND REPAIR ADJACENT
WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH EXISTING AND/OR AS REQUIRED TO
PROVIDE SMOOTH SUBSTRATES.
D18 REMOVE EXISTING PLUMBING FIXTURES AND ANY ASSOCIATED PIPING AND ANCHORS AS
NECESSARY FOR INSTALLATION OF NEW FIXTURES AND/OR FINISHES. COORDINATE WITH
PLUMBING DRAWINGS. PATCH AND REPAIR ADJACENT SURFACES AT AREAS OF REMOVAL TO
MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
D20 REMOVE, SALVAGE AND RETURN TO OWNER EXISTING MEDICAL EQUIPMENT. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS FOR MORE INFORMATION.
D21 REMOVE AND SALVAGE EXISTING MEDICAL EQUIPMENT FOR REINSTALLATION. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS FOR MORE INFORMATION.
D22 REMOVE AND DISCARD EXISTING MEDICAL EQUIPMENT. REFER TO MECHANICAL AND ELECTRICAL
DRAWINGS FOR MORE INFORMATION.
D23 EQUIPMENT VENDOR TO REMOVE EXISTING MEDICAL EQUIPMENT, CONTRACTOR TO
COORDINATE REMOVAL WITH EQUIPMENT VENDOR.
D25 REMOVE EXISTING UNISTRUT AND UNISTRUT UNIVERSAL GRID SYSTEM.
D27 REMOVE EXISTING ELECTRICAL ITEMS AND ANY ASSOCIATED CONDUIT, WIRING, AND ANCHORS
AS REQ'D. COORDINATE WITH ELECTRICAL DRAWINGS.
D29 REMOVE EXISTING LEAD LINED GYPSUM BOARD, BASE TRIM, ALL ATTACHED/EMBEDDED ITEMS, AND ALL OTHER ASSOCIATED WALL MATERIALS FROM FLOOR TO DECK ABOVE. METAL STUDS TO
REMAIN. PATCH AND REPAIR ADJACENT WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO
MATCH EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
D30 REMOVE EXISTING GYPSUM BOARD, BASE TRIM, ALL ATTACHED/EMBEDDED ITEMS, AND ALL
OTHER ASSOCIATED WALL MATERIALS FROM FLOOR TO DECK ABOVE. METAL STUDS TO REMAIN.
PATCH AND REPAIR ADJACENT WALL/FLOOR SURFACES AT AREAS OF REMOVAL TO MATCH
EXISTING AND/OR AS REQUIRED FOR PROPER INSTALLATION OF NEW FINISHES.
D31 REMOVE, SALVAGE AND RETURN TO OWNER EXISTING WALL MOUTNED FURNITURE.
1/4" = 1'-0"
PARTIAL SEVENTH FLOOR DEMOLITION PLAN
1. SUB-CONTRACTORS ARE TO COORDINATE WORK WITH ALL OTHER
TRADES.
2. CONFLICTS BETWEEN NOTES, DETAILS, SPECIFICATIONS, ETC.,
SHALL BE VERIFIED WITH THE ARCHITECT/ ENGINEER OR THE
STRICTEST PROVISIONS SHALL GOVERN.
3. DETAILS OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE
SAME NATURE AS SHOWN FOR SIMILAR CONDITIONS. ANY
UNCLEAR CONDITIONS SHALL BE VERIFIED WITH ARCHITECT/
ENGINEER PRIOR TO CONSTRUCTION OF THAT AREA.
4. DRAWINGS ARE NOT TO BE SCALED. ANY UNCLEAR DIMENSIONS
OR DIMENSIONAL DISCREPANCIES SHALL BE VERIFIED WITH
ARCHITECT.
5. ALL EXISTING CONDITIONS AND ALL RELATED DIMENSIONS
INDICATED IN THE CONTRACT DOCUMENTS SHALL BE FIELD
VERIFIED PRIOR TO FABRICATION, ERECTION, AND/OR
CONSTRUCTION. ANY CONDITIONS THAT DIFFER FROM THAT
INDICATED IN THE CONTRACT DOCUMENTS SHALL BE SUBMITTED
TO THE ARCHITECT FOR REVIEW PRIOR TO FABRICATION,
ERECTION, AND/OR CONSTRUCTION.
6. CONSTRUCTION MANAGER (CM) / GENERAL CONTRACTOR (GC) TO
REVIEW ENTIRE SET OF CONSTRUCTION DOCUMENTS (DRAWINGS
& SPECIFICATIONS) AND SHALL COORDINATE WORK BETWEEN ALL
TRADES. IF CONFLICTS ARISE DUE TO COORDINATION OF
TRADES, CM / GC IS TO VERIFY CONFLICT WITH ARCHITECT /
ENGINEER PRIOR TO CONSTRUCTION / INSTALLATION OF
CONFLICTING ITEMS.
7. REMODELING OR PATCHING SHALL BE EXECUTED IN
CONJUNCTION WITH THE NEW WORK AND THE DEMOLITION
WORK IN THE DRAWINGS.
8. PATCH ALL EXPOSED INTERIOR AND EXTERIOR WALLS WHERE
ATTACHED OR IMBEDDED ITEMS WERE REMOVED.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PREPARATIONS OF THE FLOORS, WALLS, AND CEILINGS FOR NEW
FINISHES.
10. REMOVE ADHESIVE/OR MORTAR LEFT FROM THE REMOVAL OF
EXISTING FLOOR COVERING AND PREP FLOOR W/CONCRETE (OR
FLORSTONE) AS NECESSARY TO ACCOMMODATE NEW FLOOR
COVERINGS.
11. U.N.O. PATCH AND PREPARE FLOOR W/CONCRETE (OR
FLORSTONE) FLUSH WITH ADJACENT FLOOR SURFACE. FILL ANY
SLOPING OR RECESSED AREAS LEVEL TO TYPICAL FINISH FLOOR
ELEVATION TO ACCOMMODATE NEW FLOOR COVERINGS.
12. FILL-IN EXISTING CHASE OPENINGS, PENETRATIONS IN THE
FLOOR AND CEILING DECK. FIRE-RATING OF NEW CONSTRUCTION
TO MATCH EXISTING. REFER TO DRAWINGS FOR DETAILS.
GENERAL NOTES:
13. WHEN REMOVING DEBRIS FROM CONSTRUCTION AREA WIPE OFF
WHEELS BEFORE LEAVING CONSTRUCTION AREA AND USE WET
RAGS OVER DUMPSTER TO REDUCE DUST.
14. THE OWNER RESERVES THE RIGHT TO HALT CONSTRUCTION
ACTIVITY AT ANY TIME DUE TO NOISE AND VIBRATION WHICH
MIGHT EFFECT THE OWNER'S ONGOING USE OF THE FACILITY.
15. CONTRACTOR SHALL REINSTALL CEILING SYSTEM AND PATCH
FINISHES AT FLOOR BELOW AND ABOVE WHERE WORK IMPACTS
EXISTING ASSEMBLIES. FINISH/PAINT SURFACES TO MATCH
EXISTING FINISH.
16. SEE DRAWING A-001 (TYP. DUST-PROOF CONSTRUCTION
PARTITION) FOR DETAIL OF TEMPORARY CONSTRUCTION
PARTITION.
17. ALL DIMENSIONS ARE FROM FACE OF STUD, C.M.U., OR
CONCRETE TO FACE OF FINISH, CMU, OR CONCRETE, U.N.O.
18. COORDINATE LOCATION OF ALL RECESSED OR IMBEDDED ITEMS
SO AS NOT TO INTERFERE WITH OTHER TRADE'S WORK.
19. MAINTAIN WALL FIRE RATING BEHIND RECESSED ACCESSORIES &
EQUIPMENT.
20. ADDITIONS OF OPENINGS, PENETRATIONS OR EMBEDMENTS IN
THE FIELD SHALL BE FIRST VERIFIED WITH ARCHITECT /
ENGINEER.
21. PROVIDE NEOPRENE OR VINYL ISOLATION MATERIAL BETWEEN
DISSIMILAR METALS THAT ARE IN CONTACT WITH ONE ANOTHER,
TYPICAL.
22. PATCH & REPAIR ALL MAJOR & MINOR BLEMISHES AS REQ'D. DUE
TO DEMOLITION WORK. MATCH ADJACENT MATERIAL & COLOR.
23. PROVIDE SOLID, CONTINUOUS BLOCKING IN WALL AT ALL
LOCATIONS WHERE ALL MILLWORK, PLUMBING FIXTURES, EQUIP.,
ETC. ATTACH TO WALL.
24. WHERE GYPSUM BOARD ABUTS DISSIMILAR MATERIALS, USE
METAL DRYWALL EDGE BEAD AND SEALANT WITH BACKER ROD.
25. ALL HEADERS ABOVE OPENINGS, DOORS & BORROWED LITES IN
NON-LOAD BEARING INTERIOR METAL STUD WALLS SHALL BE (2) 8"
18 GA. JOISTS (UNLESS OTHERWISE NOTED)
26. PAINT ALL EXPOSED LINTELS (TYP.)
27. WHERE RECESSED EQUIPMENT IS INSTALLED IN UNEVEN
SURFACED MATERIAL, USE SMOOTH SURFACED MATERIAL ABOUT
PERIMETER SO THAT EQUIPMENT LAYS FLUSH AND EVEN.
COORDINATE WITH EQUIPMENT MANUFACTURER.
28. ALL BLOCKING SHALL BE FIRE RETARDANT TREATED WOOD OR
MADE OF NON-COMBUSTIBLE MATERIAL.
E-M E-N E-P
ELECTROPHYSIOLOGY
E741
ELECTROPHYSIOLOGY
E744
CONTROL
E742
CLEAN UTILITY
E740
CONTROL
E741A
CORRIDOR
C7-23
EQUIPMENT
E743
CONTROL LAB
E747A
CORRIDOR
C7-22
CORRIDOR
C7-22
SOILED UTILITY
E??
PATIENT
ENTRY
E??
ECHO ROOM
E??
TAVR / CATH
LAB
E747
ELEC.
EQUIPMENT
E747B
HAC
E731
OFFICE
E700
1' - 2"
INFILL FORMER WINDOW
OPENING AS REQ'D TO
MAINTAIN LEAD LINING
CONTINUOUS COVERAGE
1B
1B
6A
1B
1A
5A5A
1B
1B
ALIGN
ALIGN
ALIGN
ALIGN
2'
4" 7'
1/ 4"
ALIGN
1A
ELEC. CLOSET
C743A
STAFF TOILET
E729
CORRIDOR
C7-16
CORRIDOR
C7-21
CORRIDOR
C7-21
CORRIDOR
C7-17
2A
2A 2A2A
1B1B
2A2A
1B
3E
3D
3C
1B1B1B
1B
W1
W1
A-2017
A-201
A-201
A-20114
A-2012
A-201 34
A-601
8' - 7"
4'
5/
5/ 8"
CL TABLE
PIVOT
ISO
CENTER
U
IT
L
C
3A .1
E
1.
E
4.
E741.1 E744.1
E
2.
E
4.
E
1A .1
E
1.
E
0.
C 7-
.1
6A
3B5C
3E
5B
3A
7/
1E1E3B
2B
2A
3B
2' - 0" 12' - 8 7/16" +/- 1' - 7"
8 7/16" +/- 6' - 0" 2' - 6" 3' - 4" 2"
6" 3'
1"
ALIGN
1' - 6" 4' - 11" +/- 8 3/4"
1' - 8 3/4"
8'
6" 1'
5"
2'
4"
2' - 10"
1' - 6"
3'
1" 7'
4"
.0 ° 1
.0
1' - 0" 1'
0"
8' - 1"
1' - 5" 6' - 0" 8"
BLKHD
ABOVE
A-20115
C L
M E
D G
A S
E S
8'
9/
CONTRACTOR TO COORDINATE WITH
VA COR FOR ACCESS TO CONTROL
LAB E747A AND MEANS AND METHODS
FOR WORK ALONG SOUTH WALL
NEW 18" DEEP, 1/2" SSM-1 OVER 3/4" PARTICLE BOARD
COUNTERTOP WITH METAL SUPPORT BRACKETS, MATCH
EXISTING HEIGHT, DEPTH, AND BACKSPLASH (CONTRACTOR
TO VERIFY IN FIELD). PROVIDE (4) 4" GROMMETS AS SHOWN.
PLAN NOTES:
1 MODIFY EXISTING HANDRAIL AS REQ'D FOR NEW LAYOUT.
CONTRACTOR TO CONTACT VA COR TO GET ACCESS TO ATTIC
STOCK.
EXISTING LEAD LINED WALL
NEW LEAD LINED WALL
WALL TYPE LEGEND
2-HR. FIRE RATED
WALL/SMOKE BARRIER
EXISTING 2-HR. FIRE RATED
WALL/SMOKE BARRIER
1-HR. FIRE RATED
WALL/SMOKE BARRIER
EXISTING 1-HR. FIRE RATED
WALL/SMOKE BARRIER
NOTE: CONTRACTOR TO VERIFY LOCATION OF LEAD LINING IN
AREAS OF NEW WORK. ALL NEW LEAD LINING TO BE CONNECTED
TO EXISTING WALL LEAD LINING FOR CONTINUOUS COVERAGE
architecture · engineering
W E
R E
C Y
C L E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Phase:
Issue Date:
Drawing Number:
Drawing Title
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Project Title
Location
Checked Drawn
Project Number
Approved : Project Director
Building Number
3419 Pierson Place Flushing, Michigan, 48433 810-230-6202
ARCHITECT / ENGINEER OF RECORDCONSULTANT
ANN ARBOR, MICHIGAN
GE HEALTHCARE CONTACT: JASON WRIGHT, JASON.WRIGHT@GE.COM, 313.236.4684
CONTRACTOR IS RESPONSIBLE TO MAKE INITIAL CONTACT WITH GE AFTER CONTRACT AWARD. CONTRACTOR TO REVIEW THE PROJECT SCHEDULE WITH GE, IDENTIFY KEY MILESTONE DATES, COORDINATE DELIVERIES (FOR CONTRACTOR INSTALLED ITEMS), AND IDENTIFY/COORDINATE INSPECTIONS NECESSARY TO PROVIDE A FULLY
FUNCTIONING SYSTEM.
CONTRACTOR TO NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR), CONTRACTING OFFICER (CO), AND EOR IMMEDIATELY IF THE EQUIPMENT VENDOR IS NOT ABLE TO MEET ANY OF THE PROPOSED DEADLINES AND WILL
AFFECT THE OVERALL COMPLETION DATE.
THE ON-SITE RADIATION SAFETY OFFICER (RSO) HAS TESTED ALL ROOMS PRIOR TO THE START CONSTRUCTION AND THEY PASS THE RADIATION SAFETY LEAK DETECTION TEST. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF ALL DISTURBED LEAD TO ENSURE THE RE-TEST PERFORMED BY THE VA RSO WILL PASS THE LEAK DETECTION TEST.
100% BID DOCUMENTS
03/29/2021 A-107
PARTIAL SEVENTH FLOOR FLOOR
PLAN
506-CSI-114CSI-114 CARDIOLOGY EP
LABS
TPM MRB
1E
1/4" = 1'-0"
PARTIAL SEVENTH FLOOR FLOOR PLAN
E-M E-N E-P
TAVR / CATH
LAB
E747
ECHO ROOM
E??
PATIENT
ENTRY
E??
SOILED UTILITY
E??
CORRIDOR
C7-22
EQUIPMENT
E743
ELECTROPHYSIOLOGY
E741
ELECTROPHYSIOLOGY
E744
CONTROL LAB
E747A
ELEC.
EQUIPMENT
E747B
CONTROL
E742
HAC
E731
OFFICE
E700
CLEAN UTILITY
E740
CORRIDOR
C7-23
CONTROL
E741A
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 6"
EXISTING CEILING TO
REMAIN, V.I.F. HEIGHT
NEW CEILING TO MATCH EXISTING,
MATCH HEIGHT
NEW UNISTRUT
UNIVERSAL GRID
SYSTEM W/ FULL
LENGTH CLOSURE
STRIPS EXISTING UNISTRUT
UNIVERSAL GRID
SYSTEM TO REMAIN
EXISTING CEILING MOUNTED
MEDICAL EQUIPMENT TO REMAIN
EXISTING CEILING MOUNTED
MEDICAL EQUIPMENT TO REMAIN
NEW CEILING
MOUNTED MEDICAL
EQUIPMENT - SEE
EQUIP. DWGS.
9' - 6"
9' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
VIF
9' - 0"
4'
5/
CL TABLE
PIVOT
ISO
CENTER
U
8' - 7"
7' - 2"
1'
2" ALIGN
A-601
EQ-13
REFLECTED CEILING PLAN LEGEND:
SUPPLY DIFFUSER
TRANSFER GRILL AND/OR EXHAUST FAN
2'x4' LIGHT FIXTURE
2'x2' LIGHT FIXTURE
EX. CEILING HEIGHT- ABOVE FINISH FLOOR
CEILING HEIGHT- ABOVE FINISH FLOOR
2X2 ACOUSTIC CEILING PANEL
EXISTING 2X2 ACOUSTIC CEILING PANEL
GYPSUM BOARD
EXPOSED
S
SPEAKER LOCATION
(SEE ELECTRICAL COMMUNICATIONS)
C
FIRE EXIT SIGN LOCATION
CAMERA LOCATION
(SEE ELECTRICAL COMMUNICATIONS)
SPRINKLER LOCATION
(SEE FIRE PROTECTION DRAWINGS)
X'-X
X'-X
NEW UNISTRUT CLOSURE STRIP
REFLECTED CEILING PLAN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .