This announcement is a pre-solicitation for a construction project at the Department of Veterans Affairs Medical Center in Ann Arbor, Michigan. The solicitation will be issued on or around May 25, 2021 for site preparation work in the cardiology electrophysiology labs, including walls, floors, utilities, and support systems to accommodate new medical equipment. The contractor must coordinate with the medical equipment provider for full installation and operation. The project is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The contractor will have 120 days to complete the work. Responses are due as specified in the forthcoming solicitation to be issued on Contract Opportunities. The awarded firm fixed price contract must be between $500,000 and $1,000,000 and will be awarded within 180 days of bid receipt.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25021B0046-0001 - 506-CSI-114 Site Prep Cardiology EP Labs Ann Arbor, MI VAMC

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 506-21-3-585-0027

506-CSI-114

Department of Veterans Affairs Ann Arbor Healthcare System Network Contracting Office 10 24 Frank Lloyd Wright Dr., Suite M2200 Ann Arbor MI 48105 Y Department of Veterans Affairs Ann Arbor Healthcare System Network Contracting Office 10 24 Frank Lloyd Wright Dr., Suite M2200 Ann Arbor MI 48105 To all Offerors/Bidders

36C25021B0046

X X X Thursday July 8, 2021 at 12:00 pm (Noon) X Amendment 0005 answers RFI questions (See Continuation Page).

Extends Bid Opening to Thursday July 8, 2021 at 12:00 pm (Noon) Eastern Time.

There are two (2) attachments to this amendment

Continuation Page

RFI Questions and Answers Q. During the Second Site Visit It was discussed that the three Desks will not be able to be blocked in E747a. The window will not be able to be removed if ICRA barriers are not able to be installed. Please advise how the VA would like this work addressed.

A. Work to remove window between TAVR control room and EP lab should be minimal. Contractor should coordinate with VA for fire rated plastic sheeting for minimal interruption to desks in E747a. Work should be completed after hours on nights/weekends. Contractor could leave desks/equipment while providing proper dust protection and paint wall around existing conditions. Contractor to provide deductive alternate to remove the scope of work demolishing the window and infilling the wall and provide and install an opaque film to the existing window.

Q. During the Second Site Visit It was discussed that during GE's de-install in EP lab e741 that ICRA barriers would be needed but were not provided under GE and are not shown in the plans to be provided by the GC under this contract. Will these ICRA barriers need to be provided by the GC under this contract? If so could more information be provided.

A. General Contractor shall provide ICRA barriers for GE de-install. Prior to construction, GC,VA COR, and end user will need to have a coordination meeting to create a workable ICRA plan for all parties involved.

Q. During the Second Site Visit it was discussed that the GC would need to follow additional ICRA requirements for working in the interstitial space. Could an ICRA plan be provided so all GC's are bidding the same requirements.

A. After award of contract, GC will need to have a coordination meeting with GC, VA COR, and end user to create a workable IRCA plan for all parties involved.

Q. Will we be able to bill for delivered Material that is stored on site?

A. Yes, if GC provides own storage. VA will not provide.

Q. For the Class IV ICRA rating is the GC required to include the cost of the Gowns, shoe covers and head covers? This question was not answered in the previous round of RFIs.

A. Yes, GC to provide.

Q. Could a Life Safety Plan be provided to show which walls extend to the deck? This will affect how our ICRA barriers are built and if the existing walls will need to be extended.

A. If no plan is received, contractor to assume no walls go to deck and shall verify in field.

Q. RFI response VA will not provide a Structural Engineer of record(GE to respond if they are able to provide of if this is the GC's responsibility) Could a determination on who is providing the Structural Engineer of Record be provided?

A. To be completed by GE.

Q. An ICRA plan was not part of the bid documents. Two of the RFI responses state that the plan will be provided. At the Second Site visit John and Jen from Infection Control were present and discussing what ICRA requirements were needed. They said they needed additional time to review and would get something over to Dan Oda (COR). Could this information be provided to all bidders.

A. Due to the sensitive operational needs for the TAVR room and its Control Room there was no ICRA plan provided so that the ICRA plan can be developed between the chosen GC, VA COR, and End Users. The contractor will have a better understanding of how long it will take to complete construction in a way to both give the users what they need while still moving forward with construction. VA COR to provide a list of additional ICRA requirements.

Q. Could the GE response be provided for the following? The RFI responses just say GE to respond. 2. Sheet A1-General Notes 03/20 Customer Site readiness – It is the contractors responsibility to contract a vibration consultant/engineer to implement site design modifications to meet the GE vibration specification. Refer to the system pre-installation manual for the vibration specification.

A. To be completed by GE.

Q. During the second visit it was discussed that moving the double doors to the electrical closet C743A may not need to be moved to due to the ICRA requirements and challenges for working in the space and keeping access open. Could additional information be provided on if this work is to be omitted from the project?

A. The work related to the electrical closet C743A is to remain in the project.

Q. There is no spec for duct insulation. Please provide a spec, and which ducts is to be insulated.

A. Supply and Return Ducts shall be insulated per VA Spec 23 07 11,see attachment.

Q. There is no spec for hot water heating piping, or insulation. Please provide a specs for both.

A. Hot water heating pipes and refrigeration pipes shall be insulated per VA Spec 23 07 11,see attachment. For TU-19-20, HHWS and HHWR pipes shall be size 3/4". For TU-19-19N, HHWS and HHWR pipes shall be size 1/2" installed according to detail (3) on sheet M-607.

Q. There is no condensate shown on M108 for the AC unit. Please provide pipe routing and spec.

A. Condensate pipe shall be rigid copper pipe type L or M, size 7/8" O.D.(sweat type)and a P-trap with minimum 2" trap height(see attached & detail#6 on sheet M-607); pitched down toward drain. Drain line shall be full size of the connection. Dielectric fitting shall be used when two dissimilar metals are to be connected .Contractor shall field verify to locate/extend pipe routing to the nearest existing/possible drain and install the Unit according to the manufacturer's manual and drawings provided with the unit.

Q. Our previously submitted question regarding med gas outlet re-certification was directed to any outlets upstream of the cut/cap and not the outlets to remain as part of the renovation. This would likely be a huge task but please clarify.

A. NFPA 99 (2021) requirements shall be met; See plumbing general notes 22 and 24: sheet MG-107.

Q. Just to confirm, Cardiology will be purchasing and installing the lights and booms?

A. VA will provide all skytron lights, booms and installation. The prep work is the responsibility of the contractor.

ATTACHMENTS:

See attached document: EP Labs Barrier Blueprint - ICRA drawing.

See attached document: RFI17_36C25021B0046 - RB Construction RFI 010_Response_210629.