This document comprises engineering drawings for a Needlepoint BiPolar Ionization (NBPI) system installation project at the College of Coastal Georgia, prepared by NBP Engineers, Inc. located in Macon, Georgia. The project scope encompasses installation of NBPI units on existing central station air handlers across multiple buildings on the Main Campus in Brunswick, Georgia, and the Camden Center in Kingsland, Georgia. The drawings are dated May 4, 2022, and marked as a review set not for construction. The project number is 22047. The document includes a comprehensive index of drawings with sheets covering the Brunswick Campus HVAC map, Camden Center first and second floor HVAC plans, and detailed abbreviations, legends, and schedules for HVAC systems. The drawings identify specific air handler units (AH-1 through AH-5) and associated equipment locations within the facilities, with particular focus on the Camden Center's multi-floor layout showing classroom spaces, mechanical rooms, and administrative areas where HVAC modifications will occur.
The drawings serve as technical documentation for the alterations work, which includes installation of NBPI units on existing air handlers and electrical work to support HVAC upgrades. The project requires protection of existing floors, finishes, and building structures during construction, with buildings remaining occupied by the College during the upgrade process. The drawings utilize standard HVAC abbreviations and symbols for piping, ductwork, valves, dampers, and control systems, providing contractors with detailed specifications for equipment placement and system integration across both campus locations.
Text of this file
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
M01
SHEET NO. TITLE
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
M21
NBP PROJECT No. 22047
COLLEGE of COASTAL GEORGIA
M22
Air Handler BiPolar Ionization
Main Campus (Brunswick, Ga) and Camden Center (Kinglsand, Ga)
CAMDEN CENTER FIRST FLOOR PLAN - HVAC
BRUNSWICK CAMPUS MAP - HVAC
M23 CAMDEN CENTER SECOND FLOOR PLAN - HVAC
ABBREVIATIONS, LEGEND, & SCHEDULE - HVAC
05.04.22 - REVIEW SET
P:\22047\22047m01.dgn
DATE PLOTTED
DGN FILE
04-MAY-2022
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22047\22047m01.dgn
AS SHOWN
STAMP
M
WSH
LTF
WSH
22047
N B P P
R O J E
C T N o
05.04.22
C O
L L E
G E o f C
O A S
T A
L G
E O
R G
IA
A ir H a n d le r
B iP o la r Io n iz a ti o n
M a in C a m p u s
B ru n s w ic k
G a a n d C a m d e n C e n te r (K in g ls a n d
G a
R E
V
IE
W
S E
T
N
O T
F
O R
C
N S T
R U
C T
IO
N
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
?F DEGREES FAHRENHEIT
?C DEGREES CENTIGRADE
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
M01
SPS
SD
COMBINATION STARTER
STARTER
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
GATE VALVE WITH
3/4" HOSE END
BALANCE VALVE
THREADED & FLANGED
GLOBE VALVE
CHECK VALVE
3-WAY MIXING VALVE
GATE VALVE
BUTTERFLY VALVE
SOLENOID VALVE
CONTROL VALVE
PLAN VIEW
2-WAY MOTORIZED VALVE
RELIEF VALVE
FLANGED UNION
BRANCH OUT TOP
STRAINER
BRANCH OUT BOTTOM
ELBOW DOWN
ELBOW UP
TEE OUT TOP
BLIND FLANGE
PIPE CAP
AUTOMATIC AIR VENTAAV
FLEX. PIPE CONN.
BACKFLOW PREVENTER
THERMOMETER
TEE OUT BOTTOM
MANUAL AIR VENT
PIPE TEST PLUG
CHILLED WATER FLOW
HEATING WATER FLOW
COLD WATER DOMESTIC
NATURAL GAS
CONDENSER WATER FLOW
DRAIN
CHILLED WATER RETURN
HEATING WATER RETURN
HOT WATER DOMESTIC
G
D
DUCT SIZE FIRST DIMENSION
IS SIDE SHOWN
24\12
DOOR GRILLE
C.F.M.
REFERS TO DETAIL OR
PLAN ON SHEET M-1.THERMOSTAT
INTERVAL TIMER
T
I.T.
1\M-4
DUCT/PLENUM w/LINER
FIRE DAMPER
ELBOW WITH
TURNING VANES
FLEX. DUCT CONN.
TURNING VANES
ELBOW WITHOUT
ADJUSTABLE AIR
EXTRACTOR
INSULATED FLEX. DUCT
INSULATED FLEX. DUCT
c
ECCENTRIC REDUCER
HWS
HWR
CHS
CHR
CONDENSER WATER RETURN
CS
CR
STATIC PRESSURE SENSOR
SMOKE DETECTOR
POINT OF CONNECTION
DUCT SPLIT
THREADED & FLANGED
THREADED & FLANGED
UNION
GAUGE TAPPING
GAUGE WITH TAPPING
THREADED & FLANGED
THREADED & FLANGED
PIPE SOCKET WELL
FLOW INDICATOR BALANCER
M
T G THERMOSTAT w/GROUND
ANNULAR ELEMENT FLOW STATION
M
DAMPER - BLADE VIEW DAMPER - END VIEW
xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)
DOUBLE WALL INSULATED
ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}
HVAC
SCHEDULE -
LEGEND, &
ABBREVIATIONS,
P:\22047\22047m21.dgn
DGN FILE
04-MAY-2022
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22047\22047m21.dgn
AS SHOWN
STAMP
M
WSH
LTF
WSH
22047
N B P P
R O J E
C T N o
05.04.22
C O
L L E
G E o f C
O A S
T A
L G
E O
R
H a n d le r
B iP o la r Io n iz a ti o n
M a in C a m p u s
B ru n s w ic k
G a a n d C a m d e n C e n te r (K in g ls a n d
G a
R E
V
T
N
O T
F
N S T
R U
C T
IO
N
M21
AREAS OF WORK
BUILDING NO. BUILDING NAME
NOT TO SCALE
BRUNSWICK CAMPUS MAP
1 1
ACADEMIC COMMONS NORTH
ACADEMIC COMMONS SOUTH
ANDREWS CENTER
CLARA WOOD GOULD LIBRARY
CORRELL TEACHER EDUCATION AND LEARNING CENTER
HARGETT BUILDING
SOUTHEAST GEORGIA CONFERENCE CENTER
STUDENT ACTIVITY CENTER
NUNNALLY HEALTH AND SCIENCE BUILDING2
CAMPUS CENTER
JONES BUILDING
HOWARD COFFIN BUILDING (GYMNASIUM)
HVAC
CAMPUS MAP -
BRUNSWICK
P:\22047\22047m22.dgn
DGN FILE
04-MAY-2022
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22047\22047m22.dgn
AS SHOWN
STAMP
M
WSH
LTF
WSH
22047
N B P P
R O J E
C T N o
05.04.22
C O
L L E
G E o f C
O A S
T A
L G
E O
R
H a n d le r
B iP o la r Io n iz a ti o n
M a in C a m p u s
B ru n s w ic k
G a a n d C a m d e n C e n te r (K in g ls a n d
G a
R E
V
T
N
O T
F
N S T
R U
C T
IO
N
WH
UP UP
45 44 43 42
41 40
33 33
1516 14 13 12
222120
3438 37 36 35
11 10 9 8
R A
M P
R A
M P
UP
CONC. LOADING DOCK
FD FD FD FD FD
FD
FD
FD
FD
WH
R
R
C
C
UP
UP
UP
UP
C O
R R I
D O
R
A
E L
E C
T R I
C A
L
B
STORAGE
102B
CLASSROOM
CLASSROOM
A/V
109A
A/V
108A
COMPUTER LAB
STORAGE
104A
STAIRS
100O A/V
104B
COMPUTER LAB &
OFFICE SIMULATION
101A/V
101A
FACULTY
WORKROOM
COMPUTER
SUPPORT LAB
CORRIDOR
STORAGE
101B
A/V
102A
COMPUTER
LECTURE LAB
DTAE
OFFICE
DTAE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
A/V
107A
CLASSROOM
A/V
103A
DISTANCE LEARNING
CLASSROOM
815SF
SCHOOL
CORRIDOR
100E
C O
R R I
D O
R
D
CLOS
120C
VEST.
117A
HSKPG.
118B
VEST.
118A
WOMEN
MEN
E L
E C
C
ELEC.
100G
VENDING
DTAE
OFFICE
HALL
124C
VESTIBULE
124D
AUDITORIUM
STAGE
124F
124E
ROTUNDA
FIRST FLOOR
ADMINISTRATION
HALL
124B
VESTIBULE
124A
CORRIDOR
100E
DTAE
TEACHING KITCHEN
ADMINISTRATION
/REC
COPY/
126Q
OFFICE
126P
OFFICE
126O
CORRIDOR
126V
OFFICE
126N
OFFICE
126M
STOR.
126Y
VAULT
126R
CONF.
126T
OFFICE
126L
OFFICE
126K
TOILET
126I
BREAK AREA
126U
OFFICE
126J
DTAE
DINING ROOM
129B
CORRIDOR
100E
ELECTRICAL
126X
OFFICE
126A
OFFICE
126B
WOMEN
OFFICE
126E
STOR.
126S
STOR.
126Z
OFFICE
126D
OFFICE
126C
CORRIDOR
126W
TOILET
126H
OFFICE
126F
OFFICE
126G
VENDING
C O
R R I
D O
R
G
ELEV.
EQUIP.
ELEV.
DRY GOODS
STORAGE
129A
C O
R R I
D O
R
I
VEST.
133A
MEN
HSKPG.
133B
VEST.
132A
DTAE
OFFICE
E L
E C
T R I
C A
L
J
TOILET
131J
S E
R V I
C E
C O
R R I
D O
R
H
ELECTRICAL
ROOM
131I
MECHANICAL
ROOM
131H
KEY FILE
ROOM
131E
ELECTRICAL/
PLUMBING/
CARPENTER
131A
STORAGE
130A
TRADES
OFFICE
131D
TRADES
OFFICE
131C
BREAK/
LOCKER
ROOM
131F
CORRIDOR
POLICE
OFFICE
131F
PLAN
ROOM
131G
DTAE
OFFICE
DTAE
OFFICE
OFFICE
OFFICE
DTAE
OFFICE
DTAE
OFFICE
ONE STOP CENTER
INDUSTRIAL
MAINTENANCE LAB
C O
R R I
D O
R
K
CONTINUING EDUCATION
CLASSROOM
A/V
142A
A/V
143A
STORAGE
144B
A/V
144A
COMPUTER
LECTURE LABS
E L
E C
T R I
C A
L
L
STORAGE
145B
A/V
145A
DRAFTING DESIGN &
ENGINEERING TECH.
ELECTRONICS
LAB
F U
C O
L D
F U
H O
T
F U
W A
S T
E
F U
T O
T A
L
F I
X T
C O
D E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
CC
C
C
C
C
C
F U
C O
L D
F U
H O
T
F U
W A
S T
E
F U
T O
T A
L
F I
X T
C O
D
EDH-2
EDH-1
T1-3
T1-4
T1-2 T1-1
T2-2
T2-1
T2-5
T2-4
T2-3 FP2-1
T2-7
T2-8
T1-6
T1-7
T1-5
T1-10
T1-9
T1-11
T1-8
T2-9
REF
EF-4
SF-3
AH-4
OPEN
EF-6 IN CEILING
EDH-6
EDH-5
D N
OPEN
R D
N
EF-3
EDH-3 EDH-4
HC4-1
T2-6
CH-1
AH-1
CU-3
R
R
CU-1
R R
AC-1
C D
CU-2
R R
AC-2
C D
WAITING
COSMETOLOGY
OFFICE
COMPRESSOR
DISP
STORAGE
WASH/ DRY
FACIAL 2
FACIAL 1
MECH111
NAIL LAB
TOIL
HALL
F E
FE-2
M22
AREAS OF WORK
BUILDING NO. BUILDING NAME
CAMDEN CENTER - FIRST FLOOR PLAN
SCALE:
= 1'-0
AH-1
HVAC
FIRST FLOOR PLAN -
CAMDEN CENTER -
CAMDEN CENTER - FIRST FLOOR PLAN
AH-5
AH-5
P:\22047\22047m23.dgn
DGN FILE
04-MAY-2022
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22047\22047m23.dgn
AS SHOWN
STAMP
M
WSH
LTF
WSH
22047
N B P P
R O J E
C T N o
05.04.22
C O
L L E
G E o f C
O A S
T A
L G
E O
R
H a n d le r
B iP o la r Io n iz a ti o n
M a in C a m p u s
B ru n s w ic k
G a a n d C a m d e n C e n te r (K in g ls a n d
G a
R E
V
T
N
O T
F
N S T
R U
C T
IO
N
3.0
0.0
4.0
3.0
DN
DN DN
S L
O P
E
F T
S L
O P
E
F T
S L
O P
E
F T
SCUPPER
DN
SCUPPERSCUPPERSCUPPER
C A
N T I
L E
V
T
B L
E
P
E D
E S
T A
L
F P
C P
X X S
C A
N S
T D
C A
N T I
L E
V
T
B L
E
P
E D
E S
T A
L
F P
C P
X X S
C A
N S
T D
C A
N T I L E
V E R
T
A B L E
P E
D E S T
A L
F P C P
X X S C
A
N S T
D
C A
N T I L E
V E R
T
A B L E
P E
D E S T
A L
F P C P
X X S C
A
N S T
D
CANTILEVER TABLE PEDESTAL
FPCP/XX/S0/CA/N/STD/27.750
CANTILEVER TABLE PEDESTAL
FPCP/XX/S0/CA/N/STD/27.750
CANTILEVER TABLE PEDESTAL
FPCP/XX/S0/CA/N/STD/27.750
CANTILEVER TABLE PEDESTAL
FPCP/XX/S0/CA/N/STD/27.750
CANTILEVER TABLE PEDESTAL
FPCP/XX/S0/CA/N/STD/27.750
CANTILEVER TABLE PEDESTAL
FPCP/XX/S0/CA/N/STD/27.750
FP.PWPS.C
SHROUD,CENTER 06-3210-C-BL
CANTILEVER TABLE PEDESTAL
FPCP/XX/S0/CA/N/STD/27.750
FP.PWPS.C
SHROUD,CENTER 06-3210-C-BL
CANTILEVER TABLE PEDESTAL
FPCP/XX/S0/CA/N/STD/27.750
FP.PWPS.C
SHROUD,CENTER 06-3210-C-BL
FP.PWPS.C
SHROUD,CENTER 06-3210-C-BL
FP.PWPS.C
SHROUD,CENTER 06-3210-C-BL
DN
DN
DN
Binary
Binary Binary
Binary
Binary
Binary Binary
Binary
Binary Binary Binary Binary Binary Binary Binary
Binary Binary Binary Binary Binary Binary Binary Binary
Binary
Binary
Binary
Binary
Binary
BinaryBinary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary Binary
Binary
Binary
Binary
Binary
Binary
BinaryBinaryBinaryBinaryBinaryBinaryBinary
BinaryBinaryBinaryBinaryBinaryBinaryBinaryBinary
Binary
Binary
Binary
Binary
Binary
Binary Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
BinaryBinary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary Binary
Binary Binary
Binary Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
Binary
BinaryBinary
BinaryBinary
BinaryBinary
Binary
Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary
Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary
Binary Binary Binary Binary Binary Binary Binary Binary Binary Binary
Binary
Binary
BinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinaryBinary
Binary
Binary Binary Binary Binary Binary Binary Binary Binary
Binary Binary Binary Binary Binary Binary Binary Binary
Binary Binary Binary Binary Binary
Binary Binary Binary Binary
BinaryBinaryBinaryBinaryBinary
Binary Binary Binary Binary BinaryBinary
Binary
Binary
BinaryBinary
Binary
Binary
Binary
C O
R R I
D O
R
A
E L
E C
T R I
C A
L
B
A/V
206A
SCIENCE LAB
BIOLOGY PREP
204B
INSTRUMENT
ROOM
206B
CHEM. PREP
206C
LARGE
CLASSROOM
A/V
204A
STORAGE
201B
STOR.
201A
A/V
202A
STOR.
201D
BIOLOGY LAB
A/V
201C
CORRIDOR
SUPPLIES
204C
DISTANCE LEARNING
CLASSROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
A/V
203A
MECHANICAL ROOM
DISTANCE LEARNING
CLASSROOM
VESTIBULE
220B
TIERED
CLASSROOM
AUDITORIUM
POWER
E L
E C
T R I
C A
L
C
VESTIBULE
220A
VEST
215A
DATA/VOICE
VEST
214A
A/V
219A
HSKPG
215B
WOMEN
MEN
C O
R R I
D O
R
D
CORRIDOR
200E
ELEC.
200M
VENDING
OFFICE
LIBRARY
A/V MASTER
CONTROL
ROTUNDA
SECOND FLOOR
CORRIDOR
200F
LIBRARY
WOMEN
VENDING
TUTORIAL
CLASSROOM
223A
ELEV.
DATA/
VOICE
C O
R R I
D O
R
H
VEST.
228A
MEN
HSKPG
228B
VEST
227A
DTAE
OFFICE
230 E L
E C
R I
C A
L
J
POWER
CORRIDOR
200L
DTAE
ALLIED HEALTH &
NURSING SUITE
241DDTAE
NURS.
STOR.
241B
OFFICE
OFFICE
A/V
243A
OFFICE
OFFICE
DTAE
OFFICE
OFFICE
CLASSROOM
CLASSROOM
A/V
242A
C O
R R I
D O
R
I
A/V
238A
CLASSROOM
MECHANICAL
ROOM
STORAGE
239B
A/V
239A
E L
E C
T R I
C A
L
K
DTAE
NURS. TLT.
241C
CLASSROOM
239 A/V
240A
A/V
241A
DTAE ALLIED
HEALTH &
NURSING SUITE
CLASSROOM
AH-3
EF-7
M.V.D.
T1-26
T1-25
T1-23
FP1-1
D N
T1-21
T1-22
T1-19
T1-18
T1-15
T1-17
T1-20
T1-16
T1-14
T1-13
T1-12
T1-27
HC1-1
HC1-2
D N
T2-14
T2-13
FP2-3
FP2-2
T2-12
T2-15
T2-16 T2-17T2-18T2-19
T2-20
T2-11
T2-10
HC3-1
AH-2
HC2-1
T2-22
EF-8
T1-24
T1-28
T1-30
T1-29&
T2-21A
T2-23 T2-25
T2-24 T2-21B
R
R
EF-9
R
HC1-3
EF-10
EF-11
M23
AREAS OF WORK
BUILDING NO. BUILDING NAME
SCALE:
= 1'-0
CAMDEN CENTER - SECOND FLOOR PLAN
CASING BELOW
SAF-1 APPARATUS CASING BELOW
SAF-2 APPARATUS
AH-2
AH-3
HVAC
SECOND FLOOR PLAN -
CAMDEN CENTER -
CAMDEN CENTER - SECOND FLOOR PLAN
| 22047aCov |
| 22047m01 |
| References |
| tb, 22047tb.dgn |
| 22047m21 |
| References |
| tb, 22047tb.dgn |
| 22047m22 |
| References |
| tb, 22047tb.dgn |
| afp1, 9054a1.dgn |
| afp2, 9054Md1.wrk |
| afp3, 14031a1.dgn |
| 22047m23 |
| References |
| tb, 22047tb.dgn |
| afp2, 9054a2.dgn |
| afp2-1, 9054Md2.wrk |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .