About this file
This document comprises final design drawings for a remedial construction project at the AMCO #1209 site located at Ward Street in Croswell, Michigan, prepared for the Michigan Department of Environment, Great Lakes and Energy (EGLE) in June 2021. The project involves removal, transportation, and disposal of gasoline-impacted soil within the limits shown on the drawings, utilizing a temporary cantilever steel sheet pile excavation support system consisting of continuous 50-foot long NZ-38 steel sheet piles. The work includes capping and removal of abandoned utility lines, installation of new utilities, backfilling of excavations, and restoration of all disturbed areas including roadways, sidewalks, and vegetative cover. The anticipated project duration is 150 calendar days from the date of Notice to Proceed, with approved work hours from 7:00 AM to 6:00 PM, and the primary site ingress/egress is located at the western end of the work area where Ward Street intersects with Howard Street.
The drawing set consists of 14 sheets providing comprehensive civil engineering details, including existing conditions plans, site layout and soil erosion and sediment control plans, utility relocation plans, excavation plans and profiles, steel sheet pile installation details, restoration plans, civil details, sequential and phased excavation details, soil erosion and sediment control specifications, and utility details. The contractor is responsible for securing all necessary permits and approvals from regulatory agencies and disposal facilities, developing and implementing a perimeter air monitoring plan and vibration monitoring plan to be approved by the professional engineer, and coordinating all work with the City of Croswell, utility owners, and adjacent property owners. The project includes installation of new 8-inch DIP water main, 12-inch SDR 35 sanitary sewer main with concrete manholes and service lines, and two concrete curb inlets with associated storm drain piping, with all existing utilities to be relocated or abandoned in place by others prior to remedial construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 18317.pdf | ||
| Advertisement 18137.pdf | ||
| Specifications 18137.pdf | ||
| Appendices 18137.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C I V
I L
C O
V E
R
S
H E
E T
G-001
A
I S
S U
E D
F
O R
L I E
N T
A
T
Y
R
E V
I E
W A
L F
T D
D
B
I S
S U
B
D
A L F
T D
D
D A
T E
N O
D S
G N
D R
R E
V I S
I O
N
C H
K
A P
V D
B Y
A P
V D
1 2 3 4 5 6
A
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
DATE
PROJ
DWG
SHEET
T H
S
A
W I N
G
H
P
O
P E
R T
Y
O
F
W
O O
D
I N
C L
U D
I N
G
A
T
E N
T E
D
A
T
E N
T A
B L
E
F
E A
T U
R E
S
A
N D
O
R
C
O N
F I D
E N
T I A
L
I N
F O
R M
A T
I O
N
A
S
U
N
D I T
I O
N E
D
U
P O
N
T
U
E
G R
E E
M E
R E
P R
O D
U C
E
T
A
W I N
G
W
O
P
A R
T
N
M
T
E R
I A
L
D
E S
C R
I B
E
R E
O N
N
T
A
W I N
G
F
Y
R
P O
H
A
N
S
P E
C I F
I C
A L
R
M I T
T E
D
I T
I N
G
B
Y
W
O O
D
FILE NAME: C:\Users\tony.donovan\OneDrive - Wood PLC\AMCO Flynn\Sheets\G-001 COVER SHEET.dwg PLOT DATE: Tue, 29 Jun 2021 PLOT TIME: 1:32 PM
OF 14
W A
R
E E
T
A M
S
I T
E
C R
O S
W E
L L
M
I C
H I G
A N
3293-18-2027
D R
A W
I N
G
S
T A
T U
S
I S
S U
D
M I
P
R O
F E
S S
I O
N A
L
E
N G
I N
E E
R
L I C
E N
M
B E
R
E n v i r o n m e n t n f r a s t r u c t u r e
I n c
C o n g r e s s
S t r e e t
S u i e
P o r t l a n d
M
E
M I C
H I G
P
A R
T M
E N
T
O
F
E
N V
I R
O N
M E
N T
G R
E A
T
L A
K E
S
A
E
R G
Y
E
G L E
T D
D A
L F
N D
L J G
JUNE 2021
AutoCAD SHX Text
BROWN STREET
AutoCAD SHX Text
HOWARD STREET
AutoCAD SHX Text
BLACK RIVER
AutoCAD SHX Text
WARD STREET
AutoCAD SHX Text
AMCO #1209 SITE
AutoCAD SHX Text
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
INCLUDED THIS SUBMITTAL
AutoCAD SHX Text
DISCIPLINE NUMBER
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
LEGEND AND ABBREVIATIONS
AutoCAD SHX Text G-001
AutoCAD SHX Text G-002
AutoCAD SHX Text C-102
AutoCAD SHX Text
RESTORATION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text AMCO #1209 SITE FINAL DESIGN DRAWINGS MICHIGAN DEPARTMENT OF ENVIRONMENT GREAT LAKES AND ENERGY (EGLE) CITY OF CROSWELL, MICHIGAN JUNE 2021
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SITE MAP
AutoCAD SHX Text
LOCUS MAP
AutoCAD SHX Text C-504
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SEQUENTIAL PANEL EXCAVATION DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING CONDITIONS PLAN
AutoCAD SHX Text C-101
AutoCAD SHX Text
CIVIL DETAILS
AutoCAD SHX Text
UTILITY DETAILS
AutoCAD SHX Text
AutoCAD SHX Text C-103
AutoCAD SHX Text
AutoCAD SHX Text C-201
AutoCAD SHX Text
AutoCAD SHX Text C-301
AutoCAD SHX Text C-502
AutoCAD SHX Text C-501
AutoCAD SHX Text
UTILITY RELOCATION PLAN
AutoCAD SHX Text
SITE LAYOUT AND SOIL EROSION AND SEDIMENT CONTROL PLAN
AutoCAD SHX Text
EXCAVATION PLAN AND PROFILE
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text G-003
AutoCAD SHX Text
AutoCAD SHX Text C-202
AutoCAD SHX Text
AutoCAD SHX Text
SHEET PILE PROFILE
AutoCAD SHX Text C-505
AutoCAD SHX Text
SOIL EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
AutoCAD SHX Text
AutoCAD SHX Text
PHASED EXCAVATION DETAILS
AutoCAD SHX Text
AutoCAD SHX Text C-503
T E
N O
D S
G N
D R
R E
V I S
I O
N
C H
K
A P
V D
B Y
A P
V D
1 2 3 4 5 6
A
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
DATE
PROJ
DWG
SHEET
T H
A
W I N
G
O
P E
R T
Y
O
F
W
O O
D
I N
C L
U D
I N
G
A
T
E N
T E
D
A
T
E N
T A
B L
E
F
E A
T U
R E
S
A
N D
O
R
C
O N
F I D
E N
T I A
L
I N
F O
R M
A T
I O
N
A
S
U
N
D I T
I O
N E
D
U
P O
N
T
E
R
E E
M E
R E
P R
O D
U C
E
T
A
W I N
G
O
P
A R
T
N
T
E R
I A
L
D
E S
C R
I B
E
R E
O N
N
T
A
W I N
G
F
R
P O
H
A
N
S
P E
C I F
I C
A L
R
M I T
T E
D
I T
I N
G
B
Y
W
O O
D
FILE NAME: C:\Users\tony.donovan\OneDrive - Wood PLC\AMCO Flynn\Sheets\G-002 LEGEND AND ABBREVIATIONS.dwg PLOT DATE: Tue, 29 Jun 2021 PLOT TIME: 2:08 PM
OF 14
W A
R
E E
T
A M
S
I T
E
C R
O S
W E
L L
M
I C
H I G
A N
3293-18-2027
D R
A W
I N
G
S
T A
T U
S
I S
S U
D
M I
P
R O
F E
S S
I O
N A
L
E
N G
I N
E E
R
L I C
E N
M
B E
R
E n v i r o n m e n f r a s t r u c t u r e
I n c
C o n g r e s s
S t r e e t
S u i
P o r t l a n d
M
E
M I C
H I G
P
A R
T M
E N
T
O
F
E
N V
I R
O N
M E
N T
G R
E A
T
L A
K E
S
A
E
R G
Y
E
G L E
T D
D A
L F
N D
L J G
JUNE 2021
C I V
I L
L E
G E
B R
E V
I A
T I O
N S
G-002
A
I S
S U
I E
T
Y
R
E V
I E
W A
L F
T D
D
B
I S
S U
D
A L F
T D
D
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
PLAN LEGEND
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS ACSM AMERICAN CONGRESS ON SURVEY & AMERICAN CONGRESS ON SURVEY & MAPPING ALTA AMERICAN LAND TITLE ASSOCIATION AMERICAN LAND TITLE ASSOCIATION ASTM AMERICAN SOCIETY FOR TESTING AND AMERICAN SOCIETY FOR TESTING AND MATERIALS AVG AVERAGE AVERAGE AWG AMERICAN WIRE GAUGE AMERICAN WIRE GAUGE AWWA AMERICAN WATER WORKS ASSOCIATION AMERICAN WATER WORKS ASSOCIATION BGS BELOW GROUND SURFACE BELOW GROUND SURFACE CI CAST IRON CAST IRON CLR CLEAR CLEAR CENTER LINE CENTER LINE CON CONCRETE CONCRETE CS CARBON STEEL CARBON STEEL CWTP CONSTRUCTION WATER TREATMENT PLANT CONSTRUCTION WATER TREATMENT PLANT DI DUCTILE IRON DUCTILE IRON DOT DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION E ELECTRICAL ELECTRICAL EF EFFLUENT EFFLUENT EGLE ENVIRONMENT GREAT LAKES AND ENERGY ENVIRONMENT GREAT LAKES AND ENERGY ELEV ELEVATION ELEVATION EW EACH WAY EACH WAY EX EXISTING EXISTING F FILTER FILTER F/O FIBER OPTICAL LINE FIBER OPTICAL LINE FE FLOW ELEMENT FLOW ELEMENT FF FINISHED FLOOR FINISHED FLOOR FM FORCE MAIN FORCE MAIN FS FILTER SOCK FILTER SOCK FT FEET FEET GR GRADE ELEVATION GRADE ELEVATION GW GROUND WATER GROUND WATER HDPE HIGH DENSITY POLYETHYLENE HIGH DENSITY POLYETHYLENE HP HIGH POINT HIGH POINT INST INSTRUMENTATION INSTRUMENTATION INV INVERT INVERT LP LOW POINT LOW POINT LS LEVEL SWITCH LEVEL SWITCH MPT MALE PIPE THREAD MALE PIPE THREAD MIN MINIMUM MINIMUM MAX MAXIMUM MAXIMUM MW MONITORING WELL MONITORING WELL NAVD NORTH AMERICAN VERTICAL DATUM NORTH AMERICAN VERTICAL DATUM NGVD NATIONAL GEODETIC VERTICAL DATUM NATIONAL GEODETIC VERTICAL DATUM NTS NOT TO SCALE NOT TO SCALE O/C ON CENTER ON CENTER OD OUTSIDE DIAMETER OUTSIDE DIAMETER P PUMP PUMP PCCP PRECAST CONCRETE CYLINDER PIPE PRECAST CONCRETE CYLINDER PIPE PI PRESSURE INDICATOR PRESSURE INDICATOR PSE&G PUBLIC SERVICE ELECTRIC & GAS PUBLIC SERVICE ELECTRIC & GAS PSI POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH PVC POLYVINYL CHLORIDE POLYVINYL CHLORIDE RCP REINFORCED CONCRETE PIPE REINFORCED CONCRETE PIPE RIM RIM ELEVATION RIM ELEVATION R.O.W. RIGHT OF WAY RIGHT OF WAY S SANITARY SEWER SANITARY SEWER SCB SOIL CEMENT BENTONITE SOIL CEMENT BENTONITE SCH SCHEDULE SCHEDULE SD STORM DRAIN STORM DRAIN STA STATION STATION TYP TYPICAL TYPICAL W WATER WATER DIAMETER
AutoCAD SHX Text 34.67
AutoCAD SHX Text A
AutoCAD SHX Text C-103
AutoCAD SHX Text C-501
AutoCAD SHX Text
REFERENCE LEGEND:
AutoCAD SHX Text
DETAIL LETTER
AutoCAD SHX Text
WHERE DETAIL APPEARS
AutoCAD SHX Text
WHERE DETAIL TAKEN
AutoCAD SHX Text
AutoCAD SHX Text C-103
AutoCAD SHX Text
CN-301
AutoCAD SHX Text
SECTION NUMBER
AutoCAD SHX Text
WHERE SECTION APPEARS
AutoCAD SHX Text
WHERE SECTION TAKEN
AutoCAD SHX Text
PHASED EXCAVATION (AREA 2)
AutoCAD SHX Text
DISCIPLINE
AutoCAD SHX Text
DISCIPLINE
AutoCAD SHX Text
BUILDING OUTLINE
AutoCAD SHX Text
PROPERTY BOUNDARY
AutoCAD SHX Text
MINOR CONTOUR
AutoCAD SHX Text
SPOT GRADE
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
OVERHEAD UTILITY
AutoCAD SHX Text
WATER LINE
AutoCAD SHX Text
GAS SERVICE LINE
AutoCAD SHX Text
STORM DRAIN LINE
AutoCAD SHX Text
SILTATION FENCE
AutoCAD SHX Text
MONITORING WELL
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
SANITARY SEWER MANHOLE
AutoCAD SHX Text
SIGNS
AutoCAD SHX Text
SINGLE TREE
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
EXCAVATION AREA
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
PLAN LEGEND
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
AutoCAD SHX Text
MAJOR CONTOUR
AutoCAD SHX Text
PROFILE LEGEND:
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
EXISTING GRADE FINAL GRADE BOTTOM OF EXCAVATION GROUNDWATER ELEVATION
AutoCAD SHX Text
FILTER SOCK
AutoCAD SHX Text
TEMPORAY CONSTRUCTION FENCE
AutoCAD SHX Text
LIMIT OF DISTURBANCE
AutoCAD SHX Text
INLET PROTECTION
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
FORCE MAIN
AutoCAD SHX Text
SEQUENTIAL PANEL EXCAVATION (AREA 4)
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
NZ 38 STEEL SHEET PILE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LP 33.60
AutoCAD SHX Text
CONSTRUCTION ENTRANCE
AutoCAD SHX Text
WATER SERVICE LINE
AutoCAD SHX Text
GAS LINE
AutoCAD SHX Text
CONCRETE CURB
SANITARY SEWER SERVICE
I V
I L
G E
N E
R A
L
N
O T
E S
G-003
A
I S
S U
T E
R N
A L
R
E V
I E
W A
L F
T D
D
B
I S
S U
D
A L F
T D
D
D A
T E
N O
D S
G N
D R
R E
V I S
I O
N
C H
K
A P
V D
B Y
A P
V D
1 2 3 4 5 6
A
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0
DATE
PROJ
DWG
SHEET
T H
A
W I N
G
O
P E
R T
Y
O
F
W
O O
D
I N
C L
U D
I N
G
A
T
E N
T E
D
A
T
E N
T A
B L
E
F
E A
T U
R E
S
A
N D
O
R
C
O N
F I D
E N
T I A
L
I N
F O
R M
A T
I O
N
A
S
U
N
D I T
I O
N E
D
U
P O
N
T
E
R
E E
M E
R E
P R
O D
U C
E
T
A
W I N
G
O
P
A R
T
N
T
E R
I A
L
D
E S
C R
I B
E
R E
O N
N
T
A
W I N
G
F
R
P O
H
A
N
S
P E
C I F
I C
A L
R
M I T
T E
D
I T
I N
G
B
Y
W
O O
D
FILE NAME: C:\Users\tony.donovan\OneDrive - Wood PLC\AMCO Flynn\Sheets\G-003 GENERAL NOTES.dwg PLOT DATE: Tue, 29 Jun 2021 PLOT TIME: 2:15 PM
OF 14
W A
R
E E
T
A M
S
I T
E
C R
O S
W E
L L
M
I C
H I G
A N
3293-18-2027
D R
A W
I N
G
S
T A
T U
S
I S
S U
D
M I
P
R O
F E
S S
I O
N A
L
E
N G
I N
E E
R
L I C
E N
M
B E
R
E n v i r o n m e n f r a s t r u c t u r e
I n c
C o n g r e s s
S t r e e t
S u i
P o r t l a n d
M
E
M I C
H I G
P
A R
T M
E N
T
O
F
E
N V
I R
O N
M E
N T
G R
E A
T
L A
K E
S
A
E
R G
Y
E
G L E
T D
D A
L F
N D
L J G
JUNE 2021
AutoCAD SHX Text GENERAL NOTES GN1. THE AMCO #1209 IS LOCATED ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN THE AMCO #1209 IS LOCATED ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN AMCO #1209 IS LOCATED ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN AMCO #1209 IS LOCATED ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN #1209 IS LOCATED ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN #1209 IS LOCATED ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN IS LOCATED ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN IS LOCATED ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN LOCATED ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN LOCATED ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN ALONG A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN A SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN SECTION OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN OF WARD STREET BETWEEN BROWN AND HOWARD STREET IN WARD STREET BETWEEN BROWN AND HOWARD STREET IN WARD STREET BETWEEN BROWN AND HOWARD STREET IN STREET BETWEEN BROWN AND HOWARD STREET IN STREET BETWEEN BROWN AND HOWARD STREET IN BETWEEN BROWN AND HOWARD STREET IN BETWEEN BROWN AND HOWARD STREET IN BROWN AND HOWARD STREET IN BROWN AND HOWARD STREET IN AND HOWARD STREET IN AND HOWARD STREET IN HOWARD STREET IN HOWARD STREET IN STREET IN STREET IN IN IN THE CITY OF CROSWELL, MICHIGAN. THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT CITY OF CROSWELL, MICHIGAN. THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT CITY OF CROSWELL, MICHIGAN. THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT OF CROSWELL, MICHIGAN. THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT OF CROSWELL, MICHIGAN. THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT CROSWELL, MICHIGAN. THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT CROSWELL, MICHIGAN. THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT MICHIGAN. THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT MICHIGAN. THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT THE PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT PROPOSED LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT LIMIT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT OF WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT WORK IS SHOWN ON DRAWING C-102 SITE LAYOUT IS SHOWN ON DRAWING C-102 SITE LAYOUT IS SHOWN ON DRAWING C-102 SITE LAYOUT SHOWN ON DRAWING C-102 SITE LAYOUT SHOWN ON DRAWING C-102 SITE LAYOUT ON DRAWING C-102 SITE LAYOUT ON DRAWING C-102 SITE LAYOUT DRAWING C-102 SITE LAYOUT DRAWING C-102 SITE LAYOUT C-102 SITE LAYOUT C-102 SITE LAYOUT SITE LAYOUT SITE LAYOUT LAYOUT LAYOUT AND SESC PLAN. GN2. THE WORK GENERALLY CONSISTS OF REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL THE WORK GENERALLY CONSISTS OF REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL WORK GENERALLY CONSISTS OF REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL WORK GENERALLY CONSISTS OF REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL GENERALLY CONSISTS OF REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL GENERALLY CONSISTS OF REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL CONSISTS OF REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL CONSISTS OF REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL OF REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL OF REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL REMOVAL, TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL TRANSPORTATION, AND DISPOSAL OF GASOLINE IMPACTED SOIL AND DISPOSAL OF GASOLINE IMPACTED SOIL AND DISPOSAL OF GASOLINE IMPACTED SOIL DISPOSAL OF GASOLINE IMPACTED SOIL DISPOSAL OF GASOLINE IMPACTED SOIL OF GASOLINE IMPACTED SOIL OF GASOLINE IMPACTED SOIL GASOLINE IMPACTED SOIL GASOLINE IMPACTED SOIL IMPACTED SOIL IMPACTED SOIL SOIL SOIL WITHIN THE LIMITS SHOWN ON THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL THE LIMITS SHOWN ON THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL THE LIMITS SHOWN ON THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL LIMITS SHOWN ON THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL LIMITS SHOWN ON THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL SHOWN ON THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL SHOWN ON THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL ON THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL ON THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL THE DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL DRAWINGS. SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL SOIL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL REMOVAL WILL BE COMPLETED USING A CANTILEVER STEEL WILL BE COMPLETED USING A CANTILEVER STEEL WILL BE COMPLETED USING A CANTILEVER STEEL BE COMPLETED USING A CANTILEVER STEEL BE COMPLETED USING A CANTILEVER STEEL COMPLETED USING A CANTILEVER STEEL COMPLETED USING A CANTILEVER STEEL USING A CANTILEVER STEEL USING A CANTILEVER STEEL A CANTILEVER STEEL A CANTILEVER STEEL CANTILEVER STEEL CANTILEVER STEEL STEEL STEEL SHEET PILE EXCAVATION SUPPORT SYSTEM AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING PILE EXCAVATION SUPPORT SYSTEM AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING PILE EXCAVATION SUPPORT SYSTEM AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING EXCAVATION SUPPORT SYSTEM AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING EXCAVATION SUPPORT SYSTEM AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING SUPPORT SYSTEM AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING SUPPORT SYSTEM AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING SYSTEM AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING SYSTEM AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING AS SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING SHOWN ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING ON THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING THE DRAWINGS. THE WORK ALSO INCLUDES CAPPING DRAWINGS. THE WORK ALSO INCLUDES CAPPING DRAWINGS. THE WORK ALSO INCLUDES CAPPING THE WORK ALSO INCLUDES CAPPING THE WORK ALSO INCLUDES CAPPING WORK ALSO INCLUDES CAPPING WORK ALSO INCLUDES CAPPING ALSO INCLUDES CAPPING ALSO INCLUDES CAPPING INCLUDES CAPPING INCLUDES CAPPING CAPPING CAPPING AND REMOVAL OF ABANDONED UTILITY LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND REMOVAL OF ABANDONED UTILITY LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND REMOVAL OF ABANDONED UTILITY LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND OF ABANDONED UTILITY LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND OF ABANDONED UTILITY LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND ABANDONED UTILITY LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND ABANDONED UTILITY LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND UTILITY LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND UTILITY LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND LINES, INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND INSTALLATION OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND OF NEW UTILITIES, BACKFILLING EXCAVATIONS, AND NEW UTILITIES, BACKFILLING EXCAVATIONS, AND NEW UTILITIES, BACKFILLING EXCAVATIONS, AND UTILITIES, BACKFILLING EXCAVATIONS, AND UTILITIES, BACKFILLING EXCAVATIONS, AND BACKFILLING EXCAVATIONS, AND BACKFILLING EXCAVATIONS, AND EXCAVATIONS, AND EXCAVATIONS, AND AND AND RESTORATION OF ALL DISTURBED AREAS INCLUDING ROADWAYS, SIDEWALKS, AND VEGETATIVE COVER. GN3. THE ANTICIPATED DURATION TO COMPLETE THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF THE ANTICIPATED DURATION TO COMPLETE THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF ANTICIPATED DURATION TO COMPLETE THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF ANTICIPATED DURATION TO COMPLETE THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF DURATION TO COMPLETE THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF DURATION TO COMPLETE THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF TO COMPLETE THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF TO COMPLETE THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF COMPLETE THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF COMPLETE THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF THE SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF SCOPE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF WORK IS 150 CALENDAR DAYS FROM THE DATE OF IS 150 CALENDAR DAYS FROM THE DATE OF IS 150 CALENDAR DAYS FROM THE DATE OF 150 CALENDAR DAYS FROM THE DATE OF 150 CALENDAR DAYS FROM THE DATE OF CALENDAR DAYS FROM THE DATE OF CALENDAR DAYS FROM THE DATE OF DAYS FROM THE DATE OF DAYS FROM THE DATE OF FROM THE DATE OF FROM THE DATE OF THE DATE OF THE DATE OF DATE OF DATE OF OF OF NOTICE TO PROCEED. APPROVED WORK HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END TO PROCEED. APPROVED WORK HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END TO PROCEED. APPROVED WORK HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END PROCEED. APPROVED WORK HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END PROCEED. APPROVED WORK HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END APPROVED WORK HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END APPROVED WORK HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END APPROVED WORK HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END WORK HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END WORK HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END HOURS ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END ARE 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END 7:00 AM TO 6:00 PM. ANY VARIANCE IN START OR END AM TO 6:00 PM. ANY VARIANCE IN START OR END AM TO 6:00 PM. ANY VARIANCE IN START OR END TO 6:00 PM. ANY VARIANCE IN START OR END TO 6:00 PM. ANY VARIANCE IN START OR END 6:00 PM. ANY VARIANCE IN START OR END 6:00 PM. ANY VARIANCE IN START OR END PM. ANY VARIANCE IN START OR END PM. ANY VARIANCE IN START OR END ANY VARIANCE IN START OR END ANY VARIANCE IN START OR END VARIANCE IN START OR END VARIANCE IN START OR END IN START OR END IN START OR END START OR END START OR END OR END OR END END END TIME MUST BE APPROVED BY ENGINEER. GN4. THE PRIMARY SITE INGRESS/EGRESS IS LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD THE PRIMARY SITE INGRESS/EGRESS IS LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD PRIMARY SITE INGRESS/EGRESS IS LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD PRIMARY SITE INGRESS/EGRESS IS LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD SITE INGRESS/EGRESS IS LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD SITE INGRESS/EGRESS IS LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD INGRESS/EGRESS IS LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD INGRESS/EGRESS IS LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD IS LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD IS LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD LOCATED AT THE WESTERN END OF THE WORK AREA WHERE WARD AT THE WESTERN END OF THE WORK AREA WHERE WARD AT THE WESTERN END OF THE WORK AREA WHERE WARD THE WESTERN END OF THE WORK AREA WHERE WARD THE WESTERN END OF THE WORK AREA WHERE WARD WESTERN END OF THE WORK AREA WHERE WARD WESTERN END OF THE WORK AREA WHERE WARD END OF THE WORK AREA WHERE WARD END OF THE WORK AREA WHERE WARD OF THE WORK AREA WHERE WARD OF THE WORK AREA WHERE WARD THE WORK AREA WHERE WARD THE WORK AREA WHERE WARD WORK AREA WHERE WARD WORK AREA WHERE WARD AREA WHERE WARD AREA WHERE WARD WHERE WARD WHERE WARD WARD WARD STREET INTERSECTS WITH HOWARD STREET. CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE INTERSECTS WITH HOWARD STREET. CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE INTERSECTS WITH HOWARD STREET. CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE WITH HOWARD STREET. CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE WITH HOWARD STREET. CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE HOWARD STREET. CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE HOWARD STREET. CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE STREET. CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE STREET. CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE CONTRACTOR SHALL COORDINATE USE OF SITE WITH THE SHALL COORDINATE USE OF SITE WITH THE SHALL COORDINATE USE OF SITE WITH THE COORDINATE USE OF SITE WITH THE COORDINATE USE OF SITE WITH THE USE OF SITE WITH THE USE OF SITE WITH THE OF SITE WITH THE OF SITE WITH THE SITE WITH THE SITE WITH THE WITH THE WITH THE THE THE PROFESSIONAL AND PROPERTY OWNERS ADJACENT TO THE WORK AREA. AND THE UTILITY OWNERS. GN5. CONTRACTOR SHALL VISUALLY INSPECT THE SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND CONTRACTOR SHALL VISUALLY INSPECT THE SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND SHALL VISUALLY INSPECT THE SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND SHALL VISUALLY INSPECT THE SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND VISUALLY INSPECT THE SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND VISUALLY INSPECT THE SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND INSPECT THE SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND INSPECT THE SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND THE SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND THE SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND SITE TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND TO ASCERTAIN THE CONDITION OF EXISTING FEATURES AND ASCERTAIN THE CONDITION OF EXISTING FEATURES AND ASCERTAIN THE CONDITION OF EXISTING FEATURES AND THE CONDITION OF EXISTING FEATURES AND THE CONDITION OF EXISTING FEATURES AND CONDITION OF EXISTING FEATURES AND CONDITION OF EXISTING FEATURES AND OF EXISTING FEATURES AND OF EXISTING FEATURES AND EXISTING FEATURES AND EXISTING FEATURES AND FEATURES AND FEATURES AND AND AND BECOME FAMILIAR WITH THE WORK. CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING FAMILIAR WITH THE WORK. CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING FAMILIAR WITH THE WORK. CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING WITH THE WORK. CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING WITH THE WORK. CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING THE WORK. CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING THE WORK. CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING WORK. CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING WORK. CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING CONTRACTOR SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING SHALL COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING COLLECT PHOTO AND VIDEO DOCUMENTATION OF EXISTING PHOTO AND VIDEO DOCUMENTATION OF EXISTING PHOTO AND VIDEO DOCUMENTATION OF EXISTING AND VIDEO DOCUMENTATION OF EXISTING AND VIDEO DOCUMENTATION OF EXISTING VIDEO DOCUMENTATION OF EXISTING VIDEO DOCUMENTATION OF EXISTING DOCUMENTATION OF EXISTING DOCUMENTATION OF EXISTING OF EXISTING OF EXISTING EXISTING EXISTING CONDITIONS OF ALL FEATURES WITHIN THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET OF ALL FEATURES WITHIN THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET OF ALL FEATURES WITHIN THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET ALL FEATURES WITHIN THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET ALL FEATURES WITHIN THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET FEATURES WITHIN THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET FEATURES WITHIN THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET WITHIN THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET WITHIN THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET THE LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET LIMITS OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET OF DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET DISTURBANCE. ANY VARIANCES FROM THIS DRAWING SET ANY VARIANCES FROM THIS DRAWING SET ANY VARIANCES FROM THIS DRAWING SET VARIANCES FROM THIS DRAWING SET VARIANCES FROM THIS DRAWING SET FROM THIS DRAWING SET FROM THIS DRAWING SET THIS DRAWING SET THIS DRAWING SET DRAWING SET DRAWING SET SET SET SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER. GN6. THE CONTRACTOR SHALL BE RESPONSIBLE TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM THE CONTRACTOR SHALL BE RESPONSIBLE TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM CONTRACTOR SHALL BE RESPONSIBLE TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM CONTRACTOR SHALL BE RESPONSIBLE TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM SHALL BE RESPONSIBLE TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM SHALL BE RESPONSIBLE TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM BE RESPONSIBLE TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM BE RESPONSIBLE TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM RESPONSIBLE TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM RESPONSIBLE TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM TO SECURE ALL NECESSARY PERMITS AND APPROVALS FROM SECURE ALL NECESSARY PERMITS AND APPROVALS FROM SECURE ALL NECESSARY PERMITS AND APPROVALS FROM ALL NECESSARY PERMITS AND APPROVALS FROM ALL NECESSARY PERMITS AND APPROVALS FROM NECESSARY PERMITS AND APPROVALS FROM NECESSARY PERMITS AND APPROVALS FROM PERMITS AND APPROVALS FROM PERMITS AND APPROVALS FROM AND APPROVALS FROM AND APPROVALS FROM APPROVALS FROM APPROVALS FROM FROM FROM REGULATORY AGENCIES AND DISPOSAL FACILITIES. GN7. THE CONTRACTOR SHALL USE INDEPENDENT THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF THE CONTRACTOR SHALL USE INDEPENDENT THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF CONTRACTOR SHALL USE INDEPENDENT THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF CONTRACTOR SHALL USE INDEPENDENT THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF SHALL USE INDEPENDENT THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF SHALL USE INDEPENDENT THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF USE INDEPENDENT THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF USE INDEPENDENT THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF INDEPENDENT THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF INDEPENDENT THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF THIRD-PARTY PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF PROFESSIONAL SURVEYOR LICENSED BY THE STATE OF SURVEYOR LICENSED BY THE STATE OF SURVEYOR LICENSED BY THE STATE OF LICENSED BY THE STATE OF LICENSED BY THE STATE OF BY THE STATE OF BY THE STATE OF THE STATE OF THE STATE OF STATE OF STATE OF OF OF MICHIGAN FOR AS REQUIRED TO COMPLETE THE PROJECT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. GN8. THE CONTRACTOR SHALL DEVELOP AND IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY THE CONTRACTOR SHALL DEVELOP AND IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY CONTRACTOR SHALL DEVELOP AND IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY CONTRACTOR SHALL DEVELOP AND IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY SHALL DEVELOP AND IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY SHALL DEVELOP AND IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY DEVELOP AND IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY DEVELOP AND IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY AND IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY AND IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY IMPLEMENT A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY A PERIMETER AIR MONITORING PLAN TO BE APPROVED BY PERIMETER AIR MONITORING PLAN TO BE APPROVED BY PERIMETER AIR MONITORING PLAN TO BE APPROVED BY AIR MONITORING PLAN TO BE APPROVED BY AIR MONITORING PLAN TO BE APPROVED BY MONITORING PLAN TO BE APPROVED BY MONITORING PLAN TO BE APPROVED BY PLAN TO BE APPROVED BY PLAN TO BE APPROVED BY TO BE APPROVED BY TO BE APPROVED BY BE APPROVED BY BE APPROVED BY APPROVED BY APPROVED BY BY BY THE PROFESSIONAL PRIOR TO CONSTRUCTION ACTIVITIES. GN9. KNOWN UNDERGROUND UTILITIES AND STRUCTURES ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED KNOWN UNDERGROUND UTILITIES AND STRUCTURES ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED UNDERGROUND UTILITIES AND STRUCTURES ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED UNDERGROUND UTILITIES AND STRUCTURES ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED UTILITIES AND STRUCTURES ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED UTILITIES AND STRUCTURES ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED AND STRUCTURES ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED AND STRUCTURES ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED STRUCTURES ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED STRUCTURES ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED ARE SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED SHOWN ON THE DRAWINGS SHOULD BE CONSIDERED ON THE DRAWINGS SHOULD BE CONSIDERED ON THE DRAWINGS SHOULD BE CONSIDERED THE DRAWINGS SHOULD BE CONSIDERED THE DRAWINGS SHOULD BE CONSIDERED DRAWINGS SHOULD BE CONSIDERED DRAWINGS SHOULD BE CONSIDERED SHOULD BE CONSIDERED SHOULD BE CONSIDERED BE CONSIDERED BE CONSIDERED CONSIDERED CONSIDERED APPROXIMATE AND IT IS ANTICIPATED ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR AND IT IS ANTICIPATED ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR AND IT IS ANTICIPATED ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR IT IS ANTICIPATED ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR IT IS ANTICIPATED ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR IS ANTICIPATED ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR IS ANTICIPATED ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR ANTICIPATED ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR ANTICIPATED ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR ADDITIONAL UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR UTILITIES ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR ARE PRESENT WITHIN THE WORK AREA. CONTRACTOR PRESENT WITHIN THE WORK AREA. CONTRACTOR PRESENT WITHIN THE WORK AREA. CONTRACTOR WITHIN THE WORK AREA. CONTRACTOR WITHIN THE WORK AREA. CONTRACTOR THE WORK AREA. CONTRACTOR THE WORK AREA. CONTRACTOR WORK AREA. CONTRACTOR WORK AREA. CONTRACTOR AREA. CONTRACTOR AREA. CONTRACTOR CONTRACTOR CONTRACTOR SHALL FIELD VERIFY LOCATION OF ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 FIELD VERIFY LOCATION OF ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 FIELD VERIFY LOCATION OF ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 VERIFY LOCATION OF ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 VERIFY LOCATION OF ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 LOCATION OF ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 LOCATION OF ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 OF ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 OF ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 ALL UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 UTILITIES PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 PRIOR TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 TO ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 ANY INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 INTRUSIVE ACTIVITIES. CONTACT MISS DIG 811 ACTIVITIES. CONTACT MISS DIG 811 ACTIVITIES. CONTACT MISS DIG 811 CONTACT MISS DIG 811 CONTACT MISS DIG 811 MISS DIG 811 MISS DIG 811 DIG 811 DIG 811 811 811 SYSTEM AT LEAST 72 HOURS PRIOR TO DATE OF REQUESTED UTILITY LOCATE SERVICES (1-800-482-7171). GN10. CONTRACTOR SHALL PLAN THE WORK AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD CONTRACTOR SHALL PLAN THE WORK AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD SHALL PLAN THE WORK AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD SHALL PLAN THE WORK AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD PLAN THE WORK AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD PLAN THE WORK AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD THE WORK AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD THE WORK AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD WORK AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD WORK AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD AND PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD PROPOSED EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD EQUIPMENT TO BE PROTECTIVE OF THE EXISTING OVERHEAD TO BE PROTECTIVE OF THE EXISTING OVERHEAD TO BE PROTECTIVE OF THE EXISTING OVERHEAD BE PROTECTIVE OF THE EXISTING OVERHEAD BE PROTECTIVE OF THE EXISTING OVERHEAD PROTECTIVE OF THE EXISTING OVERHEAD PROTECTIVE OF THE EXISTING OVERHEAD OF THE EXISTING OVERHEAD OF THE EXISTING OVERHEAD THE EXISTING OVERHEAD THE EXISTING OVERHEAD EXISTING OVERHEAD EXISTING OVERHEAD OVERHEAD OVERHEAD UTILITY LINES AND POLES THAT SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE LINES AND POLES THAT SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE LINES AND POLES THAT SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE AND POLES THAT SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE AND POLES THAT SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE POLES THAT SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE POLES THAT SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE THAT SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE THAT SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE SPAN ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE ACROSS WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE WARD STREET WITHIN THE EXCAVATION AREA. ADEQUATE STREET WITHIN THE EXCAVATION AREA. ADEQUATE STREET WITHIN THE EXCAVATION AREA. ADEQUATE WITHIN THE EXCAVATION AREA. ADEQUATE WITHIN THE EXCAVATION AREA. ADEQUATE THE EXCAVATION AREA. ADEQUATE THE EXCAVATION AREA. ADEQUATE EXCAVATION AREA. ADEQUATE EXCAVATION AREA. ADEQUATE AREA. ADEQUATE AREA. ADEQUATE ADEQUATE ADEQUATE PRECAUTIONS SHALL BE TAKEN TO MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS SHALL BE TAKEN TO MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS SHALL BE TAKEN TO MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS BE TAKEN TO MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS BE TAKEN TO MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS TAKEN TO MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS TAKEN TO MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS TO MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS TO MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS MAINTAIN SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS SAFE DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS DISTANCE FROM THESE UTILITIES AS PER THE UTILITY OWNERS FROM THESE UTILITIES AS PER THE UTILITY OWNERS FROM THESE UTILITIES AS PER THE UTILITY OWNERS THESE UTILITIES AS PER THE UTILITY OWNERS THESE UTILITIES AS PER THE UTILITY OWNERS UTILITIES AS PER THE UTILITY OWNERS UTILITIES AS PER THE UTILITY OWNERS AS PER THE UTILITY OWNERS AS PER THE UTILITY OWNERS PER THE UTILITY OWNERS PER THE UTILITY OWNERS THE UTILITY OWNERS THE UTILITY OWNERS UTILITY OWNERS UTILITY OWNERS OWNERS OWNERS AND OSHA REQUIREMENTS. GN11. THE CONTRACTOR SHALL DEVELOP, SUBMIT, AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN THE CONTRACTOR SHALL DEVELOP, SUBMIT, AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN CONTRACTOR SHALL DEVELOP, SUBMIT, AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN CONTRACTOR SHALL DEVELOP, SUBMIT, AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN SHALL DEVELOP, SUBMIT, AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN SHALL DEVELOP, SUBMIT, AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN DEVELOP, SUBMIT, AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN DEVELOP, SUBMIT, AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN SUBMIT, AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN SUBMIT, AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN AND IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN IMPLEMENT THE APPROVED VIBRATION MONITORING PLAN IN THE APPROVED VIBRATION MONITORING PLAN IN THE APPROVED VIBRATION MONITORING PLAN IN APPROVED VIBRATION MONITORING PLAN IN APPROVED VIBRATION MONITORING PLAN IN VIBRATION MONITORING PLAN IN VIBRATION MONITORING PLAN IN MONITORING PLAN IN MONITORING PLAN IN PLAN IN PLAN IN IN IN ACCORDANCE WITH THE SPECIFICATIONS. THE PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES WITH THE SPECIFICATIONS. THE PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES WITH THE SPECIFICATIONS. THE PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES THE SPECIFICATIONS. THE PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES THE SPECIFICATIONS. THE PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES SPECIFICATIONS. THE PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES SPECIFICATIONS. THE PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES THE PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES THE PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES PLAN SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES SHALL ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES ESTABLISH TRIGGER LEVELS AND MITIGATION MEASURES TRIGGER LEVELS AND MITIGATION MEASURES TRIGGER LEVELS AND MITIGATION MEASURES LEVELS AND MITIGATION MEASURES LEVELS AND MITIGATION MEASURES AND MITIGATION MEASURES AND MITIGATION MEASURES MITIGATION MEASURES MITIGATION MEASURES MEASURES MEASURES IN CONSTRUCTION METHODS TO PREVENT DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND CONSTRUCTION METHODS TO PREVENT DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND CONSTRUCTION METHODS TO PREVENT DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND METHODS TO PREVENT DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND METHODS TO PREVENT DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND TO PREVENT DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND TO PREVENT DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND PREVENT DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND PREVENT DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND DAMAGE TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND TO EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND EXISTING STRUCTURES AND OTHER SITE FEATURES BEYOND STRUCTURES AND OTHER SITE FEATURES BEYOND STRUCTURES AND OTHER SITE FEATURES BEYOND AND OTHER SITE FEATURES BEYOND AND OTHER SITE FEATURES BEYOND OTHER SITE FEATURES BEYOND OTHER SITE FEATURES BEYOND SITE FEATURES BEYOND SITE FEATURES BEYOND FEATURES BEYOND FEATURES BEYOND BEYOND BEYOND THE EXCAVATION LIMITS. ACCELERATIONS. T GN12. ALL WORK SHALL BE IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS AND ORDINANCES. ALL WORK SHALL BE IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS AND ORDINANCES. CONTRACTOR SHALL SECURE ALL PERMITS, LICENSES, AND CERTIFICATIONS PRIOR TO EXECUTING THE WORK GN13. PAVEMENT, SIDEWALKS, CURBS, UTILITIES, AND ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON PAVEMENT, SIDEWALKS, CURBS, UTILITIES, AND ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON SIDEWALKS, CURBS, UTILITIES, AND ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON SIDEWALKS, CURBS, UTILITIES, AND ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON CURBS, UTILITIES, AND ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON CURBS, UTILITIES, AND ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON UTILITIES, AND ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON UTILITIES, AND ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON AND ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON AND ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON ALL OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON OTHER SITE FEATURES SHALL BE RESTORED AS SHOWN ON SITE FEATURES SHALL BE RESTORED AS SHOWN ON SITE FEATURES SHALL BE RESTORED AS SHOWN ON FEATURES SHALL BE RESTORED AS SHOWN ON FEATURES SHALL BE RESTORED AS SHOWN ON SHALL BE RESTORED AS SHOWN ON SHALL BE RESTORED AS SHOWN ON BE RESTORED AS SHOWN ON BE RESTORED AS SHOWN ON RESTORED AS SHOWN ON RESTORED AS SHOWN ON AS SHOWN ON AS SHOWN ON SHOWN ON SHOWN ON ON ON THE DRAWINGS AT THE COMPLETION OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR DRAWINGS AT THE COMPLETION OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR DRAWINGS AT THE COMPLETION OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR AT THE COMPLETION OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR AT THE COMPLETION OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR THE COMPLETION OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR THE COMPLETION OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR COMPLETION OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR COMPLETION OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR OF REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR REMEDIATION ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR ACTIVITIES. DISTURBED AREAS NOT IDENTIFIED FOR DISTURBED AREAS NOT IDENTIFIED FOR DISTURBED AREAS NOT IDENTIFIED FOR AREAS NOT IDENTIFIED FOR AREAS NOT IDENTIFIED FOR NOT IDENTIFIED FOR NOT IDENTIFIED FOR IDENTIFIED FOR IDENTIFIED FOR FOR FOR PAVEMENT OR CONCRETE RESTORATION SHALL BE FINISHED WITH TOPSOIL AND SEED. GN14 SITE PREPARATION ACTIVITIES INCLUDING INSTALLATION OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, SITE PREPARATION ACTIVITIES INCLUDING INSTALLATION OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, PREPARATION ACTIVITIES INCLUDING INSTALLATION OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, PREPARATION ACTIVITIES INCLUDING INSTALLATION OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, ACTIVITIES INCLUDING INSTALLATION OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, ACTIVITIES INCLUDING INSTALLATION OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, INCLUDING INSTALLATION OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, INCLUDING INSTALLATION OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, INSTALLATION OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, INSTALLATION OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, OF MATERIAL STORAGE AREAS, LAYDOWN AREAS, MATERIAL STORAGE AREAS, LAYDOWN AREAS, MATERIAL STORAGE AREAS, LAYDOWN AREAS, STORAGE AREAS, LAYDOWN AREAS, STORAGE AREAS, LAYDOWN AREAS, AREAS, LAYDOWN AREAS, AREAS, LAYDOWN AREAS, LAYDOWN AREAS, LAYDOWN AREAS, AREAS, AREAS, CONSTRUCTION ENTRANCES, DECONTAMINATION PADS, WATER TREATMENT PLANT, AND SUPPORT TRAILERS SHALL ENTRANCES, DECONTAMINATION PADS, WATER TREATMENT PLANT, AND SUPPORT TRAILERS SHALL ENTRANCES, DECONTAMINATION PADS, WATER TREATMENT PLANT, AND SUPPORT TRAILERS SHALL DECONTAMINATION PADS, WATER TREATMENT PLANT, AND SUPPORT TRAILERS SHALL DECONTAMINATION PADS, WATER TREATMENT PLANT, AND SUPPORT TRAILERS SHALL PADS, WATER TREATMENT PLANT, AND SUPPORT TRAILERS SHALL PADS, WATER TREATMENT PLANT, AND SUPPORT TRAILERS SHALL WATER TREATMENT PLANT, AND SUPPORT TRAILERS SHALL WATER TREATMENT PLANT, AND SUPPORT TRAILERS SHALL TREATMENT PLANT, AND SUPPORT TRAILERS SHALL TREATMENT PLANT, AND SUPPORT TRAILERS SHALL PLANT, AND SUPPORT TRAILERS SHALL PLANT, AND SUPPORT TRAILERS SHALL AND SUPPORT TRAILERS SHALL AND SUPPORT TRAILERS SHALL SUPPORT TRAILERS SHALL SUPPORT TRAILERS SHALL TRAILERS SHALL TRAILERS SHALL SHALL SHALL BE COMPLETED PRIOR TO EARTH DISTURBANCE ACTIVITIES. GN15.