This is a Bidding and Contract Document prepared by the State of Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration for the AMCO Group #1209 Site Excavation Activities project located in Croswell, Michigan (File No. 761/18318.SAR). The project involves site excavation activities and the removal of Non-aqueous Phase Liquid (NAPL)-impacted soils on Ward Street between North Howard Street and Brown Street. The document establishes the contract terms, conditions, and glossary of terms applicable to the work. It includes provisions for demolition/remodeling project procedures, hazardous materials handling and disposal, and waste management requirements. The contract requires the contractor to prepare and maintain a comprehensive waste management plan addressing waste source identification, separation, reuse, salvage, recycling, landfill alternatives, and materials handling procedures. All permits required for proper execution of work must be secured by the contractor at their expense, including inspection costs assessed by the Bureau of Construction Codes.

The document incorporates a detailed geotechnical investigation summary based on five borings (B-1 through B-5) drilled in October 2020, which characterized subsurface conditions to depths ranging from 44 to 72 feet below ground surface. Subsurface soils consist of stratified alternating layers of sand and silt/clay, with groundwater occurring between 10 to 20 feet below ground surface at most boring locations. Laboratory testing included Standard Penetration Tests, Shelby tube sampling, moisture content determinations, Atterberg limits tests, particle-size analyses, unconsolidated undrained triaxial tests, direct shear tests, and vane shear testing to establish soil properties necessary for remedial design and temporary excavation support structures. The contractor must comply with all federal, state, and local laws governing hazardous materials handling, including regulations under the Natural Resources and Environmental Protection Act, RCRA, and TSCA, with contact information provided for the Michigan Department of Environment, Great Lakes, and Energy for permitting and compliance guidance.

View the file

Other files

File Type Posted
Drawings 18137.pdf PDF
Addendum 1 18317.pdf PDF
Advertisement 18137.pdf PDF
Specifications 18137.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bidding and Contract Document (R 08/20) Project Name: AMCO Group #1209 Site Excavation Activities File No. 761/18318.SAR

APPENDIX I

GLOSSARY

Bidding and Contract Document (R 08/20) Project Name: AMCO Group #1209 Site Excavation Activities File No. 761/18318.SAR

GLOSSARY

ActivityAn element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.

AddendaWritten instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who actually submitted a Bid, for the purpose of re-bidding the Work without re-advertising, is referred to as a post-Bid Addendum.

Agency- Any unit, section, division, department or other instrumentality of the State that benefits from the Work.

AlternateRefers to work specified in the Bidding Documents for which the Bidder must bid a Bid Price.

Apparent Low Bidders: Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation, provides acceptable responses to both Part One and Part Two of the Best Value Construction Bidder Evaluation to achieve a Best Value recommendation and with the veteran’s preference is the lowest responsive, responsible, best value Bidder it is considered the Apparent Low Bidder.

Archaeological FeatureAny prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan. The Archaeological Features are listed under Section 00800 Supplementary Conditions.

Authorized Technical DataInformation and data contained in a report of exploration and tests of subsurface conditions. Also, any physical data (dimension, location, conditions, etc.) contained in those Drawings of physical conditions of existing surface and subsurface facilities.

Best Value-The bids will be evaluated for best value based on price and qualitative components that may include but are not limited to technical design, technical approach, quality of proposed personnel, and management plans, per PA 430 of 2012.

BidWritten offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates.

The term Bid includes a re-bid.

BidderThe Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.

Bidding DocumentsThe proposed Contract Documents as advertised, and all Addenda issued before execution of the Contract.

Bid Price The Bidder’s price for a lump sum item of work, or the product of the Bidder’s unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.

Bid SecuritySecurity serving as a guarantee that the Bidder will conform to all conditions.

Bidding RequirementsThe Advertisement, Instructions to Bidders, Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and qualification submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.

BoardThe Administrative Board of the State of Michigan.

Bond Security furnished by the Contractor, as required by the Contract Documents.

Business DayAny Day except Saturdays, Sundays and holidays observed by the Owner.

BulletinA request used by the Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.

Calendar DayEvery day shown on the calendar, Saturdays, Sundays and holidays included.

Cash AllowanceAn Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents.

Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently detailed in the Contract

Bidding and Contract Document (R 08/20) Project Name: AMCO Group #1209 Site Excavation Activities File No. 761/18318.SAR

Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.

Change OrderA written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.

Contract AwardThe official action of the Board, the Director-SFA or the Director-DCD awarding the Contract to the Contractor.

Contract DocumentsWritten and graphic documents that form the legal agreement between the Owner and the Contractor, consisting of this document, completed Bid and Contract forms, terms and conditions of the contract, specifications, drawings, addenda, Notice of Award, Notice-to-Proceed and contract change orders.

Contract PriceThe total compensation, including authorized adjustments, payable by the Owner to the Contractor (subject to provisions for Unit Price Work).

Contract TimesThe Contract Times for the entire Work are the periods allowed, including authorized adjustments, for Substantial Completion and final completion of the Work. The Contract Times for a designated portion of the Work are the periods allowed for Substantial Completion and final completion of any such portion of the Work, as specified in the Contract Documents.

ContractorBusiness enterprise with which the Owner has entered into the Contract.

Correction PeriodPeriod during which the Contractor must, in accordance with the Contract Documents, (a) correct or, if rejected, remove and replace Defective Work, and (b) maintain warranties for materials and equipment in full force and effect.

Cost of the Work InvolvedThe sum of all costs that would be, or actually were, necessarily incurred by the Contractor in providing any Work Involved with the related change, less the costs that would be, or would have been, incurred by the Contractor to provide such Work without the related change.

DefectiveAs determined by the Professional, an adjective which when referring to or when applied to the term “Work” refers to (a) Work not conforming to the Contract Documents or not meeting the requirements of an inspection, test or approval, or (b) Work itemized in a Punch List which the Contractor fails to complete or correct within a reasonable time after issuance of the Punch List by the Professional.

DelayAny act or omission or other event that in any manner adversely affects or alters the schedule, progress or completion of all or any part of the Work. Delay is a generic term intended to include deferral, stoppage, slow down, interruption and extended performance, and all related hindrance, rescheduling, disruption, interference, inefficiency and productivity and production losses.

Department (DTMB)Department of Technology, Management and Budget of the State of Michigan.

Director is the Director of the Department.

Director-SFA is the Director of DTMB State Facilities Administration.

Director-DCD is the Director of DTMB State Facilities Administration, Design and Construction Division.

DivisionEach of the numbered, distinct parts (starting with Division 0) into which the Specifications are divided.

DrawingsPart of the Contract Documents showing the Work. Drawings must neither serve nor be used as Shop Drawings.

EmergencyA condition affecting the safety or protection of persons, or the Work, or property at or adjacent to the site.

State Facilities Administration (SFA)-Entity in the Department responsible for design, construction, and operations and maintenance of facilities.

Fee for the Work Involved (Fee)An established, percentage mark-up on the Cost of the Work Involved which is allowed to the Contractor for (a) reasonable administrative costs, and (b) negotiated, reasonable profit on the Cost of the Work Involved.

Hazardous MaterialAsbestos containing materials (ACMs), Polychlorinated biphenyls (PCBs), petroleum products, such construction materials as paint thinners, solvents, gasoline, oil, etc., and any other like material the manufacture, use, treatment, storage, transportation or disposal of which is regulated by federal, State or local Laws governing the protection of public health, natural resources or the environment.

Bidding and Contract Document (R 08/20) Project Name: AMCO Group #1209 Site Excavation Activities File No. 761/18318.SAR

Invitation To Bid (ITB) -The solicitation document presenting the terms and conditions that will become part of the Contract when the Bid is accepted.

Law(s)Means federal, State and local statutes, ordinances, orders, rules and/or regulations.

MCLThe Michigan Compiled Laws of the State of Michigan.

Means and MethodsIncludes means, methods, techniques, sequences and/or procedures applicable to the Work.

Notice of AwardWritten notice accepting the Bid to the lowest responsive, responsible Bidder and designating the Contract Price (and establishing the Alternates accepted by the Owner).

Notice-to-ProceedWritten notice issued by the Project Director directing the Contractor to commence the construction activities and establishing the start date of the Contract Time.

On-Site Inspection–The Professional’s on-site examination of the Contractor’s completed or in progress Work to determine and verify to the Project Director that the quantity and quality of all Work complies with the requirements of the Contract Documents.

OwnerThe State of Michigan, with whom the Contractor has entered into the Contract and for whom the Work is to be provided.

Owner Field RepresentativeA State employee or consultant, acting collaboratively with the Project Director, providing on-site, periodic observation and documentation of the Work for compliance with the Contract Documents.

Partial UseUse by the Owner of a designated portion of the Work before accomplishing Substantial Completion of the entire Work.

Partial Use does not mean Substantial Completion of the portion of the Work placed in use by the Owner.

PersonIndividuals, partnerships, corporations, receivers, trustees, joint ventures or any other legal entity and any combinations of any of them.

Political SubdivisionAny county, city, village or other local unit of the State, including any agency, department or instrumentality of any such county, city, village or other local unit.

PostBid SubmittalA Qualification Submittal required of the Bidder selected under Section 00100 - 22 before Contract Award, and which is used by the Owner in the evaluation of the Bid of the selected Bidder.

Professional Services Contractor (PSC or Professional)The individual or business entity who has the authority to practice the design disciplines required by the Contract Documents. An Agency with appropriate licensing may replace the PSC in their role if a consultant is not used.

ProjectThe total construction, which includes the Work and possibly other work completed by others, as indicated in the Contract Documents.

Project Director-Designated State employee(s) (a) Responsible for directing and supervising the Professional’s services during the period allowed for completion of the Work; and/or (b) Acting as representative for the Owner and for the enforcement of the Contract Documents, approving payment to the Contractor and coordinating the activities of the State, Owner, Professional and Contractor.

Project ScheduleWork Schedule that shows the Contractor's approach to planning, scheduling and execution of the Work and that accurately portrays completed Work as to sequencing and timing, as provided in the Contract Documents.

Project SpecificationsThe Contract Documents organized into Divisions. "Technical Specifications" means Divisions of the Specifications consisting of technical descriptions of materials, equipment, construction systems, standards and workmanship.

Provisionary AllowanceAn amount included within the Contract Price to reimburse the Contractor for the cost to furnish and perform Work that is uncertain because, for example, it is indeterminate in scope and may not be shown or detailed in the Contract Documents.

Punch ListA list of minor items to be completed or corrected by the Contractor, any one of which do not materially impair the use of the Work for its intended purpose.

Qualified Disabled Veteran (QDV)-QDV as defined by Public Act 22 of 2010, MCL 18.1241.3 and supported by a DD214 Proof of Service and Discharge, a Veterans Administration rating decision letter, proof of disability (if the disability is not indicated on the DD214), and appropriate legal documents setting forth the 51% natural persons QDV ownership.

Bidding and Contract Document (R 08/20) Project Name: AMCO Group #1209 Site Excavation Activities File No. 761/18318.SAR

Record DocumentsDrawings, Specifications, Addenda, Change Orders, Change Authorizations, Bulletins, inspection, test and approval reports, photographs, written clarifications and interpretations and all other documents recording, or annotated to show, all revisions and deviations between the as-built installation and the Contract Documents, all approved Submittals and all clarifications and interpretations.

RecordsBooks, reports, documents, electronic data, and other evidence relating to the bidding, award and furnishing and performance of the Work.

Recycled MaterialRecycled paper products, structural materials made from recycled plastics, re-refined lubricating oils, reclaimed solvents, recycled asphalt and concrete, recycled glass products, re-treaded tires, ferrous metals containing recycled scrap metals and all other materials that contain (a) waste materials generated by a business or consumer, (b) materials that have served their intended purpose, and/or (c) materials that have been separated from solid waste for collection, recycling and disposition in the percentage determined by the State as provided by Law.

Request for PaymentThe form provided by the Owner (Payment Request DTMB-0440) to be used by the Contractor in requesting payment for Work completed, which must enclose all supporting information required by the Contract Documents.

Schedule of ValuesA schedule of pay items, which subdivides the Work into its various parts and which details, for each itemized part, cost and pricing information required for making payments for Work performed. The sum of all pay item costs in the Schedule of Values must equal the Contract Price for the Work.

Shop DrawingsIncludes drawings, diagrams, illustrations, standard schedules, performance charts, instructions and other data prepared by or for the Contractor to illustrate some part of the Work, or by a Supplier and submitted by the Contractor to illustrate items of material or equipment.

Soil Erosion and Sedimentation Control–The planning, design and installation of appropriate Best Management Practices designed and engineered specifically to reduce or eliminate the off-site migration of soils via water runoff, wind, vehicle tracking, etc. Soil erosion and sedimentation control in the State of Michigan is regulated under The Natural Resources Environmental Protection Act;

Soil Erosion and Sedimentation Control, 1994 PA 451, Part 91, as amended, MCL 324.9101 et seq. Soil erosion and sedimentation control associated with this Contract is monitored and enforced by the DTMB-SFA.

StateThe State of Michigan in its governmental capacity, including its departments, divisions, agencies, boards, offices, commissions, officers, employees and agents. Non-capitalized references to a state refer to a state other than the State of Michigan.

State Construction CodeThe Michigan State Construction Code Act, 1972 PA 230, as amended, MCL 125.1501 et seq.

SubcontractorA Person having an agreement with the Contractor to provide labor at the site and furnishing materials and/or equipment for incorporation into the Work.

SubmittalsIncludes technical Submittals, Progress Schedules and those other documents required for submission by the Contract Documents. The term "technical Submittal" includes Shop Drawings, brochures, samples, Operation and Maintenance (O&M) Manuals, test procedures and any other Submittal the Contract Documents require the Contractor to submit to demonstrate how the items covered, after installation or incorporation into the Work, will conform to the information given in the Contract Documents and be compatible with the design of the completed Work as a functioning whole as indicated in the Contract Documents.

Substantial CompletionThe Work, or a portion of the Work designated in the Contract Documents as eligible for separate Substantial Completion, has been completed in accordance with the Contract Documents as determined by the PSC, to the extent that the Owner can use or occupy the entire Work, or the designated portion of the Work, for the use intended without any outstanding, concurrent Work at the site, except as may be required to complete or correct Punch List items.

SupplierA manufacturer or fabricator, or a distributor, material man or vendor representing a manufacturer or fabricator, who has an agreement with the Contractor to furnish materials and/or equipment.

Underground UtilitiesPipelines, piping, conduit, duct, cables, wells, tanks, tunnels and appurtenances, or other similar facilities, installed underground to convey or support conveyance of potable water, sprinkler or irrigation water, fire protection systems, electricity, gases, steam, petroleum products, sewerage and drainage removal, telephone, communications, cable TV, traffic or control systems.

Unit Price WorkWork involving specified quantities (i.e., related Work quantities) which when performed is measured by the Professional and paid using the measured quantities and unit prices contained in the Contract Documents. Performance of Unit Price Work for undefined quantities is contingent upon conditions encountered at the site, as determined and authorized by the Professional.

Bidding and Contract Document (R 08/20) Project Name: AMCO Group #1209 Site Excavation Activities File No. 761/18318.SAR

Unit Price Work, SpecifiedWork of specified and defined quantities (i.e., quantities are detailed in, and can be taken-off from, the Contract Documents) that when performed is measured by the Professional and paid based on the measured quantities and unit prices contained in the Contract Documents.

Work (as in “the Work,” "the entire Work”)The entire completed Construction required by the Contract Documents. The Work results from furnishing and performing all services, obligations, responsibilities, management, supervision, labor, materials, equipment, construction equipment, general conditions, permits, taxes, patent fees and royalties, testing, inspection and approval responsibilities, warranties, temporary facilities, small tools, field supplies, Bonds, insurance, mobilization, close-out, overhead and all connections, devices and incidental items of any kind or nature required and/or made necessary by the Contract Documents.

Work Involved, any Work InvolvedExisting or prospective Work (a) reflected in any notice, proposal or claim, or (b) reflected in changes ordered or in process, or (c) affected by Delay.

Bidding and Contract Document (R 08/20) Project Name: AMCO Group #1209 Site Excavation Activities File No. 761/18318.SAR

APPENDIX II

SPECIAL PROJECT PROCEDURES

Bidding and Contract Document (R 08/20) Project Name: AMCO Group #1209 Site Excavation Activities File No. 761/18318.SAR

DEMOLITION/REMODELING PROJECT PROCEDURES

Furnish all equipment, materials, labor and services necessary to complete all building demolition required in connection with the existing building, in order to permit the installation of new Work. The goal of the Owner is to generate the least amount of waste or debris possible. However, inevitable waste and debris that are generated shall be reused, salvaged, or recycled, and disposal in landfills shall be minimized to the extent economically feasible. The Contractor will be required to prepare waste management plan for the collection, handling, storage, transportation and disposal of the waste generated at the construction site for the Owner’s review and approval. The Contractor will be required to produce waste management progress reports.

1. Locations: Notations are made in various places on the Drawings to call attention to building demolition which is required;

however, these Drawings are not intended to show each and every item to be removed. The Contractor and the Subcontractors for the various trades must remove the materials related to their respective trades as required to permit the construction of the new Work as shown.

2. Permits: The Contractor must secure from the appropriate agencies all required permits necessary for proper execution of the work before starting work on the project site. All fees for securing the permits must be paid by the Contractor, including all inspection costs which may be legally assessed by the Bureau of Construction Codes in accordance with the authority granted under the Public Act 1980 PA 371, as amended.

3. Enclosures: Where it is necessary to make alterations to walls, floors or roof of the existing building, the Contractor must provide and maintain dustproof partitions to separate the parts where Work is being done from the adjoining parts occupied by the State Agency. Where any parts are opened and exposed to the elements, the Contractor must provide weather tight enclosures to fully protect the structure and its contents.

4. Waste Management Plan: The management plan must address waste source identification and separation, returns, reuse and salvage, recycling, landfill options, alternatives to landfilling, materials handling procedures and transportation.

5. Preparation: Protect all existing Work that is to remain and restore in an approved manner any such Work that becomes damaged.

5.1 Rubbish and debris resulting from the Work must be removed immediately from the site by the Contractor. However, any recyclable materials must be recycled; the Contractor will be required to use alternatives to landfills for waste disposal such as reuse or recycle of asphalt, bricks, concrete, masonry, plastics, paint, glass, carpet, metals, wood, drywall, insulation and any other waste materials to the extent practical.

5.2 Unless otherwise specified, the Agency will remove existing furniture, drapery tracks, draperies, window blinds, and other equipment items, which might interfere with the new construction.

6. Coordination: Demolition work, in connection with any new unit of Work, must not be commenced until all new materials required for completion of that new item of Work are at hand.

7. Waste Management Plan Progress Reports: Submit an updated report with the payment requests. The progress reports shall include:

a. The amount of waste sent to a landfill, tipping fees paid and the total disposal cost. Include supporting documents such as manifests, weight tickets, receipts and/or invoices.

b. Records for each material recycled/reused/salvaged from the project including the amount, date removed from the job site, final destination, transportation cost, recycled materials and the net cost/ savings.

c. Breakdown of waste by type generated to date.

d. Recycling/salvage/landfill rates.

e. Percent of waste recycled/salvaged to date.

Bidding and Contract Document (R 08/20) Project Name: AMCO Group #1209 Site Excavation Activities File No. 761/18318.SAR

HAZARDOUS MATERIALS PROJECT PROCEDURES

1. The Contractor must use, handle, store, dispose of, process, transport and transfer any material considered a Hazardous Material in accordance with all Federal, State and local Laws. If the Contractor encounters material reasonably believed to be a Hazardous Material and which may present a substantial danger, the Contractor must immediately stop all affected work, give written notice to the Owner of the conditions encountered, and take appropriate health and safety precautions.

2. This project has been identified by the DTMB-SFA as having a possibility of containing Hazardous Waste materials to be legally removed from the Project job site in order to complete the Work as described in the Proposal And Contract. If removal of friable asbestos material is required, the Contractor must contact the Air Quality Division, Department of Environment, Great Lakes, and Energy, at (5l7) 284-6773, for a permit and furnish all training, labor, materials, services, insurance, and equipment necessary to carry out the removal operations of all Hazardous Materials from the Project job site, as identified by the Scope of Work, or encountered on the Project job site, in accordance with State and Federal Hazardous Waste Codes. A Contract Change Order will be written to modify the existing Contract to pay for the additional cost.

3. Environmental Hazards (air, water, land and liquid industrial) are handled by the Waste and Hazardous Materials Division, Michigan Department of Environment, Great Lakes, and Energy (EGLE) in carrying out the requirements of the Federal Environmental Protection Agency (EPA). For general information and/or a copy of the latest regulations and publications call

(517) 335-2690.

4. The Michigan Occupational Safety and Health Administration (MIOSHA) provides protection and regulations for the safety and health of workers. The Department of Licensing and Regulatory Affairs provides for the safety of workers. The Department of Community Health provides for the health of workers (517/373-3740) (TDD 517/373-3573).

4.1 Contractor must post any applicable State and/or Federal government regulations at the job site in a prominent location.

4.2 Contractor must be responsible for training their workers in safe work practices and in proper removal methods when coming in contact with hazardous chemicals.

5. Applicable Regulations:

5.1 Natural Resources and Environmental Protection Act – PA 451 of 1994, as amended, including Part 111 – Hazardous Waste Management, Part 121 – Liquid Industrial Waste and Part 147 – PCB compounds.

5.2 RCRA, 1976 - Resource Conservation and Recovery Act: This federal statute regulates generation, transportation, treatment, storage or disposal of hazardous wastes nationally.

5.3 TSCA, 1979 – Toxic Substances Control Act: This statute regulates the generation, transportation, storage and disposal of industrial chemicals such as PCBs.

6. Definitions: Hazardous substances are ignitable, corrosive, reactive, and/or toxic, based on their chemical characteristics.

6.1 Under Federal and Michigan Law, a Small Quantity Generator of hazardous waste provides from 220 to less than 2,000 lbs./month or never accumulates 2,200 lbs. or more.

6.2 A Generator size provider of hazardous waste provides 2,200 lbs. or more/month or accumulates above 2,200 lbs.

7. Disposals: To use an off-site hazardous waste disposal facility, the Contractor must use the Uniform Hazardous Waste Manifest

(shipping paper). Small quantities of hazardous waste may not be disposed of in sanitary landfills used for solid waste.

8. Federal, State and local Laws and regulations may apply to the storage, handling and disposal of Hazardous Materials and wastes at each State Agency. Contact the Environmental Assistance Center of the Michigan Department of Environment, Great Lakes, and Energy (EGLE) at 1-800-662-9278, Fax to: 517-241-0673 or e-mail to: DEQ-EAD-env-assist@michigan.gov for general EGLE information including direct and referral assistance on air, water and wetlands permits; contaminated site clean-ups; underground storage tank removals and remediation; hazardous and solid waste disposal; pollution prevention and recycling;

and compliance-related assistance. The Center provides businesses, municipalities, and the general public with a single point of access to EGLE's environmental programs.

Bidding and Contract Document (R 08/20) Project Name: AMCO Group #1209 Site Excavation Activities File No. 761/18318.SAR

APPENDIX III

GEOTECHNICAL INVESTIGATION SUMMARY

Geotechnical Investigation Summary AMCO #1209 Site Croswell, Michigan

TECHNICAL MEMORANDUM

DATE: June 2021

TO: Michigan Department of Environment, Great Lakes, and Energy (EGLE)

FROM: Nicholas Langlais, P.E. (MI No. 6201309267)

REVIEWED BY: Richard Egan, P.E. (ME)

SUBJECT: Geotechnical Investigation Summary AMCO #1209 Site

PROJECT: 3293182027

INTRODUCTION

Wood Environment & Infrastructure Solutions, Inc. (Wood) is pleased to present this Geotechnical Investigation Summary to the Michigan Department of Environment, Great Lakes, and Energy (EGLE) to characterize the subsurface and obtain geotechnical data to support remedial design and construction at the AMCO #1209 Site in Croswell, Michigan (i.e., the Site).

It is anticipated that remedial activities will consist of excavation and disposal of Non-aqueous Phase Liquid (NAPL)-impacted soils on Ward Street, between North Howard Street to the west and Brown Street to the east. As such geotechnical/structural design of temporary excavation support will be required to perform the excavation and backfilling activities.

The following sections of this Technical Memorandum summarize the geotechnical exploration and laboratory testing programs and describe the subsurface conditions encountered.

GEOTECHNICAL INVESTIGATION PROGRAM

Wood completed five geotechnical borings, designated B-1 through B-5, at the Site from October 12-20, 2020. Boring locations were selected in relation to existing Site features and under the constraints of drill rig access and utility conflicts. The approximate as-drilled geotechnical boring locations are depicted in Figure 1.

A Wood geologist directed the drilling operations at the borings, collected soil samples, and logged subsurface conditions encountered. Job Site Services of Bay City, Michigan provided drilling services using a Mobile B-57 rig. The drilling was performed via hollow-stem auger methods (4.25-inch inside diameter, 8-inch outside diameter). The borings were drilled to depths ranging from approximately 44 to 72 feet below ground surface (bgs). As each boring was advanced, Standard Penetration Tests (SPTs) were generally performed at continuous to near-continuous intervals through the upper 10 feet of overburden and at 5-foot intervals thereafter. SPTs were performed in general accordance with American Society of Testing and Materials (ASTM) D 1586, Standard Test Method for Penetration Test and Split-Barrel Sampling of Soils. Soil samples were described using procedures outlined in ASTM D 2488, Standard Practice for Description and Identification of Soils (Visual-Manual Procedure). Shelby tube samples (3-inch diameter) were obtained at selected intervals within fine-grained soils. Shelby tubes were collected in general accordance with ASTM D 1587, Standard Practice for Thin- Walled Tube Sampling of Soils for Geotechnical Purposes. Representative soil samples collected from the SPTs were sealed in glass jars and returned to the office for further review, classification, and submission/shipment to the geotechnical laboratory for testing.

Hollow-stem auger “refusal” to further penetration (i.e., slow penetration rate) was encountered at B-2 and B-3 at 48.5 and 44 feet bgs, respectively. Bedrock coring was not performed to confirm the refusal surface as bedrock. However, considering that proximate borings B-1, B-4, and B-5 were advanced to depths of 52 to 72 feet bgs without refusal, it is not believed that bedrock was encountered at B-2 or B-3.

Upon completion of drilling, each boring was tremie-grouted to ground surface with cement-based grout. A detailed record of the drilling, testing, and sampling performed is provided on the Geotechnical Boring Records presented in Attachment 1.

ATC Associates of Novi, Michigan performed geotechnical laboratory testing of representative soil samples selected from the geotechnical borings by Wood. The following tests were performed:

• Moisture content determinations (ASTM D 2216)

• Atterberg limits tests (ASTM 4318)

• Particle-size analyses - washed sieve only (ASTM D 6913)

• Unconsolidated Undrained (UU) triaxial tests (ASTM D 2850)

• Direct Shear (ASTM D 3080)

• Laboratory vane shear

• Bulk Density

Geotechnical laboratory testing was performed in general accordance with the referenced ASTM standards. A summary of the laboratory testing results is included in Attachment 2. Individual test reports are also provided in Attachment 2.

SUBSURFACE CONDITIONS

Topsoil or asphalt pavement was encountered at ground surface at each boring locations.

Beneath the topsoil and pavement, overburden soils consist of stratified, alternating layers of Sand and Silt/Clay. Table 1 summarizes the stratigraphy encountered and/or interpreted at each boring location.

Table 1 – Summary of Soil Stratigraphy Soil Stratum B-1

(ft bgs) B-2

(ft bgs) B-3

(ft bgs) B-4

(ft bgs) B-5

(ft bgs) Topsoil/Pavement 0.0 – 1.5 0.0 – 0.5 0.0 – 0.5 0.0 – 0.5 0.0 – 1.5

Sand 1.5 – 4.5 0.5 – 4.0 0.5 – 4.9 0.5 – 4.5 1.5 – 5.0 Silt/Clay 4.5 – 13.0 4.0 – 13.0 4.9 – 21.5 4.5 – 10.0 5.0 – 9.0

Sand 13.0 – 15.2 13.0 – 15.2 21.5 – 44.0 10.0 – 20.0 9.0 – 15.0 Silt/Clay 15.2 – 26.0 15.2 – 20.0 - 20.0 – 45.5 15.0 – 16.5

Sand 26.0 – 52.0 20.0 – 48.5 - 45.5 – 60.0 16.5 – 23.0 Silt/Clay - - - 60.0 – 72.0 23.0 – 45.0

Sand - - - - 45.0 – 52.0

Asphalt pavement was encountered at ground surface at B-2, B-3, and B-4 and is approximately 6-inches thick.

Topsoil was encountered at ground surface at B-1 and B-5. Where encountered the topsoil is approximately 1.5 feet thick and consists of moist, brown silty sand with organics. The topsoil is visually classified as SM soil in accordance with the Unified Soil Classification System (USCS) and described as very loose to loose relative density based on SPT N-values of 4 blows per foot (bpf).

The Sand strata generally consists of brown to gray sand, sand with silt, or silty sand with a lesser, varying amount of gravel. Occasional gravel/cobble seams were also encountered. The Sand is classified as SP, SP-SM, or SM soil in accordance with the USCS. SPT N-values generally range from 7 to 10 bpf between 0 and 5 feet bgs, indicating loose to medium dense relative density. SPT N-values at depths greater than 5 feet bgs in the Sand strata range from approximately 17 to greater than 50 bpf, indicating medium dense to very dense relative density. The Sand is typically described as moist above the groundwater table and wet/saturated below the groundwater table. Particle-size analyses indicate the Sand consists of 2.2 to 14.2 percent gravel, 75.2 to 84.4 percent sand, and 7.4 to 13.4 percent fines (i.e., silt and clay sized particles) based on three laboratory tests. Direct shear results indicate the peak effective friction angle (’) of the Sand ranges from 33.3 to 39.9 degrees, based on four tests.

The Silt/Clay strata generally consists of gray sandy silt, silt, clay, or silty clay with a lesser, varying amount of sand. Occasional gravel/cobbles were also encountered within the Silt/Clay.

The Silt/Clay is classified as ML, CL, or CL-ML soil in accordance with the USCS. SPT N-values generally range from 5 to greater than 30 bpf indicating medium stiff to hard consistency. The Silt/Clay is typically described as moist to wet. The moisture content of the Silt/Clay ranges from

18.2 to 28.9, based on 12 tests. The liquid limit ranges from 20 to 38, the plastic limit ranges from 13 to 20, and the plasticity index ranges from 7 to 19, based on 11 tests. Two particle-size analyses indicate the Silt/Clay consists 0.0 percent gravel, 8.6 to 39.5 percent sand, and 60.5 to

91.4 percent fines. Results of four UU triaxial tests indicate peak undrained shear strength (su) of the Silt/Clay ranges from 1800 to 2232 pounds per square foot (psf).

Bedrock was not encountered and/or interpreted at any of the boring locations.

Groundwater is interpreted between 10 to 20 feet bgs at B-1 through B-4 based on observed moisture of split-spoon and Shelby tube samples. At B-5, wet soils are noted at shallower depth, approximately 2 feet bgs. Site groundwater levels will fluctuate in response to precipitation events, seasonal conditions, construction activity, site use/activity, and adjacent site use/activity, and may therefore vary from those presented herein.

CLOSING

The findings presented herein were prepared in accordance with generally accepted geotechnical engineering principles and professional engineering practice, consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. We make no other warranty, either expressed or implied. The findings presented herein are based on the results of the geotechnical explorations and laboratory testing, combined with interpretation and interpolation of soil and groundwater conditions between and beyond the widely spaced explorations. Important information from the Geoprofessional Business Association (GBA) regarding the limitations of this Technical Memorandum is provided in Attachment 3.

FIGURES

AMCO #1209 SITE

WARD STREET

CROSWELL, MI Environment & Infrastructure Solutions, Inc.

511 Congress St., Suite 200, Portland ME 04101 P: (207) 775-5401 F: (207) 772-4762 www.woodplc.com

MICHIGAN DEPARTMENT

OF ENVIRONMENT, GREAT

LAKES, AND ENERGY (EGLE)

Checked/Date:

Revised/Date: TDD 2/9/21

NDL 2/9/21

FIGURE 1

BORING LOCATION PLAN

PROJECT 3293-18-2027

AutoCAD SHX Text #45

AutoCAD SHX Text #43

AutoCAD SHX Text #31

AutoCAD SHX Text #27

AutoCAD SHX Text #26

AutoCAD SHX Text #30

AutoCAD SHX Text

BARN

AutoCAD SHX Text

BARN

AutoCAD SHX Text #37

AutoCAD SHX Text #41

AutoCAD SHX Text #33

AutoCAD SHX Text #29

AutoCAD SHX Text 11+00

AutoCAD SHX Text 10+00

AutoCAD SHX Text 9+00

AutoCAD SHX Text 8+00

AutoCAD SHX Text

BROWN ST

AutoCAD SHX Text

WARD ST

AutoCAD SHX Text

LOT 20

AutoCAD SHX Text

NO ADDRESS 310-100-005-020-00

AutoCAD SHX Text

LOT 21

AutoCAD SHX Text

NO ADDRESS 310-100-005-020-00

AutoCAD SHX Text

LOT 22

AutoCAD SHX Text

15 WARD 310-100-005-022-00

AutoCAD SHX Text

LOT 11

AutoCAD SHX Text

27 BROWN 310-100-001-011-00

AutoCAD SHX Text

30 BROWN 310-100-002-010-00

AutoCAD SHX Text

LOT 10

AutoCAD SHX Text

"MAP OF CROSWELL"

AutoCAD SHX Text

"MAP OF CROSWELL"

AutoCAD SHX Text

LOT 3

AutoCAD SHX Text

46 BROWN 310-100-004-003-00

AutoCAD SHX Text

LOT 2

AutoCAD SHX Text

46 BROWN 310-100-004-002-00

AutoCAD SHX Text

LOT 2

AutoCAD SHX Text

38 BROWN 310-100-004-001-00

AutoCAD SHX Text 122+00

AutoCAD SHX Text 122+20

AutoCAD SHX Text 75+00

AutoCAD SHX Text 76+00

AutoCAD SHX Text 77+00

AutoCAD SHX Text 78+00

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

HOUSE

AutoCAD SHX Text

HOUSE

AutoCAD SHX Text

HOUSE

AutoCAD SHX Text

HOUSE

AutoCAD SHX Text

HOUSE

AutoCAD SHX Text

HOUSE

AutoCAD SHX Text

CONC WALK

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC WALK

AutoCAD SHX Text

CONC WALK

AutoCAD SHX Text

CONC WALK

AutoCAD SHX Text

CONC WALK

AutoCAD SHX Text

GAS VALVE AND ANODE

AutoCAD SHX Text

CONC WALK

AutoCAD SHX Text

BROWN ST

AutoCAD SHX Text

CONC WALK

AutoCAD SHX Text

CONC WALK

AutoCAD SHX Text

CONC

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

CONC WALK

AutoCAD SHX Text

EX. 6" CI WATER

AutoCAD SHX Text

EX. 6" CI WATER

AutoCAD SHX Text

EX. 8" SAN

AutoCAD SHX Text

EX. 12" SAN

AutoCAD SHX Text

EX. 8" SAN

AutoCAD SHX Text

EX. 4" CI WATER

AutoCAD SHX Text

DMH

AutoCAD SHX Text

DMH

AutoCAD SHX Text

SMH

AutoCAD SHX Text

SMH

AutoCAD SHX Text

STOP

AutoCAD SHX Text

STOP

AutoCAD SHX Text

STREET NAME

AutoCAD SHX Text 20"

AutoCAD SHX Text 15"

AutoCAD SHX Text 12"

AutoCAD SHX Text 26"

AutoCAD SHX Text 15"

AutoCAD SHX Text 28"

AutoCAD SHX Text 20"

AutoCAD SHX Text 8"

AutoCAD SHX Text 36"

AutoCAD SHX Text 15"

AutoCAD SHX Text 18"

AutoCAD SHX Text 4"

AutoCAD SHX Text 28"

AutoCAD SHX Text 36"

AutoCAD SHX Text 26"

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

EX. 6" CI WATER

AutoCAD SHX Text 10"

AutoCAD SHX Text 10"

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC WALK

AutoCAD SHX Text

8' CRABAPPLE

AutoCAD SHX Text

BM #4

AutoCAD SHX Text

AD SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

SIGNS

AutoCAD SHX Text C.O.

AutoCAD SHX Text C.O.

AutoCAD SHX Text

STREET SIGN

AutoCAD SHX Text

STOP

AutoCAD SHX Text

METAL POST

AutoCAD SHX Text

METAL POST

AutoCAD SHX Text

METAL POST

AutoCAD SHX Text

METAL POST

AutoCAD SHX Text

AD SIGN

AutoCAD SHX Text

LANDSCAPED

AutoCAD SHX Text

AD SIGN

AutoCAD SHX Text

PAVED

AutoCAD SHX Text

METAL POST

AutoCAD SHX Text

SMH

AutoCAD SHX Text

SMH

AutoCAD SHX Text

SMH

AutoCAD SHX Text

METAL POST

AutoCAD SHX Text

10" CRABAPPLE

AutoCAD SHX Text

8" CEDAR

AutoCAD SHX Text

6" CRAB

AutoCAD SHX Text

6" WATER (ABAND)

AutoCAD SHX Text

SMH

AutoCAD SHX Text

12" SD

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONC

AutoCAD SHX Text

HOWARD ST

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

APPROXIMATE BORING LOCATION (WOOD 2020)

AutoCAD SHX Text B-1

ATTACHMENT 1

Geotechnical Boring Records

Layer:

Seam:

Parting:

> 3" thick

1/16" to 3" thick

< 1/16" thick

Standard Split Spoon Sample

Moist:

TYPICAL SYMBOLS

Stiff

Inorganic lean clay. Low to medium plasticity.

PI > 7 and plots on or above "A" line.

TERMS DESCRIBING STRUCTURE

Little:

SPT Notes: WR = Weight of Rods; WH = Weight of Hammer

15% to 25%

Few:

CLEAN SANDS

SANDS WITH

FINES

FINE GRAINED

SOILS

SILTS AND CLAYS

(More than 50% of coarse fraction RETAINED on

No. 4 sieve)

(Less than 5% fines)

(Less than 5% fines)

Well graded sands or sand-gravel mixtures; trace or no fines.

(Liquid Limit LESS than 50)

(Liquid Limit of 50 or GREATER)

Shelby Tube

GC

Occasional:

(i.e. particles > 3", organics, debris, etc.)

Sonic or Vibro-Core Sample (More than 50% RETAINED on No. 200 sieve)

N or N60

0 - 4

5 - 10

11 - 30

31 - 50

Over 50

GRAVELS

SANDS

Consistency

Very Soft

Soft

Very Stiff

TERMS DESCRIBING MATERIALS

Silty gravels or gravel-sand-silt mixtures.

SAND

BOUNDARY CLASSIFICATIONS: Soils possessing characteristics of two groups are designated by combinations of group symbols.

(More than 12% fines)

(More than 12% fines)

Medium

U.S. STANDARD SIEVE SIZE

GRAVEL

Cobbles Boulders

12"3"

CoarseFine

3/4"

GM

SM

SC

ML

Peat and other highly organic soils. Decomposed vegetable tissue. Fibrous to amorphous texture.

Organic silts and clays. High plasticity.

Inorganic elastic silt. PI plots below "A" line.

Organic silts, clays, and silty clays. Low to medium plasticity.

References: ASTM D 2487 (Unified Soil Classification System) and ASTM D 2488 (Visual-Manual Procedure).

GP

CL

OL

MAJOR DIVISIONS

SILTS AND CLAYS

GW

Inorganic fat clay. High plasticity.

PI plots on or above "A" line.

OH

PT

Poorly graded sands or sand-gravel mixtures, trace or no fines.

Silty sands or sand-gravel-silt mixtures.

Clayey sands or sand-gravel-clay mixtures.

CLEAN

GRAVELS

GRAVELS

WITH FINES

GRAVEL, SAND, & SILT (NON-PLASTIC)

(50% or more of coarse fraction

PASSES the No. 4 sieve)

CH

SP

SW

Poorly graded gravels or gravel-sand mixtures; trace or no fines.

Well graded gravels or gravel-sand mixtures; trace or no fines.

HIGHLY ORGANIC SOILS

KEY TO SYMBOLS AND

DESCRIPTIONS

Inorganic silts or rock flour. Non-plastic or very slightly plastic. PI < 4 or plots below "A" line.

MH

Clayey gravels or gravel-sand-clay mixtures.

GROUP

SYMBOLS

COARSE

GRAINED

SOILS

No.4No.10

Coarse

SILT OR CLAY

Fine

No.200 No.40

Auger Cuttings

3" Split Spoon Sample

Dynamic Cone Penetrometer

Bulk/Grab Sample

Water Table after 24 hours

Rock Core

Vane Shear

Geoprobe Sample

Water Table at time of drilling

Hard

GENERAL DESCRIPTIONS

(50% or more PASSES the

No. 200 sieve)

> 25%

10% to 25%

Particles present, but < 10%

TERMS DESCRIBING SOILS

Relative Density

Very Loose

Loose

Medium Dense

Very Dense

Dense

CORRELATION OF STANDARD PENETRATION TEST (SPT)

WITH RELATIVE DENSITY AND CONSISTENCY

Medium Stiff

Su (psf)

0 - 250

250 - 500

Over 4000

500 - 1000

1000 - 2000

Visible/free water

Dry:

Over 30

N or N60

0 - 2

3 - 4

5 - 8

9 - 15 16 - 30 2000 - 4000

SILT (PLASTIC) & CLAY

TERMS DESCRIBING MOISTURE

Some:

Frequent:

Some:

Trace: Particles present, but < 5%

(excludes particles > 3", organics, debris, etc.)

Absence of moisture; dusty

Damp, but no visible water

Wet:

5% to 15%

25% to 50%

Brown, fine SAND, some silt, SM, loose to very loose, moist:

TOPSOIL

- some organics Tan, fine to medium SAND, trace silt, SP, loose, moist:

SAND

Tan, CLAY, some fine to medium sand, CL, medium stiff, moist: SILT/CLAY Gray, CLAY, trace silt, CL, medium stiff to very stiff, moist:

SILT/CLAY

Gray, GRAVEL, some sand, GP, wet: SAND

Gray, CLAY, trace to some silt, trace gravel, CL, very stiff to hard, wet: SILT/CLAY

- 20.0' bgs: 3" seam of gravel/cobbles

Gray, fine to coarse SAND, trace to few gravel, trace to few silt, SP/SP-SM, medium dense to very dense, wet: SAND

- 49.5' bgs: gravel/cobbles

End of boring at 52.0' bgs

S-1

S-2

S-3

U-1

S-4 U-2

S-5

S-6

S-7

S-8

S-9

S-10

S-11

S-12

2-2-2-2 N = 4

2-3-6-6 N = 9

3-3-3-4 N = 6

1-2-3-4 N = 5

4-6-10-10 N = 16

40-24-16-22 N = 40

0-5-24-30 N = 29

4-5-26-25 N = 31

3-20-43-45 N = 63

18-43-50/0.4'

0-3-17-4 N = 20

4-9-19-23 N = 28

LOGGED BY: CHECKED BY/DATE: RSE/06-2021DW

0 10 20 30 40 50 60 70 80 90 100

(ft)

L E G E N D

735.0

730.0

725.0

720.0

715.0

710.0

705.0

700.0

695.0

690.0

685.0

680.0

675.0

670.0

665.0

660.0

655.0

B-1 10/12/20-10/13/20 AMCO #1209 Site Croswell, MI 3293182027

(ft) 10 20 30 40 50 60 70 80 90

1s t 6

2n d

6"

3r d

6"

4t h

6"

THIS BORING RECORD PRESENTS A REASONABLE INTERPRETATION OF THE

SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE

CONDITIONS AT OTHER LOCATIONS MAY DIFFER. STRATA INTERFACES (AS

SHOWN) ARE APPROXIMATE. ACTUAL TRANSITIONS BETWEEN STRATA

MAY BE GRADUAL.

DRILLER:

RIG TYPE:

METHOD:

HOLE DIAM.:

SPTs:

REMARKS:

SOIL DESCRIPTION

AND REMARKS

SAMPLES

SEE KEY TO SYMBOLS AND DESCRIPTIONS

FOR EXPLANATION OF SYMBOLS, TERMINOLOGY, AND ABBREVIATIONS

D E P T H

NM (%)

Job Site Services Mobile B-57 Hollow-Stem Augers

4.25" ID

24" long, 2" OD Tremie-grouted upon completion.

Undrained Shear Strength (psf) VS Pk; VS Rem; PP; Torv; Lab VS Triax.

Or

PL (%) LL (%)

E L E V

(ft)

T Y P E

RQD

% REC

500 1000 1500 2000

FINES (%) SPT ((N1)60-value) ORG (%)

BLOW COUNTS

BORING NO.:

DRILLED:

PROJECT:

LOCATION:

PROJECT NO.:

D E P T H

GEOTECHNICAL BORING RECORD

IDENT

B

O R

E H

O L

E : S

T A

N D

A R

D

0-

P

S F)

A M

C O

.G

PJ

7_

-1 2_

PO

R

T _D

T M

PL

T

.G D

T

/1 1/

Pavement Brown, fine SAND, some silt, SM, loose to medium dense, moist: SAND Brown to gray, CLAY, trace silt, CL, medium stiff to very stiff, moist: SILT/CLAY

Gray, coarse SAND, trace gravel, SP, wet: SAND

Gray, SILTY CLAY, trace sand, CL-ML, very stiff, wet:

SILT/CLAY

Gray to brown, fine to coarse SAND, trace to little silt, trace gravel, SP/SP-SM/SM, dense to very dense, wet: SAND

- 41.0' bgs: little to some gravel

End of boring at 48.5' bgs

S-1

S-2

S-3

U-1

S-4

S-5

U-2

S-6

S-7

S-8

S-9

S-10

S-11

4-5-5-7 N = 10 5-7-7-5 N = 14 3-2-3-2 N = 5

2-2-3-4 N = 5

9-10-10-11 N = 20

10-18-23-36 N = 41

14-47-50/0.4'

12-20-41-50/0.4' N = 61

18-30-42-48 N = 72

18-31-33-33 N = 64

16-22-30-31 N = 52

LOGGED BY: CHECKED BY/DATE: RSE/06-2021DW

0 10 20 30 40 50 60 70 80 90 100

(ft)

L E G E N D

735.0

730.0

725.0

720.0

715.0

710.0

705.0

700.0

695.0

690.0

685.0

680.0

675.0

670.0

665.0

660.0

655.0

B-2 10/14/20 AMCO #1209 Site Croswell, MI 3293182027

(ft) 10 20 30 40 50 60 70 80 90

1s t 6

2n d

6"

3r d

6"

4t h

6"

THIS BORING RECORD PRESENTS A REASONABLE INTERPRETATION OF THE

SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE

CONDITIONS AT OTHER LOCATIONS MAY DIFFER. STRATA INTERFACES (AS

SHOWN) ARE APPROXIMATE. ACTUAL TRANSITIONS BETWEEN STRATA

MAY BE GRADUAL.

DRILLER:

RIG TYPE:

METHOD:

HOLE DIAM.:

SPTs:

REMARKS:

SOIL DESCRIPTION

AND REMARKS

SAMPLES

SEE KEY TO SYMBOLS AND DESCRIPTIONS

FOR EXPLANATION OF SYMBOLS, TERMINOLOGY, AND ABBREVIATIONS

D E P T H

NM (%)

Job Site Services Mobile B-57 Hollow-Stem Augers

4.25" ID

24" long, 2" OD Tremie-grouted upon completion.

Undrained Shear Strength (psf) VS Pk; VS Rem; PP; Torv; Lab VS Triax.

Or

PL (%) LL (%)

E L E V

(ft)

T Y P E

RQD

% REC

500 1000 1500 2000

FINES (%) SPT ((N1)60-value) ORG (%)

BLOW COUNTS

BORING NO.:

DRILLED:

PROJECT:

LOCATION:

PROJECT NO.:

D E P T H

GEOTECHNICAL BORING RECORD

IDENT

B

O R

E H

O L

E : S

T A

N D

A R

D

0-

P

S F)

A M

C O

.G

PJ

7_

-1 2_

PO

R

T _D

T M

PL

T

.G D

T

/1

Brown, fine SAND, some silt, SM, loose to medium dense, moist: SAND

- 3.0' bgs: 3" clay seam Brown to gray, CLAY, trace fine sand, CL, medium stiff to very stiff, moist: SILT/CLAY

- 4.9' to 10.0' bgs: mottled

15.0' bgs: trace gravel

Gray, fine SAND, some silt, SM, medium dense, wet: SAND

Gray, SILT, trace fine to coarse sand, ML, moist: SAND

Gray to borwn, fine to coarse SAND, trace to little gravel, trace to few silt, SP/SP-SM, medium dense to very dense, wet:

SAND

End of boring at 44.0' bgs

S-1

S-2

S-3

U-1

S-4

S-5

S-6

S-7

S-8

S-9

S-10

2-3-4-4 N = 7

2-5-5-7 N = 10

5-7-9-10 N = 16

2-2-3-4 N = 5

7-8-10-10 N = 18

4-8-16-30 N = 24

16/0.5'

12-26-35-24 N = 61

2-6-11-25 N = 17

12-20-30-21 N = 50

LOGGED BY: CHECKED BY/DATE: RSE/06-2021KAM

0 10 20 30 40 50 60 70 80 90 100

(ft)

L E G E N D

735.5

730.5

725.5

720.5

715.5

710.5

705.5

700.5

695.5

690.5

685.5

680.5

675.5

670.5

665.5

660.5

655.5

B-3 10/15/20 AMCO #1209 Site Croswell, MI 3293182027

(ft) 10 20 30 40 50 60 70 80 90

1s t 6

2n d

6"

3r d

6"

4t h

6"

THIS BORING RECORD PRESENTS A REASONABLE INTERPRETATION OF THE

SUBSURFACE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .