About this file
This is a technical drawing set prepared by NBP Engineers, Inc. for the College of Coastal Georgia's Main Campus Central Energy Plant Cooling Tower #2 Replacement project located in Brunswick, Georgia. The project, identified as CCGA-2312, involves the replacement of existing Cooling Tower #2 and its associated Variable Frequency Drive (VFD) at the Central Plant facility. The drawings include comprehensive HVAC system documentation with abbreviations, legends, schedules, and both demolition and new work plans. The bid set is dated November 14, 2022, with the engineer's certificate of authorization expiring June 30, 2024. The project scope encompasses removal of the existing cooling tower and installation of a new cooling tower on the existing concrete basin, along with associated piping modifications, electrical upgrades, and control systems integration.
The technical specifications indicate that the new cooling tower installation requires connection to existing chilled water and condenser water piping systems. Electrical work includes providing a new 100-amp, three-phase, non-fused disconnect on the line side of the new VFD, installation of new 3#3 AWG copper conductors with a 1#8G ground wire in existing conduit, and a new 80-amp, three-phase circuit breaker. Control wiring must be provided from an outside disconnect back to the VFD inside the Central Plant, with auxiliary contacts designed to shut off the VFD when the disconnect is opened. The existing equipment schedule identifies multiple chilled water, condenser water, and heating water components from manufacturers including YORK, TRANE, PACO, EVAPCO, American Turbine, and Floway, with equipment installed between 1996 and 2022. The project requires coordination with existing systems including boilers, chillers, pumps, and treatment equipment that will remain operational during and after the cooling tower replacement.
Text of this file
PROJECT CONSULTANTS
INDEX OF
DRAWINGS
TITLESHEET NO.
316 CORPORATE PARKWAY MACON, GEORGIA
NBP ENGINEERS, INC.
CONSULTANTS
College of Coastal Georgia
Brunswick, Georgia
M001
M301
M302
LARGE SCALE PLAN - DEMOLITION - HVAC
LARGE SCALE PLAN - NEW WORK - HVAC
ABBREVIATIONS, LEGEND & SCHEDULES - HVAC
Main Campus - Central Energy Plant Cooling Tower #2 Replacement
Project No.: CCGA-2312
BID SET 11-14.22
M001
WSH
JJH
WSH
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
ACD ACCESS DOOR
AD AREA DRAIN
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SCIM STANDARD CUBIC INCHES PER MINUTE
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
TP CONDENSER WATER (TOWER) PUMP
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
?F DEGREES FAHRENHEIT
?C DEGREES CENTIGRADE
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TE TOP ELEVATION (UNINSULATED)
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SST SATURATED SUCTION TEMPERATURE
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
DHR DOMESTIC HOT WATER CIRCULATING
ES END SUCTION
FPR FINNED PIPE RADIATION
PRF PROPELLER ROOF FAN
RF ROOF FAN
UF UTILITY FAN
URF UPBLAST ROOF FAN
RSF ROOF SUPPLY FAN
RAF RANGE EQUIPMENT FAN
CAB CABINET FAN
CLG CEILING FAN
FRT FLOW RATE TRANSDUCER
SCR SILICON CONTROLLED RECTIFIER
UNK UNKNOWN
SUMMER WINTER
OUTSIDE
INSIDE
93 F DB/76 F WB
72 F DB75 F DB/55% RH
COMBINATION STARTER STARTER
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
GATE VALVE WITH
3/4" HOSE END
BALANCE VALVE
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
GLOBE VALVE
CHECK VALVE
3-WAY MIXING VALVE
GATE VALVE
BUTTERFLY VALVE
SOLENOID VALVE
CONTROL VALVE
PLAN VIEW
2-WAY MOTORIZED VALVE
NEEDLE VALVE
RELIEF VALVE
SCREWED UNION FLANGED UNION
BRANCH OUT TOP
STRAINER
BRANCH OUT BOTTOM
ELBOW DOWNELBOW UP
TEE OUT TOP
BLIND FLANGE
PIPE CAP
GAUGE WITH COCK
AUTOMATIC AIR VENTAAV
FLEX. PIPE CONN.
BACKFLOW PREVENTER
THERMOMETER
GAS COCK
TEE OUT BOTTOM
MANUAL AIR VENT
BOILER DRAIN
PIPE TEST PLUG
UNDERGROUND
BOTTOM OF LINE (BARE)
FLOW INDICATOR BAL.
CHILLED WATER FLOWHEATING WATER FLOW
COLD WATER DOMESTIC
NATURAL GAS CONDENSER WATER FLOW
DRAIN
MANUAL AIR VENT
LONG RADIUS
FLOW METER
CHILLED WATER RETURNHEATING WATER RETURN
HOT WATER DOMESTIC
U.G.
B.O.L.
G
D
M.A.V.
L.R.
DUCT SIZE FIRST DIMENSION
IS SIDE SHOWN
24\12 DOOR GRILLE
NIGHT THERMOSTAT
C.F.M.
RELIEF AIR SUPPLY
MANUAL VOL. DAMPER
TOP ELEVATION
FLAT ON TOP
RETURN AIR
NOT TO SCALE
REFERS TO DETAIL OR
PLAN ON SHEET M-1.
THERMOSTAT
INTERVAL TIMER
AUTO VOL. DAMPER
BOTTOM ELEVATION
FLAT ON BOTTOM
OUTSIDE AIR
DOOR UNDERCUT (3/4 ")
ADJUSTABLE AIR
EXTRACTOR
T
I.T.
A.V.D.
B.E.
F.O.B.
O.A.
U.C.
R.A.S.
M.V.D.
T.E.
F.O.T.
R.A.
NTS
1\M-4
T N
LINED DUCT OR PLENUM
DAMPER
FIRE DAMPER
ELBOW WITH
TURNING VANES
FLEX. DUCT CONN.
DAMPER
TURNING VANES
ELBOW WITHOUT
ADJUSTABLE AIR
EXTRACTOR
INSULATED FLEX. DUCT
SPLITTER DAMPER
INSULATED FLEX. DUCT
FIRE DAMPERF.D.
c
DN DOWNTB THRUST BLOCK
ECCENTRIC REDUCER
A.E.
SEPARABLE SOCKET WELL
A.D. ACCESS DOOR
GAUGE COCK
HWS
HWR
CHS
CHR
CONDENSER WATER RETURN
CS
CR
SPS STATIC PRESSURE SENSOR EAL EXHAUST AIR LOUVER
OAL OUTSIDE AIR LOUVER RAO RETURN AIR OPENING
STATIC PRESSURE SENSORSMOKE DETECTOR
DESIGN CONDITIONS
21 F DB
MARK AMBIENT
COOLING TOWER SCHEDULE
GPM EWT
F
LWT
F WB F
MAX
MOTOR HP
MANUFACTURERS
REMARKSEVAPCO BAC MARLEY
PRESS.
INLET
(PSIG)
CT-3
480V/3{
MARK
EXISTING EQUIPMENT SCHEDULE (CHILLED WATER)
CHR-1
CHR-2
PCP-1
PCP-2
CP-1
CP-2
TP-1A
TP-1B
TP-2A
TP-2B
CT-1
CT-2
TYPE
CHILLED WATER TOWER
CHILLER
CHILLER
HSC
HSC
HSC
HSC
VT
VT
VT
VT
CT
CT
1400 28 270
GPM GPM
HP/Kw TONS YEAR REMARKS
465 2010
YORK YKFQFQQ6
PACO 4x5x15
PACO
PACO
FLOWAY
FLOWAY
AMERICAN TURBINE
EVAPCO
EVAPCO
FLOWAY
PACO 6x8x15
1500 30
30 500
500 1996
CT
1400 25 HP
CP-3 HSC 1200 50 1750
CHILLER
480/3{20111200
CHR-3 251
1 150
1 125
HEAD (FT)HEAD (FT)
NOTES:
CT-2 1500 5.7 PT2 MDAT30808595
EVAPCO
1 150 15 1400 20 253 465 TRANE CVHF
201 1
201 1
SCHEDULES - HVAC
LEGEND &
ABBREVIATIONS,
P:\22102\22102m001.dgn
DATE PLOTTED
DGN FILE
14-NOV-2022
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22102\22102m001.dgn
AS SHOWN
22102
C o ll e g e o f C o a s ta l G e o rg ia
B ru n s w ic k
G e o rg ia
M a in C a m p u s C e n tr a l E n e rg y P la n t C o o li n g T o w e r
R e p la c e m e n t
WSH
LTF
WSH
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
B
ID
S E
T
11.14.22
P ro je c t
N o
C
C G
A
3300|
4"HWR
4"HWS
H&PE
(DEAD)
(DEAD)
C H
W S
C H
W R
4"HWR
FM
12" BYPASS
CHWR
CHWS 12"CHWS
12"CHWR
"C
H W
R
"C
H W
R
"C
H W
R
CHWS
CHWR
DN
DN
FRT
FRT
FM
SPACE
TUBE
WEST LOOP
4" HW TO
CHILLER#2
EXISTING
EXISTING EXISTING
EXISTING
EXISTING
AIR COMPRESSOR
SOUTH LOOP
8" CH TO
WEST LOOP
8" CH TO
CP-1
C P
12" CWS
10" CHWR
10" CHWS
"C
W R
"C
W S
12" CWR
8"
8"
FM
FM
"H
W S
"H
W R
8" CHR
6" CHR
C H
R
6" CHS
" C
H S
R V
4" HWR
4" HWS
12" CWR
12" CWS
" 10
UNDERGROUND
EXISTING
SLOPE
ƒ"
2" CUG
2" CUG
LOOP
SOUTH
TO
STARTER
2 SPD EF
TO REMAIN
SHOTFEED
EXISTING
REF. DRYER
EXISTING
TO REMAIN
CHW CFP
EXISTING
5"HWS
5"HWR
TANK
TANK
EXISTING
EXISTING
10"
TO REMAIN
EXISTING AIR SEPARATOR
10" CWR (UNDERRGROUND)
10" CWS (UNDERRGROUND)
C W
R
(U
N D
E R
R G
R O
U N
D
C W
S
(U
N D
E R
R G
R O
U N
D
C W
R
(U
N D
E R
R G
R O
U N
D
C W
S
(U
N D
E R
R G
R O
U N
D
VFD
"C
W R
"C
W R
" C
W R (U
ND
ER
RG
RO
UN
D)
" C
W S (U
ND
ER
RG
RO
UN
D)
TOWER CONCRETE BASIN
VFD
"C
W S
FM
C H S
C H
R
MAV
FM
MAV
MAVDN
8"CHWR
"C
H W
R
"C
H W
S
MAV
ƒ" HW ƒ" CH &
8" CWR
8" CWS
M
C W
R
(U
N D
E R
R G
R O
U N
D
"C
H W
R
TANK ON CONC PAD
WATER EXPANSION
EXISTING HEATING
EXISTING UG PIPING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTINGCP-2
EXISTING
TREATMENT
TOWER
CHR
HP-2HP-1
SF-2
SF-1
SF-3
SF-5
OA LOUVER
40"x32"
SF-6
OA LOUVER
40"x32"
SF-7
OA LOUVER
40"x32"
PCP-1
EXISTING
TP-2A
EXISTING
TP-1A
EXISTING
B L
R 1B
E X
IS
T
IN
G
BLR-1A
EXISTING
BLR-1C
EXISTING
B L
R 1D
E X
IS
T
IN
G
TANK
EXISTING
TANK
EXISTING
TP-2B
EXISTING
TP-1B
EXISTING
LOOP PIPING
CHW & HW NORTH
EXISTING OVERHEAD
PAINTSHOP ROOM
ROOF
EF-1 ON
EXISTING
CHR-3
SPACE
TUBE PULL
CP-3
TP-3
IN VERTICAL RISE
INSTALL VALVES
CT-3
1•"
EF-2
FCU-CEP-01
BYPASS
TOWER
B.E. @ 0'-8" AFF
w/FULLSIZE 18" PLENUM
EXISTING 36"x36" EA LOUVER
MAKEUP DEVICES
EXISTING CT WATER
CEP CONTROLS
EXISTING
EXISTING EF-2
WATER STATION
EXISTING TOWER MAKEUP
TREATMENT POWER PANEL
EXISTING TOWER
TOWER TREATMENT SYSTEM
EXISTING PULSED POWER
PCP-2
EXISTING
LEAK MONITOR
EXISTING REFRIGERANT
BOILER #2
BHP-2
SF-4
SF-7
SF-6
SF-5
SF-4
EXPANSION TANK ON CONCRETE PAD
EXISTING CHILLED WATER
CW THIS AREA
TO EXISTING DOMESTIC
EXISTING 1 •" CW
T
T
UC
T
OA LOUVER
CLR ANODIZIED
38"x32"
"C
W S
(U
G
"C
W R
(U
G
12"CWR (UG)
12"CWS (UG)
"C
W S
(U
G
HSBLE
DATA
F A
P
E L
E C
MCC #3
E
T E
L
M C
C
MSG
T
S
CAUTION: UG HIGH VOLTAGE IN AREA
POWER PANEL
EXISTING PULSED
J
M C
C
EXISTING CT-3
EXISTING CT-1
TP-3
EXISTING
CT-1 VFD
EXISTING
P:\22102\22102m301.dgn
DATE PLOTTED
DGN FILE
14-NOV-2022
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22102\22102m301.dgn
AS SHOWN
22102
C o ll e g e o f C o a s ta l G e o rg ia
B ru n s w ic k
G e o rg ia
M a in C a m p u s C e n tr a l E n e rg y P la n t C o o li n g T o w e r
R e p la c e m e n t
WSH
LTF
WSH
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
T
11.14.22
P ro je c t
N o
C
C G
A
SECURITY OFFICE
CHILLER ROOM
BOILER ROOM
TLT
TLT
CONTROL ROOM
LINK FENCE
EXISTING CHAIN
LINK FENCE
EXISTING CHAIN
LINK FENCE
EXISTING CHAIN
SCALE:
= 1'-0
4 0 2 4 8
M301
N DEMOLITION - HVAC
LARGE SCALE PLAN - LARGE SCALE PLAN - DEMOLITION - HVAC
EXISTING CT-2
REMOVE
C T
V F
D
LINE LEGEND
EXISTING TO REMAIN
DEMOLITION
CT-2 VFD
EXISTING
REMOVE
BASIN TO REMAIN
EXISTING CONCRETE
BACK TO EXISTING ISOLATION VALVE
REMOVE EXISTING CONDENSER WATER PIPING
EXISTING ISOLATION VALVES.
MAKE UP WATER PIPING BACK TO
REMOVE EXISTING COOLING TOWER
3300|
4"HWR
4"HWS
H&PE
(DEAD)
(DEAD)
C H
W S
C H
W R
4"HWR
FM
12" BYPASS
CHWR
CHWS 12"CHWS
12"CHWR
"C
H W
R
"C
H W
R
"C
H W
R
CHWS
CHWR
DN
DN
FRT
FRT
FM
SPACE
TUBE
WEST LOOP
4" HW TO
CHILLER#2
EXISTING
EXISTING EXISTING
EXISTING
EXISTING
AIR COMPRESSOR
SOUTH LOOP
8" CH TO
WEST LOOP
8" CH TO
CP-1
C P
12" CWS
10" CHWR
10" CHWS
"C
W R
"C
W S
12" CWR
8"
8"
FM
FM
"H
W S
"H
W R
8" CHR
6" CHR
C H
R
6" CHS
" C
H S
R V
4" HWR
4" HWS
12" CWR
12" CWS
" 10
UNDERGROUND
EXISTING
SLOPE
ƒ"
2" CUG
2" CUG
LOOP
SOUTH
TO
STARTER
2 SPD EF
TO REMAIN
SHOTFEED
EXISTING
REF. DRYER
EXISTING
TO REMAIN
CHW CFP
EXISTING
5"HWS
5"HWR
TANK
TANK
EXISTING
EXISTING
10"
TO REMAIN
EXISTING AIR SEPARATOR
10" CWR (UNDERRGROUND)
10" CWS (UNDERRGROUND)
C W
R
(U
N D
E R
R G
R O
U N
D
C W
S
(U
N D
E R
R G
R O
U N
D
C W
R
(U
N D
E R
R G
R O
U N
D
C W
S
(U
N D
E R
R G
R O
U N
D
VFD
"C
W R
"C
W R
" C
W R (U
ND
ER
RG
RO
UN
D)
" C
W S (U
ND
ER
RG
RO
UN
D)
TOWER CONCRETE BASIN
VFD
"C
W S
FM
C H S
C H
R
MAV
FM
MAV
MAVDN
8"CHWR
"C
H W
R
"C
H W
S
MAV
ƒ" HW ƒ" CH &
8" CWR
8" CWS
M
C W
R
(U
N D
E R
R G
R O
U N
D
"C
H W
R
TANK ON CONC PAD
WATER EXPANSION
EXISTING HEATING
EXISTING UG PIPING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTINGCP-2
EXISTING
TREATMENT
TOWER
CHR
HP-2HP-1
SF-2
SF-1
SF-3
SF-5
OA LOUVER
40"x32"
SF-6
OA LOUVER
40"x32"
SF-7
OA LOUVER
40"x32"
PCP-1
EXISTING
TP-2A
EXISTING
TP-1A
EXISTING
B L
R 1B
E X
IS
T
IN
G
BLR-1A
EXISTING
BLR-1C
EXISTING
B L
R 1D
E X
IS
T
IN
G
TANK
EXISTING
TANK
EXISTING
TP-2B
EXISTING
TP-1B
EXISTING
LOOP PIPING
CHW & HW NORTH
EXISTING OVERHEAD
PAINTSHOP ROOM
ROOF
EF-1 ON
EXISTING
CHR-3
SPACE
TUBE PULL
CP-3
TP-3
IN VERTICAL RISE
INSTALL VALVES
CT-3
1•"
EF-2
FCU-CEP-01
BYPASS
TOWER
B.E. @ 0'-8" AFF
w/FULLSIZE 18" PLENUM
EXISTING 36"x36" EA LOUVER
MAKEUP DEVICES
EXISTING CT WATER
CEP CONTROLS
EXISTING
EXISTING EF-2
WATER STATION
EXISTING TOWER MAKEUP
TREATMENT POWER PANEL
EXISTING TOWER
TOWER TREATMENT SYSTEM
EXISTING PULSED POWER
PCP-2
EXISTING
LEAK MONITOR
EXISTING REFRIGERANT
BOILER #2
BHP-2
SF-4
SF-7
SF-6
SF-5
SF-4
EXPANSION TANK ON CONCRETE PAD
EXISTING CHILLED WATER
CW THIS AREA
TO EXISTING DOMESTIC
EXISTING 1 •" CW
T
T
UC
T
OA LOUVER
CLR ANODIZIED
38"x32"
"C
W S
(U
G
"C
W R
(U
G
12"CWR (UG)
12"CWS (UG)
"C
W S
(U
G
HSBLE
DATA
F A
P
E L
E C
MCC #3
E
T E
L
M C
C
MSG
T
S
CAUTION: UG HIGH VOLTAGE IN AREA
POWER PANEL
EXISTING PULSED
J
M C
C
EXISTING CT-3
EXISTING CT-1
TP-3
EXISTING
CT-1 VFD
EXISTING
P:\22102\22102m302.dgn
DATE PLOTTED
DGN FILE
14-NOV-2022
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\22102\22102m302.dgn
AS SHOWN
22102
C o ll e g e o f C o a s ta l G e o rg ia
B ru n s w ic k
G e o rg ia
M a in C a m p u s C e n tr a l E n e rg y P la n t C o o li n g T o w e r
R e p la c e m e n t
WSH
LTF
WSH
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
T
11.14.22
P ro je c t
N o
C
C G
A
SECURITY OFFICE
CHILLER ROOM
BOILER ROOM
TLT
TLT
CONTROL ROOM
LINK FENCE
EXISTING CHAIN
LINK FENCE
EXISTING CHAIN
LINK FENCE
EXISTING CHAIN
SCALE:
= 1'-0
4 0 2 4 8
M302
N NEW WORK - HVAC
LARGE SCALE PLAN - LARGE SCALE PLAN - NEW WORK - HVAC
LINE LEGEND
POINT OF CONNECTION
EXISTING TO REMAIN
NEW WORK
VFD
CT-2
NEW
NEW
CT-2
ON EXISTING CONCRETE BASIN
INSTALL NEW COOLING TOWER
PIPING AT ISOLATION VALVE
AND CONNECT TO EXISTING
EXTEND NEW 12" CWR PIPING DN
PIPING TO NEW TOWER
TOWER MAKE UP WATER
CONNECT EXISTING COOLING
NOTES:(THIS SHEET ONLY)
PROVIDE NEW 100A/3P NON-FUSED DISCONNECT ON LINE SIDE OF NEW VFD.
SHALL MATCH AIC RATINGS OF EXISTING CIRCUIT BREAKERS IN THIS MOTOR CONTROL CENTER.
BUCKET AND INSTALL A NEW CIRCUIT BREAKER ONLY KIT WITH 80A/3P CIRCUIT BREAKER. NEW BREAKER
EXISTING COOLING TOWER #2 FAN IS SERVED OUT OF THIS MOTOR CONTROL CENTER, REMOVE THE EXISTING
MAKE ALL FINAL CONNECTIONS. NEW CONDUCTORS SHALL BE COPPER.
REPLACE EXISTING CONDUCTORS SERVING THIS FAN. PROVIDE NEW 3#3 AWG. 1#8G IN EXISTING CONDUIT.
SHALL BE WIRED TO SHUT OFF THE VFD WHEN THE OUTSIDE DISCONNECT IS MOVED TO THE OPEN POSITION.
PROVIDE CONTROL CONDUIT AND WIRING BACK TO VFD INSIDE CENTRAL PLANT. THE AUX CONTACTS
REMOVE EXISTING DISCONNECT. PROVIDE NEW 100A/3P/3R NON-FUSED DISCONNECT WITH AUX CONTACTS.
| 22102aCov |
| 22102m001 |
| References |
| tb, 22102tb.dgn |
| 22102m301 |
| References |
| tb, 22102tb.dgn |
| afp, 22102a1.dgn |
| 22102m302 |
| References |
| tb, 22102tb.dgn |
| afp, 22102a1.dgn |
| existing, 22102m301.dgn |
Other files
| File | Type | Posted |
|---|---|---|
| Project manual | — | |
| Bid Results | — | |
| Bid Invite | — | |
| Award Information | — | |
| Add. # 1 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .