Drawings 01_Rev 03_Pavement.pdf
PDF 5 MB Posted
- Attached to
- Ft Leavenworth Asphalt Pavement Rehabilitation
- Solicitation number
- W91QF4-26-B-A007
About this file
This document is a set of construction drawings for a pavement rehabilitation project at Fort Leavenworth. The project encompasses full-depth removal and replacement or mill and overlay work on multiple roadways and parking areas: Sherman Avenue (28,814 sq ft full depth, 5,640 sq ft mill and overlay), Buford Avenue (5,082 sq ft mill and overlay), Meade Avenue (15,807 sq ft mill and overlay), B-52 Parking Lots (48,947 sq ft mill and overlay), Grant Park West Alley (9,417 sq ft full depth, 5,413 sq ft mill and overlay), Grant Park East Alley (200 sq ft full depth, 18,531 sq ft mill and overlay), and West Warehouse Road (23,470 sq ft mill and overlay). The total project scope includes patching as needed throughout.
The drawings are organized into seven sheets including a cover sheet, phasing plan, plan views at multiple scales, and detour plans. The project is divided into four construction phases with specific sequencing shown on the phasing plan sheet. The detour plan sheets provide Phase 3 and Phase 4 traffic management strategies, including Type III barricades, road closed signage, and directional arrows to route traffic around active work areas. The drawing submittal is marked as "Ready to Award RTA" with a date of June 25, 2026. Fort Leavenworth DPW (Directorate of Public Works) is the managing agency for this infrastructure rehabilitation work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Asphalt Contract Specs.pdf | ||
| Drawings 01_Rev 03_Pavement 20260722.pdf | ||
| SOW Asphalt Pavement Rehab REV2.pdf | ||
| Sol_W91QF4-26-B-A007 Asphalt.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
C
B
A
1 2 3 4 5
FORT LEAVENWORTH PAVEMENT REHABILITATION
FORT LEAVENWORTH
DPW
- SHERMAN AVENUE, BUFORD AVENUE,
MEADE AVENUE, and B-52 PARKING LOTS
- GRANT PARK WEST ALLEY
- GRANT PARK EAST ALLEY
- WEST WAREHOUSE ROAD
FULL DEPTH REMOVE AND REPLACE
MILL & OVERLAY
W/PATCHING AS NEEDED
DRAWING SUBMITTAL:
READY TO AWARD RTA
DATE: 6/25/2026
e½#!!;;
Gl
C1
C2-C5
C6-C7
SHEET LIST
COVER SHEET
PHASING PLAN
PLAN VIEW
DETOUR PLAN
Estimated Quantities
Sherman Avenue 28,814 sq ft Full Depth 5,640 sq ft Mill & Overlay
Buford Avenue 5,082 sq ft Mill & Overlay
Meade Avenue 15,807 sq ft Mill & Overlay
8-52 Parking Lots 48,947 sq ft Mill & Overlay
Grant Park West Alley 9,417 sq ft Full Depth 5,413 sq ft Mill & Overlay
Grant Park East Alley 200 sq ft Full Depth 18,531 sq ft Mill & Overlay
West Warehouse Road 23,470 sq ft Mill & Overlay
FT LEAVENWORTH
DPW
LU <O 0
� "' z 0 :,;: ti
LUU> LU
::::, ..... � Ul�
�o a.
ta
0 � LU z z \!l :s:
Ul ...J �ii LU a.
00 00
Vl c::
Oz3: 0 -U Vl I- - u al 2: z
�o� LL l!) ca O�z w c:: l!)I- w - <I'. w Vlc:: zw oG 0 ti z
W W c::
z
-I I-o- 3: �z ca w <I'.
>I <I'.
w w c::
_J I- � iE o:a:
LL W
w
1-1
1-1 c::
u Vlw c::
<I'.
0 - LU c :,,: u LU ...J w-
N Ul
J: a. -z uo Ul <(
Vl
- ::ii'.w
> I- <I'. � Nz O a, :5 3:� _J Z I w w " _J > Nu <l'.o :Eu w \0
_J
0 I- N C::
<X) 0
LL
w I Ul c:: w u
SHEET ID
Gl