Drawing set- Water Environment Servies- Tri-City WRRF Boiler Gas Feed- September 2026.pdf
PDF 9 MB Posted
- Attached to
- BID 2026-79 Tri-City WRRF Boiler Gas Feed
- Solicitation number
- S-C01010-00018330
- Issued by
- Oregon
About this file
This drawing set comprises engineering plans and specifications for the Tri-City Water Reclamation and Resource Recovery Facility (WRRF) Boiler Gas Feed Project under Contract No. 700226319, issued for bid in September 2026 by Clackamas Water Environment Services (WES) in Oregon. The project involves modification of existing stainless-steel digester gas piping to create new connections allowing anaerobic digester biogas to flow through gas conditioning units before fueling three boilers at the facility. Work includes demolition of sections of existing 6-inch and 8-inch stainless-steel piping, installation of new piping with butterfly valves and plug valves, addition of pressure gauges, purging of gas lines, and coordination of temporary contractor staging and storage areas. The drawing set, prepared by Hazen and Sawyer, contains 18 sheets including site plans, isometric views, bottom plans, enlarged sections, digester gas flow diagrams, photo details of isolation and purge valves at multiple locations throughout the facility, and standard pipe support details. The project location is primarily in the basement of Building 580 (Dewatering and Digester Control Building) with associated work in the boiler room, digester control room, and at external structures including the gas storage bubble and gas flare.
The design incorporates structural compliance with the 2025 Oregon Structural Specialty Code and seismic design requirements applicable to Risk Category IV structures with a Design Seismic Category D classification. All digester gas and condensate piping modifications must be isolated and purged in accordance with project specifications and WES procedures. The contractor is responsible for field verification of existing conditions, coordination of anchorage and bracing for nonstructural components to resist gravity, operational, wind, and seismic forces, and provision of special seismic certification from equipment manufacturers. Pipe supports must be designed and sealed by a registered Oregon professional engineer and submitted for review prior to installation. The contract documents specify that contractor staging, storage, and hot work areas must be coordinated with the owner, with temporary parking permitted along the east side driveway, and all areas must be restored to original conditions upon project completion. No pricing information, set-asides, funding sources, or award dates are included in this drawing set.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid 2026-79 Tri-City WRRF Boiler Gas Feed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NN
CLACKAMAS WATER ENVIRONMENT SERVICES (WES)
VICINITY MAP
TRI-CITY WRRF
BOILER GAS FEED
ISSUED FOR BID
CONTRACT NO. 700226319
DATE SEPTEMBER 2026
NOT TO SCALE
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
LOCATION MAP
NOT TO SCALE
PROJECT LOCATION
DESIGNED BY:
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-G
EN
.rv t 9/
8/
:4 4:
P
M
G000-002
M STRAIN
D GARBELY
S LAFOREST
INDEX OF DRAWINGS AND NOTES
GENERAL
GENERAL
DRAWING NO DRAWING NAME
G000-001 COVER SHEET
G000-002 INDEX OF DRAWINGS AND NOTES
G000-003 LEGEND, SYMBOLS, AND ABBREVIATIONS
G000-004 SITE PLAN AND STAGING AREA
G000-005 DIGESTER GAS FLOW DIAGRAM
G000-006 PHOTO DETAILS - ISOLATION AND PURGE VALVES
SHEET I
G000-007 PHOTO DETAILS - ISOLATION AND PURGE VALVES
SHEET II
G000-008 PHOTO DETAILS - ISOLATION AND PURGE VALVES
SHEET III
MECHANICAL
DRAWING NO DRAWING NAME
DEWATERING AND DIGESTER CONTROL
BUILDING
M580-001 ISOMETRIC VIEW - DEMOLITION
M580-002 ISOMETRIC VIEW
M580-003 BOTTOM PLAN - DEMOLITION
M580-004 ENLARGED BOTTOM PLAN - DEMOLITION
M580-005 ENLARGED SECTIONS - DEMOLITION
M580-101 BOTTOM PLAN
M580-301 ENLARGED BOTTOM PLAN
M580-401 ENLARGED SECTIONS
STANDARD DETAILS
M999-901 SHEET I
GENERAL NOTES:
1. ALL DIGESTER GAS AND CONDENSATE PIPING MODIFIED UNDER
THIS PROJECT TO BE ISOLATED AND PURGED IN ACCORDANCE
WITH SECTION 01 14 00 AND WES PROCEDURES.
STRUCTURAL NOTES:
1.
2.
3.
4.
5.
THESE NOTES ARE GENERAL AND SUPPLEMENT THE
SPECIFICATIONS. THESE NOTES APPLY TO THE ENTIRE PROJECT
UNLESS MODIFIED OR NOTED OTHERWISE IN THE CONTRACT
DOCUMENTS.
THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING
INFORMATION IN THE FIELD AS REQUIRED FOR NEW WORK.
IF A CONFLICT IS FOUND BETWEEN DIFFERENT PORTIONS OF THE
CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE
ENGINEER IMMEDIATELY. CONTINUED CONSTRUCTION OF THE
AREA IN CONFLICT SHALL BE AT THE CONTRACTOR'S OWN RISK
UNTIL THE CONFLICT IS RESOLVED.
DESIGN IS IN ACCORDANCE WITH AND CONSTRUCTION SHALL
COMPLY WITH THE PROVISIONS OF THE 2025 OREGON
STRUCTURAL SPECIALTY CODE. SEISMIC DESIGN VALUES SHALL
BE AS GIVEN IN STRUCTURAL NOTE 5.
SEISMIC LOAD:
RISK CATEGORY = IV
SITE CLASS = DEFAULT
MAPPED SPECTRAL RESPONSE ACCELERATIONS (Ss/S1) = 0.89/0.33
SPECTRAL RESPONSE ACCELERATIONS (SMS/SM1) = 1.09/0.74
SPECTRAL RESPONSE COEFFICIENTS (SDS/SD1) = 0.73/0.49
SEISMIC DESIGN CATEGORY = D
NONSTRUCTURAL COMPONENT ANCHORAGE
AND BRACING NOTES:
1.
2.
3.
4.
ANCHORAGE AND BRACING SHALL BE PROVIDED FOR
NONSTRUCTURAL COMPONENTS IN ACCORDANCE WITH
SPECIFICATION 01 73 23 ANCHORAGE AND BRACING OF
NONSTRUCTURAL COMPONENTS. "NONSTRUCTURAL
COMPONENTS" INCLUDES ALL ARCHITECTURAL, MECHANICAL,
ELECTRICAL, AND PLUMBING ELEMENTS OR SYSTEMS (AND THEIR
SUPPORTS OR ATTACHMENTS) WHICH ARE PERMANENTLY
ATTACHED TO A SUPPORTING STRUCTURE. DESIGN OF
ANCHORAGE AND BRACING SHALL BE PROVIDED BY
CONTRACTOR'S ENGINEER UNLESS SPECIFICALLY DETAILED ON
THE CONTRACT DRAWINGS.
ANCHORAGE AND BRACING OF ALL NONSTRUCTURAL
COMPONENTS SHALL BE DESIGNED AND INSTALLED TO RESIST
THE CONTROLLING LOAD COMBINATION OF GRAVITY LOADS,
OPERATIONAL FORCES, WIND FORCES, SEISMIC FORCES, AND
ANY OTHER APPLICABLE FORCES IN ACCORDANCE WITH THE
GOVERNING BUILDING CODE. WIND AND SEISMIC FORCES SHALL
BE AS PER ASCE 7. COMPONENTS SHALL BE BOLTED, WELDED, OR
OTHERWISE POSITIVELY FASTENED WITHOUT CONSIDERATION OF
FRICTIONAL RESISTANCE PRODUCED BY THE EFFECTS OF
GRAVITY. A CONTINUOUS LOAD PATH OF SUFFICIENT STRENGTH
AND STIFFNESS TO RESIST REQUIRED FORCES SHALL BE
PROVIDED BETWEEN THE COMPONENT AND THE SUPPORTING
STRUCTURE. ANCHORAGE AND BRACING SHALL BE DESIGNED TO
RESIST LOADS IN BOTH ORTHOGONAL DIRECTIONS (TRANSVERSE
AND LONGITUDINAL) AND SHALL BE DESIGNED AND SEALED BY
THE CONTRACTOR'S ENGINEER CURRENTLY REGISTERED IN THE
STATE OF OREGON.
COMPONENT REACTION FORCES AT THE POINT OF ATTACHMENT
TO THE STRUCTURE SHALL BE SUBMITTED TO AND COORDINATED
WITH THE ENGINEER FOR CONFIRMATION THAT SUPPORTING
STRUCTURE IS ADEQUATE TO RESIST REQUIRED REACTION
FORCES.
CONTRACTOR SHALL PROVIDE SPECIAL SEISMIC CERTIFICATION
(SSC) FROM MANUFACTURER OF EQUIPMENT FOR ALL SYSTEMS
REQUIRED BY SPECIFICATIONS. SPECIAL SEISMIC CERTIFICATION
SHALL BE IN COMPLIANCE WITH ASCE 7.
1 ISSUED FOR BID 09/2026 AM
M
S
A A6
A A3
ROOM NAME
ABBREVIATIONS
LINETYPES
SYMBOLS
SECTION AND DETAIL KEYING
ROOM NAME LABEL ELEVATION CALL OUT
MATERIALS
LEGEND
PROPOSED ITEMS
EXISTING ITEMS
HIDDEN ITEMS
CENTER LINE
DEMOLITION ITEMSDRAWING WHERE SECTION IS SHOWN
DRAWINGS ARE CROSS REFERENCED IN THE FOLLOWING METHOD:
(A) A SECTION CUT ON DRAWING A3 IS IDENTIFIED AS FOLLOWS:
REFERENCED ITEM
REFERENCED ITEM
AND ARE SHOWN ON THE CONTRACT DRAWINGS BY ONE OF TWO METHODS:
STANDARD DETAILS ARE REFERENCED BY A UNIQUE SEVEN DIGIT NUMBER
ARE IDENTIFIED BY A SQUARE WITH A NUMBER IN THE UPPER HALF.
DETAILS ARE CROSS REFERENCED IN A SIMILAR MANNER, EXCEPT DETAILS
(B) THE SECTION SHOWN ON DRAWING A6 IS IDENTIFIED AS FOLLOWS:
DRAWING FROM WHERE SECTION WAS TAKEN
SEE M-40-0100
OR:
SECTION LETTER
SECTION LETTER
MATCH LINE
BRICK
CHECKERED PLATE
WOOD BLOCKING
GLASS
CONCRETE
GRAVEL
ASPHALT PAVING
GRADE OR EARTH
INSULATION
WATER SURFACE
GRATING
CAST IRON
STEEL
CONCRETE FILL
OR GROUT
CONCRETE
MASONRY UNIT
M-40-0100
ROOM NAME
ROOM NUMBER
ELEVATION #
DRAWING #
DIRECTION OF VIEW
GENERAL
A###
A/C AIR CONDITIONER
AB ANCHOR BOLT
AC ASBESTOS CEMENT
ACP AIR COMPRESSOR
ACT-MR ACOUSTICAL CEILING TILE,
MOISTURE RESISTANT
AD AREA DRAIN
ADH ADHESIVE
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
AH AIR HEATER
AHU AIR HANDLING UNIT
AL, ALUM ALUMINUM
ALLOW ALLOWANCE/ALLOWABLE
ALT ALTERNATE
APPROX APPROXIMATE
AR AIR RECEIVER
ARCH ARCHITECTURAL
ASB ASBESTOS
ASPH ASPHALT
AT ASPHALT TILE
ATF AIR TERMINAL UNIT (FAN
POWERED)
ATS AUTOMATIC TRANSFER
SWITCH
ATU AIR TERMINAL UNIT
B BORING
BC BOILER CHEMICALS
BD BOARD
BDD BACKDRAFT DAMPER
BF BLIND FLANGE
BFE BOTTOM OF FITTING ELEV
BH BASEBOARD HEATER
BITUM BITUMINOUS
BL BUILDING LINE
BLDG BUILDING
BLK BLOCK
BLW BLOWER
BM BENCH MARK
BOC BACK OF CURB
BOM BOTTOM OF MASONRY
BOT BOTTOM
BRC BRIDGE CRANE
BRG BEARING
BRK BRICK
BRL BUILDING RESTRICTION
LINE
BRZ BRONZE
BT BOLT
CB CATCH BASIN
CBD COUNTERBALANCE
BACKDRAFT DAMPER
CC COOLING COIL
C/C CENTER TO CENTER
CCP CIRCULATING PUMP
CD CONTROL DAMPER
CDWP CONDENSER WATER PUMP
CE CONSTRUCTION EASEMENT
CEM CEMENT
CER CERAMIC
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CL CENTERLINE
CLKG CAULKING
CPLG COUPLING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CON CONCENTRIC
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS,
CONTINUATION
CONTR CONTRACTOR
CORP CORPORATION
CP CONCRETE PLANK OR
CONTROL PANEL, OR
CONTROL POINT
CPT CONTROL POWER
TRANSFORMER
CR CONTROL RELAY
CRS COURSE
CSP CHEMICAL SERVICE PUMP
CSSP CHEMICAL SERVICE SUMP
PUMP
CST CHEMICAL STORAGE TANK
CT CERAMIC TILE
CTJ CONTROL JOINT
CU COPPER OR CONDENSING
UNIT
CY CUBIC YARD
D DIGESTER
DAD DESICCANT AIR DRYER
DD DESICCANT DRYER
DEC DECANT
DEH DEHUMIDIFIER
DEM DEMISTER
DET DETAIL
DF DUCT FAN OR DRINKING
FOUNTAIN
DIA OR Ø DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISC DISCONNECT
DISCH DISCHARGE
DIST DISTRIBUTION
DJ DISMANTLING JOINT
DKC DOOR OPERATOR (ELECTRIC)
DL DEAD LOAD
DN DOWN
DOZ DOZEN
DP DISTRIBUTION PANEL
DS DISCONNECT SWITCH
D/S DOWNSTREAM
DT DAY TANK
DWG(S) DRAWING(S)
DWL DOWEL
EA EACH
ECC ECCENTRIC
ECH ELECTRIC CABINET HEATER
ED EQUIPMENT DRAIN
EDH ELECTRIC DUCT HEATER
EDP EMERGENCY DISTRIBUTION
PANEL
EE EACH END
EEW EMERGENCY EYE WASH
EF EACH FACE OR EXHAUST FAN
EFF EFFLUENT
EHH ELECTRICAL HANDHOLE
EL ELEVATION
ELEC ELECTRICAL
ELP EMERGENCY LIGHTING
PANEL
EMH ELECTRICAL MANHOLE
ENGR ENGINEER
ENT ENTRANCE
EOG EDGE OF GRAVEL
EOP EDGE OF PAVEMENT
EPP EMERGENCY POWER PANEL
EPX EPOXY
EQ EQUAL
EQPT EQUIPMENT
ERH ELECTRIC WIRE ROPE HOIST
ES EMERGENCY SHOWER OR
EMERGENCY SWITCH
ES/EEW EMERGENCY SHOWER AND
EYEWASH
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST/EX EXISTING
EXC EXCAVATE
EXH EXHAUST
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
F FAN
FAB FABRICATE
F&C FRAME AND COVER
F&G FRAME AND GRATE
FC FLUSHING CONNECTION
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER/FLOW
ELEMENT
FEF FUME EXHAUST FAN
FH FIRE HYDRANT
FIG FIGURE
FIN FINISH
FIX FIXTURE
FL FLOOR
FLEX FLEXIBLE
FLG FLANGE
FLXC FLEXIBLE CONNECTION
FM FLOW METER
FOC FIBER OPTICS CABLE
FPRF FIREPROOF
FS FLOW SWITCH
FSD FIRE/SMOKE DAMPER
FT FEET OR FIN TUBE HEATER
FTG FITTING
FURR FURRING OR FURRED
G GATE
GA GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GIH GAS INFRARED HEATER
GPM GALLONS PER MINUTE
GR GRADE
GRTG GRATING
GUH GAS UNIT HEATER
GW GUY WIRE
GWH GAS WATER HEATER
GYP GYPSUM
HB HOSE BIBB
HC HEATING COIL
HCP HORIZONTAL END SUCTION
CENTRIFUGAL PUMP
HDW HARDWARE
HE HEAT EXCHANGER
HEX HEXAGONAL
HFCA HARNESSED FLANGED
COUPLING ADAPTER
HHRG HYBRID HIGH RESISTANCE
GROUNDING
HORIZ HORIZONTAL
HP HORSEPOWER OR HEAT
PUMP
HPT HIGH POINT
HRU HEAT RECOVERY UNIT
HRG HIGH RESISTANCE
GROUNDING
HSCP HORIZONTAL SPLIT CASE
PUMP
HUM HUMIDIFIER
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
HW HEADWALL
HWB HEATING WATER BOILER
HWCH HEATING WATER CABINET
HEATER
HWL HIGH WATER LEVEL
HWP HEATING WATER PUMP
HWY HIGHWAY
HYD HYDRAULIC
I IRON
I&C INSTRUMENTATION AND
CONTROLS
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH
INCL INCLUDED
INF INFLUENT
INSUL INSULATION
INT INTERIOR
INV INVERT
IPP INSTRUMENT POWER PANEL
JB JUNCTION BOX
JCT JUNCTION
JT JOINT
L LENGTH/ANGLE
LA LINE AHEAD
LAB LABORATORY
LAM LAMINATED
LAT LATERAL
LAV LAVATORY
LB POUND OR LINE BACK
LD COMBINATION
LOUVER/DAMPER
LF LINEAR FEET
LG LONG
LI LEVEL INDICATOR
LIP LIGHTING INDICATING
PANEL
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LIGHTING PANEL
LPT LOW POINT
LRG LOW RESISTANCE
GROUNDING
LS LEVEL SWITCH
LTG LIGHTING
LVR LOUVER
LWL LOW WATER LEVEL
MAINT MAINTENANCE
MATL MATERIAL
MAU MAKE UP AIR HANDLING
UNIT
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
MCLU MOTOR CONTROL LINE-UP
MECH MECHANICAL
MET METAL
MFR MANUFACTURER
MFM MAGNETIC FLOW METER
MG MILLION GALLONS
MGD MILLION GALLONS PER DAY
MJ MECHANICAL JOINT
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOLDING
MO MASONRY OPENING
MOD MODIFY OR MODIFIED
MON MONUMENT
MOPO MAINTENANCE OF PLANT
OPERATIONS
MSS MANUFACTURERS
STANDARDIZATION SOCIETY
MTD MOUNTED
MTG MOUNTING
MULT MULTIPLE
N NORTH
NA NOT APPLICABLE
NAD '83 NORTH AMERICAN DATUM OF
NAVD '88 NORTH AMERICAN VERTICAL
DATUM OF 1988
NC NORMALLY CLOSED
NF NEAR FACE
NGVD '29 NATIONAL GEODETIC
VERTICAL DATUM OF 1929
NIC NOT IN CONTRACT
No. NUMBER
NO NORMALLY OPEN
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER OR
OVERHEAD DOOR
OF OUTSIDE FACE
OHE OVERHEAD ELECTRIC
OML OIL MIST LUBRICATOR
OPER OPERATOR
OPNG OPENING
OPP OPPOSITE
ORF OIL REMOVAL FILTER
ORIG ORIGINAL
P&ID PROCESS AND
INSTRUMENTAION DIAGRAM
PAC PACKAGED AIR
CONDITIONING UNIT
PAR PARALLEL
PC POINT OF CURVE OR PIECE
OR PERSONAL COMPUTER
PCC POINT OF COMPOUND CURVE
PCF POUNDS PER CUBIC FOOT
PE PLAIN END
PERF PERFORATED
PERP PERPENDICULAR
PF PROPELLER FAN
PI POINT OF INTERSECTION
PL PROPERTY LINE OR PLATE
PLC PROGRAMMABLE LOGIC
CONTROLLER
PLMB PLUMBING
PNL PANEL
PP POWER PANEL OR POWER
POLE
PREFAB PREFABRICATED
PROP PROPOSED
PRVN POWER ROOF VENTILATOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSU POWER SUPPLY UNIT
PVMT PAVEMENT
QTY QUANTITY
RAD RADIUS
RECIR RECIRCULATION
RECT RECTANGULAR
RED REDUCER
REF REFERENCE
REG REGISTER
REINF REINFORCING
REM REMOVE
REQD REQUIRED
REST RESTRAINED
REV REVISE
RFD REFRIGERANT AIR DRYER
RH ROOF HOOD
RIO REMOTE INPUT/OUTPUT
RJ RESTRAINED JOINT
RM ROOM
RND ROUND
RO ROUGH OPENING
RPM REVOLUTIONS PER MINUTE
RR RAILROAD
RT RIGHT
RTU REMOTE TERMINAL UNIT
R/W OR ROW RIGHT OF WAY
S SOUTH OR SLOPE
SB SOIL BORING
SBL SURVEY BASELINE
SBMP SODIUM BISULFITE
METERING PUMP
SCH SCHEDULE
SCG SLUICE GATE
SCR SELECTIVE CATALYTIC
REDUCTION
SDG SLIDE GATE
SECT SECTION
SERV SERVICE
SF SQUARE FEET
SG SWITCH GEAR
SHT(S) SHEET(S)
SI SQUARE INCH
SIL SILENCER
SIM SIMILAR
SMH STORM MANHOLE
SP SUMP PUMP
SPEC SPECIFICATION
SQ SQUARE
SSP SUBMERSIBLE SUMP PUMP
SST STAINLESS STEEL
STA STATION OR STACK
STD STANDARD
STG STORAGE OR STOP GATE
(LOG)
STIR STIRRUP
STL STEEL
STRU STRUCTURAL
SUB SUBSTITUTE
SUCT SUCTION
SUPT SUPERINTENDENT
SUR SURFACE
SUSP SUSPENDED
SWD SIDE WATER DEPTH
SYM SYMMETRICAL
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TAN TANGENT
TBA TO BE ABANDONED
TBCN TRAVELING BRIDGE CRANE
TBM TEMPORARY BENCH MARK
TC TOP OF CURB
TCP TEMPERATURE CONTROL
PANEL
TDH TOTAL DYNAMIC HEAD
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE
TG TEMPERED GLASS
THD THREADED
THK THICK
THRU THROUGH
TOC TOP OF CONCRETE
TOD TOP OF DECK
TOF TOP OF FOOTING
TOM TOP OF MASONRY/MANHOLE
TOS TOP OF SLAB/ TOP OF STEEL
TOW TOP OF WALL
TOL TOLERANCE
TYP TYPICAL
UG UNDERGROUND
UGE UNDERGROUND ELECTRIC
UGG UNDERGROUND GAS
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER
SUPPLY
U/S UPSTREAM
UTIL UTILITY
VAC VACUUM
VACP VACUUM PUMP
VAP VAPORIZER
VAV VARIABLE AIR VOLUME UNIT
VCD VOLUME CONTROL DAMPER
VEL VELOCITY
VENT VENTILATING OR
VENTILATION
VERT VERTICAL
VF VANE AXIAL FAN
VOL VOLUME
VTR VENT THROUGH ROOF
W WEST OR WIDTH
W/ WITH
WES WATER ENVIRONMENT
SERVICES
WF WALL FAN
WG WIRE GLASS
WH WALL HYDRANT OR WALL
HEATER
WL WATER LEVEL
WM WATER METER
W/O WITHOUT
WP WATERPROOF
WPFG WATER PROOFING
WSE WATER SURFACE ELEVATION
WSP WEATHER STRIP
WT WEIGHT
WV WATER VALVE
WWF WELDED WIRE FABRIC
WWTP WASTEWATER TREATMENT
PLANT
XFMR TRANSFORMER
XMH EXISTING MANHOLE
YH YARD HYDRANT
YI YARD INLET
YD YARD
YR YEAR
VALVES
PIPING MATERIALS
CIP CAST IRON PIPE
CMP CORRUGATED METAL PIPE
CPP CORRUGATED PLASTIC PIPE
CPVC CHLORINATED POLYVINYL
CHLORIDE
CU COPPER PIPE
DIP DUCTILE IRON PIPE
ERCP ELLIPTICAL REINFORCED
CONCRETE PIPE
FRP FIBERGLASS REINFORCED
PIPE
GSP GALVANIZED STEEL PIPE
HDPE HIGH DENSITY
POLYETHYLENE
PE LINING POLYETHYLENE LINING
RCP REINFORCED CONCRETE
PIPE
SSP STAINLESS STEEL PIPE
IPS IRON PIPE SIZE
PVC POLYVINYLCHLORIDE
PCCP PRESTRESSED CONCRETE
CYLINDER PIPE
VCP VITRIFIED CLAY PIPE
PROCESS PIPING
QUICK CONNECT COUPLING
FLUSHING CONNECTION
HOSE BIBB
BUTTERFLY VALVE
SWING CHECK VALVE
DIAPHRAGM VALVE
BALL CHECK VALVE
BALL VALVE
GLOBE VALVE
PINCH VALVE
PLUG VALVE
GATE VALVE
PRESSURE REDUCING REGULATOR
UNION
PRESSURE RELIEF VALVE
MOTOR OPERATED VALVE
CONTROL VALVE
SOLENOID VALVE
STRAINER
PRESSURE
RELIEF/VACUUM BREAKER VALVE PARTITION TYPE
DOOR SCHEDULE
LOUVER TYPE
HARNESSED SLEEVE TYPE
SLEEVE TYPE COUPLING
EXPANSION JOINT
HARNESSED FLANGED
COUPLING
ADAPTER
WELDED JOINT
FLANGED JOINT
MECHANICAL, PUSH-ON OR
MECHANICAL COUPLING
WALL PENETRATION
RESTRAINED JOINT
FLEXIBLE HOSE
SINGLE LINE DRAWINGS
DOUBLE LINE DRAWINGS
FIRE EXTINGUISHER
ES/EEW
DISMANTLING JOINT
FE
L#
CHECK VALVE
NEEDLE VALVE
PRESSURE GAUGE
WITH/WITHOUT DIAPHRAGM SEAL
REDUCER
THREE WAY VALVE
AAV
ALTV
ARV
AVV
BFPV-DC
BFPV-RP
BFV
BFV-HP
BFV-R
BFV-TP
BLV-2P
BLV-3P
BLV-MC
BLV-MS
BLV-PC-TP
BLV-SA
BLV-TP
CARV
CNV
CV-B-MC
CV-B-TP
CV-DB
CV-DD
CV-D-TP
CV-FI
CV-RF
CV-S
CV-S-MC
CV-S-TP
CV-TD
DGV-TP
DV-TP
DV-MC
DWV
GLV
GLV-TP
GV-DD
GV-HK
GV-MS
GV-RD
GV-RW
GV-SK
HV
MDV
NV
NV-TP
PNV-B
PNV-O
PRGV
PRV
PV-DG
PV-FP
PV-PP
SRV
SV-2W
SV-3W
SV-4W
TSV
VBV
AIR ADMITTANCE VALVE
ALTITUDE VALVE
AIR RELEASE VALVE
AIR / VACUUM VALVE
BACKFLOW PREVENTION VALVE
DOUBLE CHECK STYLE
BACKFLOW PREVENTION VALVE
REDUCED PRESSURE STYLE
BUTTERFLY VALVE
HIGH-PERFORMANCE BUTTERFLY
VALVE
RECTANGULAR BUTTERFLY VALVE
THERMOPLASTIC BUTTERFLY VALVE
TWO-PIECE BALL VALVE
THREE-PIECE BALL VALVE
METAL BALL VALVE FOR CHEMICAL
SERVICE
METAL SEATED BALL VALVE
THERMOPLASTIC PROPORTIONAL
CONTROL BALL VALVE
BALL VALVE FOR SERVICE AIR
THERMOPLASTIC BALL VALVE
COMBINATION AIR RELEASE AND
AIR/VACUUM VALVE
CONE VALVE
METAL BALL CHECK VALVE FOR
CHEMICAL SERVICE
THERMOPLASTIC BALL CHECK VALVE
DUCKBILL CHECK VALVE
DOUBLE DOOR CHECK VALVE
THERMOPLASTIC DIAPHRAGM CHECK
VALVE
FLANGE INSERT CHECK VALVE
RUBBER FLAPPER CHECK VALVE
SWING CHECK VALVE
METAL SWING CHECK VALVE FOR
CHEMICAL SERVICE
THERMOPLASTIC SWING CHECK
VALVE
TILTING DISC CHECK VALVE
THERMOPLASTIC DEGASSING VALVE
THERMOPLASTIC DIAPHRAGM VALVE
METAL DIAPHRAGM VALVE FOR
CHEMICAL SERVICE
DEEP WELL VALVE
GLOBE VALVE
THERMOPLASTIC GLOBE VALVE
DOUBLE DISC GATE VALVE
HIGH PERFORMANCE KNIFE GATE
VALVE
METAL SEATED GATE VALVE
ROTATING DISC GATE VALVE
RESILIENT WEDGE GATE VALVE
STANDARD KNIFE GATE VALVE
HOSE VALVE
MUD VALVE
NEEDLE VALVE
THERMOPLASTIC NEEDLE VALVE
BONNETED PINCH VALVE
OPEN PINCH VALVE
PRESSURE REGULATING VALVE
PRESSURE RELIEF VALVE
ECCENTRIC PLUG VALVE FOR
DIGESTER GAS
FULL PORT ECCENTRIC PLUG VALVE
PARTIAL PORT ECCENTRIC PLUG
VALVE
SURGE RELIEF VALVE
SOLENOID VALVE TWO-WAY
SOLENOID VALVE THREE-WAY
SOLENOID VALVE FOUR-WAY
TELESCOPING VALVE
VACUUM BREAKER VALVE
AS ANTISCALANT
CDG CLEAN DIGESTER GAS
CDG/D CLEAN DIGESTER GAS DRAIN
DG DIGESTER GAS
DG/D DIGESTER GAS DRAIN
DS DIGESTER SLUDGE
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
NG NATURAL GAS
PW POTABLE WATER
WS2 WATER SUPPLY 2
WS3 WATER SUPPLY 3
DESIGNED BY:
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-G
EN
.rv t 9/
8/
:4 4:
P
M
G000-003
M STRAIN
D GARBELY
S LAFOREST
LEGEND, SYMBOLS, AND ABBREVIATIONS
GENERAL
W
QR
A
0F T
BU
FF
ER
W
QR
A
0F T
BU
FF
ER
W
QR
A
0F T
BU
FF
ER
51 51
46 46
47 4848
494949
49 49
49 49
50 50
CB
CB
CB
CB
C B
C B
D
D
D
D
S
S
C B
C B
C B
S
S
C B
NOTES:
1. COORDINATE USAGE AND LIMITS OF CONTRACTOR
STAGING, STORAGE, AND PARKING WITH OWNER.
2. CONTRACTOR MAY PREPARE STAGING AREA IN THIS
LOCATION AS REQUIRED FOR CONTRACTOR'S USE.
OWNER MAKES NO WARRANTY AS TO THE SUITABILITY
OF THE EXISTING GROUND IN THIS STAGING AREA FOR
ANY PARTICULAR PURPOSE.
3. CONTRACTOR SHALL RESTORE ENTIRE AREA TO
ORIGINAL CONDITIONS WHEN WORK IS COMPLETE.
SCALE: 1" = 50'
PLAN
PL
O
T D
AT
E:
/9
/2
1:
P
B Y:
M
ST
R
AI
N Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\8
-0
\P
R O
JE
C
T
FI
LE
S\
1- D
ES
IG
N \0
1- H
AZ
EN
\G
EN
ER
AL
\G
0-
ST
AG
IN
G P
LA
N
S av ed b y M
ST
R
AI
N
S av e da te : 9
/8 /2
4:
P M
80002-002
SEPTEMBER 2026A MCCASKILL
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:
ISSUED FOR BID
TRI-CITY WRRF
BOILER GAS FEED
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
700226319
P VAVONESE
M STRAIN
G000-004
D GARBELY
GENERAL
SITE PLAN AND STAGING AREA
TO AGNES AVE
ADMINISTRATION
BUILDING
S AGNES AVE
SCREENINGS
BUILDING
MBR
ELECTRICAL
BUILDING
FINE SCREEN
BUILDING
DIGESTER 1
DIGESTER 2
STORAGE
BUILDING
DIGESTER 3
SECONDARY
CLARIFIER 1
MEMBRANE
BUILDING
RAS BUILDING
SECONDARY
CLARIFIER 2
STORMWATER
RETENTION POND
BACKUP
CENTRIFUGE
UV DISINFECTION
BUILDING
OFFICE
BUILDING
BLOWER
BUILDING
AE
R
AT
IO
N B
AS
IN
AE
R
AT
IO
N B
AS
IN
AE
R
AT
IO
N B
AS
IN
AE
R
AT
IO
N B
AS
IN
FACILITIES
FINE SCREENING BUILDING
AERATION BASINS
EXISTING THICKENING BUILDING
DIGESTER FEED TANK
DIGESTER CONTROL BUILDING
DIGESTER 1 AND 2
DIGESTER 3
DEWATERING FEED TANKS
DIGESTER GAS HANDLING
DEWATERING AND DIGESTER CONTROL BUILDING
ODOR CONTROL
545560
PRIMARY PROJECT
LOCATION IN
BASEMENT OF BLDG 580
CONTRACTOR
STAGING,
STORAGE,
AND HOT
WORK/WELDING
AREA
TEMPORARY PARALLEL PARKING ALONG
CURB ON EAST SIDE OF DRIVEWAY IS
PERMITTED. COORDINATE WITH OWNER
CONTRACTOR ENTRANCE
DIGESTER 3
DIGESTER 2
DIGESTER 1
520 THICKENING BUILDING
(BASEMENT)
580 DIGESTER
CONTROL ROOM
(BASEMENT)
580 BOILER ROOM
(GROUND FLOOR)
540 GENERATOR ROOM
(GROUND FLOOR)
540 DIGESTER 1&2
PUMP ROOM
(BASEMENT)
540 SEDIMENT TRAP ROOM 1
(GROUND FLOOR)
540 SEDIMENT
TRAP ROOM 2
(GROUND FLOOR)
PIPE
GALLERY
(BASEME.)
521 DIGESTER FEED
TANKS 1 & 2
580 DIGESTER GAS
HANDLING ROOM
(GROUND FLOOR)
GAS FLARE
(OUTSIDE)
GAS STORAGE BUBBLE
(OUTSIDE)
560 H2S
REMOVAL VESSEL
(OUTSIDE)
CENTRATE
HOLDING
TANK
COGEN
GAS
CONDITIONING
SKID
545 DEWATERING
FEED TANK 1
545 DEWATERING
FEED TANK 2
520 GBT
FILTRATE
TANK
560 SILOXANE
REMOVAL VESSELS
(OUTSIDE)
BOILER
BOILER
BOILER
RAW DIGESTER GAS (DG)
CONDITIONED DIGESTER GAS (CDG)
NATURAL GAS (NG)
CONDENSATE DRAIN
VAULT
RAW DIGESTER GAS, CONDENSATE DRAIN
HALLWAY
PROPOSED BYPASS LINE
PL
O
T D
AT
E:
/9
/2
1:
M
ST
R
AI
N Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\8
-0
\P
R O
JE
C
T
FI
LE
S\
1- D
ES
IG
N \0
1- H
AZ
EN
\G
EN
ER
AL
\G
0-
Sa ve d by M
ST
R
AI
N
S av e da te : 9
/8 /2
4:
P M
80002-002
SEPTEMBER 2026A MCCASKILL
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:
ISSUED FOR BID
TRI-CITY WRRF
BOILER GAS FEED
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
700226319
P VAVONESE
M STRAIN
G000-005
D GARBELY
GENERAL
DIGESTER GAS
FLOW DIAGRAM
VALVE I
VALVE J
VALVE K
PURGE POINT O
PURGE POINT X,
SEE SHEETS
G000-006 G000-007 G000-008
VALVE E,
SEE SHEET
G000-006
VALVE L,
SEE SHEET
G000-007
VALVE H
PURGE POINT S,
SEE SHEETS
G000-006 G000-007
VALVE C
VALVE D
VALVE M
PURGE POINT R,
SEE SHEETS
G000-006 G000-007
VALVE F
VALVE E
VALVE N
PURGE POINT Q
PURGE POINT P,
SEE SHEETS
G000-006 G000-007
VALVE A
VALVE B
PURGE POINT T,
SEE SHEETS
G000-006 G000-007
PL
O
T D
AT
E:
/9
/2
1:
M
ST
R
AI
N Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\8
-0
\P
R O
JE
C
T
FI
LE
S\
1- D
ES
IG
N \0
1- H
AZ
EN
\G
EN
ER
AL
\G
0-
Sa ve d by M
ST
R
AI
N
S av e da te : 9
/8 /2
4:
P M
80002-002
SEPTEMBER 2026A MCCASKILL
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:
ISSUED FOR BID
TRI-CITY WRRF
BOILER GAS FEED
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
700226319
P VAVONESE
M STRAIN
G000-006
D GARBELY
GENERAL
PHOTO DETAILS - ISOLATION AND PURGE VALVES
SHEET I
F G000-006
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 580 THICKENING BUILDING (BASEMENT)
VALVE F: DIGESTER 3
CONDENSATE TRAP
DIGESTER GAS
ISOLATION VALVE
E G000-006
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 580 THICKENING BUILDING (BASEMENT)
VALVE E: DIGESTER 3
CONDENSATE TRAP
DIGESTER GAS ISOLATION VALVE
D G000-006
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 520 THICKENING BUILDING (BASEMENT)
VALVE D: DIGESTER 1,
DIGESTER 2, AND
GAS FLARE
DIGESTER GAS
ISOLATION VALVE
G000-006
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 520 THICKENING BUILDING (BASEMENT)
VALVE C: DIGESTER FEED TANKS
1 AND 2 DIGESTER GAS ISOLATION VALVE
C
G G000-006
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 580 DIGESTER CONTROL ROOM (BASEMENT)
VALVE G: GAS
BUBBLE
DIGESTER GAS
ISOLATION VALVE
I G000-006
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 580 BOILER ROOM (GROUND FLOOR)
VALVE I: BOILER
DIGESTER GAS
ISOLATION VALVE
J G000-006
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 580 BOILER ROOM (GROUND FLOOR)
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 545 DEWATERING FEED TANKS (ROOF)
VALVE A: DEWATERING FEED TANK 2
DIGESTER GAS ISOLATION VALVE
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 545 DEWATERING FEED TANKS (ROOF)
VALVE B: DEWATERING FEED TANK 2
DIGESTER GAS ISOLATION VALVE
G000-006 B
G000-006 A
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 540 GENERATOR ROOM (GROUND FLOOR)
VALVE H:
CO-GENERATOR
CONDITIONED
DIGESTER GAS
ISOLATION VALVE
G000-006 H
VALVE J: BOILER
DIGESTER GAS
ISOLATION VALVE
T D
AT
E:
/9
/2
1:
M
ST
R
AI
N Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\8
-0
\P
R O
JE
C
T
FI
LE
S\
1- D
ES
IG
N \0
1- H
AZ
EN
\G
EN
ER
AL
\G
0-
Sa ve d by M
ST
R
AI
N
S av e da te : 9
/8 /2
4:
P M
80002-002
SEPTEMBER 2026A MCCASKILL
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:
ISSUED FOR BID
TRI-CITY WRRF
BOILER GAS FEED
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
700226319
P VAVONESE
M STRAIN
G000-007
D GARBELY
GENERAL
PHOTO DETAILS - ISOLATION AND PURGE VALVES
SHEET II
PHOTO DETAIL
NOT TO SCALE
VALVE N: CONDITIONED DIGESTER
GAS TREATMENT SYSTEM
DIGESTER GAS ISOLATION VALVE
N G000-007
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 520 THICKENING BUILDING (BASEMENT)
VALVE M: CONDENSATE
DRAIN VAULT DIGESTER
GAS ISOLATION VALVE
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 560 H2S REMOVAL VESSEL (OUTSIDE)
VALVE L: H2S
REMOVAL VESSEL
DIGESTER GAS
ISOLATION VALVE
L G000-007 G000-007
M
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 580 DIGESTER GAS
PURGE POINT P: DIGESTER 3
CONDENSATE TRAP
DIGESTER GAS PURGE VALVE
P G000-007
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 520 THICKENING BUILDING (BASEMENT)
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 540 GENERATOR ROOM (GROUND FLOOR)
PHOTO DETAIL
NOT TO SCALE
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 545 DEWATERING FEED TANKS (ROOF)
PURGE POINT O: BOILER
DIGESTER GAS PURGING VALVE
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 580 BOILER (GROUND FLOOR)
PURGE POINT S:
CO-GENERATOR CONDITIONED
DIGESTER GAS PURGE VALVE
PURGE POINT Q: DIGESTER GAS
TREATMENT SYSTEM CONDITIONED
DIGESTER GAS PURGE VALVE
PURGE POINT R: DIGESTER 1,
DIGESTER 2, AND GAS FLARE
DIGESTER GAS PURGE VALVE
G000-007
T G000-007 G000-007
SR
G000-007
O
G000-007 Q
HANDLING ROOM (GROUND FLOOR)
PHOTO LOCATION: 580 DIGESTER GAS
HANDLING ROOM (GROUND FLOOR)
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 580 BOILER ROOM (GROUND FLOOR)
VALVE K: BOILER
DIGESTER GAS
ISOLATION VALVE
G000-007 K
PHOTO LOCATION: 580 DIGESTER GAS
HANDLING ROOM (GROUND FLOOR)
PURGE POINT T:
DEWATERING FEED
TANK 1 AND 2 DIGESTER
GAS PURGE VALVE
T D
AT
E:
/9
/2
1:
M
ST
R
AI
N Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\8
-0
\P
R O
JE
C
T
FI
LE
S\
1- D
ES
IG
N \0
1- H
AZ
EN
\G
EN
ER
AL
\G
0-
Sa ve d by M
ST
R
AI
N
S av e da te : 9
/8 /2
4:
P M
80002-002
SEPTEMBER 2026A MCCASKILL
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
CONTRACT NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:
ISSUED FOR BID
TRI-CITY WRRF
BOILER GAS FEED
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
700226319
P VAVONESE
M STRAIN
G000-008
D GARBELY
GENERAL
PHOTO DETAILS - ISOLATION AND PURGE VALVES
SHEET III
PHOTO DETAIL
NOT TO SCALE
PHOTO LOCATION: 580 BOILER ROOM (GROUND FLOOR)
PURGE POINT X:
BOILER DIGESTER
GAS, SEE NOTE 1
X G000-008
NOTES:
1. PURGE POINT X MAY BE CONSIDERED AND INCORPORATED INTO THE
SHUTDOWN PLAN SUBMITTAL.
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-5
-D
C -M
.rv t
9/ 8/
:4
8:
P M
M580-001
M STRAIN
D GARBELY
S LAFOREST
DEWATERING AND DIGESTER CONTROL BUILDING
ISOMETRIC VIEW - DEMOLITION
MECHANICAL
ISOMETRIC VIEW - DEMOLITION
NTS
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-5
-D
C -M
.rv t
9/ 8/
:4
8:
P M
M580-002
M STRAIN
D GARBELY
S LAFOREST
DEWATERING AND DIGESTER CONTROL BUILDING
ISOMETRIC VIEW
MECHANICAL
ISOMETRIC VIEW
NTS
SEE ENLARGED BOTTOM
PLAN/M580-004
OVERHEAD ACCESS
DOOR LOCATION
N
DESIGNED BY:
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-5
-D
C -M
.rv t
9/ 8/
:4
8:
P M
M580-003
M STRAIN
D GARBELY
S LAFOREST
DEWATERING AND DIGESTER CONTROL BUILDING
BOTTOM PLAN - DEMOLITION
MECHANICAL
3/16" = 1'-0"
BOTTOM PLAN - DEMOLITION
6" 7"
5"
7" 7" 14" 20"
6" NG, CL 43.17
8" DG, CL 42.25
3" HWR, CL 40.33
6" DS, CL 40.25
4" DS, CL 39.75
6" NG, CL 44.83
4" WS3, CL 40.75
2" WS2, CL 40.75
2" AS, CL 40.75
1" CONDUIT, CL 42.17, TYP
8" DG, CL 43.75
8" DG, CL 44.67
6" CDG, CL 43.75
6" DS, CL 40.25
6" HWS, CL 33.67
6" DS, CL 42.25
3" HWR, CL 37.83 4" HWS, CL 40.08
6" DS, CL 42.25
6" DS, CL 41.25
6" DS, CL 33.75
4" DS, CL 39.75
4" DS, CL 39.75
CABLE TRAY, TYP
ARV
M580-005 A_______
M580-005 A_______
M580-005 B_______
M580-005 B_______
6" CDG, CL 43.08
8" DG, CL 41.50
DG FROM DIGESTER 3
CDG FROM SKID
SEE NOTE 4
PH
O
TO
M
0-
PHOTO 2
M580-004
3'
2'
5"
8" DG, CL 43.75
3'
1" 4"
2'
3"
4" DS, CL 40.25
6" DS, CL 42.25
6" PLUG VALVE, TYP
6" DS, CL 42.25
SEE NOTE 5
DG TO BOILERS
OVERHEAD ACCESS
DOOR LOCATION
1" CONDUIT, CL 11.50
SEE NOTE 1, 2,
AND 3
2" AS, CL 41.75
8" DG, CL 41.50
SEE NOTE 3
SEE NOTE 4
SEE NOTE 5
N
DESIGNED BY:
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-5
-D
C -M
.rv t
9/ 8/
:4
8:
P M
M580-004
M STRAIN
D GARBELY
S LAFOREST
DEWATERING AND DIGESTER CONTROL BUILDING
ENLARGED BOTTOM PLAN - DEMOLITION
MECHANICAL
3/8" = 1'-0"
ENLARGED BOTTOM PLAN - DEMOLITION
NOTES:
1.
2.
3.
4.
5.
REFER TO SPECIFICATION SECTION 01 14 00 FOR PIPE REMOVAL
AND INSTALLATION REQUIREMENTS.
CONTRACTOR IS TO FIELD VERIFY SIZE AND LOCATIONS OF
ELECTRICAL CONDUIT AND PIPE SUPPORTS FOR PIPE ROUTING.
EXISTING PIPE TO BE DISCONNECTED AT FLANGES, REMOVED AND
SALVAGED TO OWNER. DO NOT CUT OR OTHERWISE DAMAGE
PIPE SEGMENT.
CUT, REMOVE, AND DISPOSE OF EXISTING PIPE SEGMENT.
CONTRACTOR TO REMOVE EXISTING PIPE SUPPORT AND REPLACE
WITH NEW PIPE SUPPORT, SEE DETAIL M-40-0320R/SHEET
M999-901. PROVIDE TEMPORARY PIPE SUPPORT AS NECESSARY.
DETAIL
NTS
DETAIL
NTS
EL 46.50
EL 32.00
EL 32.50EL 32.67
8" DG
CL 43.75
6" NG
CL 44.83
6" NG
CL 43.17
8" DG
CL 42.25
1" CONDUIT
CL 42.17
4" WS3
CL 40.75
4" DS
CL 39.75
3" HWR
CL 37.83
3" HWS
CL 34.33
6" DS
CL 33.75
3" HWS
CL 39.83
3" HWR
CL 40.33
4" WS3
CL 40.75
6" DG
CL 43.92
4" HWR
CL 39.25 CABLE TRAY, TYP
8" DG
CL 44.67
8" DG
CL 41.50 6" CDG
CL 43.08
SEE NOTE 1, 2,
AND 3
2" AS
CL 41.50
EL 32.67
EL 32.00
EL 46.50
6" DS
CL 42.25
6" DS
CL 41.25
6" DS
CL 40.25
4" HWS
CL 35.75
4" DS
CL 39.75
CABLE TRAY, TYP
6" CDG
CL 43.08
6" PLUG VALVE, TYP
SEE NOTE 4
SEE NOTE 5
DESIGNED BY:
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-5
-D
C -M
.rv t
9/ 8/
:4
8:
P M
M580-005
M STRAIN
D GARBELY
S LAFOREST
DEWATERING AND DIGESTER CONTROL BUILDING
ENLARGED SECTIONS - DEMOLITION
MECHANICAL
SECTION
3/8" = 1'-0" M580-004
A SECTION
3/8" = 1'-0" M580-004
B
NOTES:
1.
2.
3.
4.
5.
REFER TO SPECIFICATION SECTION 01 14 00 FOR PIPE REMOVAL
AND INSTALLATION REQUIREMENTS.
CONTRACTOR IS TO FIELD VERIFY SIZE AND LOCATIONS OF
ELECTRICAL CONDUIT AND PIPE SUPPORTS FOR PIPE ROUTING.
EXISTING PIPE TO BE DISCONNECTED AT FLANGES, REMOVED AND
SALVAGED TO OWNER. DO NOT CUT OR OTHERWISE DAMAGE
PIPE SEGMENT.
CUT, REMOVE, AND DISPOSE OF EXISTING PIPE SEGMENT.
CONTRACTOR TO REMOVE EXISTING PIPE SUPPORT AND REPLACE
WITH NEW PIPE SUPPORT, SEE DETAIL M-40-0320R/SHEET
M999-901. PROVIDE TEMPORARY PIPE SUPPORT AS NECESSARY.
SEE ENLARGED BOTTOM
PLAN/M580-301
OVERHEAD ACCESS
DOOR LOCATION
N
DESIGNED BY:
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-5
-D
C -M
.rv t
9/ 8/
:4
8:
P M
M580-101
M STRAIN
D GARBELY
S LAFOREST
DEWATERING AND DIGESTER CONTROL BUILDING
BOTTOM PLAN
MECHANICAL
3/16" = 1'-0"
BOTTOM PLAN
3'
7"
4"
7" 7" 14" 20"
6" NG, CL 43.17
3" HWR, CL 40.33
8" CDG, CL 41.50
6" DS, CL 40.25
2" AS, CL 40.75
1" CONDUIT, CL 42.17, TYP
8" DG, CL 43.75
8" DG, CL 44.67
6" CDG, CL 43.75
6" DS, CL 40.25
6" HWS, CL 33.67
6" DS, CL 42.25
3" HWR, CL 37.83 4" HWS, CL 40.08
6" DS, CL 42.25
6" DS, CL 41.25
6" DS, CL 33.75
4" DS, CL 39.75
4" DS, CL 39.75
CABLE TRAY, TYP
ARV
6" BUTTERFLY
VALVE, TYP
8" BUTTERFLY
VALVE, TYP
M580-401 C_______
M580-401 C_______
M580-401 D_______
M580-401 D_______
4" WS3, CL 40.75
2" WS2, CL 40.75
DG FROM DIGESTER 3
CDG FROM SKID
OVERHEAD ACCESS
DOOR LOCATION
6" CDG, CL 40.83
6" CDG, CL 43.08
4" DS, CL 39.75
6" NG, CL 44.83
6" CDG, CL 43.08
8" DG, CL 43.75
4" DS, CL 40.25
6" DS, CL 42.25
6" PLUG VALVE, TYP
6" DS, CL 42.25
CDG TO BOILERS
1" CONDUIT, CL 11.50
2" AS, CL 41.75
8" DG, CL 41.50
VALVE U
VALVE V
M-40-0320R
SEE NOTE 1 AND 3, TYP
8" CDG, CL 42.25
M-40-0301R
PRESSURE GAUGE
PRESSURE
GAUGE
M-40-0301R
6" TEE
8" X 8" X 6 " TEE
SEE NOTE 2
N
DESIGNED BY:
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-5
-D
C -M
.rv t
9/ 8/
:4
8:
P M
M580-301
M STRAIN
D GARBELY
S LAFOREST
DEWATERING AND DIGESTER CONTROL BUILDING
ENLARGED BOTTOM PLAN
MECHANICAL
3/8" = 1'-0"
ENLARGED BOTTOM PLAN
NOTES:
1.
2.
3.
CONTRACTOR IS TO FIELD VERIFY SIZE AND LOCATIONS OF
ELECTRICAL CONDUIT AND PIPE SUPPORTS FOR PIPE ROUTING.
OTHER THAN WELDS AT NEW FLANGES, NO FIELD WELDING OF
STAINLESS STEEL SHALL BE PERMITTED. FIELD WELD NEW
FLANGES ONTO EXISTING PIPE AND INSTALL NEW 6" TEE.
OTHER THAN WHERE SPECIFICALLY INDICATED, PIPE SUPPORTS
ARE TO BE LOCATED BY CONTRACTOR AND PROVIDED IN
ACCORDANCE WITH SPECIFICATIONS.
6" BUTTERFLY
VALVE, TYP
EL 32.00
EL 46.50
6" CDG
CL 43.086" NG
CL 43.17
6" CDG, CL 40.83
SEE NOTE 1 AND
8" CDG
CL 41.50
4" WS3
CL 40.75
8" CDG
CL 42.25
3" HWR
CL 40.33
3" HWS
CL 39.83
2" AS
CL 41.50
2" DG/D
CL 40.17
8" DG
CL 41.50
8" DG
CL 43.75
2" DG/D
CL 40.75
VALVE V
VALVE U
VALVE W
M-40-0320R
SEE NOTE 3, TYP
PRESSURE
GAUGE
M-40-0301R ,TYP
M-40-0705R
6" TEE
8" X 8" X 6 " TEE
SEE NOTE 2, TYP
6" DS
CL 42.25
6" DS
CL 41.25
6" DG
CL 43.92
6" NG
CL 43.17
3" HWR
CL 40.33
3" HWS
CL 39.83
4" HWR
CL 39.25
EL 32.00
6" BUTTERFLY VALVE, TYP
8" DG
CL 41.50
6" CDG
CL 43.08
1" CONDUIT
CL 11.50
1" CONDUIT
CL 11.00
6" PLUG VALVE, TYP
8" CDG
CL 42.25
6" TEE
8" X 8" X 6 " TEE
M-40-0301R
, TYP
DESIGNED BY:
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-5
-D
C -M
.rv t
9/ 8/
:4
8:
P M
M580-401
M STRAIN
D GARBELY
S LAFOREST
DEWATERING AND DIGESTER CONTROL BUILDING
ENLARGED SECTIONS
MECHANICAL
SECTION
3/8" = 1'-0" M580-301
C SECTION
3/8" = 1'-0" M580-301
D
NOTES:
1.
2.
3.
CONTRACTOR IS TO FIELD VERIFY SIZE AND LOCATIONS OF
ELECTRICAL CONDUIT AND PIPE SUPPORTS FOR PIPE ROUTING.
OTHER THAN WELDS AT NEW FLANGES, NO FIELD WELDING OF
STAINLESS STEEL SHALL BE PERMITTED. FIELD WELD NEW
FLANGES ONTO EXISTING PIPE AND INSTALL NEW 6" TEE.
OTHER THAN WHERE SPECIFICALLY INDICATED, PIPE SUPPORTS
ARE TO BE LOCATED BY CONTRACTOR AND PROVIDED IN
ACCORDANCE WITH SPECIFICATIONS.
SCHEDULE C
NOTE 8)
DIP (SEE
ROD ∅ (INCHES)
5/8
1/2
1/2
1/2
3/8
3/8
3/8
3/8
3/8
PIPING
STEEL AIR
PIPING
PROCESS
MAX SPAN IN FEET (SEE NOTE 9)
2 1/2-3 1/2
4-5
1 1/4-2
UP TO 1
8-12
14-16
20-24
SEE NOTE 6
BACK PLATE
(INCHES)
PIPE SIZE
(INCHES)
3/8
3/8
3/8
1/2
5/8
3/4
7/8
1 1/4
MINIMUM
COPPER PLASTIC STEEL
SUPPORT RODS AND BRACKET SPACING
(FOR STANDARD WEIGHT PIPE)
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
CONTRACTOR SHALL DESIGN THE SUPPORT
SYSTEMS BASED ON ACTUAL WEIGHTS AND
CONDITIONS AS SPECIFIED OR AS SHOWN ON
THE CONTRACT DRAWINGS. PIPE HANGERS,
SUPPORTS AND BRACKETS SHOWN HERE IN
VARIOUS COMBINATIONS REPRESENT
MINIMUM REQUIREMENTS FOR ACCEPTABLE
SUPPORTS AS TO TYPES, MATERIALS,
THICKNESSES, ORIENTATION, AND QUALITY.
CONTRACTOR SHALL SUBMIT DESIGN
CALCULATIONS AND DETAILS FOR PIPE
SUPPORTS SEALED BY A PROFESSIONAL
ENGINEER LICENSED BY THE STATE OR
COMMONWEALTH WHERE THE PROJECT IS
LOCATED WITH ALL PIPE HANGER AND
SUPPORT SUBMISSIONS FOR REVIEW BY THE
ENGINEER. WHEN SUBMITTING PROPOSED
PIPE SUPPORTS AND SUPPORT LOCATIONS,
THE CONTRACTOR SHALL USE APPROVED
PIPING LAYOUT SUBMITTAL DRAWINGS TO
SHOW PROPOSED PIPE SUPPORT TYPE AND
LOCATION WITH ACCURATE DIMENSIONS TO
DEMONSTRATE THAT SUPPORTS DO NOT
EXCEED THE MAXIMUM SPACING
REQUIREMENTS OF SECTION 40 05 07. THIS
ENSURES THAT SUPPORTS HAVE BEEN
COORDINATED WITH ACTUAL PIPE
INSTALLATION DRAWINGS. AND THAT
SPACING DOES NOT EXCEED MAXIMUM
ALLOWABLE SPACING. THE PIPE SUPPORTS
SHOWN AND REFERENCED UNDER
SCHEDULES A, B AND C ARE DESIGNED AND
DETAILED FOR GRAVITY LOADING ONLY.
RESULTING LATERAL LOADS FROM
CONSTRUCTION CONDITIONS, DESIGN
SEISMIC EVENT OR OTHER RELATED
CONDITIONS SHALL BE APPLIED TO THE PIPE
AND OTHER NON-STRUCTURAL COMPONENTS
IN ACCORDANCE WITH THE GOVERNING
BUILDING CODE. SUPPLEMENTAL LATERAL
STIFFNESS, RESISTANCE AND MEMBERS
(WHEN NECESSARY) SHALL BE PROVIDED
ALONG PIPE OR AT GRAVITY SUPPORTS AND
CONNECTIONS WHEN REQUIRED BY
CALCULATIONS.
TRAPEZE SUPPORT RODS TO BE SPACED 3"
LARGER THAN FLANGE DIAMETER OF PIPE
PASSING THROUGH.
MSS REFERS TO THE MANUFACTURERS
STANDARDIZATION SOCIETY OF THE VALVE
AND FITTINGS INDUSTRY, STANDARD
PRACTICE SP-58 AND SP-69.
PIPE WALL SUPPORT AND PIPE SUPPORT
RACK SHALL BE ASSEMBLED WITH CHANNEL
FRAMES AND ACCESSORIES AS
MANUFACTURED BY UNISTRUT CORP, OR
VERSABAR CORP, OR EQUAL.
FABRICATED PIPE SUPPORT MAY BE USED AS
SHOWN IN PIPE SUPPORT RACK DETAIL, OR
TO SUPPORT PIPE FROM THE FLOOR.
BACK PLATES SHALL BE DESIGNED BY THE
CONTRACTOR ACCORDING TO WALL TYPES
AND THE WEIGHTS INVOLVED. BACK PLATE TO
BE SUPPLIED BY BRACKET MANUFACTURER.
ALL INSULATED PIPES SHALL USE A SHIELD
(MSS TYPE 40) WITH THE APPLICABLE PIPE
SUPPORT.
MINIMUM OF ONE HANGER PER PIPE SECTION,
CLOSE TO JOINT, ON THE BARREL. ALSO AT
CHANGE IN DIRECTION AND BRANCH
CONNECTIONS.
RODS AND SPACING ARE BASED ON
STANDARD WEIGHT MATERIALS ACCORDING
TO MSS SP-69. AND ARE FOR REFERENCE
ONLY. THE CONTRACTOR SHALL SPACE
HANGERS BASED ON ACTUAL CONDITIONS.
REFER TO THE APPROPRIATE AND RELATED
SPECIFICATION SECTIONS AND DRAWINGS OF
THE CONTRACT DOCUMENTS REGARDING
SUPPLEMENTAL DESIGN REQUIREMENTS
RELATING TO PERFORMANCE SUBMISSIONS
BY CONTRACTOR. ALL NON-STRUCTURAL
COMPONENTS, INCLUDING PIPING, HVAC
DUCT, PLUMBING AND ELECTRICAL CONDUIT
SUPPORT SYSTEMS SHALL BE ADEQUATELY
DESIGNED AND INSTALLED UTILIZING
SUFFICIENT CONNECTIONS AND MEMBERS TO
ACCOMMODATE AND RESIST THE DESIGN
LATERAL FORCES ASSOCIATED WITH A
SPECIFIC COMPONENT'S DYNAMIC INERTIA
DURING THE DESIGN SEISMIC EVENT. REFER
TO THE GENERAL STRUCTURAL NOTES FOR
STRUCTURAL DESIGN INFORMATION FOR
SPECIFIC SEISMIC DESIGN CRITERIA.
PIPE SUPPORT
BRACKET
NTS
CARRIER PIPE, SEE
SCH C AND NOTE 1
ADJUSTABLE WROUGHT
CLEVIS, MSS TYPE 1
SUPPORT ROD (LENGTH AS
REQD) SEE SCH C
BACK PLATE, SEE SCH C
WELDED STEEL BRACKET MSS
TYPE 32 OR 33, SIZE AND
SPACING AS REQD
DOUBLE NUTS REQUIRED
CONCRETE ANCHORS
AS REQUIRED
M-40-0306
SCHEDULE D
TRAPEZE
SUPPORT
NTS
PIPE SIZE
12-14
16-24
30-36
48 8x4x3/8
6x4x3/8
6x4x3/8
4x4x3/8
4x4x3/8
STEEL TUBE
SUPPORT
BEAM VERT
x HORIZ PROCESS
PIPING
STEEL AIR
PIPING
MINIMUM ROD ∅
(INCHES)
1/2
3/4
1 1/4
1 1/2 1
3/4
3/4
5/8
1/2
TRAPEZE SUPPORT (DIM IN INCHES)
WASHER
PLATE
4x4x1/4
4x4x3/8
4x4x1/2
5x5x1/2
5x5x3/4 2
A
BASE PLATE
B
12 1
3/4
1/2
1/2
3/8
C
WELD
D
3/16
3/16
1/4
1/4
1/4 1
7/8
3/4
5/8
1/2
CONCRETE
ANCHOR DIA
MAX SUPPORT SPACING
IN FEET (SEE NOTE 9)
PROCESS
PIPING
STEEL AIR
PIPING
10 30
CAST-IN-PLACE CONCRETE
(DO NOT ATTACH TO
PRECAST PANELS UNLESS
APPROVED BY ENGINEER)
WELDED BEAM ATTACHMENT,
TYPICAL MSS TYPE 22
STEEL TUBE SUPPORT
BEAM, LONG DIM VERTICAL
(SEE SCHEDULE D)
WASHER PLATE, TYP
(SEE SCHEDULE D)
M-40-0310
DOUBLE NUTS, TYP
FABRICATED PIPE SADDLE
WELDED TO SUPPORT BEAM
SUPPORT ROD, TYP LENGTH AS
REQD (SEE SCHEDULE D)
B
CONCRETE ANCHOR
(4 EA PLATE SEE SCHEDULE D)
MAX
PIPE DIA + 12"
MIN TYP
90°
8"� A
(SQ)
B
C
D
TYP
4"
FLANGE TYPE SUPPORT
NTS
M-40-0311
3" MIN
(L)
VARIES
3'-0" MAX
0.75(L)
(L
BOLT THROUGH
SUPPORT AND FLANGE
NOTCH ANGLE TO CLEAR
BOLTS AS REQUIRED
316L SST ANGLES, TYP
3/4"Ø 316 SST CONC
ANCHORS, TYP
ADJUST L3x3x1/2 TO
MAINTAIN TOP LEG NORMAL
TO PIPE CENTER LINE
1/4
3 SIDES, TYP
SCHEDULE E
NOTE 8)
DIP (SEE
ROD ∅ (INCHES)
5/8
1/2
1/2
1/2
3/8
3/8
3/8
3/8
3/8
PIPING
STEEL AIR
PIPING
PROCESS
MAX SPAN IN FEET (SEE NOTE 9)
2 1/2-3 1/2
4-5
1 1/4-2
UP TO 1
8-12
14-16
20-24
SEE NOTE 6
BACK PLATE
(INCHES)
PIPE SIZE
(INCHES)
3/8
3/8
3/8
1/2
5/8
3/4
7/8
1 1/4
MINIMUM
COPPER PLASTIC STEEL
SUPPORT RODS AND BRACKET SPACING
(FOR STANDARD WEIGHT PIPE)
SCHEDULE F
PIPE SUPPORT
BRACKET
NTS
PIPE SIZE
≥6 4x4x3/8
STEEL TUBE
SUPPORT
BEAM VERT
x HORIZ PROCESS
PIPING
STEEL AIR
PIPING
MINIMUM ROD ∅
(INCHES)
1/2 1/2
TRAPEZE SUPPORT (DIM IN INCHES)
WASHER
PLATE
4x4x1/4 1
A
BASE PLATE
B
10 3/8
C
WELD
D
3/16 1/2
CONCRETE
ANCHOR DIA
MAX SUPPORT SPACING
IN FEET (SEE NOTE 9)
PROCESS
PIPING
STEEL AIR
PIPING
10 15
CAST-IN-PLACE CONCRETE
(DO NOT ATTACH TO
PRECAST PANELS UNLESS
APPROVED BY ENGINEER)
WELDED BEAM ATTACHMENT,
TYPICAL MSS TYPE 22
STEEL TUBE SUPPORT
BEAM, LONG DIM VERTICAL
(SEE SCHEDULE F)
WASHER PLATE, TYP
(SEE SCHEDULE F)
M-40-0320R
DOUBLE NUTS, TYP
SUPPORT ROD, TYP
LENGTH AS REQD (SEE
SCHEDULE F)
B
CONCRETE ANCHOR
(4 EA PLATE SEE SCHEDULE F)
MAX
PIPE DIA + 12"
MIN TYP
8"� A
(SQ)
B
C
D
TYP
PIPE PASSING THROUGH, NOT
SUPPORTED BY DETAIL
8" M
IN
3" M
IN
NOTE 1
1.
NOTE:
TRAPEZE SUPPORT RODS TO BE SPACED 3"
LARGER THAN FLANGE DIAMETER OF PIPE
PASSING THROUGH.
CARRIER PIPE, SEE
SCH E AND NOTE 1
ADJUSTABLE WROUGHT
CLEVIS, MSS TYPE 1
SUPPORT ROD (LENGTH AS
REQD) SEE SCH E
PIPE SUPPORT BRACKET
A
A
STEEL TUBE SUPPORT
BEAM, LONG DIM VERTICAL
(SEE SCHEDULE F)
DOUBLE NUTS REQUIRED
SEE SECTION A
4"
1/2" BALL VALVE,
NORMALLY OPEN
THREADED CONNECTION,
SEE NOTE 2
SNUBBER
PRESSURE
GAUGE OR
INSTRUMENT,
SEE NOTE 3
THREADED
CONNECTION,
SEE NOTE 2
DIAPHRAGM SEAL
NOTES:
1.
2.
3.
ALL COMPONENTS SHALL BE 316 SST, DEPENDENT ON CHEMICAL
COMPATIBILITY STANDARDS, FITTINGS SHALL BE THREADED, BALL
VALVES SHALL BE FULL PORT WITH LEVER STYLE HANDLE.
ASSEMBLY SHALL BE MOUNTED WITH A THREADED FACTORY
WELDED BOSS ON SST PIPE SYSTEMS.
GAUGE FACE SHALL BE ROTATED AS NECESSARY TO BE VISIBLE
AND READABLE FROM OPERATING LEVEL.
M-40-0301R
FOR PIPES 2" AND LARGER
(SHOWN WITH DIAPHRAGM SEAL)
NTS
PRESSURE GAUGE INSTALLATION
SNUBBER
SS PIPE
DRAIN VALVE
NTS
M-40-0705R
1.
2.
NOTE:
ALL COMPONENTS SHALL BE 316 SST, DEPENDENT ON CHEMICAL
COMPATIBILITY STANDARDS, FITTINGS SHALL BE THREADED, BALL VALVES
SHALL BE FULL PORT WITH LEVER STYLE HANDLE.
ASSEMBLY SHALL BE MOUNTED WITH A THREADED FACTORY WELDED BOSS
ON SST PIPE SYSTEMS.
1" SST NIPPLE
1" BALL VALVE, NORMALLY CLOSED
PIPE
6"
THREADED
CONNECTION,
SEE NOTE 2
1" SST NIPPLE
DESIGNED BY:
DATE:
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
700226319
REV ISSUED FOR DATE BY
HAZEN AND SAWYER
4640 S MACADAM AVENUE, SUITE 50
PORTLAND, OR 97239
CLACKAMAS
WATER ENVIRONMENT SERVICES
(WES)
TRI-CITY WRRF
BOILER GAS FEED
A MCCASKILL
0 1/2" 1"
ISSUED FOR BID
SEPTEMBER 2026
80002-002
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
Au to de sk
D oc s:
//8
-0
/8
-0
-M
-S ta nd D et ai ls .rv t 9/
9/
:2 2:
P
M
M999-901
M STRAIN
D GARBELY
S LAFOREST
STANDARD DETAILS
SHEET I
MECHANICAL
SECTION
NTS
A
| G00-001 - GENERAL - COVER SHEET |
| G000-002 - GENERAL - INDEX OF DRAWINGS AND NOTES |
| G000-003 - GENERAL - LEGEND, SYMBOLS, AND ABBREVIATIONS |
| G000-004 - GENERAL - SITE PLAN AND STAGING AREA |
| G000-005 - GENERAL - DIGESTER GAS FLOW DIAGRAM |
| G000-006 - GENERAL - PHOTO DETAILS - ISOLATION AND PURGE VALVES SHEET I |
| G000-007 - GENERAL - PHOTO DETAILS - ISOLATION AND PURGE VALVES SHEET II |
| G000-008 - GENERAL - PHOTO DETAILS - ISOLATION AND PURGE VALVES SHEET III |
| M580-001 - MECHANICAL - DEWATERING AND DIGESTER CONTROL BUILDING ISOMETRIC VIEW - DEMOLITION |
| M580-002 - MECHANICAL - DEWATERING AND DIGESTER CONTROL BUILDING ISOMETRIC VIEW |
| M580-003 - MECHANICAL - DEWATERING AND DIGESTER CONTROL BUILDING BOTTOM PLAN - DEMOLITION |
| M580-004 - MECHANICAL - DEWATERING AND DIGESTER CONTROL BUILDING ENLARGED BOTTOM PLAN - DEMOLITION |
| M580-005 - MECHANICAL - DEWATERING AND DIGESTER CONTROL BUILDING ENLARGED SECTIONS - DEMOLITION |
| M580-101 - MECHANICAL - DEWATERING AND DIGESTER CONTROL BUILDING BOTTOM PLAN |
| M580-301 - MECHANICAL - DEWATERING AND DIGESTER CONTROL BUILDING ENLARGED BOTTOM PLAN |
| M580-401 - MECHANICAL - DEWATERING AND DIGESTER CONTROL BUILDING ENLARGED SECTIONS |
| M999-901 - MECHANICAL - STANDARD DETAILS SHEET I |
| 2026-09-09T17:33:15-0700 | |
| Andy McCaskill |
| 2026-09-09T17:33:08-0700 | |
| Andy McCaskill |
| 2026-09-09T17:32:59-0700 | |
| Andy McCaskill |
| 2026-09-09T17:32:51-0700 | |
| Andy McCaskill |
| 2026-09-09T17:32:42-0700 | |
| Andy McCaskill |
| 2026-09-09T17:32:33-0700 | |
| Andy McCaskill |
| 2026-09-09T17:32:24-0700 | |
| Andy McCaskill |
| 2026-09-09T17:32:16-0700 | |
| Andy McCaskill |
| 2026-09-09T17:32:07-0700 | |
| Andy McCaskill |
| 2026-09-09T17:31:57-0700 | |
| Andy McCaskill |
| 2026-09-09T17:31:48-0700 | |
| Andy McCaskill |
| 2026-09-09T17:31:40-0700 | |
| Andy McCaskill |
| 2026-09-09T17:31:30-0700 | |
| Andy McCaskill |
| 2026-09-09T17:31:21-0700 | |
| Andy McCaskill |
| 2026-09-09T17:31:09-0700 | |
| Andy McCaskill |
| 2026-09-09T17:30:58-0700 | |
| Andy McCaskill |
| 2026-09-09T17:30:17-0700 | |
| Andy McCaskill |
File details come from the government source that posted it. Updated .