Drawing for First Floor .Main building.pdf
PDF 74 KB Posted
- Attached to
- DHS SP ISD CTE Main Building Carpeting
- Solicitation number
- 21-444DHS-REHAB-B-21751
- Issued by
- Mercer County, Illinois
About this file
This document appears to be a drawing for the first floor of the Main building related to a state and local contract opportunity issued by the Illinois Department of Human Services for the replacement of carpet in the CTE (Vocational Building) and the 1st floor of the Main Building at the Illinois School for the Deaf located in Jacksonville, IL. The contract opportunity is limited to the jurisdiction of Morgan County, Illinois. No additional details are provided regarding response dates, due dates, site visits, bidder's meetings, award dates, or the term of the contract.
The document does not contain any information about pricing terms, set asides, incumbents, the current environment, funding requirements and sources, or any other salient details beyond the project overview and location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| StandardTermsConditions201~30.pdf | ||
| RMU50~59.docx | DOCX document | |
| Mandatory Onsite Visit Guidance for Vendors~40.docx | DOCX document | |
| Standard Terms and Conditions v.20.1.pdf | ||
| Forms B~18.docx | DOCX document | |
| Drawing for CTE carpeting.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .