Drawing 621-22-115_1_GI001_03-21-2023.pdf

PDF 383 KB Posted

Attached to
Z1DZ--621-22-115 - Replace Buildings 160 & 77 Lower Roofs
Solicitation number
36C24923B0013
Issued by

About this file

This solicitation document requests bids for a federal contract to replace the lower roofs of two buildings at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. Key details include that the solicitation number is 36C24923B0013 and bids are due by June 26, 2023 at 1:00 PM Central Time. This is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The project involves replacing the lower roofs of Buildings 160 and 77. Bidders must submit bids electronically and include all required forms and documentation such as the SF1442 cover page, bid schedule, SF24 bid bond, and representations and certifications. Performance and payment bonds will be required for any award over $35,000 and $150,000 respectively. The North American Industry Classification System code for this project is 238160 for Roofing Contractors.

View the file

Other files

File Type Posted
Site Visit RFI Answers 36C24923B0013 Project 621-22-115 Replace Bldgs. 160 77 Lower Roofs Amendment 0003.pdf PDF
36C24923B0013 Price_Cost Schedule.pdf PDF
Pages from 621-22-115 Construction Drawings 21to25of25_Rev1 06-12-2023 T1.pdf PDF
Pages from 621-22-115 Construction Drawings 1to5of25_Rev1 06-12-2023 T1.pdf PDF
621-22-115_075323 EPDM Rev1_06-12-2023.pdf PDF
Pages from 621-22-115 Construction Drawings 16to20of25_Rev1 06-12-2023 T1.pdf PDF
Pages from 621-22-115 Construction Drawings 6to10of25_Rev1 06-12-2023 T1.pdf PDF
36C24923B0013 0003.docx DOCX document
Pages from 621-22-115 Construction Drawings 11to15of25_Rev1 06-12-2023 T1.pdf PDF
36C24923B0013 0002.docx DOCX document
36C24923B0013 0001.docx DOCX document
Amendment 0001 Pre-bid Site Visit sign in sheet 36C24923B0013 Project 621-22-115-Replace Buildings 160_77 Lower Roofs.pdf PDF
UEI _ TAX ID.docx DOCX document
Drawing 621-22-115_12_PME101_03-21-2023.pdf PDF
Davis-Bacon Act WD TN20230191 Dated 05122023.pdf PDF
Drawing 621-22-115_13_PME102_03-21-2023.pdf PDF
Contractor EMR Certification Form.docx DOCX document
RFI Form.docx DOCX document
Drawing 621-22-115_5_AS101_03-21-2023.pdf PDF
Drawing 621-22-115_9_AE102_03-21-2023.pdf PDF
36C24923B0013_1.docx DOCX document
Drawing 621-22-115_10_AE302_03-21-2023.pdf PDF
Drawing 621-22-115_11_AE303_03-21-2023.pdf PDF
Drawing 621-22-115_3_AD101_03-21-2023.pdf PDF
Drawing 621-22-115_4_AD102_03-21-2023.pdf PDF
Drawing 621-22-115_2_A001_03-21-2023.pdf PDF
Drawing 621-22-115_8_AE101_03-21-2023.pdf PDF
Drawing 621-22-115_6_AS102_03-21-2023.pdf PDF
Drawing 621-22-115_7_AS103_03-21-2023.pdf PDF
Specification 621-22-115.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 -w C

II

0 - C

II

QJ C•

L C

L

0 -w C

II

C

C

II

L u C

C

II

L C rn C

II

L C

L

,c .•

'G)

E �: .____ :E ---ro� rn C

II

L

C

C

0 t u u.--J

C ----0

,o

0 - C

II

C

L

L m I I rn c�© C

SITE KEY PLAN

PROJECT LOCATION

JAMES H. QUILLEN MEDICAL CENTER

BUILDING B, DOGWOOD AVENUE

MOUNTAIN HOME, TENNESSEE 37684

BUILD�rNi1G r

LOCATION MAP - MOUNTAIN HOME, TN

Revisions

1/381 ;

· _____ .: 34

,321;

By Date

-•• __ I

_ __,--t<_---

I

I

I j-

-----� i _,,,--

PROJECT LOCATION

JAMES H. QUILLEN MEDICAL CENTER

BUILDING 160, DOGWOOD AVENUE

MOUNTAIN HOME, TENNESSEE 37684

1 26

1 26

Department of Veterans Affairs

James H Quillen

VA Medical Center

Dogwood Ave.

Mountain Home, TN 37684 j �1;;11

-�--[�Ji

I ' ' ' ' ' ''

SEAL

I f:

PEAR LANE

PROJECT DESCRIPTION

SCOPE OF WORK

1-f ::::\IRA'.:l:k SHA.I lk'.i'-/I1:f A I -<!II ''-i-I"I , l"!IA. f-!AI',, lid(;R, :.,l'fRll-I-IJH-F- ':AH Y, ::I.A. I 1 :>:1-.I-!U, AJ.J AUJll\·3T�t>Jv:=:: 1J'/ERS TE -o =i:=::RFCFf,.,-1 \i'/0�< =-c:R ')A =·�C-. _IECT J/32_'-22-1 -=: RFE=_L,,,=::=:: LU1;\'EF FOC:F·-:; �:._,IIL[T\:=; 77 J'.: ::;o

"A I .JAHIS II ().111111. '-iA. I; )CA ::II.Ill?, Hi'I .. /IA,II .. I'-HI, II, 'I '" il:l:AJ! WI II 111 II.l<H\IAI](;]. AS C"A.--I:A_L mI:,A-El O I ":Jl6-RI.CT JII : Ul:crS" DP.WI 1:s JATE:, \:l,A.C:C-, 2 . ===---- AJID sr'EC ° CAJ Olb UME I CF I DiTEC lili\F::f- 2 2,1°2. •!'!:RI! II,:_I:,cs, EIT i ,:- U,1I-E[ TO, •IS"c:-I>- :F E<l"-T IIC DE-!JLcD ::1,,-RCIT :1- :J C:� 1 L"il(L'-/,/lhl(�S I ,:_Ji ,:,1_ 1-'.lkl, I L.A\)I II\'.; __ >: ...:,;,._r\�:10\I ,JO \j :_::�.1\/L r: LJ, �1 -!(J:J l·U'-llSI l(Jt�,; SI I Ck' Ul(4\Nll"·. j(_:

r.c,r.H-:IFIT.ATl:-:1 1:F F!'T r: I IC-TFI\ i:-; r-R::T0,-,T::1. S'i',FH; rJF].;IC, I-I,Y.1, RFl,;ICl•iA, Air: r:i::.r,;::'A :-,c F/ISTII.IC [I-I.\llll[OI_IS :.= :.,_- roe, ,,YS-[],;I, [0 :,v ::c:J, S·'ST='i. 1:-_IL:\T OII [ :;J COl!IPL=T[ -o STf,L,:Llc/\L :-o-, [![Cle., E'l'TIII·-. · ···p FL'''HII-. T- ·I T-Rllll 'T-II·- "I[ E'P•1--I· ·I1IT -1--p- --, 'L ·1· 0 -III---,LL'T-1 -F --TI·· .\:) "\(_, (_,j-'., · /:,") ·\i__.,, --,/ \', =-\\/ \P, 1_)\,), f:._\) /_ i-'-_\::_:, 1._:·, _, 1. _; \ !__,I __ ,'/=-\:); \=--\'•_1 /c,-, /', \�I ·-=- \::_) ,L.., ."'. ,_:\ 1_) =-/. ':c \,_;

L C7 c\II-IC I k'.-1I::: l:YI "'SU;; kc'iU#,_ AJj -!: b],A_LAI 011 ()f =' '; ll\1, HcU-AI\ICA_ '' cLc:: RIC.AL :UUI '-::II io.],j 'Si:IT=· I ,;,,A,L_S G=·- l[RA.L ,:,:,1IS-Rl_,i:T<:11I ,I:u_.:1 I:: I1.s-_A,L_A-I::,.I :11=w [::,JIPl!l[I-T C'.JR□::, :;J,:;J :,:::- I1 •. ,.I_,LA.-]J\I, l•:C1c::111-\1(; l�I c\ JO,L?):/\\'.\/1 Ii l'.OA-! ·, I �Tl\/1 l-iC1 i")I II\J1; s·l-:1 \,L \/-1,L r<II\J; _-,A"' ,,,� ·) 111'-I(;, I >:}',tJ.ISl'.J\ 'C:lh .l c,J\l l-'.:1 T'; \/ 0 �A.c, -111IC, Al-I[: Tc�'ill]A,-I0 Ii; '-!ODIFl:ATICI\ ,:!F E/ ,T '-1::: ,,E!Rl-:1 'i-:A.-E� J(i\/,;j.l sr-:, E "RO\I A3C:-.!E; urcA.-E & FE IST/.J-.TI:]. CF L<�-HIIIIG ==c-ECT CII SYST]-.,1 -= icE- ::i.��cr ST/-.]l[:;\R[i, UL CER-IF:I/.TIJl-1 CF L 1_:-nIII.,� fki_'<]:'.-.! I:_',\j ,;-,:,; U;I; cc b]A.,A]I_I. d l'-:lcCf-A -ll'._i,A.L & c_cC kliAL ='J Y-;JUI A\LJ :i_-c::l•I '-'iA.L_:o, '/✓ He\ /,Jl;]-ilfL: cl'. AL_ :..-'r"Sl=J.-b .42 (}U'>,ll-CA_LY 11\J,j,,l=-U ,L\JL'. U:_S�Rl[)[.l_; Ir\ IHC. :,-,:_t,,1,\/\J'.,j A.[\_) 'Jl_c-u,,101·-b )7,L._L Dl :�::)Jf,Tf\JA [_l: ;'.'.J\__) 1I_I_L'( 11, •I ::-1: :.,_

A.LI :RIP c Ii iE!SE -.!"FER

LIST OF DRAWINGS

GENERAL

GI001 COVER SHEET

ARCHITECTURAL

A001 ARCHITECTURAL SYMBOLS ABBREVIATIONS

AD101 BUILDING 77 DEMO ROOF PLAN

AD102 BUILDING 160 DEMO ROOF PLAN

AS101 BUILDING 77 LOWER ROOF FRAMING PLAN - REFERENCE

AS102 BUILDING 160 LOWER ROOF FRAMING PLAN - REFERENCE

AS103 BUILDING 160 LOWER ROOF FRAMING PLAN - REFERENCE DETAILS

AE101 BUILDING 77 LOWER ROOF NEW WORK PLAN AND SECTION DETIAL

AE102 BUILDING 160 LOWER ROOF NEW WORK PLAN AND SECTION DETAILS

AE302 BUILDING 160 LOWER ROOF EXISTING PICTURES (P-SIDE)

AE303 BUILDING 160 LOWER ROOFEXISTING PICTURES (N-SIDE)

PME101 BUILDING 77 PLUMBING, MECHANICAL & ELECTRICAL ROOF DETIALS

PME102 BUILDING 160 PLUMBING, MECHANICAL & ELECTRICAL ROOF DETIALS

Recommended Approvals:

TENNES(SEE

GENERAL DEMOLITION NOTES

A ROOFING SUPPLIERS, MANUFACTURERS, & INSTALLERS SHALL REVIEW ALL

ROOFING DETAILS & ADVISE THE ARCHITECT ON ANY RECOMMENDED

CHANGES FOR LONGEVITY, WARRANTY, AND OTHER CONCERNS.

B CONTRACTOR & ALL SUBS/TRADES SHALL BE AWARE & EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL TOOLS AND DELETERIOUS MATERIALS.

C CONTRACTOR SHALL REVIEW EXISTING CONDITIONS OF STRUCTURAL,

MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL TO PROVIDE

NECESSARY FRAMING, BLOCKING, ETC.

VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND

REPORT DISCREPANCIES IMMEDIATELY

E PREPARE/CLEAN EXISTING MASONRY AS REQUIRED TO ENSURE ADEQUATE

ADHESION OF NEW ROOFING MATERIAL.

F CONTRACTOR SHALL BE REQUIRED TO SHORE UP EXISTING MECHANICAL

UNITS AND USE FLEXIBLE TEMPORARY BOOTS TO KEEP HVAC SYSTEM IN

OPERATION DURING CONSTRUCTION. MECHANICAL UNITS SHALL BE RASE□

TO ALLOW FOR ROOF CURBS TO BE INCREASED IN HEIGHT AND ROOFING

ASSEMBLY TO BE INSTALL£□.

G REPLACE ROOF AFTER DEMOLITION WITHIN THE SAME DAY TO AVOID

EXPOSURE TO THE ELEMENTS.

GENERAL ROOF PLAN NOTES

A NEW ROOF ASSEMBLY TO BE 60MIL REINFORCED EPDM MECHANICALLY

FASTENED OVER 112" PROTECTION BOARD ABOVE R-30 MIN. INSULATION.

PROVIDE 30 YEAR WARRANTY.

ROOFING SUPPLIERS, MANUFACTURERS, AND INSTA11_ERS SHALL REVIEW

ALL ROOFING DETAILS AND ADVISE THE ARCHITECT ON ANY RECOMMENDED

CHANGES FOR LONGEVITY, WARRANTY, AND OTHER CONCERNS.

C UNLESS NOTIFIED OTHERWISE, ROOFING SUPPLIERS, MANUFACTURERS

AND INSTALLERS WILL BE ASSUMED TO HAVE REVIEWED AND APPROVED

THE DETAILS SHOWN.

D PROVIDE FLASHING AND SEALANT PER ROOFING MANUFACTURER

RECOMMENDATION TO INCLUDE ALL CONDUIT & HVAC LINES PENETRATING

THE ROOF.

E CONTRACTOR & ALL SUBS/TRADES SHALL BE AWARE & EXERCISE THE

NECESSARY CARE TO PREVENT DAMAGE TO OR PUNCTURE OF THE ROOF.

THIS SHALL INCLUDE ALL MATERIALS, TOOLS, DELETERIOUS MATERIALS.

F CONTRACTOR SHALL REVIEW EXISTING CONDITIONS OF STRUCTURAL,

MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL TO PROVIDE

NECESSARY FRAMING, BLOCKING, ETC.

G VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND

REPORT DISCREPANCIES IMMEDIATELY

H PREPARE/CLEAN EXISTING MASONRY AS REQUIRED TO ENSURE ADEQUATE

ADHESION OF NEW ROOFING MATERIAL.

I PROVIDE TYPICAL FLASHING DETAIL AT ROOF MOUNTED EQUIPMENT.

J LIGHTNING PROTECTION SHALL BE REINSTA11_ED WITH NEW ROOF

ASSEMBLY AND CONTRACTOR SHALL HAVE THE SYSTEM RECERTIFIED.

K CONTRACTOR SHALL BE REQUIRED TO SHORE UP EXISTING MECHANICAL

UNITS AND USE FLEXIBLE TEMPORARY BOOTS TO KEEP HVAC SYSTEM IN

OPERATION DURING CONSTRUCTION. MECHANICAL UNITS SHALL BE RASE□

TO ALLOW FOR ROF CURBS TO BE INCREASED IN HEIGHT AND ROOFING

ASSEMBLY TO BE INSTALL£□.

L ROOF CURBS SHALL MEET REQUIRED HEIGHT ABOVE NEW HIGHER ROOF

LEVEL.

Drawing Title

1. M EDICA.L DIRECTOR 6. OPERATIO,IS SERVICE Lll•IE MANAGER COVERSHEET

2, ASSOCIATE DIRECTOR

.,. CHIFF OF STAFF

4. ASSOC. DIRECTOR

5. SERVl'.:E LIIIE MGRS.

7, lflFECTIOli COI-ITROL 1.;Allt.GER

8. SAFETY MAIJAGFR

9. GEl•IERAL cNGINcER

10. COR

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

GENERAL NOTES (APPLICABLE TO ALL DRAWINGS):

A.

8.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

0.

P.

Q, R.

R.

s.

EACH CONTRACTOR, SUPPLIER AND, OR MANUFACTURER SHALL REFER TO

ALL DOCUMENTS PERTAINING TO THIS PROJECT AND COORDINATE

ACCORDINGLY SO AS TO ENSURE ADEQUACY OF FIT, COMPLIANCE WITH

SPECIFICATIONS, PROPER VOLTAGE AND CURRENT CHARACTERISTICS AND

AVOID CONFLICT WITH ANY OTHER BUILDINGS SYSTEMS. VERIFY SAME WITH

SHOP DRAWINGS.

ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL. ETC., MAY NOT BE INDICATED,

Bl/T SHA11_ BE PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE

INCLUDED FOR SAME AT EACH PROPOSERS' DISCRETION.

INSTALL NO PIPING, CONDUIT, DUCTWORK, ETC. IN A LOCATION OR IN A

MANNER WHICH WILL ALLOW FREEZING AND/OR THE COLLECTION OF

CONDENSATION THEREON.

OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS (LOCAL, STATE,

FEDERAL, MUNICIPALITY, UTILITY COMPANY, OSHA, ETC.). THIS INCLUDES

EXISTING FACILITY STANDARDS FOR CONSTRUCTION.

ALL SYSTEMS, EQUIPMENT AND MATERIALS ARE TO BE INSTALLED IN A NEAT

AND WORKMANLIKE MANNER WORK NOT DONE SO SHALL BE REMOVED AND

REINSTALLED SATISFACTORILY.

WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT WITH

ANY OTHER BUILDING SYSTEM, CONTACT THE ENGINEERS BEFORE

INSTALLATION. REFER ALSO TO ARCHITECTURAL WALL INTERIOR AND

EXTERIOR WALL ELEVATIONS, CEILING HEIGHTS AND OTHER DETAILS OF

THESE DOCUMENTS.

DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL

BE LAID OUT FROM DIMENSIONED DRAWINGS OR DIMENSIONS SUPPLIED TO

THE CONTRACTOR.

THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR HIS WORK. ALL CUTTING AND PATCHING SHALL

MATCH EXISTING ADJACENT SURFACES AND BE IN ACCORD WITH HOSPITAL

STANDARDS FOR SUCH WORK.

THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE,

HOWEVER LOCATIONS, DEPTHS, ELEVATIONS AND SIZES WERE TAKEN FROM

DIFFERENT SOURCES AND ARE SUBJECT TO DEVIATION. THE CONTRACTOR

SHALL ASSUME SOME DEVIATIONS AND INCLUDE OFFSETS, ADDITIONAL

PIPING, ETC. AT THE TIME OF BID.

ADVISE THE ENGINEERS/COR OF ANY CONFLICTS, ERRORS, OMISSIONS, ETC.

AT LEAST TEN DAYS PRIOR TO BID DATE, TO ALLOW CLARIFICATION BY

WRITTEN ADDENDUM.

DEVIATION FROM SPECIFICATIONS OR PLANS REQUIRES PRIOR WRITTEN

APPROVAL FROM THE ENGINEERS AND MUST BE SUBMITTED IN WRITING NO

LATER THAN TEN DAYS PRIOR TO BID DATE.

THE PURPOSE AND INTENT OF A11_ THE DOCUMENTS PERTAINING TO THIS

PROJECT IS TO PROVIDE A COMPLETE, FUNCTIONAL, SAFE, LIKE-NEW ROOF,

ANYTHING LESS SHALL BE UNACCEPTABLE.

INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORDANCE WITH THE

MANUFACTURER'S RECOMMENDATIONS AND DIRECTION. IF IN CONFLICT

WITH THE DESIGN INDICATED IN CONTRACT DOCUMENTS, ADVISE THE

ENGINEER/CCR PRIOR TO INSTALLATION FOR CLARIFICATION.

ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE

AND FROM THE BUILDING STRUCTURE. DO NOT SUPPORT WORK FROM

OTHER TRADES, EQUIPMENT OR SUPPORTS WITHOUT WRITTEN PERMISSION

FROM THE ENGINEER AND CONSENT OF THE OTHER TRADES, IN WRITING. DO

NOT SUPPORT EQUIPMENT FROM WALLS OR PARTITIONS. SUPPORT FROM

STRUCTURAL BRIDGING IN UNACCEPTABLE.

DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT FROM

THAT PRIME SPECIFIED SHALL BE THE RESPONSIBILITY OF THE PURCHASER

OF THAT EQUIPMENT. ANY PROVISIONS REQUIRED TO ACCOMMODATE A

DEVIATION, WHETHER APPROVED BY THE ENGINEERS OR NOT, SHALL BE THE

RESPONSIBILITY OF THE PURCHASER.

THE GENERAL CONTRACTOR FOR THE CONSTRUCTION IS RESPONSIBLE FOR

THE COORDINATION, APPEARANCE, SCHEDULING AND TIMELINES OF THE

WORK OF ALL TRADES, CONTRACTORS, SUPPLIERS, INSTALLERS, ETC. EACH

TRADE SHALL COORDINATE THEIR WORK WITH OTHER TRADES AND THE

GENERAL CONTRACTOR. THIS INCLUDES ANY REQUIRED SHUTDOWNS THAT

WILL NEED TO BE COORDINATED WITH THE HOSPITAL.

ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT

CONDUITS, PIPING, ETC. DO NOT BLOCK ACCESS TO VALVES, EQUIPMENT,

DUCT ACCESS DOORS, ETC. ITEMS THAT HAVE BEEN INSTALLED WHERE

ACCESS IS COMPROMISED SHALL BE RELOCATED AT THE CONTRACTOR'S

EXPENSE. REFER TO SPECIFICATIONS FOR COORDINATION DRAWING

REQUIREMENTS.

INCLUDE IN BID ALL COST ASSOCIATED WITH DRAINING AND FILLING ALL

PIPING SYSTEMS AS REQUIRED TO INSTALL WORK. THIS INCLUDES:

HOT WATER HEATING SYSTEM

CHILLED WATER PIPING SYSTEM

STEAM PIPING SYSTEM

ALL WORK FOR ROOF DRAINS WITH SPACE BELOW TO BE COORDINATED

WITH VA STAFF TWO WEEKS PRIOR TO WORK COMMENCING.

CONTRACTORS SHALL COORDINATE ALL EXISTING EQUIPMENT BEING

REMOVED/RE-INSTALLED WITH GENERAL CONTRACTOR AND OWNER OWNER

SHALL BE GIVEN A MINIMUM OF TWO (2) WEEKS NOTICE PRIOR TO

INTERRUPTION OF ANY EQUIPMENT.

Prnject Title

REPLACE LOWER ROOFS

BLDG. 77 & 160

Drawn Building [�umber AutoCAD File �lame

77 & 160

Checked Reviewed

I Const. Conti-act No.

Date

MARCH 21 , 2023

Project l\lumber

621-22-115

DRAWll•IG No.

GIOOl

DWG of

Cl)

C

00 Cf.)

L 1..._

Q)·..... cd

Q)::::

w w