Drake Building Roof Replacement Project Summary
This document consists of construction drawings and project specifications for a roofing replacement project prepared by MERIK, INC. Building Construction Consultants for Upson County Board of Commissioners at the Drake Building located at 305 S. Hightower Street, Thomaston, Georgia 30286. The project scope includes complete demolition of existing laminate asphalt shingle roofing systems, repair or replacement of deteriorated wood roof decking, installation of new Class A rated fiberglass asphalt architectural shingles (GAF Timberline HDZ in Oyster Gray color), synthetic underlayment, 36-inch wide self-adhering rubberized asphaltic leak barrier membrane, new 7-inch K-style aluminum gutters and 4-inch by 5-inch aluminum downspouts, roof edge vents, ridge vents, step flashing with counterflashing at masonry wall transitions, new roof deck overlayment with OSB sheathing, and repair and repainting of existing wood louvers. The project requires compliance with the 2024 International Building Code with Georgia amendments, 2024 IRC, and applicable ASTM, OSHA, NRCA, and SMACNA standards. The roofing system design accommodates wind uplift pressures ranging from 32.4 to 44.0 pounds per square foot based on three wind zones. The drawings indicate that testing has identified asbestos-containing materials in existing mastic on the parapet walls, with removal included as an alternate. Additional alternates include replacement of wood louvers with prefinished metal louvers, tuck-pointing of face brick mortar joints above the roof line, and a 100% payment and performance bond requirement. Unit cost provisions are included for additional plywood decking, leak barrier underlayment, gutters, downspouts, and pressure-treated wood nailers in various dimensions.
The specifications require contractors to verify all existing site conditions and dimensions in the field prior to bid submission and to notify the design professional of any errors, omissions, or discrepancies within 72 hours before the bid deadline. Contractors and subcontractors must conduct a mandatory pre-bid site visit to inspect existing conditions and correlate observations with drawing requirements. The roofing system installation must provide a minimum of six fasteners per shingle with written warranty guarantee, 50 years of non-prorated material defect coverage including stain guard and algae protection, and a 25-year workmanship guarantee. All roof system components must be from a single manufacturer. The contractor is responsible for protecting building occupants, materials, and existing property; documenting existing conditions prior to work commencement; and restoring any damaged existing construction to original condition. Work must proceed with minimal interference to occupied spaces and adjacent facilities, with all demolition operations complying with 2019 NFPA 241 standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drake Building Roof Project Manual Bid Info.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MERIK, INC.
BUILDING CONSTRUCTION CONSULTANTS
MERIK PROJECT NO. 26UCGU03RR396
08/24/26 - ISSUED DRAWINGS
DRAKE BUILDING - UPSON COUNTY BOC
305 S. HIGHTOWER STREET, THOMASTON, GA 30286
ROOFING PROJECT
INDEX OF DRAWINGS
A000 COVER SHEET
A001 PROJECT INFORMATION
A100 ROOF PLAN
A150 WIND UPLIFT PLAN
A300 DETAILS
A301 DETAILS
VICINITY MAP
PROJECT LOCATIONGENERAL NOTES:
SYMBOLS:
ENLARGED PLAN OR
DETAIL MARKER
OPP = OPPOSITE HAND
TYP = TYPICAL SECTION
SIM = SIMILAR TO
DRAWING TITLE
ELEVATION MARKER
OPP = OPPOSITE HAND
TYP = TYPICAL SECTION
SIM = SIMILAR TO
SECTION MARKER
OPP = OPPOSITE HAND
TYP = TYPICAL SECTION
SIM = SIMILAR TO
REVISION CLOUD WITH REVISION
NUMBER
DETAIL MARKER
OPP = OPPOSITE HAND
TYP = TYPICAL SECTION
SIM = SIMILAR TO
APPLICABLE CODES AND STANDARDS
WORK SHALL BE IN ACCORDANCE WITH THE CURRENT BUILDING CODE FOR THE STATE OF
GEORGIA, INCLUDING LOCAL AMENDMENTS. THE PUBLICATIONS LISTED BELOW ARE THE
GOVERNING CODES AND STANDARDS AND ARE REFERENCED BY THE BASIC DESIGNATION. IN THE
CASE OF CONFLICTING REQUIREMENTS THE BUILDING CODE (IBC) SHALL GOVERN.
IBC INTERNATIONAL BUILDING CODE, 2024 WITH GEORGIA AMENDMENTS (2026)
IECC INTERNATIONAL ENERGY CONSERVATION CODE, 2015
WITH GEORGIA SUPPLEMENTS AND AMENDMENTS (2020, 2022, 2023)
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
ASTM ASTM INTERNATIONAL
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
SMACNA SHEET METAL & AIR CONDITIONER CONTRACTOR'S NATIONAL ASSOCIATION
NRCA NATIONAL ROOFING CONTRACTORS ASSOCIATION
ALL DEMOLITION WORK SHALL COMPLY WITH THE REQUIREMENTS OF 2019 NFPA 241, "STANDARD
FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS".
A000
SCALE
TITLEX
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE DESIGN
PROFESSIONAL VIA RFI OF ANY ERRORS, OMISSIONS, INCONSISTENCIES,
DISCREPANCIES, AND CONFLICTS WITHIN THE DRAWINGS AND
SPECIFICATIONS AND FIELD CONDITIONS NO LESS THAN 72 HOURS
BEFORE THE BID IS DUE.
2. CONTRACTOR IS TO VERIFY LAYOUT AND DIMENSIONS AND ALL
CONDITIONS IN THE FIELD WHICH MAY AFFECT THEIR BID.
3. THE CONTRACTOR AND SUBCONTRACTORS SHALL BE REQUIRED TO VISIT
THE PREMISES TO INSPECT EXISTING CONDITIONS, BECOME FAMILIAR
WITH LOCAL CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED
AND CORRELATE OBSERVATIONS WITH REQUIREMENTS OF THE DRAWINGS
AND SPECIFICATIONS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING ADEQUATE
PRECAUTIONS TO PROTECT THE BUILDING OCCUPANTS, MATERIALS AND
EXISTING PROPERTY AND FINISHES. EXISTING-TO-REMAIN CONSTRUCTION,
MATERIALS OR EQUIPMENT DAMAGED BY THE CONTRACTOR SHALL BE
RESTORED TO ORIGINAL CONDITION. CONTRACTOR TO DOCUMENT
EXISTING CONDITIONS PRIOR TO THE START OF WORK AND SUBMIT
RECORDS TO OWNER'S REPRESENTATIVE.
5. DRAWINGS ARE INTENDED TO BE PRINTED AT 24x36.
6. ALL MATERIALS TO BE NEW UNLESS NOTED OTHERWISE.
7. DO NOT SCALE DRAWINGS - VERIFY ALL DIMENSIONS IN FIELD.
ABBREVIATIONS:
A
AB ANCHOR BOLT
ABV ABOVE
ADD ADDENDUM
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ANG ANGLE
APX APPROXIMATELY
ASP ASPHALT
ASPS ASPHALT SHINGLE
AWB AIR AND WATER
RESISTIVE BARRIER
B
BD BOARD
BEL BELOW
BIT BITUMINOUS
BLDG BUILDING
BL BUILDING LINE
BLKG BLOCKING
BM BEAM
B.M. BENCHMARK
BOT BOTTOM
BPL BEARING PLATE
BTJT BUTT JOINT
BUR BUILT-UP ROOFING
BW BOTH WAYS
C
CBD CEMENTITIOUS BOARD
CF CUBIC FOOT
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CMU CONCRETE MASONRY UNIT
CO CLEAN-OUT
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CT CERAMIC TILE
CY CUBIC YARD
D
DIA DIAMETER
DIM DIMENSION
DN DIAMETER NOMINAL
DS DOWNSPOUT
DWG DRAWING
DWG(S) DRAWING/S
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
F
FL FLOOR LEVEL
FTG FOOTING
G
GALV GALVANIZED
H
HOR HORIZONTAL
I
ID INSIDE DIAMETER
IE INVERT ELEVATION
IL INVERT LEVEL
IO INSPECTION OPENING
IP INTERSECTION POINT
J
JT JOINT
K
K.J. KEY JOINT
L
LWC LIGHTWEIGHT
INSULATING
CONCRETE
M
MAX MAXIMUM
MFGR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
N
N.I.C. NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
OPT OPTIONAL
OPP OPPOSITE HAND
P
PL PLATE
PLYWD PLYWOOD
PT PRESSURE TTREATED
Q
QTY QUANTITY
R
R RADIUS
RCP REFLECTED CEILING PLAN
REF REFERENCE
REQ'D REQUIRED
REV REVISION
RH RIGHT HAND
S
SAF SELF-ADHERING FLASHING
SIM SIMILAR
SPUF SPRAYED POLYURETHANE FOAM
SQ SQUARE
SS STAINLESS STEEL
SSM STANDING SEAM METAL
STD STANDARD
T
THK THICK
TI TASK ITEM
TO TOP OF
TS TUBE STEEL
TYP TYPICAL
U
U/S UNDER SIDE
UNO UNLESS NOTED OTHERWISE
V
VERT VERTICAL
V.I.F. VERIFY IN FIELD
W
WP WATER PROOF
WRB WEATHER RESISTIVE BARRIER
SPECIAL CHARACTERS
° = DEGREES
Ø = DIAMETER
# = NUMBER
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26UCGU03RR396
Issues:
Drawn: TRM/ Approved: MB
UP
SO
N
CO
UN
TY
B
OC
DR
AK
E
BU
IL
DI
NG
S.
H
IG
HT
OW
ER
S
TR
EE
T, T
HO
M
AS
TO
N, G A
08/24/2026 Issued Drawings
RO
OF
IN
G
PR
OJ
EC
T
AutoCAD SHX Text
NORTH
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text
A001
PROJECT NOTES:
1. Extent of Work Includes:
Scope of Work (SOW)
Existing Roof Construction:
Laminate asphalt shingles over bituminous felt underlayment over wood sheathing on wood framing. Ridge vents are present at the main ridge.
Gable louvers are wood and very weathered with some damage. There are no soffit vents. Some power vents are present. Concrete copings are present at the top of face brick gable end walls. The concrete coping requires joint replacement/repointing as well as the face brick. Metal valley and roof flashings are present. Flashings at the backside of the face brick walls have a flush-mounted counterflashing.
New Roof Construction:
Provide new fiberglass asphalt shingles, overlay decking, underlayment, leak barrier membrane, gutters and downspouts to provide a complete roofing system installation. Tuck point face brick mortar joints above the roof line (Add Alternate). Provide additional intake edge vents to increase intake air ventilation. Provide step flashing at roof to wall intersections. Repair and repaint existing wood louvers.
Section 024000 - Demolition
1. Testing indicates all mastic materials have asbestos containing materials (ACMs) on the backside of the parapet walls. Removal of this material is included as an Alternate.
2. Remove the existing shingles and underlayment down to the existing wood decking.
3. Replace existing deteriorated wood roof decking as needed. Infill with exterior rated plywood that equals the existing wood deck thickness. Remove in full panels that span to underlying roof structural rafter elements and mechanically fasten the replacement panels to rafters.
4. Coordinate the saw cutting a new slot in the existing and new overlay wood deck as required by the edge vent manufacturer for a new edge vent installation where located on the drawings.
5. Remove existing metal flashings, mastic, pipe boots, and related existing roof system accessories.
6. Remove roof level sealant at flashed and repaired areas. Prepare for new flashing and roofing installations.
7. Remove existing attic static and power vents.
Section 042100 - Masonry Restoration (Alternate)
1. Tuck point exposed face brick joints at areas above the roof eave.
This only includes the roof side of parapets. Match existing mortar joint color located at the exterior side of the walls.
Section 061000 - Rough Carpentry
1. Install a new 4'x8'x7/16” OSB sheathing over the existing repaired sheathing. Use “H” clips to maintain an 1/8” spacing between boards. Coordinate new overlayment board configuration and securement methods, with the shingle system manufacturer requirements for the specified warranty and wind uplift requirements. Stagger joints with underlying existing wood decking.
2. Provide a gap at hips and ridges for the installation of new ridge vents.
3. Provide cut outs in the deck for vent pipes roof penetrations.
4. Provide new pressure-treated 2x wood nailers and blocking as needed to install new flashings and roof elements.
5. Repair, reprime, and repaint existing wood louvers. Remove rotted or damaged wood areas and replace with new pressure treated or exterior rated material. Block off openings or gaps in the flashing at the dormer trim.
Section 073100 - Fiberglass Asphalt Shingle Roof System Installation
1. Install a new Class A rated, fiberglass asphalt architectural shingle roof system. Basis of Design is GAF Timberline HDZ - Color Oyster Gray. Provide 50 years of non-prorated material defect coverage that includes stain guard and algae protection and a 25-year workmanship guarantee. Provide a minimum of (6) fasteners per shingle and include this as a written guarantee in the Installer's Warranty. Roof system design is to comply with the 2024 IBC and IRC with current Georgia Amendments.
2. Install new 36” wide self-adhering rubberized asphaltic leak barrier membrane at eaves, rakes, and valleys. Provide two layers at areas behind parapet/wall conditions at eaves. Install around pipe boots and roof vents.
3. Install an edge vent at eave areas shown on the drawings with a slot cut into the existing wood deck and new overlay decking as directed by the edge vent manufacturer.
4. Install a synthetic underlayment over the entire wood roof deck as shown on the drawings. Lap over the L-type eave drip edge and under the rake drip edge.
5. Provide a starter strip of shingles at eaves and rakes and overhang a minimum of ¾” for “L” type drip edge at eaves. Coordinate with the gutter installation.
6. Install ridge vents as shown on the drawings.
7. Install pipe penetration flashings where indicated on the drawings.
8. Lap shingles at valleys in lieu of using a metal valley flashing.
9. Roof system components are to be from one manufacturer.
Section 076000 - Flashing and Sheet Metal
1. Provide a prefinished 24 ga galvanized steel or aluminum Type “C” drip edge at eaves and rake edges. Extend at least ¼” below the roof sheathing and a minimum of 2” onto the roof deck. Vertical leg is to be 1 ½” long. Overlap sections a minimum of 2” and mechanically fasten at 12-inches on center maximum.
2. Install new prefinished 7”, “K”- style aluminum gutters with expansion joints not to exceed 40-feet and gutter supports at 4'-0” OC- equally spaced.
3. Install new prefinished 4” x 5”, aluminum downspouts with a minimum of (3) straps per 10' OC in height (equally spaced) or 4' OC (equally spaced if over 12' in height). Provide concrete splash blocks at the downspouts that are to discharge at grade.
4. Provide black finished 24 ga. galvanized steel sheet metal panels that are installed from the inside of all gable and dormer vents that completely block opening. Apply exterior urethane sealant around perimeter edges to make the openings airtight. Insect screens are to remain.
5. Provide a sidewall step flashing with a two-piece counterflashing at all masonry walls to roof transitions.
6. Provide crickets at inside corners of roof at masonry walls.
7. Provide metal kick-outs at the ends of wall to gutter transitions.
Section 079200 - Sealants and Caulking
1. Install the specified sealant at locations indicated in the construction drawings, including flashings, wood trim, and wall louvers.
2. Seal interior perimeter of new metal louver backup panels.
3. Seal any openings not flashed at areas above roof surface.
Section 099100 - Exterior Painting (Alternate)
1. Paint repaired wood louvers.
Alternates:
Additive Alternate #1 Replace wood louvers with prefinished metal louvers. Match existing sizes. Provide fasteners and sealant as needed to make a complete installation.
Additive Alternate #2 Tuck point face brick mortar joints above roof line at backside of parapets. Match existing mortar color.
Additive Alternate #3 Provide a Payment and Performance Bond for 100% of the total Base Bid added to the total project amount.
Additive Alternate #4 Remove mastic with ACMs from the backside of all parapets down to existing face brick. Dispose of legally- see Specifications.
Allowances
1. Provide for the installation of (10) new 4'x8'x1/2” exterior rated plywood with (12) galvanized mechanical fasteners.
Unit Costs
1. Unit Cost #1: Provide the installation of (1) new 4'x8'x1/2” exterior rated plywood with (12) galvanized mechanical fasteners.
2. Unit Cost #2: Provide 36” self-adhered rubberized asphalt leak barrier underlayment (cost per lineal foot).
3. Unit Cost #3: Provide prefinished 7”, “K”- style aluminum gutters (cost per lineal foot).
4. Unit Cost #4: Provide prefinished 4” x 5”, square aluminum downspout (cost per lineal foot).
5. Unit Cost #4: Provide new 2 x 4 pressure treated s.y.p. wood nailers (cost per board foot).
6. Unit Cost #5: Provide new 2 x 6 pressure treated s.y.p. wood nailers (cost per board foot).
7. Unit Cost #6: Provide new 2 x 8 pressure treated s.y.p. wood nailers (cost per board foot).
8. Unit Cost #7: Provide new 2 x 10 pressure treated s.y.p. wood nailers (cost per board foot).
* SEE SPECIFICATIONS FOR FULL EXTENT OF WORK.
1. Existing structure to remain. Contractor to verify integrity of existing structure and notify owner if any of the proposed new work will adversely affect the existing structure.
2. Protect from damage existing finish work that is to remain in place.
If it becomes damaged during demolition promptly repair damage caused to facilities by demolition.
3. Conduct demolition operations and debris removal to ensure minimum interference with walks, roads, and occupied spaces, and adjacent facilities.
4. Contractor shall verify existing structure prior to submittal of bid and prior to any demolition operations.
5. Contractor to verify all conditions and elements prior to submitting bid.
6. DO NOT SCALE DRAWINGS - VERIFY ALL DIMENSIONS IN
FIELD
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26UCGU03RR396
Issues:
Drawn: TRM/ Approved: MB
UP
SO
N
CO
UN
TY
B
OC
DR
AK
E
BU
IL
DI
NG
S.
H
IG
HT
OW
ER
S
TR
EE
T, T
HO
M
AS
TO
N, G A
08/24/2026 Issued Drawings
RO
OF
IN
G
PR
OJ
EC
T
V
V
V
VV
V
DS
VA
LL
EY
VALLEY
R
ID
G E
VALLEY
VALL
EY
DS
DS
DS
DS DS DSDS DS
VALLEY VA
LL
EY
RIDGE
R
ID
G E
VALLEYVA
LL
EY
R
ID
G E
VALLEYVA
LL
EY
R
ID
G E
VALLEY
RIDGE
VALLEY
HIP
HIP
RIDGE RIDGE
DS DS
DS
G
AB
LE
DS
DSDS DSDSDSDS DS DS
A100
TYP.
KEY NOTES:
1 Demolition: Note: ACMs are present in the mastic on the back side of the parapet walls. Remove the existing shingles and underlayment down to the wood decking.
Replace deteriorated wood roof decking as needed with exterior-rated plywood matching the existing deck thickness. Remove full panels spanning to the underlying roof rafters and mechanically fasten replacement panels to the rafters. Remove existing metal flashings, pipe boots, and related roof system accessories. Remove roof-level caulking at flashed and repaired areas and prepare surfaces for new flashing and roofing installations.
Demolition: Coordinate saw cutting a new slot in the existing underlayment as required by the edge vent manufacturer for a new edge vent installation. See Detail 5/A300.
Demolition: Remove existing attic power and static roof-mounted vents.
New Roof System: Install a new Class A rated, fiberglass asphalt architectural shingle roof system. Basis of Design is GAF Timberline HDZ - Color Oyster Gray. Provide a minimum of (6) fasteners per shingle and include this as a written guarantee in the Installer's Warranty. Provide 50 years of non-prorated material defect coverage that includes stain guard and algae protection and a 25-year workmanship guarantee. Roof system design is to comply with the 2024 IBC and IRC with current Georgia Amendments.
Install new 36” wide self-adhering rubberized asphaltic leak barrier membrane at eaves, rakes, and valleys. Provide two layers of leak barrier at areas behind parapet/wall conditions and at eaves. Install a leak barrier around pipe boots and roof vents.
Install an edge vent at eave areas with a slot cut into the existing wood deck and new overlay decking as directed by the edge vent manufacturer.
Install a synthetic underlayment over the entire wood roof deck as shown on the drawings. Lap over the L-type eave drip edge and under the rake drip edge.
Provide a starter strip of shingles at eaves and rakes. See Details on Sheets A300 & A301.
Install ridge vents as shown on the drawings. See Detail 4/A300.
Install hip ridge shingles (non-vented) where shown on drawings. See Detail 3/A300.
Install lapped valley shingles where shown on drawings.
See Detail 1/A301.
Install pipe penetration flashings where indicated on the drawings. See Detail 3/A301.
Install new prefinished 7”, “K”- style aluminum gutters with expansion joints not to exceed 40-feet and gutter supports at 4'-0” OC- equally spaced. Provide kick- outs where wall flashing meets gutter at eave. See Details 2 & 5/A300.
Install new prefinished 4” x 5”, aluminum downspouts with a minimum of (3) straps per 10' OC in height (equally spaced) or 4' OC (equally spaced if over 12' in height).
Provide concrete splash blocks at the downspouts that are to discharge at grade.
Provide black finished 24 ga. galvanized steel sheet metal panels that are installed from the inside of all gable and dormer vents on framing that completely block opening.
Apply exterior urethane sealant around perimeter edges to make the openings airtight. Insect screens are to remain.
Provide step flashing with a two-piece counterflashing at all masonry walls to roof transitions. See Detail 2/A301.
Provide a cricket to drain around wall returns, typ.
Provide a kick-out at wall to gutter terminations.
TYP.
DO NOT SCALE DRAWINGS - VERIFY
ALL DIMENSIONS IN FIELD
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26UCGU03RR396
Issues:
Drawn: TRM/ Approved: MB
UP
SO
N
CO
UN
TY
B
OC
DR
AK
E
BU
IL
DI
NG
S.
H
IG
HT
OW
ER
S
TR
EE
T, T
HO
M
AS
TO
N, G A
08/24/2026 Issued Drawings
RO
OF
IN
G
PR
OJ
EC
T
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
GABLE
VENT
TYP.
TYP.
TYP.
RIDGE
VENT
TYP.
TYP.
GABLE VENT TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
9 9
TYP.
TYP.
TYP.
TYP.
TYP.
5 16
TYP.
TYP.
TYP.
TYP.
5 16
GABLE
VENT
TYP.
TYP.
Ventilation Requirements:
2024 IBC allows 300 sf for NVFA if split between intake & venting NFVA = 24,320 SF / 300 SF = 81 SF * 144 = 11,164 sq. in.
11,674 / 2 = 5,837 sq. in. - 5,837 sq. in. intake required for Edge Vents and Ridge Vents for venting
AutoCAD SHX Text
EQ.
AutoCAD SHX Text
EQ.
AutoCAD SHX Text
EQ.
AutoCAD SHX Text
EQ.
AutoCAD SHX Text
3'-0" TYP.
AutoCAD SHX Text
EQ.
AutoCAD SHX Text 3'-0"
AutoCAD SHX Text
EQ,
AutoCAD SHX Text
EQ.
AutoCAD SHX Text
EQ,
AutoCAD SHX Text
EQ.
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
OVERALL ROOF PLAN
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text 2,5
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text 2,5
AutoCAD SHX Text A300
AutoCAD SHX Text 2,5
AutoCAD SHX Text A300
AutoCAD SHX Text 2,5
AutoCAD SHX Text A300
AutoCAD SHX Text 2,5
AutoCAD SHX Text A300
AutoCAD SHX Text 2,5
AutoCAD SHX Text A300
AutoCAD SHX Text 2,5
AutoCAD SHX Text A300
AutoCAD SHX Text 2,5
AutoCAD SHX Text A300
AutoCAD SHX Text 2,5
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A300
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A301
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
ZONE
A150
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26UCGU03RR396
Issues:
Drawn: TRM/ Approved: MB
UP
SO
N
CO
UN
TY
B
OC
DR
AK
E
BU
IL
DI
NG
S.
H
IG
HT
OW
ER
S
TR
EE
T, T
HO
M
AS
TO
N, G A
08/24/2026 Issued Drawings
RO
OF
IN
G
PR
OJ
EC
T
The wind uplift forces are in accordance with the current ASCE 7-22 Standard and are used for the resistance of the designed roofing systems to resist these forces. The analysis of the structures to resist these forces is not included nor a part of this scope of work.
Wind pressures shown are allowable wind pressures and are to be used for the design of the roof assembly. These wind pressures are based on ultimate wind pressures reduced by a factor of 0.6 for wind and increased by a safety factor of 2.0.
Risk Category II Exposure Category B Basic Wind Speed = 105 mph
WIND UPLIFT ZONES AND PRESSURES
ZONE 1' NOT USED
ZONE 1 -32.4 psf
ZONE 2 -35.8 psf
ZONE 3 -44.0 psf
(pounds per square foot - psf)
Note: The basis-of-design is a replacement roof assembly. The roof securement pattern shall be designed to meet the wind uplift values stated above for the new roof materials only. The Design Professional shall determine if enhancements to the existing roof material securement are needed. The roof manufacturer is to provide a tested wind uplift assembly.
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text 6'-0"
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
WIND UPLIFT PLAN
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
PROJECT
L-TYPE DRIP
EDGE METAL
SL
OPE
SEALING STRIP
UNDERLAYMENT
ASPHALT SHINGLES
MANUFACTURED
STARTER COURSE
3/4"
ROOFING NAIL¾
MAX 12" O.C.
MANUFACTURED
STARTER COURSE
NOTES:
1. REFER TO THE SPECIFICATION FOR MATERIALS AND INSTALLATION REQUIREMENTS.
NEW METAL GUTTER TO BE
INSTALLED. SEAL GUTTER
SEAMS WITH NEW SEALANT
NOTES:
1. THIS DETAIL SHOWS ONE TYPE OF GUTTER SUPPORT. GUTTER SECUREMENT AND
SUPPORT OPTIONS VARY. PROVIDE GUTTER AND DOWNSPOUT SUPPORT METHODS IN
THE SUBMITTALS.
2. PROVIDE NEW GUTTER AND DOWNSPOUTS AS NOTED IN THE PLAN KEYNOTES.
DOWNSPOUTS ARE TO DISCHARGE ONTO CONCRETE SPLASH BLOCKS AT GRADE.
MANUFACTURED
STARTER COURSE
ROOFING NAIL ¾
MAX 12" O.C.
UP TO 3/4" OVERHANG WITH
L-TYPE DRIP EDGE METAL
L-TYPE DRIP EDGE
METAL
ASPHALT SHINGLES
SEALING STRIP
3" M
IN
STRIPPING PLY
" M
IN
WATER AND ICE-DAM
PROTECTION MEMBRANE
SEALING
STRIP
3" M
AX
UNDERLAYMENT
UNDERLAYMENT
WRAPPED OVER
RIDGE
RIDGE SHINGLES
ROOF NAIL SHOULD BE LONG
ENOUGH TO PENETRATE THROUGH
ALL LAYERS OF ROOFING
MATERIALS AND INTO DECK
SEALING STRIPS
ASPHALT
SHINGLES
UNDERLAYMENT
OPTION
NONRIGID RIDGE VENT MATERIAL.
DO NOT COMPRESS WHEN
INSTALLING RIDGE SHINGLES
CONTINUOUS RIDGE VENT,
INSTALL PER MANUFACTURER'S
RECOMMENDATIONS
ASPHALT SHINGLES
UNDERLAYMENT
SEALING STRIPS
NEW GUTTER
NEW SLOT CUT INTO BOTH DECKS
AS RECOMMENDED BY ROOF
EDGE VENT MANUFACTURER
NEW FASTENERS @ 8" O.C., MIN.
NEW SHEET METAL DRIP EDGE
NEW ROOF EDGE VENT,
AS SPECIFIED
NEW LEAK BARRIER STRIP AS
RECOMMENDED BY ROOF EDGE
VENT MANUFACTRURER
NEW OVERLAY DECK
NEW ASPHALT SHINGLE SYSTEM
NEW UNDERLAYMENT
NEW 36" WIDE LEAK BARRIER STRIP
EXISTING DECK
A300
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26UCGU03RR396
Issues:
Drawn: TRM/ Approved: MB
UP
SO
N
CO
UN
TY
B
OC
DR
AK
E
BU
IL
DI
NG
S.
H
IG
HT
OW
ER
S
TR
EE
T, T
HO
M
AS
TO
N, G A
08/24/2026 Issued Drawings
RO
OF
IN
G
PR
OJ
EC
T
AutoCAD SHX Text 1"
AutoCAD SHX Text 34"
AutoCAD SHX Text
RAKE WITH STARTER COURSE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
EAVE WITH GUTTER
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
NON-VENTED RIDGE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
RIDGE WITH CONTINUOUS RIDGE VENT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
EDGE VENT DETAIL
AutoCAD SHX Text
NOT TO SCALE
S
LO
P E
2" MIN.
FIELD UNDERLAYMENT
AND ROOF DECK NOT
SHOWN FOR CLARITY
ASPHALT SHINGLES
EXTEND SHINGLE 12"
MIN. BEYOND
CENTER OF VALLEY
TRIM CORNER
OF SHINGLES
SEALING STRIPS
VALLEY
UNDERLAYMENT
NOTES:
1. VALLEY UNDERLAYMENT TYPE MAY VARY DEPENDING ON CLIMATIC CONDITIONS.
2. NO FASTENERS WITHIN 6 INCHES OF VALLEY CENTER.
3. THE CUT SIDE OF THE VALLEY SHOULD BE ON THE SIDE WITH THE GREATEST ROOF
AREA.
SEALANT
TWO-PIECE SHEET-METAL
COUNTERFLASHING, OVERLAP
STEP FLASHING MIN. 2"
FACE BRICK NOT
SHOWN FOR CLARITY
2" MIN.
APPROPRIATE FASTENERS
SLO
PE
SHEET-METAL STEP
FLASHING AT EACH COURSE
MAINTAIN 1" ABOVE
ROOF SURFACE
ASPHALT SHINGLES
SEALING STRIP
SLO
PE
4" MIN.
2" MIN.
OPTION, STEP FLASHING NAILED INTO THE WALL
ASPHALT SHINGLES
SEALING STRIP
SOFT-METAL FLASHING SLEEVE,
ROLL INTO PIPE APPROX. 1"
SECTION
PIPE
PENETRATION
FLASHING
UNDERLAYMENT
IF POSSIBLE, LAP
UNDERLAYMENT OVER
FLASHING OR SEAL UPPER
FLANGE TO UNDERLAYMENT
WITH ROOF CEMENT
IF POSSIBLE, LAP UNDERLAYMENT
OVER TOP OF FLASHING FLANGE OR
SEAL UPPER FLANGE TO
UNDERLAYMENT WITH ROOF CEMENT
OPTIONAL:
SEALANT
SEALING STRIP
FIELD UNDERLAYMENT
AND ROOF DECK NOT
SHOWN FOR CLARITY
OPTIONAL: SEALANT
UNDER SHINGLES
A301
S H
AL
LO
W
FO
R D
R O
AD
SU
IT
E
M
AR
IE
TT
A, G
A
0-
5-
M
ER
IK
S
O U
TH
P.
O . B
O X
W . W
H
IT
E R
O
AD
BY
R
O N
, G A
8-
4-
Project: 26UCGU03RR396
Issues:
Drawn: TRM/ Approved: MB
UP
SO
N
CO
UN
TY
B
OC
DR
AK
E
BU
IL
DI
NG
S.
H
IG
HT
OW
ER
S
TR
EE
T, T
HO
M
AS
TO
N, G A
08/24/2026 Issued Drawings
RO
OF
IN
G
PR
OJ
EC
T
AutoCAD SHX Text
VALLEY
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
SIDEWALL FLASHING
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AutoCAD SHX Text
VENT PIPE FLASHING
AutoCAD SHX Text
NOT TO SCALE
| Sheets and Views |
| Drake_Cover-A000 |
| Drake_Roof Plan-A001 |
| Drake_Roof Plan-A100 |
| Drake_Roof Plan-A150 |
| Drake_Details-A300 |
| Drake_Details-A301 |
File details come from the government source that posted it. Updated .