DRAFT_Statement of Work.pdf

PDF 162 KB Posted

Attached to
Aeration Blower and Silencer Vibration and Shock Fixture Fabrication
Solicitation number
N6660426Q0459
Issued by

About this file

Statement of Work Summary: Aeration Blower and Silencer Vibration and Shock Fixture Fabrication

This Statement of Work (SOW) defines the requirements for fabricating, assembling, and testing vibration and shock fixtures for an aeration blower and silencer system in support of PMS321's LCC19 aeration blower and discharge assembly. The work will be performed at the contractor's facility and at NUWCDIVNPT in Rhode Island, with Code 45 as the authorized user and OMN funding type. The contractor must fabricate and assemble test fixtures using Government Furnished Material (GFM), including copper-nickel piping and rigid fixtures, to replicate shipboard environmental conditions per Mil-DTL-901E standards. The manufacturing effort supports two specific test series: the Engineered Systems & Products Model NB12005/10/2542 Blower Package and the Stoddard D13-2.5 Dwg 71C622 Blower Discharge Silencer. Work is governed by applicable documents including CUI_FIXTURING BLOWER, CUI_PP SEGMENTS-BLOWER TEST, CUI_SILENCER FIXTURING, CUI_SILENCER PP ASSY (all dated 29 May 2026), Mil-Std-167A, and Mil-DTL-901E.

The contractor must deliver a written Fabrication & Inspection Report in PDF format within five business days of assembly completion, documenting drawing compliance and inspection results. The contractor shall ship both assemblies to NUWCDIVNPT and provide on-site technical personnel during Government-executed fitment evaluation, with minimum 10 business days' advance notice required. Following fitment evaluation, the contractor shall incorporate necessary modifications and submit a draft Summary Report within 10 business days of completion; the Government will review within 5 business days, after which the contractor must provide a final version incorporating feedback within 3 business days. Final acceptance of the Summary Report is required for contract closeout and final invoice approval. All contractor personnel must comply with 32 CFR Part 117 (NISPOM) security requirements, Controlled Unclassified Information (CUI) safeguarding protocols, and Operations Security (OPSEC) procedures; any electronic spillage caused by the contractor will result in all remediation costs being charged to the contractor.

View the file

Other files

File Type Posted
FINAL_Statement of Work.pdf PDF
N6660426Q0459.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

v4.11_JULY2026

STATEMENT OF WORK (SOW)

Aeration Blower and Silencer Vibration and Shock Fixture Fabrication

1.0 Background

In support of PMS32, NUWCDIVNPT Code 45 requires vibration and shock testing of an aeration blower and silencer prior to delivery. In order to test the aeration blower and silencer, the shipboard environment needs to be replicated to meet the intent of Mil-DTL-901E. In order to replicate the shipboard environment, interfacing piping and hardware needs to be fabricated and includes copper-nickel piping, and sufficiently rigid fixtures. This contract includes the material procurement, fabrication and assembly, including welding of piping and fixtures required for testing.

1.1 Places of Performance

The work will be performed at the contractor facility and NUWCDIVNPT, RI

1.2 Authorized Users

Code 45

1.3 Sponsors

The applicable sponsor for this SOW is PMS321

1.4 Types of Funding

OMN

2.0 Scope

2.1 Program or Systems Supported

The LCC19 aeration blower and discharge assembly funded by PMS321 is supported by this

SAP.

3.0 Applicable Documents

The contractor shall perform the tasking required in Section 4.0 in accordance with (IAW) the below Applicable Documents (ADs).

NUMBER TITLE

REVISION/

DATE

APPLICABLE

SOW TASK

Military Specifications and Standards

3.1 CUI_FIXTURING BLOWER 29 May 2026 4.1

3.2 CUI_PP SEGMENTS-BLOWER TEST 29 May 2026 4.1

3.3 CUI_SILENCER FIXTURING 29 May 2026 4.1

3.4 CUI_SILENCER PP ASSY 29 May 2026 4.1

3.5 Mil-Std-167A 2 November

4.2

3.6 Mil-DTL-901E 20 June 2017 4.2

4.0 Technical Requirements

The Contractor shall integrate Government Furnished Material (GFM) into shock fixtures in accordance with the applicable test procedures and drawings. The manufacturing supports two test series:

(1) Engineered Systems & Products Model NB12005/10/2542 Blower Package

(2) Stoddard D13-2.5 Dwg 71C622 Blower Discharge Silencer.

Note: Vibration (Mil-Std-167) and Medium Weight Shock (Mil-DTL-901E) testing will be executed solely by the Government at NUWCDIVNPT. The Contractor is not responsible for executing qualification test events.

4.1 Fabrication and Assembly:

The Contractor shall provide the materials, personnel and facilities to fabricate, weld, and assemble test fixtures in accordance with (IAW) ADs in Section 3.0.

4.1.1 The Contractor shall deliver a written Fabrication & Inspection Report (PDF format via email to the TPOC) within 5 business days of assembly completion, documenting drawing compliance and inspection results.

4.2 Fitment Testing and Evaluation:

The Contractor shall provide technical personnel on-site at NUWCDIVNPT during the Government-executed fitment evaluation of the fabricated fixtures. Contractor personnel shall support the evaluation by assessing physical alignment, bolt patterns, and interface dimensions defined in the Government Furnished Information (GFI) to determine suitability of the fixtures.

The Government will provide the Contractor with a minimum of ten (10) business days advance written notice prior to the scheduled evaluation date.

4.2.1 The contractor shall ship both assemblies to NUWCDIVNPT for fitment evaluation. Once the fitment evaluation is complete, necessary modifications will be performed.

4.2.2 The Contractor shall submit the draft Summary Report within 10 business days following completion of all testing activities. The Government will review the report within 5 business days of receipt. The Contractor shall incorporate any Government feedback and provide a final version within 3 business days of receiving comments. Final acceptance of this report is required for contract closeout and final invoice approval.

4.3 Summary Report:

The contractor shall provide a summary report, including a summary of fabrication, fitment testing and evaluation, and any modifications to the provided GFI. The contractor shall include redlines to drawings to accommodate shock fixtures as necessary.

5.0 Government Furnished Information

The following Government Furnished Information (GFI) will be made available under this contract/task order. See below table format example.

Number Title Applicable SOW Task

Number

6.1 Network Patch Cable and Wall Plate Labeling Requirements

ALL

6.2 User information from the PBX 4.1.2

6.3 Facilities System Move Requests ALL

6.4 Life Cycle Management Plans 4.1.1, 4.1.2, 4.1.3, 4.1.4

6.5 CUI_2025-TP-00003 SCD 2976 Blower, Aeration Blower Package - Redline, and Silencer Print

4.2

7.0 Government Furnished Property

The Government shall provide Government Furnished Property (GFP) as listed in Attachment 1.

The contractor shall adhere to DFARS Clause 252.245–7005 for the management and reporting of Government Property and shall use the GFP Module of the Procurement Integrated Enterprise Environment (PIEE) as specified in the clause.

8.0 Quality Surveillance and Performance Standards

Reserved

9.0 Information and Communication Technology (ICT) Accessibility Requirements

The Government has determined that this procurement is not Information and Communication Technology (ICT).

10.0 Security Compliance

10.1 Program Protection

SECURITY: All Contractor personnel shall adhere to the Security provisions of 32 CFR Part 117

– National Industrial Security Program Operating Manual (NISPOM. While performing work at a Government Facility, Contractor personnel shall comply with the security regulations of the host facility. Applicable FAR, DFARS, NMCARS clauses, and NAVSEA text shall be adhered to in the performance of this contract. Security incidents shall be promptly reported through the companies Facility Security Officer (FSO), to the Contracting Officer’s Representative (COR), Technical Point of Contact (TPOC), and the Cognizant Security Office to NUWCDIVNPT Security.

Controlled Unclassified Information (CUI) including Legacy FOUO and Covered Defense Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoD Instruction 5200.48, CUI available at:

https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) in accordance with DoDI 5230.24 (Distribution Statements on Technical Documents); and DoDI 5230.24, Enclosure 3 Procedures, available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/523024p.pdf

INFORMATION SECURITY: If the work is performed at the Contractor's facility, the Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and controlled unclassified information (CUI) and to control distribution of CUI in accordance with National Industrial Security Program Operating Manual (NISPOM) codifying 32 CFR Part 117, NISPOM Rule, and SECNAV M- 5510.36B. If the work is performed at the Government's facility, the Contractor shall comply with facility policy.

CUI INCIDENT REPORTING AND RESPONSE: The Contractor shall promptly report any unauthorized, inadvertent, or illegal release or disclosure of CUI to the Contracting Officer’s Representative / Technical Point of Contact (TPOC), Procuring Contracting Officer, and the Security Office. Contractor personnel shall coordinate this effort through the relevant industry site FSO.

PUBLIC RELEASE: Any controlled unclassified information pertaining to this contract shall not be released for public dissemination, including posting to any social media sites such as Facebook or Twitter, unless it has been approved for public release by appropriate U.S.

Government authority. Proposed public releases shall be submitted for approval prior to release through the appropriate U.S. Government Office.

10.2 Operations Security (OPSEC)

OPSEC is a process that identifies critical information to determine if friendly actions can be observed by adversary intelligence systems, determines if information obtained by adversaries could be interpreted to be useful to them, and then executes selected measures that eliminate or reduce adversary exploitation of friendly critical information.

The Contractor shall develop and implement, and update and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract.

The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. The Contractor developed OPSEC program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Presidential Memorandum (NSPM) 28, and at a minimum shall include:

1) Assignment of responsibility for OPSEC direction and implementation.

2) Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.

3) Establishment of OPSEC education and awareness training. To include initial and annual OPSEC training.

4) Provisions for management, annual review, and evaluation of OPSEC programs.

5) Flow down of OPSEC requirements to subcontractors when applicable.

While performing aboard Government sites, the contractor shall: comply with all OPSEC instructions and policies; include OPSEC as part of its ongoing security awareness program and take all required Agency training; Be responsive to the Supporting OPSEC Manager on a non-interference basis; and Protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the Requiring Organization and contractor in support of the mission.

10.3 Electronic Spillage

Electronic Spillage (ES) is defined as a situation where information of higher classification than a system is authorized to process is introduced into that system, intentionally or otherwise. If a Contractor is determined to be responsible for an ES, all direct and indirect costs incurred by the Government for ES remediation will be charged to the Contractor.