DRAFT Statement of Qualifications _ Landfill .pdf
PDF 164 KB Posted
- Solicitation number
- PE-66062-NONST-2026-000000327
- Issued by
- Fulton County, Atlanta City, Georgia
About this file
This is a Draft Statement of Qualifications for a Multi-Agency Landfill and Airport Slope Mowing and Clearing contract. The document outlines mandatory qualifications for firms interested in providing steep-slope mowing, vegetation clearing, and sediment management services at airport and landfill facilities. Prospective offerors must demonstrate a minimum of five years of experience performing these services in comparable regulated environments, with documentation of at least three completed projects within the last seven years involving steep slopes at 2:1 grade or greater, heavy vegetation removal, and regulatory oversight. Firms must also demonstrate prior compliance experience with FAA Part 139 airside operations, state or federal landfill environmental regulations, or wildlife hazard mitigation environments. Offerors are required to own or maintain dedicated access to specialized equipment, including high-track skid steers with forestry attachments and heavy-duty tractors rated for slope operations, supported by proof of ownership or executed lease agreements.
Personnel qualifications are mandatory, requiring trained operators with documented steep-slope and regulated-site experience, along with OSHA-compliant equipment operation certifications. Additional compliance requirements include formal wildlife hazard response procedures aligned with FAA Part 139.337, environmental controls addressing herbicide prohibitions and soil protection standards, and documented utility coordination and damage prevention protocols. Firms must provide evidence of general liability, auto liability, workers' compensation, and environmental coverage meeting city minimums, along with three references from similar projects completed within the last five years. Failure to meet any mandatory qualifications in the areas of relevant experience, regulatory compliance, equipment access, personnel training, wildlife response capability, environmental controls, utility procedures, insurance coverage, or references will result in disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cascade Acres Map.pdf | ||
| Confederate Ave_ Acres.pdf | ||
| ECLF Acres Map.pdf | ||
| DRAFT Scope of Work _ Landfill and Airfiled S.pdf | ||
| Gun Club Acres Map.pdf | ||
| Key Road Acres Map.pdf | ||
| DRAFT APPENDIX B DPW_DOA Landfill and Airport.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Multi Agency - Landfill and Airport Slope Mowing and Clearing
Statement of Qualifications
A. Mandatory Firm Qualifications (Pass/Fail)
1. Relevant Experience (Core Capability Threshold)
Offeror must demonstrate a minimum of five (5) years of experience providing steep-slope mowing, vegetation clearing, and sediment management services in environments comparable to airports, landfills, or regulated industrial facilities.
Documentation Required:
• Narrative summary of experience
• At least three (3) completed projects within the last seven (7) years involving:
o Steep slopes (2:1 or greater) o Heavy vegetation removal o Regulatory oversight (FAA, EPD, or equivalent)
Disqualifier:
Failure to demonstrate steep-slope or regulated-site experience.
2. Airport and Environmental Regulatory Experience
Offeror must demonstrate prior compliance experience with at least one of the following:
• FAA Part 139 airside operations
• State or federal landfill environmental regulations
• Wildlife hazard mitigation environments
Documentation Required:
• Project descriptions explicitly identifying the regulatory authority
• Description of compliance procedures used on prior projects
General landscaping experience without regulatory or controlled-access environments.
3. Equipment Ownership or Dedicated Access
Offeror must own or have guaranteed access (via lease or agreement) to equipment capable of safely performing steep-slope clearing, including:
• High-track skid steer with forestry or bush hog attachment
• Heavy-duty tractor (minimum 100 hp) with slope-rated mower
Documentation Required:
• Equipment list with model numbers
• Proof of ownership or executed lease agreements
Reliance on subcontracted equipment without secured access.
4. Personnel Qualifications & Safety Training
Offeror must employ or retain trained operators with documented experience in:
• Steep-slope operations
• Airfield or landfill safety protocols
• OSHA-compliant equipment operation
Documentation Required:
• Summary of crew structure
• Training certifications (OSHA, site safety, equipment operation)
No evidence of slope-specific or regulated-site training.
B. Compliance & Risk Qualifications (Pass/Fail)
5. Wildlife Hazard Response Capability
Offeror must demonstrate the ability to comply with FAA wildlife hazard response requirements, including:
• Immediate work stoppage
• Notification protocols
• Incident documentation
Documentation Required:
• Written wildlife hazard response procedure aligned with FAA Part 139.337
Absence of a formal wildlife response protocol.
6. Environmental Compliance Controls
Offeror must demonstrate understanding of and ability to comply with:
• Herbicide prohibitions on landfill properties
• Soil testing and hydroseeding controls
• EPD slope protection standards
Documentation Required:
• Environmental compliance narrative
• Sample reporting or testing documentation
Use of chemical vegetation controls without documented approval controls.
7. Utility & Infrastructure Damage Prevention
Offeror must demonstrate formal procedures for:
• Utility locates
• Damage prevention
• Restoration and remediation
Documentation Required:
• Written utility coordination and damage prevention plan
No documented protocol for utility verification and liability management.
C. Financial & Legal Readiness (Pass/Fail)
8. Insurance & Risk Coverage (Minimum Thresholds)
Offeror must provide evidence of:
• General Liability
• Auto Liability
• Workers’ Compensation
• Pollution or environmental coverage (if applicable)
Documentation Required:
• Certificates of Insurance meeting City minimums
Inability to meet insurance requirements at SOQ stage.
9. Past Performance & References
Offeror must provide three (3) references from similar projects performed within the last five (5) years.
Documentation Required:
• Client name, contact, project scope, completion date
References unrelated to steep slopes, airports, or landfills.
File details come from the government source that posted it. Updated .