This is a specification document for a Medium Voltage (MV) Powerhouse, a factory-built, single-piece NEMA 3R rated enclosure designed to house MV and LV electrical distribution equipment at NASA's Stennis Space Center facility in Mississippi.

The MV Powerhouse shall be a pre-assembled unit with nominal dimensions of 38 feet length, 15 feet width, and 10 feet 6 inches ceiling height, constructed of interlocking pre-galvanized steel panels on a structural steel grid base engineered for lifting and transport. The enclosure must withstand environmental loads including 20 psf roof and snow loads, 130 mph winds (Exposure C), and Seismic Category C conditions, with insulation values of R-13 (walls), R-19 (roof), and R-12 (floor). The HVAC system consists of two Bard 4-ton wall-mounted units operating at 480V, 3-phase, maintaining interior temperatures between 65°F and 80°F with exterior design range of 0°F to 100°F, featuring lead-lag controller with comprehensive alarm capabilities and Modbus TCP/IP communication.

Structural construction includes W16x26 and C10x15.3 steel members with six SL-30FL lift lugs, 1/4-inch steel plate flooring with 4-inch fire-resistant spray polyurethane foam insulation, and 16-gauge G90 galvanized interlocking panels. Electrical systems include fourteen 4-ft LED interior fixtures, two exterior LED wallpacks with photocells, emergency lighting, a 45 kVA transformer (480V–208Y/120V), 480/277V 600A AC panelboard, 125VDC distribution panel, DC PowerCab system with 100 AH battery string, 5 kV EPR/PVC shielded cables (#350 MCM), and cable tray systems. A full perimeter copper grounding bar loop (2 in × 1/4 in) with stainless steel ground pads and #4/0 lugs provides grounding. Customer-supplied equipment including 5 kV switchgear, MCCs, and breaker lift truck shall be installed by the contractor. Documentation deliverables include PE-sealed structural calculations, HVAC calculations, center-of-gravity documentation, foundation load charts, UL compliance certification, and electronic drawing sets for structural and electrical systems. The powerhouse weighs approximately 66,301 pounds total and ships at dimensions of 38 ft 6 in L × 15 ft 6 in W × 13 ft 2.5 in H, with HVAC units, canopies, and select accessories potentially shipping loose.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

National Aeronautics and Space Administration

NASA Shared Services Center (NSSC) Building 1111, Jerry Hlass Road Stennis Space Center, MS 39529

SPECIFICATION

MEDIUM VOLTAGE (MV) POWERHOUSE

1.0 GENERAL DESCRIPTION

The Medium Voltage (MV) Powerhouse shall be a factory-built, single-piece, NEMA 3R rated enclosure designed to house MV and LV electrical distribution equipment. The structure shall be capable of transport with all internal equipment installed and shall be suitable for general-purpose, non-hazardous industrial applications.

2.0 ENCLOSURE CONFIGURATION

• Construction: NEMA 3R, interlocking pre-galvanized steel wall and roof panels

• Base: Structural steel grid base engineered for lifting, transport, and floor loading

• Dimensions (nominal):

– Length: 38 ft

– Width: 15 ft

– Ceiling Height: 10 ft 6 in

• Configuration: Single-piece factory-assembled unit

• Environmental Design:

– Roof load: 20 psf

– Snow load: 20 psf

– Wind load: 130 mph, Exposure C

– Seismic Category: C

– Interior lighting level: 30 foot-candles at 3 ft elevation

• Insulation Values:

– Walls: R-13

– Roof: R-19

– Floor: R-12

– Personnel doors: R-6.8

3.0 HVAC SYSTEM

• Two (2) Bard 4-ton wall-mounted HVAC units, 480V, 3-phase

• Cooling Redundancy: None

• Temperature Set Points:

– Interior: 65°F minimum / 80°F maximum

– Exterior design range: 0°F to 100°F

• Features: High/low pressure protection, low ambient control, alarm relay, thermostat, anti-cycle protection

• Lead-lag controller with alarms for power loss, refrigerant lockout, high/low temp, smoke/fire, filter replacement, humidity/temperature monitoring, and Modbus TCP/IP communication

• HVAC disconnects and filtered supply/return

• Coated coils and economizers included

• No ductwork included unless required during engineering review

4.0 STRUCTURAL CONSTRUCTION

• Structural steel members: W16x26, C10x15.3, 3×3×3/16 rectangular tube steel frames

• Lift lugs: Six (6) SL-30FL heavy-duty lift lugs

• Floor system:

– 1/4 in steel plate flooring

– 4-inch spray polyurethane foam insulation (fire-resistant)

• Wall & roof assemblies:

– 16-gauge G90 galvanized steel interlocking panels (walls, roof, ceiling)

– Interior walls: 16-gauge galvanized panel system

– Insulation: R-13 fiberglass in walls, R-19 urethane ductboard in ceiling

• Exterior & equipment doors:

– Wind-rated CECO doors (3070 and 6080)

– Panic hardware, drip shields, closures, crash chain, stainless hinges

– Equipment access doors with full gasketing, padlocking hardware, and reinforced design

• Exterior canopies: 4 ft × 3 ft and 7 ft × 3 ft galvanized assemblies (ship loose)

5.0 FINISH SYSTEMS

• Exterior: ANSI-70 polyurethane system, min. 3.0 mils DFT

• Interior: White polyurethane or factory pre-painted galvannealed panels

• Floor coating: High-solids epoxy, minimum 4 mils with non-skid aggregate

• Base exterior and underside coated per corrosion and protective coating specifications

• Touch-up paint provided

6.0 ELECTRICAL SYSTEMS

6.1 General

• All equipment UL listed

• Wiring installed per NEC voltage separation criteria

6.2 Conduit & Cabling

• Interior: EMT conduit, minimum 3/4 in

• Exterior: Rigid galvanized steel conduit, minimum 3/4 in

• Wiring: THHN/THWN copper conductors, #12 AWG minimum

• HVAC controls: #18 AWG thermostat wiring

6.3 Lighting & Power Distribution

• Interior lighting: Fourteen (14) 4-ft LED fixtures (4000 lumens each)

• Exterior wallpacks: Two (2) LED wall-mount fixtures with photocell

• Emergency lighting: Two (2) combination exit/emergency units

• Receptacles:

– Interior 120V duplex

– Exterior GFCI

– Combination switch/receptacle stations

• Distribution Equipment: – Eaton 125VDC distribution panel

– 45 kVA transformer (480V–208Y/120V)

– 480/277V, 600A AC panelboard

– DC PowerCab system with 100 AH battery string

6.4 MV Cable Systems

• 5 kV EPR/PVC shielded cables (#350 MCM) in specified linear footage

• Stress cone termination kits

• Cable trays (18-in and 24-in widths) with straight sections, 90-degree elbows, and full support system

7.0 GROUNDING SYSTEM

• Full perimeter copper grounding bar loop (2 in × 1/4 in)

• Ground pads (stainless steel) and lugs (#4/0)

• Ground drops:

– Major equipment: 4/0 bare copper

– Small equipment: appropriately sized copper ≤ #6

8.0 CUSTOMER-SUPPLIED EQUIPMENT (INSTALLED BY CONTRACTOR)

• 5 kV switchgear (multiple vertical sections)

• 5 kV MCCs (multiple vertical sections)

• Breaker lift truck

• Mechanical bus splicing (booted style, up to 4 bars)

• Control wiring re-terminations (up to 12 per splice)

• Floor fastening by bolting or welding as required

• Heater circuits and control-power circuits routed to panelboards

9.0 CONTROL WIRING

• Up to 150 points for panel-to-panel control wiring (14 AWG THHN)

• Customer must supply complete wiring lists with source/destination terminals, labels, and cable types

• Additional wiring engineering will be billed separately

10.0 ACCESSORIES

• Door signage (“Danger High Voltage”)

• Gutter system with hangers, end caps, downspouts

• Removable floor cutouts with gaskets

• No platforms or stairs provided

• Fire extinguisher (4A:60B:C) included

11.0 DOCUMENTATION & SERVICES

• Structural calculations (PE-sealed)

• HVAC calculations

• Center-of-gravity documentation

• Foundation load chart

• UL compliance certification

• In-house material handling and inspection

• Two days of customer FAT participation

• Electronic drawing sets (structural & electrical) for approval, construction, and as-built conditions

• Project management services

12.0 SHIPPING

• Approx. shipping dimensions:

– 38 ft 6 in L

– 15 ft 6 in W

– 13 ft 2.5 in H

• Weight:

– Empty: 42,996 lb

– Equipment installed: 23,305 lb

– Total: 66,301 lb

• Items such as HVAC units, canopies, and select accessories may ship loose

• All customer-provided equipment must be labeled with required reference numbers

13.0 NOTES

• All lifting shall use provided lift lugs

• During transport, support at lift or pier locations only

• If HVAC units operate with independent thermostats (non-lead-lag), temperature settings shall be staggered by 5–10 degrees

• Spreader bars, rigging, and lifting gear not included unless otherwise specified

File details come from the government source that posted it. Updated .