About this file

This document is a detailed technical specification (DRAFT SPECIFICATION 26 32 15) for stationary engine-generator sets for the Power Independence Mission Control Station at Buckley Space Force Base in Colorado. The specification outlines comprehensive technical requirements for multiple Cummins brand generators rated between 15-2500 kW, including detailed specifications for engine, generator, fuel system, cooling system, electrical components, safety systems, and performance parameters. Key requirements include compliance with EPA Tier 4 Final emissions standards, capability for parallel operation, voltage regulation within 2% from no-load to full-load, and ability to operate in ambient temperatures ranging from -8°F to 99°F.

The specification covers extensive testing protocols, including factory and field inspections, performance tests, vibration analysis, and functional acceptance testing. It mandates specific installation requirements, grounding standards, and requires the contractor to provide comprehensive operation and maintenance manuals, on-site training for government personnel, and demonstration of the generator sets' capabilities. The generators are intended to support critical infrastructure at the mission control station, with a focus on reliability, minimal maintenance, and comprehensive safety and monitoring systems. The document includes extensive technical details on electrical, mechanical, and environmental performance specifications for the generator sets.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Power I ndependence, Mi ssi on Cont r ol St at i on - Buckl ey SFB, CO BUCO00102

SECTI ON TABLE OF CONTENTS

DI VI SI ON 26 - ELECTRI CAL

SECTI ON 26 32 15

ENGI NE- GENERATOR SET STATI ONARY 15- 2500 KW, WI TH AUXI LI ARI ES

05/ 24

PART 1 GENERAL

1. 1 REFERENCES

1. 2 RELATED MATERI ALS

1. 3 SUSTAI NABI LI TY REQUI REMENTS

1. 4 SUBMI TTALS

1. 5 QUALI TY ASSURANCE

1. 5. 1 Conf or mance t o Codes and St andar ds

1. 5. 2 Si t e Wel di ng

1. 5. 3 Vi br at i on Li mi t at i on

1. 5. 4 Tor si onal Anal ysi s

1. 5. 5 Per f or mance Dat a

1. 5. 6 Sei smi c Requi r ement s

1. 5. 7 Exper i ence

1. 5. 8 Fi el d Engi neer

1. 5. 9 Det ai l ed Dr awi ngs

1. 5. 10 Auxi l i ar y Syst ems Engi ne- Gener at or Set and Auxi l i ar y

Equi pment Dr awi ng Requi r ement s

1. 5. 11 Auxi l i ar y Syst ems Dr awi ng Requi r ement s

1. 5. 12 Vi br at i on I sol at i on Syst em Cer t i f i cat i on

1. 5. 13 Fuel Syst em Cer t i f i cat i on

1. 6 DELI VERY, STORAGE, AND HANDLI NG

1. 7 EXTRA MATERI ALS

1. 8 MAI NTENANCE SERVI CES

1. 8. 1 Oper at i on Manual

1. 8. 2 Mai nt enance Manual

1. 8. 3 Assembl ed Oper at i on and Mai nt enance Manual s

1. 9 SI TE CONDI TI ONS

PART 2 PRODUCTS

2. 1 SYSTEM REQUI REMENTS

2. 1. 1 Engi ne- Gener at or Par amet er Schedul e

2. 1. 2 Rat ed Out put Capaci t y

2. 1. 2. 1 Engi ne Emi ssi on Li mi t s

2. 1. 3 Power Rat i ngs

2. 1. 4 Tr ansi ent Response

2. 1. 5 Rel i abi l i t y and Dur abi l i t y

2. 1. 6 Par al l el Oper at i on

2. 1. 7 Load Shar i ng

2. 1. 8 Vi br at i on I sol at i on

2. 1. 9 Har moni c Requi r ement s

2. 1. 10 St ar t i ng Ti me Requi r ement s

2. 2 NAMEPLATES

2. 2. 1 Mat er i al s

2. 2. 2 Cont r ol Devi ces and Oper at i on I ndi cat or s

SECTI ON 26 32 15 Page 1

2. 2. 3 Equi pment

2. 3 SAFETY DEVI CES

2. 4 MATERI ALS AND EQUI PMENT

2. 4. 1 Ci r cui t Br eaker s, Low Vol t age

2. 4. 2 Fi l t er El ement s

2. 4. 3 I nst r ument Tr ansf or mer s

2. 4. 4 Pi pe ( Fuel / Lube- Oi l , Compr essed Ai r , Cool ant , and Exhaust )

2. 4. 4. 1 Fl anges and Fl anged Fi t t i ngs

2. 4. 4. 2 Pi pe Wel di ng Fi t t i ngs

2. 4. 4. 3 Thr eaded Fi t t i ngs

2. 4. 4. 4 Val ves

2. 4. 4. 5 Gasket s

2. 4. 5 Pi pe Hanger s

2. 4. 6 El ect r i c Mot or s

2. 4. 7 Mot or Cont r ol l er s

2. 5 ENGI NE

2. 5. 1 Sub- base Mount i ng

2. 5. 2 Assembl y

2. 5. 3 Tur bochar ger

2. 5. 4 Al t er nat or

2. 5. 5 I nt er cool er

2. 5. 6 Mi scel l aneous Engi ne Accessor i es

2. 5. 7 I nt er cool er

2. 6 FUEL SYSTEM

2. 6. 1 Mai n Pump

2. 6. 2 Fuel Fi l t er

2. 6. 3 Rel i ef / Bypass Val ve

2. 6. 4 Fuel Suppl y Syst em

2. 6. 5 St r ai ner

2. 6. 6 Fuel Oi l Cool er

2. 7 LUBRI CATI ON

2. 7. 1 Lube- Oi l Fi l t er

2. 7. 2 Lube- Oi l Sensor s

2. 7. 3 Pr eci r cul at i on Pump

2. 7. 4 Cr ankcase Dr ai n

2. 8 COOLI NG SYSTEM

2. 8. 1 Cool ant Pumps

2. 8. 2 Heat Exchanger

2. 8. 2. 1 Fi n- Tube- Type Heat Exchanger ( Radi at or )

2. 8. 2. 2 Shel l and U- Tube Type Heat Exchanger

2. 8. 3 Expansi on Tank

2. 8. 4 Ther most at i c Cont r ol Val ve

2. 8. 5 Duct wor k

2. 8. 6 Temper at ur e Sensor s

2. 9 AI R I NTAKE EQUI PMENT

2. 10 EXHAUST SYSTEM

2. 10. 1 Fl exi bl e Sect i ons and Expansi on Joi nt s

2. 10. 2 Exhaust Muf f l er

2. 10. 3 Exhaust Pi pi ng

2. 11 CATALYTI C REDUCTI ON SYSTEMS FOR ENGI NE EXHAUST

2. 11. 1 Cat al yt i c Reduct i on Syst em

2. 11. 2 Syst em Component s

2. 12 PYROMETER

2. 13 EMI SSI ONS

2. 14 STARTI NG SYSTEM

2. 14. 1 Cont r ol s

2. 14. 2 Capaci t y

2. 14. 3 El ect r i cal St ar t i ng

2. 14. 3. 1 Bat t er y

SECTI ON 26 32 15 Page 2

2. 14. 3. 2 Bat t er y Char ger

2. 14. 4 St ar t i ng Ai ds

2. 14. 4. 1 Gl ow Pl ugs

2. 14. 4. 2 Jacket - Cool ant Heat er s

2. 14. 4. 2. 1 St andby Rat ed Set s

2. 14. 5 Exer ci ser

2. 15 GOVERNOR

2. 16 GENERATOR

2. 16. 1 Cur r ent Bal ance

2. 16. 2 Vol t age Bal ance

2. 16. 3 Wavef or m

2. 17 EXCI TER

2. 17. 1 El ect r omagnet i c I nt er f er ence ( EMI ) Suppr essi on

2. 18 VOLTAGE REGULATOR

2. 19 GENERATOR I SOLATI ON AND PROTECTI ON

2. 19. 1 Devi ces

2. 20 SAFETY SYSTEM

2. 20. 1 Audi bl e Si gnal

2. 20. 2 Vi sual Si gnal

2. 20. 3 Al ar ms and Act i on Logi c

2. 20. 3. 1 Shut down

2. 20. 3. 2 Pr obl em

2. 20. 4 Saf et y I ndi cat i ons and Shut downs

2. 20. 5 Ti me- Del ay on Al ar ms

2. 21 SYNCHRONI ZI NG PANEL

2. 22 SURGE PROTECTI ON

2. 23 NEUTRAL GROUNDI NG RESI STOR

2. 24 AUTOMATI C ENGI NE- GENERATOR- SET SYSTEM OPERATI ON

2. 24. 1 Moni t or i ng and Tr ansf er

2. 24. 2 Aut omat i c Par al l el i ng and Loadi ng of Engi ne- Gener at or Set s

2. 25 MANUAL ENGI NE- GENERATOR- SET SYSTEM OPERATI ON

2. 26 BASE

2. 27 THERMAL I NSULATI ON

2. 28 PAI NTI NG AND FI NI SHI NG

2. 29 FACTORY I NSPECTI ON AND TESTS

2. 29. 1 Fact or y I nspect i on

2. 29. 2 Fact or y Test s

PART 3 EXECUTI ON

3. 1 GENERAL I NSTALLATI ON

3. 2 PI PI NG I NSTALLATI ON

3. 2. 1 Suppor t

3. 2. 1. 1 Cei l i ng and Roof

3. 2. 1. 2 Wal l

3. 2. 2 Fl anged Joi nt s

3. 2. 3 Cl eani ng

3. 2. 4 Pi pe Sl eeves

3. 3 ELECTRI CAL I NSTALLATI ON

3. 4 FI ELD PAI NTI NG

3. 5 ONSI TE I NSPECTI ON AND TESTS

3. 5. 1 Test Condi t i ons

3. 5. 1. 1 Dat a

3. 5. 1. 2 Power Fact or

3. 5. 1. 3 Cont r act or Suppl i ed I t ems

3. 5. 1. 4 I nst r ument s

3. 5. 1. 5 Sequence

3. 5. 2 Const r uct i on Test s

3. 5. 2. 1 Pi pi ng Test

SECTI ON 26 32 15 Page 3

3. 5. 2. 2 El ect r i cal Equi pment Test s

3. 5. 3 I nspect i ons

3. 5. 4 Engi ne Test s

3. 5. 5 Gener at or Test s

3. 5. 5. 1 Rout i ne Test s

3. 5. 5. 2 Desi gn Test s

3. 5. 6 Assembl ed Engi ne- Gener at or Set Test s

3. 5. 6. 1 I ni t i al St abi l i zat i on Readi ngs

3. 5. 6. 2 Regul at or Range Test

3. 5. 6. 3 Fr equency Range Test

3. 5. 6. 4 Tr ansi ent Response Test

3. 5. 7 Pr e- oper at i onal Test s

3. 5. 7. 1 Pr ot ect i ve Rel ays

3. 5. 7. 2 I nsul at i on Test

3. 5. 7. 3 Engi ne- Gener at or Connect i on Coupl i ng Test

3. 5. 8 Saf et y Run Test

3. 5. 9 Per f or mance Test s

3. 5. 9. 1 Cont i nuous Engi ne Load Run Test

3. 5. 9. 2 Vol t age and Fr equency Dr oop Test

3. 5. 9. 3 Vol t age Regul at or Range Test

3. 5. 9. 4 Gover nor Adj ust ment Range Test

3. 5. 9. 5 Fr equency and Vol t age St abi l i t y and Tr ansi ent Response

3. 5. 10 Par al l el Oper at i on Test

3. 5. 10. 1 Combi nat i ons

3. 5. 10. 2 Mul t i pl e Combi nat i ons

3. 5. 11 Par al l el Oper at i on Test ( Commer ci al Sour ce)

3. 5. 12 Aut omat i c Oper at i on Test s

3. 6 GROUNDI NG

3. 6. 1 Engi ne- Gener at or Set Gr oundi ng

3. 6. 2 Connect i ons

3. 6. 3 Gr oundi ng and Bondi ng Equi pment

3. 7 START- UP ENGI NEER

3. 8 PREREQUI SI TES FOR FUNCTI ONAL ACCEPTANCE TESTI NG

3. 8. 1 Pi pi ng Test s

3. 8. 2 Per f or mance of Accept ance Checks and Test s

3. 8. 3 Gener at or Set s

3. 8. 3. 1 Aut omat i c Tr ansf er Swi t ches

3. 8. 4 Pr el i mi nar y Oper at i ons

3. 8. 5 Pr el i mi nar y Assembl ed Oper at i on and Mai nt enance Manual s

3. 8. 6 Funct i onal Accept ance Test Pr ocedur e

3. 8. 7 Test Equi pment

3. 9 FI ELD QUALI TY CONTROL

3. 9. 1 Accept ance Checks and Test s

3. 9. 1. 1 Ci r cui t Br eaker s - Low Vol t age I nsul at ed Case/ Mol ded Case

3. 9. 1. 2 Cur r ent Tr ansf or mer s

3. 9. 1. 3 Met er i ng and I nst r ument at i on

3. 9. 1. 4 Bat t er y Syst ems

3. 9. 1. 5 Engi ne- Gener at or Set

3. 9. 1. 6 Gr oundi ng Syst em

3. 9. 2 Funct i onal Accept ance Test s

3. 10 DEMONSTRATI ON

3. 10. 1 I nst r uct or ' s Qual i f i cat i on Resume

3. 10. 2 Tr ai ni ng Pl an

3. 10. 2. 1 Oper at i ng Per sonnel Tr ai ni ng

3. 10. 2. 2 Mai nt enance Per sonnel Tr ai ni ng

3. 11 ONSI TE TRAI NI NG

3. 12 POSTED DATA AND I NSTRUCTI ONS

3. 13 ACCEPTANCE

SECTI ON 26 32 15 Page 4

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 26 32 15 Page 5

SECTI ON 26 32 15

ENGI NE- GENERATOR SET STATI ONARY 15- 2500 KW, WI TH AUXI LI ARI ES

05/ 24

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY OF MECHANI CAL ENGI NEERS ( ASME)

ASME B16. 1 ( 2020) Gr ay I r on Pi pe Fl anges and Fl anged Fi t t i ngs Cl asses 25, 125, and 250

ASME B16. 3 ( 2021) Mal l eabl e I r on Thr eaded Fi t t i ngs, Cl asses 150 and 300

ASME B16. 5 ( 2020) Pi pe Fl anges and Fl anged Fi t t i ngs NPS 1/ 2 Thr ough NPS 24 Met r i c/ I nch St andar d

ASME B16. 9 ( 2018) Fact or y- Made Wr ought But t wel di ng Fi t t i ngs

ASME B16. 11 ( 2022) For ged Fi t t i ngs, Socket - Wel di ng and Thr eaded

ASME B16. 21 ( 2021) Nonmet al l i c Fl at Gasket s f or Pi pe Fl anges

ASME B31. 1 ( 2022) Power Pi pi ng

ASME B31. 3 ( 2022; Er r at a 2023) Pr ocess Pi pi ng

ASME BPVC SEC I X ( 2017; Er r at a 2018) BPVC Sect i on I X- Wel di ng, Br azi ng and Fusi ng Qual i f i cat i ons

ASME BPVC SEC VI I I D1 ( 2019) BPVC Sect i on VI I I - Rul es f or Const r uct i on of Pr essur e Vessel s Di v i s i on 1

ASSOCI ATI ON OF EDI SON I LLUMI NATI NG COMPANI ES ( AEI C)

AEI C CS8 ( 2013) Speci f i cat i on f or Ext r uded Di el ect r i c Shi el ded Power Cabl es Rat ed 5 Thr ough 46 kV

ASTM I NTERNATI ONAL ( ASTM)

ASTM A53/ A53M ( 2024) St andar d Speci f i cat i on f or Pi pe, St eel , Bl ack and Hot - Di pped, Zi nc- Coat ed, Wel ded and Seaml ess

ASTM A106/ A106M ( 2019a) St andar d Speci f i cat i on f or

SECTI ON 26 32 15 Page 6

Seaml ess Car bon St eel Pi pe f or Hi gh- Temper at ur e Ser vi ce

ASTM A126 ( 2004; R 2023) St andar d Speci f i cat i on f or Gr ay I r on Cast i ngs f or Val ves, Fl anges, and Pi pe Fi t t i ngs

ASTM A181/ A181M ( 2014; R 2020) St andar d Speci f i cat i on f or Car bon St eel For gi ngs, f or Gener al - Pur pose Pi pi ng

ASTM A193/ A193M ( 2023) St andar d Speci f i cat i on f or Al l oy- St eel and St ai nl ess St eel Bol t i ng Mat er i al s f or Hi gh- Temper at ur e Ser vi ce and Ot her Speci al Pur pose Appl i cat i ons

ASTM A194/ A194M ( 2023) St andar d Speci f i cat i on f or Car bon St eel , Al l oy St eel , and St ai nl ess St eel Nut s f or Bol t s f or Hi gh- Pr essur e or Hi gh- Temper at ur e Ser vi ce, or Bot h

ASTM A234/ A234M ( 2023a) St andar d Speci f i cat i on f or Pi pi ng Fi t t i ngs of Wr ought Car bon St eel and Al l oy St eel f or Moder at e and Hi gh Temper at ur e Ser vi ce

ASTM B395/ B395M ( 2018) St andar d Speci f i cat i on f or U- Bend Seaml ess Copper and Copper Al l oy Heat Exchanger and Condenser Tubes

ASTM D975 ( 2020) St andar d Speci f i cat i on f or Di esel Fuel Oi l s

ELECTRI CAL GENERATI NG SYSTEMS ASSOCI ATI ON ( EGSA)

EGSA 101P ( 1995) Per f or mance St andar d f or Engi ne Dr i ven Gener at or Set s

I NSTI TUTE OF ELECTRI CAL AND ELECTRONI CS ENGI NEERS ( I EEE)

I EEE 1 ( 2000; R 2011) Gener al Pr i nci pl es f or Temper at ur e Li mi t s i n t he Rat i ng of El ect r i c Equi pment and f or t he Eval uat i on of El ect r i cal I nsul at i on

I EEE 43 ( 2013) Recommended Pr act i ce f or Test i ng I nsul at i on Resi st ance of Rot at i ng Machi ner y

I EEE 48 ( 2020) Test Pr ocedur es and Requi r ement s f or Al t er nat i ng- Cur r ent Cabl e Ter mi nat i ons Used on Shi el ded Cabl es Havi ng Lami nat ed I nsul at i on Rat ed 2. 5 kV t hr ough 765 kV or Ext r uded I nsul at i on Rat ed 2. 5 kV t hr ough 500 kV

I EEE 81 ( 2012) Gui de f or Measur i ng Ear t h Resi st i v i t y, Gr ound I mpedance, and Ear t h Sur f ace Pot ent i al s of a Gr ound Syst em

SECTI ON 26 32 15 Page 7

I EEE 100 ( 2000; Ar chi ved) The Aut hor i t at i ve Di ct i onar y of I EEE St andar ds Ter ms

I EEE 115 ( 2019) Gui de f or Test Pr ocedur es f or Synchr onous Machi nes: Par t I Accept ance and Per f or mance Test i ng; Par t I I Test Pr ocedur es and Par amet er Det er mi nat i on f or Dynami c Anal ysi s

I EEE 120 ( 1989; R 2007) Mast er Test Gui de f or El ect r i cal Measur ement s i n Power Ci r cui t s

I EEE 404 ( 2012) St andar d f or Ext r uded and Lami nat ed Di el ect r i c Shi el ded Cabl e Joi nt s Rat ed 2500 V t o 500, 000 V

I EEE 519 ( 2022) St andar d f or Har moni c Cont r ol i n El ect r i cal Power Syst ems

I EEE C2 ( 2023) Nat i onal El ect r i cal Saf et y Code

I EEE C50. 12 ( 2005; R 2010) St andar d f or Sal i ent Pol e 50 HZ and 60 Hz Synchr onous Gener at or s and Gener at i on/ Mot or s f or Hydr aul i c Tur bi ne Appl i cat i ons Rat ed 5 MVA and above

I EEE C57. 13. 1 ( 2006; R 2012) Gui de f or Fi el d Test i ng of Rel ayi ng Cur r ent Tr ansf or mer s

I NTERNATI ONAL CODE COUNCI L ( I CC)

I CC I BC ( 2024) I nt er nat i onal Bui l di ng Code

I NTERNATI ONAL ELECTRI CAL TESTI NG ASSOCI ATI ON ( NETA)

NETA ATS ( 2021) St andar d f or Accept ance Test i ng Speci f i cat i ons f or El ect r i cal Power Equi pment and Syst ems

I NTERNATI ONAL ELECTROTECHNI CAL COMMI SSI ON ( I EC)

I EC 60034- 2A ( 1974; ED 1. 0) Rot at i ng El ect r i cal Machi nes Par t 2: Met hods f or Det er mi ni ng Losses and Ef f i c i ency of Rot at i ng El ect r i cal Machi ner y f r om Test s ( Excl udi ng Machi nes f or Tr act i on Vehi c l es) Measur ement of Losses by t he Cal or i met r i c Met hod

I NTERNATI ONAL ORGANI ZATI ON FOR STANDARDI ZATI ON ( I SO)

I SO 3046 ( 2002, 2006, 2009, 2001) Reci pr ocat i ng I nt er nal Combust i on Engi nes - Per f or mance- - Par t 1, 3, 4, 5, 6

MANUFACTURERS STANDARDI ZATI ON SOCI ETY OF THE VALVE AND FI TTI NGS

I NDUSTRY ( MSS)

MSS SP- 58 ( 2018) Pi pe Hanger s and Suppor t s -

SECTI ON 26 32 15 Page 8

Mat er i al s, Desi gn and Manuf act ur e, Sel ect i on, Appl i cat i on, and I nst al l at i on

MSS SP- 70 ( 2011) Gr ay I r on Gat e Val ves, Fl anged and Thr eaded Ends

MSS SP- 71 ( 2018) Gr ay I r on Swi ng Check Val ves, Fl anged and Thr eaded Ends

MSS SP- 80 ( 2019) Br onze Gat e, Gl obe, Angl e and Check Val ves

MSS SP- 85 ( 2011) Gr ay I r on Gl obe & Angl e Val ves Fl anged and Thr eaded Ends

NATI ONAL ELECTRI CAL MANUFACTURERS ASSOCI ATI ON ( NEMA)

NEMA I CS 2 ( 2000; R 2020) I ndust r i al Cont r ol and Syst ems Cont r ol l er s, Cont act or s, and Over l oad Rel ays Rat ed 600 V

NEMA I CS 6 ( 1993; R 2016) I ndust r i al Cont r ol and Syst ems: Encl osur es

NEMA MG 1 ( 2021) Mot or s and Gener at or s

NEMA WC 74/ I CEA S- 93- 639 ( 2022) 5- 46 kV Shi el ded Power Cabl e f or Use i n t he Tr ansmi ssi on and Di st r i but i on of El ect r i c Ener gy

NEMA/ ANSI C12. 11 ( 2006; R 2019) I nst r ument Tr ansf or mer s f or Revenue Met er i ng, 10 kV BI L t hr ough 350 kV BI L ( 0. 6 kV NSV t hr ough 69 kV NSV)

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 30 ( 2024) Fl ammabl e and Combust i bl e Li qui ds Code

NFPA 37 ( 2024) St andar d f or t he I nst al l at i on and Use of St at i onar y Combust i on Engi nes and Gas Tur bi nes

NFPA 54 ( 2024) Nat i onal Fuel Gas Code

NFPA 58 ( 2024; TI A 23- 1) Li quef i ed Pet r ol eum Gas Code

NFPA 70 ( 2023; ERTA 7 2023; TI A 23- 15) Nat i onal El ect r i cal Code

NFPA 110 ( 2022) St andar d f or Emer gency and St andby Power Syst ems

SOCI ETY OF AUTOMOTI VE ENGI NEERS I NTERNATI ONAL ( SAE)

SAE ARP892 ( 1965; R 1994) DC St ar t er - Gener at or , Engi ne

SAE J537 ( 2016) St or age Bat t er i es

SECTI ON 26 32 15 Page 9

U. S. DEPARTMENT OF DEFENSE ( DOD)

MI L- STD- 461 ( 2015; Rev G) Requi r ement s f or t he Cont r ol of El ect r omagnet i c I nt er f er ence Char act er i st i cs of Subsyst ems and Equi pment

UFC 3- 301- 01 ( 2023; wi t h Change 1, 2023) St r uct ur al Engi neer i ng

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

40 CFR 60 St andar ds of Per f or mance f or New St at i onar y Sour ces

UNDERWRI TERS LABORATORI ES ( UL)

UL 467 ( 2022) UL St andar d f or Saf et y Gr oundi ng and Bondi ng Equi pment

UL 489 ( 2016; Rev 2019) UL St andar d f or Saf et y Mol ded- Case Ci r cui t Br eaker s, Mol ded- Case Swi t ches and Ci r cui t - Br eaker Encl osur es

UL 1236 ( 2015; Repr i nt Feb 2021) UL St andar d f or Saf et y Bat t er y Char ger s f or Char gi ng Engi ne- St ar t er Bat t er i es

1. 2 RELATED MATERI ALS

Sect i on 26 13 13 METAL- CLAD SWI TCHGEAR, Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM, Sect i on 26 05 48 SI ESMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENTand Sect i on 26 08 00 APPARATUS I NSPECTI ON AND TESTI NG appl y t o t hi s sect i on, except as modi f i ed her ei n.

1. 3 SUSTAI NABI LI TY REQUI REMENTS

Mat er i al s i n t hi s t echni cal speci f i cat i on may cont r i but e t owar ds cont r act compl i ance wi t h sust ai nabi l i t y r equi r ement s. See Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG f or pr oj ect r equi r ement s.

1. 4 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e [ f or Cont r act or Qual i t y Cont r ol appr oval . ] [ f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . ]

On r e- submi t t al s, t he cont r act or shal l i ncl ude t he acknowl edgement of and/ or r esponse t o al l comment s f r om t he pr i or submi t t al , i ncl udi ng i dent i f i cat i on of wher e changes ar e made i ncor por at i ng t he r evi ew comment s. Changes t o pr evi ousl y- appr oved i t ems or subpor t i ons of i t ems shal l be c l ear l y i dent i f i ed and i ncl ude a st at ement r egar di ng t he pur pose of t he change.

When submi t t i ng mul t i pl e i t ems, c l ear l y i dent i f y t he pages r el evant t o t he speci f i c i t ems r ef er enced by i t em number and i t em name. A cover sheet wi t h t he i t em number and i t em name i mmedi at el y bef or e t he f i r st page of

SECTI ON 26 32 15 Page 10 i nf or mat i on per t ai ni ng t o a gi ven i t em i s accept abl e.

On pr oduct dat a cut sheet s submi t t ed wi t h mul t i pl e var i ant s ( model s, opt i ons, et c. ) , i dent i f y t he speci f i c model t ype( s) , opt i on( s) , et c. , whi ch wi l l be used.

Wher e mul t i pl e par t i es cont r i but e t o t he cont ent s of a par t i cul ar submi t t al i t em or l ogi cal l y- gr oup set of i t ems, al l i t ems shal l be submi t t ed i n one cohesi ve t r ansmi t t al package f or r evi ew ( t hat i s, por t i ons of i t ems shal l not be pi ecemeal ed acr oss mul t i pl e submi t t al s and/ or i nappr opr i at el y- assi gned submi t t al i t ems) .

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 02 Shop Dr awi ngs

Engi ne- Gener at or Set and Auxi l i ar y Equi pment ; G, DO

Auxi l i ar y Syst ems; G, DOC

Det ai l ed Dr awi ngs; G, DOC

Accept ance; G, DOC

SD- 03 Pr oduct Dat a

Har moni c Requi r ement s; G, DOC

Engi ne- Gener at or Set Ef f i c i enci es; G, DOC

Emi ssi ons; G, DOC f i l t er s; G, DOC speci al t ool s; G, DCO

Remot e Al ar m Annunci at or ; G, DCO

Engi ne- Gener at or Par amet er Schedul e; G, DO

Heat Exchanger ; ; G, DO

Gener at or ; ; G, DOC Manuf act ur er ' s Cat al og Si t e Wel di ng; ; G, RO

Spar e Par t s; ; G, RO

Onsi t e Tr ai ni ng: ; G, RO

Vi br at i on- I sol at i on; ; G, DO

Post ed Dat a and I nst r uct i ons; G, RO

I nst r uct i ons; G, RO

Exper i ence Fi el d Engi neer ; ; G, RO

SECTI ON 26 32 15 Page 11

Gener al I nst al l at i on; ; G, RO

Exci t er SD- 05 Desi gn Dat a

Per f or mance Cr i t er i a; ; G, DO

Sound Li mi t at i ons; G, DO

I nt egr al Mai n Fuel St or age Tank

Day Tank

Power Fact or

Heat Exchanger ; ; G, DO

Ti me- Del ay on Al ar ms; ; G, DO

Cool i ng Syst em; G, DO

Vi br at i on I sol at i on; G, DO

Bat t er y Char ger ; G, DO

Capaci t y Cal cul at i ons f or Engi ne- Gener at or Set ; G, DO

Br ake Mean Ef f ect i ve Pr essur e ( BMEP) Cal cul at i ons; G

Tor si onal Vi br at i on St r ess Anal ysi s Comput at i ons; G, DO

Capaci t y Cal cul at i ons f or Bat t er i es; G

Tur bochar ger Load Cal cul at i ons; G

SD- 06 Test Repor t s

Per f or mance Test s; ; G, ROC

Fact or y I nspect i on and Test s; G, ROC

Fact or y Test s; G, RO;

Onsi t e I nspect i on and Test s; G, RO

Accept ance Checks and Test s; G, DO

Funct i onal Accept ance Test s; G, DO

Mai nt enance Pr ocedur es; G, RO

Oper at i on and Mai nt enance Manual s; G, RO

I nspect i ons; G, RO

Funct i onal Accept ance Test Pr ocedur e; G, DO

SD- 07 Cer t i f i cat es

SECTI ON 26 32 15 Page 12

Cool i ng Syst em; G, RO; G, RO

Vi br at i on I sol at i on; G, RO; G, RO

Pr ot ot ype Test ; G, RO; G, RO

Rel i abi l i t y and Dur abi l i t y ; G, RO; G, RO

Fuel Syst em Cer t i f i cat i on; G, RO

St ar t - Up Engi neer ; G, RO

I nst r uct or ' s Qual i f i cat i on Resume; G

Engi ne Emi ssi on Li mi t s; G, RO

Sound Li mi t at i ons

Si t e Vi s i t

Cur r ent Bal ance

Mat er i al s and Equi pment ; G, RO; G, RO

Fact or y I nspect i on and Test s

SD- 09 Manuf act ur er ' s Fi el d Repor t s

Engi ne Test s; G, RO

Gener at or Test s; G, RO

Assembl ed Engi ne- Gener at or Set Test s; G, RO

SD- 10 Oper at i on and Mai nt enance Dat a

Pr el i mi nar y Assembl ed Oper at i on and Mai nt enance Manual s; G, RO

Submi t i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE DATA and t he par agr aph ASSEMBLED OPERATI ON AND

MAI NTENANCE MANUALS.

SD- 11 Cl oseout Submi t t al s

Post ed Dat a and I nst r uct i ons; G, RO

Tr ai ni ng Pl an; G, RO

1. 5 QUALI TY ASSURANCE

1. 5. 1 Conf or mance t o Codes and St andar ds

Wher e equi pment i s speci f i ed t o conf or m t o r equi r ement s of any code or st andar d such as UL, NEMA, et c. , t he desi gn, f abr i cat i on and i nst al l at i on must al so conf or m t o t he code.

1. 5. 2 Si t e Wel di ng

Wel d st r uct ur al member s i n accor dance wi t h Sect i on 05 05 23. 16 STRUCTURAL

SECTI ON 26 32 15 Page 13

WELDI NG. For al l ot her wel di ng, qual i f y pr ocedur es and wel der s i n accor dance wi t h ASME BPVC SEC I X.

a. Wel di ng pr ocedur es qual i f i ed by ot her s, and wel der s and wel di ng oper at or s qual i f i ed by a pr evi ousl y qual i f i ed empl oyer may be accept ed as per mi t t ed by ASME B31. 1.

b. Submi t a copy of qual i f y i ng pr ocedur es and a l i s t of names and i dent i f i cat i on symbol s of qual i f i ed wel der s and wel di ng oper at or s.

c. Submi t a l et t er l i s t i ng t he wel der qual i f y i ng pr ocedur es f or each wel der , compl et e wi t h suppor t i ng dat a such as t est pr ocedur es used, what was t est ed t o, and a l i s t of t he names of al l wel der s and t hei r i dent i f i cat i on symbol s.

d. Per f or m wel der qual i f i cat i on t est s f or each wel der whose qual i f i cat i ons ar e not i n compl i ance wi t h t he r ef er enced st andar ds.

Not i f y t he Cont r act i ng Of f i cer 24 hour s i n advance of qual i f i cat i on t est s whi ch must be per f or med at t he wor k s i t e, i f pr act i cal .

e. The wel der or wel di ng oper at or must appl y t he per sonal l y assi gned symbol near each wel d made as a per manent r ecor d.

1. 5. 3 Vi br at i on Li mi t at i on

Li mi t t he maxi mum engi ne- gener at or set v i br at i on i n t he hor i zont al , ver t i cal , and axi al di r ect i ons t o 6 mi l s ( peak- peak RMS) , wi t h an over al l vel oci t y l i mi t of 0. 95 i nches/ second RMS, at r at ed speed f or al l l oads t hr ough 110 per cent of r at ed speed. [ I nst al l a v i br at i on i sol at i on syst em bet ween t he f l oor and t he base t o l i mi t t he maxi mum vi br at i on t r ansmi t t ed t o t he f l oor at al l f r equenci es t o a maxi mum of [ _____] ( peak f or ce) . ] [ The engi ne- gener at or set must be pr ovi ded wi t h v i br at i on i sol at i on i n accor dance wi t h t he manuf act ur er ' s st andar d r ecommendat i on. ] Wher e t he vi br at i on i sol at i on syst em does not secur e t he base t o t he st r uct ur e f l oor or uni t f oundat i on, pr ovi de sei smi c r est r ai nt s i n accor dance wi t h t he sei smi c par amet er s speci f i ed.

1. 5. 4 Tor si onal Anal ysi s

Submi t t or s i onal anal ysi s i ncl udi ng pr ot ot ype t est i ng or cal cul at i ons whi ch cer t i f y and demonst r at e t hat no damagi ng or danger ous t or si onal v i br at i ons wi l l occur when t he pr i me mover i s connect ed t o t he gener at or , at synchr onous speeds, pl us/ mi nus 10 per cent .

1. 5. 5 Per f or mance Dat a

Submi t v i br at i on i sol at i on syst em per f or mance dat a f or t he r ange of f r equenci es gener at ed by t he engi ne- gener at or set dur i ng oper at i on f r om no l oad t o f ul l l oad and t he maxi mum vi br at i on t r ansmi t t ed t o t he f l oor .

Al so submi t a descr i pt i on of sei smi c qual i f i cat i on of t he engi ne- gener at or mount i ng, base, and vi br at i on i sol at i on.

1. 5. 6 Sei smi c Requi r ement s

[ Sei smi c r equi r ement s must be i n accor dance wi t h UFC 3- 301- 01 and Sect i ons 13 48 73 SEI SMI C CONTROL FOR MI SCELLANEOUS EQUI PMENT, 23 05 48. 19 [ SEI SMI C] BRACI NG FOR HVAC and 26 05 48 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT] [ as shown on t he dr awi ngs] .

SECTI ON 26 32 15 Page 14

1. 5. 7 Exper i ence

Each component manuf act ur er must have a mi ni mum of 3 year s ' exper i ence i n t he manuf act ur e, assembl y and sal e of component s used wi t h st at i onar y engi ne- gener at or set s f or commer ci al and i ndust r i al use. The engi ne- gener at or set manuf act ur er / assembl er must have a mi ni mum of 3 year s ' exper i ence i n t he manuf act ur e, assembl y and sal e of st at i onar y engi ne- gener at or set s f or commer ci al and i ndust r i al use. Submi t a st at ement showi ng and ver i f y i ng t hese r equi r ement s.

1. 5. 8 Fi el d Engi neer

The engi ne- gener at or set manuf act ur er or assembl er must f ur ni sh a qual i f i ed f i el d engi neer t o super vi se t he compl et e i nst al l at i on of t he engi ne- gener at or set , assi st i n t he per f or mance of t he onsi t e t est s, and i nst r uct per sonnel as t o t he oper at i onal and mai nt enance f eat ur es of t he equi pment . The f i el d engi neer must have at t ended t he engi ne gener at or manuf act ur er ' s t r ai ni ng cour ses on i nst al l at i on and oper at i on and mai nt enance of engi ne gener at or set s. Submi t a l et t er l i s t i ng t he qual i f i cat i ons, school s, f or mal t r ai ni ng, and exper i ence of t he f i el d engi neer .

1. 5. 9 Det ai l ed Dr awi ngs

Submi t det ai l ed dr awi ngs showi ng t he f ol l owi ng:

a. Base- mount ed equi pment , compl et e wi t h base and at t achment s, i ncl udi ng anchor bol t t empl at e and r ecommended cl ear ances f or mai nt enance and oper at i on.

b. St ar t i ng syst em.

c. Fuel syst em.

d. Cool i ng syst em.

e. Exhaust syst em.

f . El ect r i c wi r i ng of r el ays, br eaker s, pr ogr ammabl e cont r ol l er s, and swi t ches i ncl udi ng si ngl e l i ne and wi r i ng di agr ams.

g. Lubr i cat i on syst em, i ncl udi ng pi pi ng, pumps, st r ai ner s, f i l t er s, [ heat exchanger s f or l ube oi l and t ur bochar ger cool i ng, ] [ el ect r i c heat er , ] cont r ol s and wi r i ng.

h. Locat i on, t ype, and descr i pt i on of v i br at i on i sol at i on devi ces f or al l appl i cat i ons.

i . The saf et y syst em, i ncl udi ng wi r i ng schemat i cs.

j . One- l i ne schemat i c and wi r i ng di agr ams of t he gener at or , exci t er , r egul at or , gover nor , and i nst r ument at i on.

k. Panel l ayout s.

l . Mount i ng and suppor t f or each panel and maj or pi ece of el ect r i cal equi pment .

m. Engi ne- gener at or set r i ggi ng poi nt s and l i f t i ng i nst r uct i ons.

SECTI ON 26 32 15 Page 15

1. 5. 10 Auxi l i ar y Syst ems Engi ne- Gener at or Set and Auxi l i ar y Equi pment Dr awi ng Requi r ement s

Submi t dr awi ngs per t ai ni ng t o t he engi ne- gener at or set and auxi l i ar y equi pment , i ncl udi ng but not l i mi t ed t o t he f ol l owi ng:

a. Cer t i f i ed out l i ne, gener al ar r angement ( set t i ng pl an) , and anchor bol t det ai l s. Show t ot al wei ght and cent er of gr avi t y of assembl ed equi pment on t he st eel sub- base.

b. Det ai l ed el ement ar y, schemat i c wi r i ng, and i nt er connect i on di agr ams of t he engi ne st ar t i ng syst em, j acket cool ant heat i ng syst em, engi ne pr ot ect i ve devi ces, engi ne al ar m devi ces, engi ne speed gover nor syst em, gener at or and exci t at i on syst em, and ot her i nt egr al devi ces.

c. Det ai l ed el ement ar y, schemat i c wi r i ng; and i nt er connect i on di agr ams of t he f uel syst em, st ar t i ng bat t er y syst em, engi ne- gener at or cont r ol panel , gener at or c i r cui t br eaker [ , and r emot e al ar m annunci at or ] .

d. Di mensi onal dr awi ngs or cat al og cut s of exhaust s i l encer s, r adi at or , f uel day t anks, f uel oi l cool er , val ves and pumps, i nt ake f i l t er s, v i br at i on i sol at or s, and ot her auxi l i ar y equi pment not i nt egr al wi t h t he engi ne- gener at or set .

1. 5. 11 Auxi l i ar y Syst ems Dr awi ng Requi r ement s

Submi t dr awi ngs showi ng f l oor pl an ar r angement of [ exhaust , ] [ ai r i nt ake, ] [ f uel oi l cool er , ] [ and] [ j acket cool ant wat er ] syst ems i ncl udi ng ar r angement of pi pi ng and pi pe si zes.

1. 5. 12 Vi br at i on I sol at i on Syst em Cer t i f i cat i on

Submi t cer t i f i cat i on f r om t he manuf act ur er t hat t he v i br at i on i sol at i on syst em wi l l r educe t he vi br at i on t o t he l i mi t s speci f i ed i n t he par agr aph

VI BRATI ON I SOLATI ON.

1. 5. 13 Fuel Syst em Cer t i f i cat i on

When t he f uel syst em r equi r es a f uel oi l cool er as descr i bed i n t he par agr aph FUEL OI L COOLER, submi t cer t i f i cat i on f r om t he engi ne manuf act ur er t hat t he f uel syst em desi gn i s sat i sf act or y.

1. 6 DELI VERY, STORAGE, AND HANDLI NG

Pr oper l y pr ot ect mat er i al s and equi pment , i n accor dance wi t h t he manuf act ur er s r ecommended st or age pr ocedur es, bef or e, dur i ng, and af t er i nst al l at i on. Pr ot ect st or ed i t ems f r om t he weat her and cont ami nat i on.

Dur i ng i nst al l at i on, cap pi pi ng and si mi l ar openi ngs t o keep out di r t and ot her f or ei gn mat t er .

Del i ver equi pment on pal l et s or bl ocki ng wr apped i n heavy- dut y pl ast i c, seal ed t o pr ot ect par t s and assembl i es f r om moi st ur e and di r t . Pr ot ect and pr epar e bat t er i es f or shi pment as r ecommended by t he bat t er y manuf act ur er . St or e auxi l i ar y equi pment at t he s i t e i n cover ed encl osur es, pr ot ect ed f r om at mospher i c moi st ur e, di r t , and gr ound wat er .

SECTI ON 26 32 15 Page 16

1. 7 EXTRA MATERI ALS

Pr ovi de [ t wo] [ _____] set s of speci al t ool s and [ t wo] [ _____] set s of f i l t er s r equi r ed f or mai nt enance. Speci al t ool s ar e t hose t hat onl y t he manuf act ur er pr ovi des, f or speci al pur poses, or t o r each ot her wi se i naccessi bl e par t s. One handset must be pr ovi ded f or each el ect r oni c gover nor when r equi r ed t o i ndi cat e and/ or change gover nor r esponse set t i ngs. Fur ni sh 4 l i t er s one gal l on of i dent i cal pai nt used on engi ne- gener at or set i n manuf act ur er ' s seal ed cont ai ner wi t h each engi ne- gener at or set .

Wr enches and t ool s speci f i cal l y desi gned and r equi r ed t o wor k on t he new equi pment , whi ch ar e not commer ci al l y avai l abl e as st andar d mechani c ' s t ool s, must be f ur ni shed t o t he Cont r act i ng Of f i cer .

Pr ovi de pr oposed oper at i ng i nst r uct i ons f or t he engi ne- gener at or set and auxi l i ar y equi pment l ami nat ed bet ween mat t e- sur f ace t her mopl ast i c sheet s and sui t abl e f or pl acement adj acent t o cor r espondi ng equi pment . Af t er appr oval , i nst al l oper at i ng i nst r uct i ons wher e di r ect ed.

1. 8 MAI NTENANCE SERVI CES

Submi t t he oper at i on and mai nt enance manual s and have t hem appr oved pr i or t o commenci ng onsi t e t est s.

1. 8. 1 Oper at i on Manual

Pr ovi de [ t hr ee] [ _____] copi es of t he [ manuf act ur er s st andar d oper at i on manual ] [ oper at i on manual i n 8- 1/ 2 by 11 i nch t hr ee- r i ng bi nder s] .

Sect i ons must be separ at ed by heavy pl ast i c di v i der s wi t h t abs whi ch i dent i f y t he mat er i al i n t he sect i on. Fol d dr awi ngs wi t h t he t i t l e bl ock v i s i bl e, and pl aced i n 8- 1/ 2 by 11 i nch pl ast i c pocket s wi t h r ei nf or ced hol es. The manual must i ncl ude:

a. St ep- by- st ep pr ocedur es f or syst em st ar t up, oper at i on, and shut down;

b. Dr awi ngs, di agr ams, and si ngl e- l i ne schemat i cs t o i l l ust r at e and def i ne t he el ect r i cal , mechani cal , and hydr aul i c syst ems wi t h t hei r cont r ol s, al ar ms, and saf et y syst ems;

c. Pr ocedur es f or i nt er f ace and i nt er act i on wi t h r el at ed syst ems t o i ncl ude, ut i l i t y power and par al l el i ng swi t chgear , [ aut omat i c t r ansf er swi t ches, ] [ , f i r e al ar m/ suppr essi on syst ems, and ] [ l oad sheddi ng syst ems] [ uni nt er r upt i bl e power suppl i es] [ _____] .

1. 8. 2 Mai nt enance Manual

Pr ovi de [ t hr ee] [ _____] copi es of t he [ manuf act ur er s st andar d mai nt enance manual ] [ mai nt enance manual cont ai ni ng t he i nf or mat i on descr i bed bel ow i n 8- 1/ 2 x 11 i nch t hr ee- r i ng bi nder s] . Separ at e each sect i on by a heavy pl ast i c di v i der wi t h t abs. Fol d dr awi ngs wi t h t he t i t l e bl ock v i s i bl e, and pl aced i n pl ast i c pocket s wi t h r ei nf or ced hol es. The manual must i ncl ude:

a. [ Pr ocedur es f or each r out i ne mai nt enance i t em. ] [ Pr ocedur es f or t r oubl eshoot i ng. ] [ Fact or y- ser vi ce, t ake- down over haul , and r epai r ser vi ce manual s, wi t h par t s l i s t s. ]

b. The manuf act ur er ' s r ecommended mai nt enance schedul e.

SECTI ON 26 32 15 Page 17

c. A component l i s t whi ch i ncl udes t he manuf act ur er ' s name, addr ess, t ype or st y l e, model or ser i al number , r at i ng, and cat al og number f or t he maj or component s.

d. A l i s t of spar e par t s f or each pi ece of equi pment and a compl et e l i s t of mat er i al s and suppl i es needed f or oper at i on.

1. 8. 3 Assembl ed Oper at i on and Mai nt enance Manual s

The cont ent s of t he assembl ed oper at i on and mai nt enance manual s must i ncl ude t he manuf act ur er ' s O&M i nf or mat i on r equi r ed by t he par agr aph SD- 10, OPERATI ON AND MAI NTENANCE DATA and t he manuf act ur er ' s O&M i nf or mat i on speci f i ed i n Sect i on 26 36 23 AUTOMATI C TRANSFER SWI TCHES AND

BY- PASS/ I SOLATI ON SWI TCH.

a. Manual s must be i n separ at e books or vol umes, assembl ed and bound secur el y i n dur abl e, har d cover ed, wat er r esi st ant bi nder , and i ndexed by maj or assembl y and component s i n sequent i al or der .

b. A t abl e of cont ent s ( i ndex) must be made par t of t he assembl ed O&M.

The manual must be assembl ed i n t he or der not ed i n t abl e of cont ent s.

c. The cover sheet or bi nder on each vol ume of t he manual s must be i dent i f i ed and mar ked wi t h t he wor ds, " Oper at i on and Mai nt enance Manual . "

1. 9 SI TE CONDI TI ONS

Pr ot ect t he component s of t he engi ne- gener at or set , i ncl udi ng cool i ng syst em component s, pumps, f ans, and si mi l ar auxi l i ar i es when not oper at i ng and pr ovi de component s capabl e of t he speci f i ed out put s i n t he f ol l owi ng envi r onment :

a. Si t e Locat i on: Buckl ey, CO[ _____]

b. Si t e El evat i on: 5, 663[ _____] f eet above mean sea l evel .

c. Ambi ent Temper at ur es:

( 1) Maxi mum 99[ _____] degr ees F dr y bul b, 59[ _____] degr ees F wet bul b.

( 2) Mi ni mum - 8[ _____] degr ees F dr y bul b.

d. Desi gn Wi nd Vel oci t y: [ _____] mph.

e. Pr evai l i ng Wi nd Di r ect i on: [ _____] f d. Sei smi c Zone: Zone C[ _____] as def i ned by I CC I BC.

PART 2 PRODUCTS

2. 1 SYSTEM REQUI REMENTS

a. Pr ovi de and i nst al l each engi ne- gener at or set compl et e and t ot al l y f unct i onal , wi t h al l necessar y anci l l ar y equi pment t o i ncl ude: ai r f i l t r at i on; st ar t i ng syst em; gener at or cont r ol s, pr ot ect i on, and i sol at i on; i nst r ument at i on; l ubr i cat i on; f uel syst em; cool i ng syst em;

and engi ne exhaust syst em. Each engi ne- gener at or set must sat i sf y t he

SECTI ON 26 32 15 Page 18 r equi r ement s speci f i ed i n t he Engi ne- Gener at or Par amet er Schedul e.

Submi t cer t i f i cat i on t hat t he engi ne- gener at or set and cool i ng syst em f unct i on pr oper l y i n t he ambi ent t emper at ur es speci f i edAl l equi pment speci f i ed wi t hi n t hi s sect i on and Sect i on 26 13 13 METAL- CLAD SWI TCHGEAR, ar e t o be pr ovi ded by Cummi ns.

b. Pr ovi de and i nst al l each engi ne- gener at or set compl et e and t ot al l y f unct i onal , wi t h al l necessar y anci l l ar y equi pment t o i ncl ude: ai r f i l t r at i on; SCR Syst em; st ar t i ng syst em; gener at or cont r ol s, pr ot ect i on, and i sol at i on; i nst r ument at i on; l ubr i cat i on; f uel syst em;

cool i ng syst em; and engi ne exhaust syst em. Each engi ne- gener at or set must sat i sf y t he r equi r ement s speci f i ed i n t he Engi ne- Gener at or Par amet er Schedul e. Submi t cer t i f i cat i on t hat t he engi ne- gener at or set and cool i ng syst em f unct i on pr oper l y i n t he ambi ent t emper at ur es speci f i ed.

bc. Pr ovi de each engi ne- gener at or set consi st i ng of one engi ne, one gener at or , and one exci t er mount ed, assembl ed, and al i gned on one base; and al l ot her necessar y anci l l ar y equi pment whi ch may be mount ed separ at el y. Assembl e set s havi ng a capaci t y of 750 kW or smal l er and at t ach t o t he base pr i or t o shi ppi ng. Set s over 750 kW capaci t y may be shi pped i n sect i ons. Pr ovi de set component s t hat ar e envi r onment al l y sui t abl e f or t he l ocat i ons shown and t hat ar e t he manuf act ur er ' s st andar d pr oduct of f er ed i n cat al ogs f or commer ci al or i ndust r i al use. Pr ovi de a gener at or st r i p heat er f or moi st ur e cont r ol when t he gener at or i s not oper at i ng. I dent i f y any nonst andar d pr oduct s or component s and t he r eason f or t hei r use.

2. 1. 1 Engi ne- Gener at or Par amet er Schedul e

Engi ne- Gener at or Set and Auxi l i ar y Equi pment Capaci t y Cal cul at i ons f or Engi ne- Gener at or Set

ENGI NE- GENERATOR PARAMETER SCHEDULE

I dent i f i cat i onMake/ Model Cummi ns " DQLE"

El ect r i cal Char act er i st i cs

Power Rat i ng [ Pr i me] [ Li mi t ed Runni ng Ti me] [ Emer gency St andby] [ I ndust r i al ] Gr oss bhp r at i ng / Net br ake power r at i ng 2500[ _____] kW at 0. 8 power f act or

Gover nor Type Type Make / Model [ I sochr onous] [ Dr oop]

Over l oad Capaci t y ( Pr i me appl i cat i ons onl y)

110 per cent of Ser vi ce Load f or 1 hour i n 12 consecut i ve hour s

Ser vi ce Load 3125[ _____] kVA ( maxi mum) 2500[ _____] kVA ( cont i nuous)

SECTI ON 26 32 15 Page 19

ENGI NE- GENERATOR PARAMETER SCHEDULE

Mot or St ar t i ng kVA ( Max. )

3125[ _____] kVA

Power Fact or [ 0. 8] [ _____] l aggi ng

Engi ne- Gener at or Appl i cat i ons par al l el wi t h ot her gener at or s on an i sol at ed bus

Vol t age Regul at i on ( No Load t o Ful l Load) ( St and- al one appl i cat i ons) pl us or mi nus 2 per cent ( maxi mum)

Vol t age Bandwi dt h ( st eady st at e) pl us or mi nus [ 0. 5] [ 1] [ 2] per cent

Fr equency [ 50] [ 60] Hz

Vol t age 13, 200[ _____] vol t s

Phases [ 3 Phase, Wye] [ 3 Phase, Del t a] [ 1 Phase]

Mi ni mum Gener at or Sub- t r ansi ent React ance

12[ _____] per cent Sub- t r ansi ent

Max St ep Load I ncr ease

[ 25] [ 50] [ 75] [ 100] per cent of Ser vi ce Load at 0. 8[ _____] PF

Tr ansi ent Recover y Ti me wi t h St ep Load I ncr ease ( Vol t age)

10[ _____] seconds

Tr ansi ent Recover y

10[ _____] seconds

Ti me wi t h St ep Load I ncr ease ( Fr equency)

10 seconds

SECTI ON 26 32 15 Page 20

Maxi mum Vol t age Devi at i on wi t h St ep Load I ncr ease

[ 5] [ 10] [ 30] [ ] per cent of r at ed vol t age

Maxi mum Fr equency Devi at i on wi t h St ep Load I ncr ease

[ 2. 5] [ 5] [ ] per cent of r at ed f r equency

Max St ep Load Decr ease ( wi t hout shut down)

100 per cent of Ser vi ce Load at 0. 8[ _____] PF

Fr equency Bandwi dt h ( st eady st at e) pl us or mi nus 0. 035[ ] [ 0. 4] [ 0. 25] per cent

Fr equency Regul at i on ( dr oop) ( No Load t o Ful l Load)

[ 3] [ _____] per cent ( maxi mum)

Fr equency Bandwi dt h ( st eady st at e) pl us or mi nus 0. 035[ _____] [ 0. 4] [ 0. 25] per cent

React ances Synchr onous r eact ance, Xd Tr ansi ent r eact ance, X' d Sub- t r ansi ent r eact ance, X" d Negat i ve sequence r eact ance, X2 Zer o sequence r eact ance, Xo

I nst al l at i on El evat i on

5, 663[ _____] above sea l evel

Engi ne- Gener at or Set Ef f i c i enci es

Fuel Consumpt i on

At 0. 8 power f act or , Gal l ons / hour f or :

1 / 2 l oad 3 / 4 l oad Ful l Load

SECTI ON 26 32 15 Page 21

Gener at or Ef f i c i ency

At 0. 8 power f act or , ( per cent ) [ i n accor dance wi t h I EC 60034- 2A] f or :

1 / 2 l oad 3 / 4 l oad Ful l Load

Radi at or Capaci t y

Cool ant Type gpm cool ant cf m ai r t hr ough r adi at or Bt u per hr of heat exchange based on opt i mum cool ant t emper at ur e t o and f r om engi ne

Engi ne- Gener at or Set Emi ssi ons Dat a

Exhaust Temper at ur e

Degr ees F at f ul l l oad

Wei ght of Exhaust Gas l b per hr at f ul l l oad

Wei ght of I nt ake Ai r l b per hr at f ul l l oad

Tot al Heat Rej ect ed

Bt u per hr , at f ul l l oad t o:

Jacket Cool ant Syst em Fuel Oi l Cool i ng Syst em

Emi ssi ons l b per hr , at f ul l l oad Tot al Suspended Par t i cul at e Par t i cul at e Mat t er wi t h an aver age aer odynami c di amet er of 10 mi cr ons Sul f ur Di oxi des Ni t r ogen Oxi des ( as NO2) Car bon Monoxi de Vol at i l e Or gani c Compounds

Vi si bl e Emi ssi ons

Per cent opaci t y at f ul l l oad

Br ake Mean Ef f ect i ve Pr essur e ( BMEP) Cal cul at i ons

Cal cul at i on must ver i f y t hat t he engi ne meet s t he speci f i ed maxi mum BMEP, as f ol l ows:

BMEP psi = ( 120, 000 X bkW) X ( 792, 000 X bhp) ( r pm X cu. i n. )

Wher e:

bkW bhp = bkW' + bkW" bhp' + bhp" bkW" bhp" i s t he Br ake kW hor sepower r equi r ed by engi ne dr i ven f an f or cool i ng r adi at or or mot or dr i ven f an f or cool i ng r adi at or .

bkW' bhp' = kW/ GEN. EFF. kW/ ( GEN. EFF. t i mes 0. 746) GEN. EFF. = Gener at or ef f i c i ency

cu. i n. = Tot al engi ne pi st on di spl acement i n cubi c i nches r pm = Engi ne r evol ut i ons per mi nut e kW = Mi ni mum power r at i ng

SECTI ON 26 32 15 Page 22

Tor si onal Vi br at i on St r ess Anal ysi s Comput at i ons

Tor si onal v i br at i onal st r esses i n t he cr ankshaf t and gener at or shaf t of assembl ed engi ne and dr i ven gener at or must not exceed 5000 psi when engi ne i s dr i v i ng gener at or at r at ed speed whi l e assembl ed uni t i s l oaded t o r at ed engi ne- gener at or set power . Comput at i ons must be based on a mat hemat i cal model of t he assembl ed gener at or set pr ovi ded or based on cal cul at i ons usi ng measur ed val ues f r om t est s on a uni t i dent i cal t o t he one pr ovi ded. Cal cul at i ons based on model s of , or measur ed dat a f r om, t he unassembl ed engi ne and gener at or wi l l not be accept abl e.

Cal cul at i ons must i ncl ude:

a. A descr i pt i on of t he syst em r el at i ng i nf or mat i on per t i nent t o anal ysi s such as oper at i ng speed r ange and i dent i f i cat i on pl at e dat a.

b. A mass el ast i c assembl y dr awi ng, showi ng t he ar r angement of t he uni t s i n t he gener at or set and di mensi ons of shaf t i ng, i ncl udi ng mi ni mum di amet er s ( or sect i on modul i ) of shaf t i ng i n t he syst em.

c. A l abel ed l i ne di agr am of t he mass el ast i c syst em i ndi cat i ng val ues of masses, st i f f ness, equi val ent l engt hs, and equi val ent di amet er s i ncl udi ng basi c assumpt i ons and def i ni t i on of t er ms.

d. Sampl e comput at i ons showi ng pr ocedur es used t o obt ai n r esul t i ng st r ess val ues.

e. Comput at i ons i ndi cat i ng assembl ed engi ne- gener at or speed of 1800 r pm wi t h assembl y l oaded t o r at ed gener at or power and t he r esul t i ng comput ed cr i t i cal t or si onal st r ess val ues i n t he assembl ed engi ne cr ankshaf t and gener at or shaf t .

Tur bochar ger Load Cal cul at i ons

NOTE: When t he engi ne- gener at or set i nst al l at i on i ncl udes f i el d i nst al l ed exhaust syst em ( i . e. , t he engi ne- gener at or set i s i nst al l ed i nt er nal t o a bui l di ng i n l i eu of i n a sel f - cont ai ned out door encl osur e) , i ncl ude t he f ol l owi ng par agr aph.

When t he pr oposed exhaust syst em l ayout i s di f f er ent f r om t hat shown on t he cont r act dr awi ngs, submi t cal cul at i ons showi ng t hat t he ext er nal l oads f r om t he exhaust syst em such as wei ght and t her mal expansi on do not exceed t he engi ne manuf act ur er ' s maxi mum al l owed f or ces and moment s on t he t ur bochar ger .

2. 1. 2 Rat ed Out put Capaci t y

Pr ovi de each engi ne- gener at or - set wi t h power equal t o t he sum of ser vi ce l oad pl us t he machi ne' s ef f i c i ency l oss and associ at ed anci l l ar y equi pment l oads. Rat ed out put capaci t y must al so consi der engi ne and/ or gener at or over si z i ng r equi r ed t o meet r equi r ement s i n par agr aph Engi ne- Gener at or Par amet er Schedul e.

The engi ne must meet t he speci f i ed maxi mum BMEP r equi r ement s at r at ed speed as cal cul at ed i n accor dance wi t h t he cal cul at i ons i n t he

SECTI ON 26 32 15 Page 23 engi ne- gener at or par amet er schedul e. The engi ne capaci t y must be based on t he f ol l owi ng:

a. Engi ne bur ni ng di esel f uel conf or mi ng t o [ MI L- DTL- 16884] [ ASTM D975, Gr ade 2- D wi t h ULSD, and 40- 48 cet ane number , ] or [ MI L- DTL- 5624, Gr ade JP- 5] at an ambi ent t emper at ur e of 85 degr ees F. For st at i onar y engi nes oper at ed i n t he Uni t ed St at es, di esel f uel r equi r ement s ar e f ound i n 40 CFR 60 Subpar t I I I I .

b. Engi ne cool ed by a r adi at or f an mechani cal l y dr i ven by t he engi ne or r emot e wi t h a mot or dr i ven f an.

c. Engi ne cool ed by cool ant mi xt ur e of wat er and et hyl ene gl ycol , 50 per cent by vol ume of each.

Maxi mum BMEP, psi

Nat ur al l y Aspi r at ed Tur bochar ged Tur bochar ged and I nt er cool ed

Four - cycl e engi nes [ _____] [ _____] [ _____]

Engi ne speed, r pm: [ 1800] [ 1500] [ _____] [ _____]

2. 1. 2. 1 Engi ne Emi ssi on Li mi t s

Engi ne must be cer t i f i ed by t he manuf act ur er t o meet appl i cabl e EPA emi ssi on st andar ds f ound i n 40 CFR 60 Subpar t I I I I . I n addi t i on, engi ne must meet any appl i cabl e st at e or l ocal emi ssi on r equi r ement s and have an emmi ssi on l evel of " St at i onar y EPA Ti er 4 f i nal " ( ex: Cal i f or ni a SCAQMD) .

2. 1. 2. 2 Per f or mance Cl ass

The vol t age and f r equency behavi or of t he gener at or set must be i n accor dance wi t h I SO 8528 oper at i ng l i mi t val ues f or per f or mance Cl ass[ G1] [ G2] [ G3] [ G4 as f ol l ows] .

2. 1. 3 Power Rat i ngs

Power r at i ngs must be i n accor dance wi t h EGSA 101P.

2. 1. 4 Tr ansi ent Response

The engi ne- gener at or set gover nor and vol t age r egul at or must cause t he engi ne- gener at or set t o r espond t o t he maxi mum st ep l oad changes such t hat out put vol t age and f r equency r ecover t o and st abi l i ze wi t hi n t he oper at i onal bandwi dt h wi t hi n t he t r ansi ent r ecover y t i me. The engi ne- gener at or set must r espond t o maxi mum st ep l oad changes such t hat t he maxi mum vol t age and f r equency devi at i ons f r om bandwi dt h ar e not exceeded.

2. 1. 5 Rel i abi l i t y and Dur abi l i t y

[ Pr ovi de pr i me engi ne- gener at or set s t hat have bot h an engi ne and a gener at or capabl e of del i ver i ng t he speci f i ed power on a pr i me basi s wi t h an ant i c i pat ed mean t i me bet ween over haul s of not l ess t han 10, 000 hour s oper at i ng wi t h a 70 per cent l oad f act or . Ci t e t wo l i ke engi nes and t wo l i ke gener at or s t hat have per f or med sat i sf act or i l y i n a st at i onar y power pl ant , i ndependent f r om t he physi cal l ocat i on of t he manuf act ur er ' s and

SECTI ON 26 32 15 Page 24 assembl er ' s f aci l i t i es. The engi ne and gener at or s shoul d have been i n oper at i on f or a mi ni mum of 8000 act ual hour s at a mi ni mum l oad of 70 per cent of t he r at ed out put capaci t y. Dur i ng t wo consecut i ve year s of ser vi ce, t he uni t s shoul d not have exper i enced any f ai l ur e r esul t i ng i n a downt i me i n excess of 72 hour s. Pr ovi de engi nes t hat ar e t he same model , speed, bor e, st r oke, number and conf i gur at i on of cyl i nder s and r at ed out put capaci t y. Pr ovi de gener at or s t hat ar e t he same model , speed, pi t ch, cool i ng, exci t er , vol t age r egul at or and r at ed out put capaci t y. ] [ Each st andby engi ne- gener at or set must have bot h an engi ne and a gener at or capabl e of del i ver i ng t he speci f i ed power on a st andby basi s wi t h an ant i c i pat ed mean t i me bet ween over haul s of no l ess t han 5, 000 hour s oper at i ng wi t h a l oad f act or of 70 per cent . Ci t e t wo l i ke engi nes and t wo l i ke gener at or s t hat have per f or med sat i sf act or i l y i n a st at i onar y power pl ant , i ndependent and separ at e f r om t he physi cal l ocat i on of t he manuf act ur er ' s and assembl er ' s f aci l i t i es, f or st andby wi t hout any f ai l ur e t o st ar t , i ncl udi ng al l per i odi c exer ci se. Pr ovi de l i ke engi nes and gener at or s t hat have had no f ai l ur es r esul t i ng i n downt i me f or r epai r s i n excess of 72 hour s dur i ng t wo consecut i ve year s of ser vi ce. Pr ovi de engi nes t hat ar e t he same model , speed, bor e, st r oke, number and conf i gur at i on of cyl i nder s, and r at ed out put capaci t y. Pr ovi de gener at or s t hat ar e t he same model , speed, pi t ch, cool i ng, exci t er , vol t age r egul at or and r at ed out put capaci t y. ]

Submi t a r el i abi l i t y and dur abi l i t y cer t i f i cat i on l et t er f r om t he manuf act ur er and assembl er t o pr ove t hat exi st i ng f aci l i t i es ar e and have been successf ul l y ut i l i z i ng t he same component s pr oposed t o meet t hi s speci f i cat i on, i n s i mi l ar ser vi ce.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .