This document contains a draft statement of work and related federal contract opportunity synopsis. The statement of work outlines requirements to develop, test, manufacture and deploy forty-eight Indicator Control Box units for AN/MPN-14K Airport Surveillance Radar systems. Key deliverables include four first article test units, forty production units, technical documentation, and depot support packages. The period of performance is twelve months. The synopsis provides additional context that the Air Force is conducting market research to identify potential sources for this effort to either make it competitive or set it aside for small businesses. Responses are requested by March 4th to include capability statements limited to three pages describing similar past projects and company information. The proposed North American Industry Classification System code is 334511.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

for

Replacement of the

AN/MPN-14K Airport Surveillance Radar

(ASR)

The Indicator Control Box (C-8625/T) “A-Box”

Prepared by:

01 Feb 22

DRAFT

1. INTRODUCTION

The AN/MPN-14K Landing Control Central (LCC) is a tactical air traffic control system comprised of two equipment vans housing radar and associated communications and electronics equipment: The Precision Approach Radar (PAR)/Airport Surveillance Radar

(ASR) van and the Operational (OPS) van. The Indicator Control Box (C-8625T) “A-Box” interfaces physically and functionally with a segment of Interrogator Set AN/TPX-42

Identification Friend or Foe (IFF). It operates in conjunction with an indicator group to enable synthetic target symbols to be displayed on the indicator as determined by the controls located on its front panel assembly. The MPN-14K is currently planned to remain in service through

2030.

1.1 Scope

The scope of this work statement is to develop, test, manufacture, and deploy a total of forty-eight (48) “A-Box” units, to include forty (40) production units, four (4) First Article

Test (FAT) units and four (4) spare units, along with the complete technical data package

(TDP). Upon completion of the FAT and acceptance by the Government/Program Office, the Contractor will assemble remaining units and will distribute them to the units and locations identified in Table 1. First article units will be removed and shipped to Tobyhanna

Army Depot (TYAD) and remain installed in the system mock-up and will not be considered production units. Additionally, the TDP and field-level maintenance instructions will be delivered to the ATCALS Program Office ten (10) days prior to start of full-rate production.

2. PERIOD OF PERFORMANCE

The period of performance for this effort shall be 12 months after contract award. In the event an extension is required, the request will be worked through the Contracting Officer.

3. QUALITY ASSURANCE

The Contractor shall establish and maintain a documented quality system that, at a minimum is compliant with the requirements of ANSI/ISO/ASQ Q9001:2015, Quality Management Systems Requirements or equivalent. The quality system shall address the Contractor’s processes for ensuring quality services, documentation, hardware and software. The quality system procedures, planning and all other documentation and data that comprise the quality system shall be made available to the Government/Program Office upon request.

4. CONTRACTOR RESPONSIBILITIES

4.0 Program Management

The Contractor shall maintain a formal organization to manage the contract/task order including program control, quality assurance, configuration management and security.

The Contractor shall assign a Program Manager to organize, plan, schedule, implement, control and report on all elements of the contract/task order. The Program Manager shall be prepared to discuss the status of contract activities with the Government/Program

Office at any time during normal business hours (8:00 am to 4:00 pm CST).

The Contractor’s Program Manager shall be identified to the Government/ATCALS

Program Office. The Contractor shall provide all necessary qualified personnel, management, non- personal administrative and technical services, materials and facilities to support the requirements of this SOW including shipping of completed units.

4.1 Meetings and Reports

a) Status Reports

The Contractor shall submit monthly status reports IAW (CDRL A001 DI-

MGMT-81928 Contractor’s Progress and Status Report) throughout the period of performance of the contract.

b) Program Management Reviews/Technical Interchange Meetings

The first Program Management Review/Technical Interchange Meeting

(PMR/TIM) shall be held in conjunction with the Kickoff Meeting and may be accomplished via telecon.

The purpose of the PMR is to discuss contract status, track and review outstanding action items, review potential and actual programmatic problem areas and proposed solutions, and track and discuss planned versus actual for schedule and performance.

The purpose of the TIM is to discuss specific technical activities, including but not limited to technical actions items, studies, test plans, test results, technical decisions, and implementation concerns to continue visibility into technical progress.

Additional PMRs/status update meetings shall be held per agreement determined by the Contractor and Government/Program Office.

The following schedule is provided as a recommended meeting schedule:

First four (4) months – monthly

Second four (4) months – bi-weekly/every other week

Final months – weekly until first units are produced and accepted

An agenda for each PMR/TIM shall be developed by the Contractor IAW (CDRL

A002 DI-ADMN-81249C Meeting Agenda). The Contractor shall provide a copy of the briefing package to the Government/Program Office electronically at least five

(5) calendar days before each PMR/TIM and a set of meeting minutes IAW

(CDRL A003 DI-ADMN-81250C Meeting Minutes) within five (5) days after the

PMR/TIM/meeting.

c) Informal Meetings

The Contractor shall support informal meetings at the request of the

Government/Program Office in the form of telecommunications – email and/or telecom. These may include short periodic meetings to determine status of the program and allow for the opportunity to address ongoing topics. This may also include more prompt meetings to discuss issues that need rapid feedback.

These informal meetings shall not require the delivery of meeting agendas, meeting minutes or presentation packages.

4.2 Schedule

The Contractor shall develop and provide a schedule outlining estimated dates for the completion of this effort. Items to be included on the schedule include but are not limited to – Critical Design Review, First Article Testing Date, Delivery dates for FAT units, Delivery dates for additional units, estimated shipping dates, meeting dates, and estimated completion date. Any deviations that may negatively impact the schedule shall be immediately reported to the GSA Contracting Officer and the Program Office.

Contractor format for the schedule will be acceptable but shall be in a

Microsoft electronic format such as Project or Excel.

5. First Article Test/Inspection

The Acceptance Test Procedure (ATP) for FAT testing shall be developed by the

Contractor and agreed upon by the Government/Program Office. The ATP is proposed to consist of basic operational tests of the FAT units, approval and review of TDP documentation and evaluation of four (4) units operationally working within a fielded location for 3 to 5 days. The “A-Boxes” must pass the ATP. The Contractor shall develop the ATP and provide it to the Government/Program Office for concurrence IAW (CDRL

A004 DI-QCIC-80553A/T Acceptance Test Procedures). Test requirements for the FAT shall be defined by the Contractor and approved by the Program Office. The Contractor shall plan to deliver the four (4) FAT units NLT 36 weeks (approximately 252 days) after contract award. The preferred location for the FAT is the 260th ATCS in Portsmouth, NH but may be changed by the Program Office if needed. The Program Office will strive to give the Contractor as much advance notice of the change as possible in the event the location is changed. The Contractor shall complete and deliver a FAT Trip Report IAW (CDRL A005

DI-MISC-81943 First Article Trip (FAT) Report) following the FAT installation test.

6. Production Units and Delivery

Upon acceptance of the FAT units by the Government/Program Office, the

Government/Program Office shall provide authorization to the Contractor to begin full rate production of the “A-Box” Units. Upon start, the Contractor shall provide an updated schedule

IAW (CDRL A006 DI-MGMT-81650/T Integrated Master Schedule (IMS)) showing the estimated completion dates and delivery dates and numbers of the “A-Box” Units. The

Contractor shall strive to have the first eight (8) production units produced and shipped within

60 days after direction to proceed with regularly scheduled deliveries until all remaining A-Box have been delivered to the Government. The Contractor shall deliver completed “A-Box” Units as identified in Table 2.

7. Depot Support Package

The Contractor shall develop and deliver a depot support package to include Interface Test

Adapters (ITA) (as needed), automated test program(s) for top level assembly and each LRU requiring depot level test, and documented test procedures for use on the Mixed Signal

Automated Tester (MSAT). Validation of the depot support package shall be conducted at the

Contractor’s facility.

NOTE: This depot support package does not include a MSAT test station.

Acceptance of the depot support package may be done onsite at the Contractor’s facility.

The Government/Program Office agrees to allow utilization of the MSAT based depot test station in support of manufacturing operations of production units to expedite delivery of production units.

8. GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/FACILITIES

The Government/Program Office will provide access to working and correctly configured AN/MPN-14K system(s) and technical data as required.

9. DATA RIGHTS

All Data Rights (i.e. technical and source) to the hardware design and software, developed at Government’s expense, shall be conveyed to the Government/Program Office. At a minimum, the Government/Program Office shall be granted Limited Rights to commercial data and restricted data for products developed at Contractor’s expense.

10. TRAVEL

The Contractor shall travel as directed by the Contracting Officer (CO) in accordance with the

Joint Travel Regulations. The Contractor shall submit travel requests to the CO at least 30 days prior to planned departure. However, travel to the 260 ATCS, Pease, ANGB, Portsmouth, NH in support of this effort is considered normal and routine travel and shall not require CO approval;

but, shall require coordination with the 260 ATCS personnel before traveling. The Contractor may be requested to attend the Government/Program Office’s yearly Weapon System Review held during the spring. This review is held in the Oklahoma City, Ok area.

11. HOLIDAYS AND FACILITY CLOSINGS

Contractor personnel shall only be permitted access to Government facilities when

Government personnel are present.

12. DELIVERABLES

The following is a recap of expected deliverables from the Contractor.

a. Four (4) First Article “A-Box” Units.

b. Technical Documentation including Technical Order Supplements (to include remove and replace instructions and field-level maintenance documentation), Technical Drawings, Electrical Schematics/Block Diagrams, Mechanical CAD

Drawings, Circuit Card Assembly Schematics, Circuit Card Assembly CAD

(Gerber) drawings, and the Parts List IAW TMCR/(CDRL A007 DI-SESS-

81000F/T Product Drawings/Models and Associated Lists)

c. One (1) 604610 MSAT-compatible depot support package, including Test Center software and appropriate software for testing functionality of “A-Box” Unit. Note:

the software will include basic pass/fail and diagnostic information at each of the top level assemblies only (Diagnostic information at the component or subcomponent level is not included in this effort).

NOTE: This does not include a MSAT test station.

d. Forty (40) production displays as designed and shipped to the locations identified in Table 2

e. Four (4) spare units to be shipped to the Air Force supply system

CDRLs as listed throughout this SOW and identified in Table 1.

13. SECURITY REQUIREMENTS

No security clearances are required for performance of this effort. The Contractor shall perform all activities required to meet the security requirements of DOD facilities they are required to access during the performance of this contract. The Contractor, when working in

DOD facilities, shall wear identification badges on their outer garment in the chest area and abide by all rules, regulation, etc. of the DOD facility. Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as

Contractor personnel and displaying distinguishing badges or other visible identification for meeting with Government/Program Office personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence. In the event Contractor personnel required access to a government system, the Contractor shall contact the Contracting Officer for assistance.

14. Mission Essential Contractor Services. N/A.

15. Invoicing/Payment and Receipt/Acceptance:

The Contractor shall submit/process payment requests and receipt/acceptance documents via

Wide Area WorkFlow e-Business Suite/Invoicing, Receipt, Acceptance, and Property Transfer

(iRAPT) IAW all applicable clauses located in the basic contract.

Table 1

APPLICABLE CDRLS

CDRL No. CDRL Title Paragraph

A001 Contractor’s Progress and Status Report 4.1.a

A002 Meeting Agenda 4.1.b

A003 Meeting Minutes 4.1.b

A004 Acceptance Test Procedures 5

A005 First Article Trip (FAT) Report 5

A006 Integrated Master Schedule (IMS) 6

A007 Product Drawings/Models and Associated Lists 12.b

Table 2 AN/MPN-14K LOCATIONS

UNIT/POC LOCATION ADDRESS CITY STATE ZIP # of “A-Box”

UNITS

New London

NC

28127

St Joseph

MO

64503

Cheyenne

WY

82007

McEntire

JNGB

SC

29044

Meridian

MS

39307

Johnstown PA 15904 4

Alexandria

LA

71303

Portsmouth

NH

Klamath Fa ls

OR

97603

Kapolei

HI

96707

Supply System

Wi l be provided by

Program

Office

Wi l be provided by Program

Office

Wi l be provided by

Program

Office

Wi l be provided by Program

Office