This document is a Statement of Work (SOW) from NASA Glenn Research Center for a Multipurpose Power Quality Test System. The requirement is to purchase a BOLAB Multipurpose Power Quality Test System or equivalent, which will be used for testing electrical and electronic systems under various power conditions for aeronautics and space applications. The system must include multiple components such as a 4-quadrant voltage amplifier, isolation amplifier, power supplies, safety relays, measurement devices, and software interfaces, with specific technical requirements for 120Vdc and 1000Vdc operations.

The system specifications include capabilities like real-time voltage and current measurements, complex impedance calculations, data recording, transient voltage injection, and high-bandwidth signal generation up to 200 kHz. The vendor will be required to provide on-site and virtual technical support, including equipment integration assistance, problem analysis, and training. The delivery timeline is 25 weeks after receipt of award, with an additional 4 weeks allocated for installation at NASA Glenn Research Center in Cleveland, Ohio. The system must be modular, portable, and capable of supporting various testing protocols for power quality evaluation.

View the file

Other files

File Type Posted
RFI Sources Sought - Posting to SAM.docx.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

GLENN RESEARCH CENTER (GRC)

CLEVELAND, OHIO

Multipurpose Power Quality Test System

1. BACKGROUND

Power quality testing provides critical information to evaluate how an entire electrical or electronic system behaves under a range of real-world power conditions. These tests ensure that the system can operate reliably, safely, and within performance specifications. This testing requires hardware capable of generating voltage transients with high dV/dt and injecting signals at high bandwidth, while maintaining the required power levels. The complete system requirements are outlined below.

2. SCOPE OF WORK

This requirement is for the purchase of the brand name or equivalent BOLAB Multipurpose Power Quality Test System. Power quality testing is performed to help define system standards and typically includes steady-state operating points, line-step transient voltage, over voltage surge, input impedance sweeps, ripple voltage spectrum, and inrush/surge current limiting. The BOLAB Multipurpose Power Quality Test System, or an equivalent system, shall have the capability to inject controlled, high-bandwidth signals—up to 200 kHz—and apply a wide range of voltage and current waveforms to the system.

3. OBJECTIVE

BOLAB Multipurpose Power Quality Test System or equivalent is a critical component required to perform high-power power quality testing of electrical systems for both aeronautics and space applications.

4. SYSTEM REQUIREMENTS

*Brand Name of Equal to

QTY PART # DESCRIPTION

1 BLS 160-70R-TS Arbitrary 4-Quadrant Voltage Amplifier 228A | 6kW 1 BLS 100I4 Internal 4 channel Isolation Amplifier 290kHz (-3db) Bandwidth 1 BLS 100VR Adjustable Internal Resistor 200mOhn 1 BLS 100AC-OVP Over voltage protection for the High voltage DC power supply and a 4-quadrant amplifier 1 BLS 480 WM-HV Voltage Measurement Device for closed-loop regulation 1 BLS 18/338-160 1C Single Channel High Dynamic Power Supply 18kW 1 BLS G5.HMI.1 Human Machine Interface for single-device and multi-unit system operation

1 BLS G5.ISR.1 Integrated Safety Relay for 18kW power supply 1 BLS SAFREL Safety Relay to reach PL e 1 BLS 400-6361 AnyWave + WaveMaster 1 BLS 708-15 5007 Mobile 19” rack 15 U, 800 mm depth, 19” width 1 BLS Cx 10000-400-200 Capacitor Cx, stand alone 1 BLS AN-RD-BI-200A Resonance Damper for ripple network 1 BLS CS-HV-4Q Supporting cables for HV test system – 4 quadrant amplifiers 1 BLS CS-HV-PS Supporting cables for HV test system – HV Power Supply 1 BLS 100-SSM-ANY-12 WaveMaster-Software service, support, and maintenance for

AnyWave 1 BLS 300-SSM-TS-12 WaveMaster-Software service, support, and maintenance for AC

+ DC test system 1 BLS 9301-7-12 BLS Learning Management System Access 1 BLS 9301-7 System installation, training online / e-learning for AC + DC and EV test systems onsite at the customer (mandatory).

Including Travel

4.1 General specification for BOLAB Multipurpose Power Quality Test System (or equivalent)

4.1.1 The software interface shall have real-time display of voltage and current measurements.

4.1.2 The software interface shall facilitate data recording of voltage and current measurements.

4.1.3 The software interface shall perform complex impedance measurements and calculations from 1Hz to 200kHz.

4.1.4 The software interface shall be capable of automatically generating test protocol reports.

4.1.5 Each analog input channel shall have a minimum accuracy of 16 bits.

4.1.6 Each analog input channel shall have the option to be configured to +/-10V input.

4.1.7 Test system shall have available analog input to serve as a command signal.

4.1.8 Test system shall have the ability to reproduce recorded field data and user defined waveforms.

4.1.9 The system shall provide configurable over-voltage and over-current protection.

4.1.10 The system shall include an interlock mechanism to enable external shutdown.

4.1.11 The system shall include remote sense capability for closed loop voltage regulation at the terminals of the load.

4.1.12 The system shall be portable.

4.2 Specification for BOLAB Multipurpose Power Quality Test System (or equivalent) for

120Vdc Operation

4.2.1 Power supply with bidirectional capability rated for at least 16kW.

4.2.2 Power supply shall have an output of 0-136Vdc.

4.2.3 The power supply shall have a nominal input voltage rating of 480VacLL at 60Hz.

4.2.4 High bandwidth capability to inject sinusoidal or triangular AC voltage waveforms up to

5Vrms into a DC system from 30Hz to 150kHz.

4.2.5 The system shall be able to inject transient voltages with a magnitude of at least -

30V and +70V for at least 5msec.

4.2.6 The system shall be able to inject transient voltages with slew rates (+/-) >10V/us.

4.2.7 The system shall be able to inject the overvoltage transient test waveform per PWR120-2013V of ISPSIS. Rev. A for loads drawing up to 133A, with a peak current surge of at least 150A.

4.2.8 The system shall support Master/Slave operation with configurable options for series or parallel connection.

4.3 Specification for BOLAB Multipurpose Power Quality Test System (or equivalent) for 1000Vdc Operation

4.3.1 The system shall be able to integrate with external bidirectional power supplies (customer owned) with nominal voltages from 270Vdc to 1000Vdc.

4.3.2 The system shall be able to couple to loads drawing continuous currents of at least 110

Adc.

4.3.3 The system shall be able to source pulsed power of at least 4kW, at 20V, on top of the continuous current draw at 1000Vdc.

4.3.4 The system shall be to sink pulsed power of at least 4kW, at -20V, on top of the continuous current draw at 1000Vdc.

4.3.5 The system shall be able to inject transient voltages with slew rates (+/-) >1V/us.

4.3.6 The system shall be modular with the ability to:

4.3.6.1 Add future capability to parallel additional hardware to provide 18kW pulsed power.

4.3.6.2 Series additional elements to increase the pulse voltage up to 100Vpeak with a continuous current draw of great than or equal to 60ADC.

4.3.7 The system shall be able to inject AC voltages (sinusoidal or triangular) up to:

4.3.7.1 20 Vrms into the DC system from 1Hz to 37.5 kHz.

4.3.7.2 10 Vrms into the DC system from 37.5kHz to 50 kHz.

4.3.7.3 5 Vrms into the DC system from 50kHz to 150 kHz.

5. ADDITIONAL RESOURCES

5.1 The vendor shall work with the project team on-site to understand safe and reliable equipment integration and operation.

5.2 The vendor shall provide on-site and virtual assistance in the analysis of problems.

5.3 The vendor shall work with the project team on-site to understand proper use of the system interface.

5.4 The vendor shall provide expertise in testing methods.

5.5 The vendor shall provide support in root-cause analysis of any product/component failures.

6. PLACE OF PERFORMANCE

Shipping and Installation NASA Glenn Research Center 21000 Brookpark Road, Cleveland, OH 44135

7. PERIOD OF PERFORMANCE

Hardware Delivery – Twenty-Five (25) weeks after receipt of award (ARO) Installation – To be completed four (4) weeks after delivery.