DRAFT SOW for BAF.docx

DOCX document 647 KB Posted

Attached to
Big Ass Fan (BAF) Maintenance
Solicitation number
FA480025R00025
Issued by

About this file

This Statement of Work outlines preventive maintenance requirements for 124 Big Ass Fan (BAF) commercial blade fans at the 128th Aviation Brigade, Fort Eustis. The maintenance covers various fan types and sizes (Yellow jacket, pivot, 8 to 24 foot blades) mounted on interior building beams at heights between 12 and 40 feet. The contract includes a base period from February 15, 2022 through February 14, 2023, with four one-year option periods extending through February 14, 2027.

The contractor must perform a 21-point manufacturer-recommended inspection on each fan once during the contract period, including cleaning, hardware checks, safety inspections, and electrical system verification. Work must be performed Monday through Friday, 0700-1700 hours, excluding federal holidays. The contractor is responsible for providing all tools and OSHA-approved lift equipment. Service reports documenting building numbers, fan types, serial numbers, and maintenance findings must be submitted to the organization POC. Any required repairs identified during inspections must be quoted through BAF and submitted to the organization POC for approval.

View the file

Other files

File Type Posted
BAF FAN Maintenance Sources Sought.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK: Preventive Maintenance Big Ass Fans (BAF)

Perform recommended preventive maintenance (PM) on 124 various Big Ass Fan (BAF) commercial blade fans, per the attached list of fan locations.

Fans are Big Ass Fans brand, various types and sizes (Yellow jacket, pivot, 8 to 24 foot blades) located in buildings within the 128th Aviation Brigade footprint on Fort Eustis, mounted on interior building horizontal or vertical steam beams from approximately 12 feet to over 40 feet above the floor. List of fan models and building locations is attached.

Preventive maintenance will be performed on each fan one time within the contract period. The PM will be performed between 0700 to 1700 hours, Monday through Friday, except Federal Holidays and possibly organization 'off' days. Vendor will coordinate the maintenance schedule with the 128th Aviation Brigade Facilities Manager, Jed Dalgleish, (757)878-4209 prior to performing any maintenance.

Period of performance:

Base Year: February 15, 2022 thru February 14, 2023 Option Year 1: February 15, 2023 thru February 14, 2024 Option Year 2: February 15, 2024 thru February 14, 2025 Option Year 3: February 15, 2025 thru February 14, 2026 Option Year 4: February 15, 2026 thru February 14, 2027

Vendor will provide, or ensure BAF provides, the organization POC a report on completed services (e.g. building number, type of fan, fan serial number, findings or needed repairs and/or recommendations.

Performance includes providing all tools and OSHA approved lift capability and/or ladders. Preventive Maintenance includes recommended manufacturer 21 point inspection:

1. Clean all airfoils

2. Check tightness of all hardware with a torque wrench

3. Check breather cap (if applicable)

4. Check oil levels (if applicable) and inspect for any signs of leakage

5. Check safety cables

6. Verify airfoil retainer clips are installed

7. Check safety clips and document clearance between clip and bottom frame plate

8. Check mounting method

9. Check fan for plumb and level

10. Check torque of Fenner at 167 ft-lbs, if applicable

11. Check dimensions of any supplemental steel supports

12. Visually inspect welds

13. Check wiring methods used

14. Verify raceways are isolated (line, load, other fans)

15. Verify all electrical connections on motor and controller are correct arrangement and properly tightened

16. Verify fault history

17. Verify properly sized fuses are installed in controller, if applicable

18. Verify maximum HZ has not been changed in the VFD

19. Inspect for any signs of physical damage to fan or controller

20. Clear debris and dirt from the VFD with air gun

21. Document any customer complaints If PM determines repairs are required then PM contacts BAF to obtain a service quote and provides the quote to the organization POC. PM will include, or ensure BAF provides to the organization POC a report on completed services (e.g., Building number, type of fan, fan serial number, findings or needed repairs and/or recommendations).

Building

Ceiling Height

WO/installed Big Ass Fan

YJ
pivot
powerfoil diameter
8
10
12
14
16
18
24
39
14-13
Apr 2015
30
10-34
Apr 2012
27
10-34
Apr 2012
2719
South
14
12-56
May 2013
2719
North
14
13-23
May 2014
35
10-34
Apr 2012
27501
East
15
14-13
Apr 2015
27501
West
15
14-13
Apr 2015
2
2
27504
East
13
13-23
May 2014
27504
West
13
14-13
Apr 2015
27506
East
13
13-23
May 2014
4
27506
East
13
13-23
May 2014
27506
West
13
13-23
May 2014
27508
East
14
9-51
Aug 2009
27508
West
14
9-51
Aug 2009

27509

28
13-23
May 2014
27510
West
14
8-52
Sep 2009
27510
Middle
13-23
May 2014
1
3
27510
East
14
13-23
May 2014

27512

18
9-51
Aug 2009
27601
West
26
13-23
May 2014
27601
East
40
14-13
Apr 2015

27602

25
13-23
May 2014
27603
West
14
13-23
May 2014
9
27605
East
14
14-13
Apr 2015
27605
West
14
14-13
Apr 2015
9
27609
East
13
10-34
Apr 2012
27609
Middle
13
15-14
Jan 2016
27609
West
13
14-13
Apr 2015

27611

40
10-34
Apr 2012

27612

40
10-34
Apr 2012

27613

24
13-23
May 2014

27614

24
9-51
Aug 2009

27615

22
13-23
May 2014

Type BAF

YJ
pivot
powerfoil diameter
8
10
12
14
16
18
24
22
12
8
15
25
10
21
1
10
Total BAF
124

-c tCa:-,.

Ill 00 C:

X :l X .C Ll'I X r-,. X N \0 =<t "N"" i (j) r (j) ::J w

· ■ r ■I'll I•• r a:

0• • u_ image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg

File details come from the government source that posted it. Updated .