DRAFT SOW-FIRE DAMPER REPAIR.docx
DOCX document 40 KB Posted
- Solicitation number
- 36C26126Q1167
About this file
This is a Statement of Work (SOW) for Fire Damper Repairs at the VA Central California Healthcare System (VACCHCS) located in Fresno, California. The contractor must complete all repair work within 60 days of receiving the Notice to Proceed. The scope involves repairing fire damper deficiencies identified during FY24 and FY25 inspections, including pneumatic actuator repairs, damper access door replacements across multiple sizes (6x6 through 14x14), Belimo actuator installations in two torque ratings (30 in-lb and 70 in-lb at 120V AC), and miscellaneous access doors and fusible links. The contractor must supply all tools, equipment, personal protective equipment, and waste disposal at their own expense and provide one-year warranty on all components, equipment, and labor.
Work shall be performed during standard business hours (8:00 AM–4:30 PM, Monday–Friday, excluding federal holidays), with prior written authorization required for weekend or after-hours work. The contractor must comply with all applicable codes and standards including OSHA, NFPA (70, 70E, 72, 80, 90, 90B, 92, 99, 105), and VA requirements. Safety requirements mandate hard hats, safety glasses, reflective vests, and closed-toe shoes; Safety Data Sheets must be submitted within 15 days of award and maintained on-site. The contractor is responsible for all hazardous waste disposal in compliance with EPA regulations, and must coordinate all work with the Contracting Officer's Representative (COR), obtain security badges, and maintain company identification visible at all times. The contractor bears full responsibility for safeguarding their own equipment and materials on government property.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126Q1167.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FIRE DAMPER REPAIRS
Place of Performance: VA Central California Healthcare System (VACCHCS) 2615 E. Clinton Ave Fresno, CA 93703-2223
Part 1: Project Scope of Work Overview:
The Department of Veterans Affairs Central California Health Care System (VACCHCS), Fresno Facilities Maintenance Service, requires a contract for Fire Damper Repairs for deficiencies of Fire Damper Inspections FY24 & FY25.
Part 2: Period of Performance (POP):
Period of performance is to be completed within 60 days after Notice to Proceed.
Part 3: General Information and Requirements:
3.1 The contractor shall provide all tools, equipment, and personal protective equipment necessary to complete this project as deemed by industry standards, this SOW, all related specifications, applicable code requirements, and site policy.
3.2 Disposal of all waste and debris is at the contractor’s own expense.
3.3 The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses
3.4 All work shall be coordinated with the COR assigned to this project and only commence once approved.
3.5 Schedule: Normal work hours will be 8:00am – 4:30 pm Monday-Friday excluding Official Federal Holidays, A contractor is not to work on Official Federal Holidays as listed on OPM.gov(https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=Overview). The contractor, if needed to perform work over the weekend (Saturday and Sunday) or outside of the work hours listed above, will need to request authorization prior to performing any work from the COR/Engineer and final approval from the Contracting Officer. Any request to utility shutdowns must be requested in writing at a minimum of 21 days prior to the requested day of shutdown.
3.6 Codes and Standards: The Contractor shall follow all applicable codes and standards for this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, Lock-out Tag-out, Rules of Station, NFPA, etc. If any code/standard is found to be contradictory; the authority having jurisdiction (COR) shall make the final determination and work shall proceed at no additional cost to the medical center.
3.7 Smoking is prohibited on VACCHCS grounds and inside buildings Part 4: Detailed Project Scope of Work:
4.1 The contractor shall provide all tools, materials, equipment, supervision, personnel, and transportation necessary to assure that all services are in accordance with contract and all applicable codes, law, and regulations.
4.2 The responding vendor shall perform repair of the deficiencies. VA standards require compliance according to the latest published version of the codes listed in Section 6.1.
4.3 Contractor shall provide one designated point of conrtact to the government’s designated representative.
4.4 Contractor shall provide 1-year warranty on all components, equipment, and labor.
4.5 Repairs based on Deficiency – Damper Repairs
| DESCRIPTION |
| ORDER QUANTITY |
Building 31
| Pneumatic Actuator-No Compression and blades closed |
| 4 |
Building 1
| CD 5080 -10x10 -Damper Access Door |
| 3 |
| CD 5080 - 14x14 -Damper Access Door |
| 1 |
| CD 5080 - 6x6- Damper Access Door |
| 3 |
| CD 5080 - 8x8 -Damper Access Door |
| 1 |
| ED 2002 - 12x12 - Drywall Access Doors |
| 1 |
| ED 2002 - 14x14 - Drywall Access Doors |
| 1 |
Belimo Actuator - 120v FSLF120 US 30in - lb. - w/Additional Material (Brand‑Name or Equal):
• Torque: Minimum 30 in‑lb.
• Voltage: 120V AC
• Control Type: Fail‑Safe Spring Return
• Operation: On/Off or Floating (match existing control sequence)
• Shaft Compatibility: Round or Square damper shaft, ⅜" to ½"
• Environmental Rating: Commercial HVAC damper‑rated
• Certifications: UL/CSA listed or equivalent
• Warranty: Minimum 1 year
Belimo Actuator - 120v FSNF120 US 70in - lb. - w/Additional Material (Brand‑Name or Equal):
• Torque: Minimum 70 in‑lb
• Voltage: 120V AC
• Control Type: Fail‑Safe Spring Return
• Operation: On/Off or Floating (match existing control sequence)
• Shaft Compatibility: Round or Square damper shaft, ⅜" to ½"
• Environmental Rating: Commercial HVAC damper‑rated
• Certifications: UL/CSA listed or equivalent
• Warranty: Minimum 1 year
| Duro Dyne - 21151 - 8x12 Access Door 15"-18" RD |
| 1 |
| Model B fusible link |
| 1 |
Part 5: Safety:
5.1 At a minimum contractor, subcontract, and personnel shall at all times wear hard hats, safety glasses, reflective vest, and safety shoes.
5.2 No shorts or tank tops shall be permitted.
5.3 Contractor shall adhere to OSHA 10 CFR 1910 and 1926.
5.4 Contractor shall be responsible for using appropriate PPE when required by OSHA and VACCHCS.
5.5 Safety plan shall be submitted to the COR within 15 days of awarded contract.
5.6 Contractor shall submit Safety Data Sheet for all chemicals used at the VACCHCS. Chemicals must be approved by COR or Safety Services. Safety Data Sheet shall be kept at work site at all times.
5.7 Contractor shall comply with Environment Protection Agency standards. No dumping of water or chemical in the storm drains. Contaminates shall be removed from VACCHCS property and shall be disposed of by all Federal, State, and Local EPA regulation and standards at no additional cost to the government.
5.7.1 Any penalties incurred due to unlawful disposal of hazardous material or EPA, State, or Local regulation and standards shall be the responsibility of the Contractor.
Part 6: Performance Standards:
6.1 Contractor shall adhere to the performance standards listed below. Contractor shall adhere to all references in the performance standard to include all notes, explanatory material, and appendixes. The most current edition will be used on all references listed below.
6.1.1 OSHA Standard 29 CFR 1910
6.1.2 OSHA Standard 29 CFR 1926
6.1.3 NFPA 70, National Electrical Code
6.1.4 NFPA 70E, Standards for Electrical Safety in the Workplace
6.1.5 NFPA 72, Nation Fire Alarm and Signaling Code
6.1.6 NFPA 80, Standards for Fire Doors and Other Openings
6.1.7 NFPA 90, Standard for the Installation of Air-conditioning and Ventilating Systems
6.1.8 NFPA 90B, Standard for the Installation of Warm Air Heating and Air-Conditioning Systems
6.1.9 NFPA 92, Standards for Smoke Control Systems
6.1.10 NFPA 99, Health Care Facilities Code
6.1.11 NFPA 105, Standard for Smoke Door Assemblies and Other Opening Protectives
Part 7: Documentation Requirements:
7.1 Security Badge: Vendor shall notify VA police on arrival and obtain a temporary badge. The VA Issued Security badge shall be worn on the upper torso and always visible.
7.2 Contractor’s Badge: Vendor employees, and representatives shall always have a company badge or identification visible.
7.3 Physical Security: The vendor shall be responsible for safeguarding their equipment while on government property. Additionally, the contractor shall be responsible for any government equipment, information and property provided for vendor use. Vendor will NOT be provided a staging area for storage of tools, equipment, material, supplies, and other items. The Government will not be responsible for damage or loss of vendor’s property. Vendor is responsible to safeguard its property.
7.4 OI&T Security: Office of Information and Technology (OI&T) certification and accreditation requirements do not apply for this service contract and therefore a Security Accreditation Package is not required. At no time will the vendor be in contact or have access to VA sensitive information, OI&T systems, or the VA OI&T network.
File details come from the government source that posted it. Updated .