DRAFT SOW Attachment 6 - Required Submittals.pdf

PDF 516 KB Posted

Attached to
T-7 Sunshade Shelters
Solicitation number
FA301626R0026
Issued by

About this file

This is a Statement of Work attachment specifying product data and design submittals required for T-7A shelter construction. The document outlines 14 categories of technical documentation and materials that contractors must provide throughout the project lifecycle.

The required submittals encompass operational documentation, structural components, and system integration details. Contractors must submit operation and maintenance manuals, warranty documentation for all equipment and materials, and as-built drawings showing shelter configuration including equipment and materials. For the concrete foundation system, submittals include reinforcing steel specifications, concrete mix designs with admixtures and reinforcing fibers, testing results with compressive strength data, and detailed pier design documents showing layout, locations, and anchor bolt information. Additional requirements cover paints and coatings with all product data and safety sheets, color samples for government approval, and pavement striping specifications including product data and safety documentation. The electrical scope requires product data and compatibility information for integration with existing electrical systems, specifications for electrical infrastructure including manholes, handholes, pull boxes, cable boxes, underground trenching and conduit, and lightning protection and grounding system coordination with existing systems. Final submittals include closeout documentation. This attachment establishes the technical documentation baseline necessary for the government to evaluate design compliance and construction quality for the T-7A shelter project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Attachment 4

T-7A shelters – Solicitation product data and design submittals

1. Operation and Maintenance Data and Manuals

2. Warranty on equipment and materials

3. Sun shelter as-built drawings including equipment and materials

4. Reinforcing steel for concrete piers/foundations for shelters

5. Concrete mix design for piers/foundations for shelters including admixtures, reinforcing fibers, etc.

6. Concrete testing results and subsequent break results, compressive strength testing

7. Concrete pier design, layout, and location of each pier, include anchor bolt locations/information

8. Paints and coatings – all product data and safety sheets

9. Color samples for approval by the government

10. Pavement stripping – all product data, colors, safety sheets, etc.

11. Electrical product data and information required to coordinate and be compatible with existing electrical

12. Electrical manholes, handholes, pull boxes, cable boxes, including underground trenching and conduit, etc.

13. Lightning protection and grounding systems and how it coordinates and is compatible with existing systems

14. Closeout submittals

DRAFT

File details come from the government source that posted it. Updated .