DRAFT SOW Att 3 - C-130J Mooring Points Stamped Drawings.pdf
PDF 484 KB Posted
- Attached to
- Construct 176WG ADS Pad Federal contract opportunity
- Solicitation number
- W50S6L-20-B-0010
About this file
This notice provides details for an upcoming federal construction contract solicitation. The U.S. Army Alaska National Guard intends to issue a firm fixed-price invitation for bid to construct a concrete foundation pad and support work for a relocatable simulator shelter at the 176th Air Defense Squadron campus. The project magnitude is estimated between $500,000 to $1,000,000. A 20% bid bond is required. The construction period is 180 days with a notice to proceed. The NAICS code is 236220. This will be a total small business set-aside with a size standard of $36.5 million average annual revenue. A minimum of 15% of work must be done by the contractor's own employees, excluding materials. A site visit is scheduled for May 11th, 2020 in Alaska. The solicitation is expected to be released on April 30th, 2020 with a closing date of June 2nd, 2020 through the SAM website. Interested parties can provide comments by the notice closing date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A02.4 SOW_ADS Pad 20200622.pdf | ||
| DRAFT SOW Att 2 - ANG RSS Site Prep_Release_2.0.pdf | ||
| DRAFT SOW - Construct 176 ADS Training Support Pad.pdf | ||
| DRAFT SOW Att 1 - RSS Concept Site Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALASKA AIR NATIONAL GUARD 176TH WING
C-130J SUPER HERCULES
AIRCRAFT MOORING ON STANDARD 30-FOOT SPACED TIE-DOWN RING GRID
SHEET INDEX
ID NAME
T1.0 COVERSHEET
S-1.0 MOORING POINT PLAN
S-2.0 DETAILS
MOORING/ TIE-DOWN DESIGN
THE C-130J IS A 4-ENGINE TURBOPROP MILITARY AIRCRAFT
UTILIZED IN SEARCH AND RESCUE, AERIAL REFUELING, AIRDROP,
TRANSPORT, HUMANITARIAN AND COMBAT MISSIONS AROUND
THE WORLD. NEW TIE-DOWN POINTS ARE REQUIRED AS THE
FORMER C-130 MODEL UTILIZED DIFFERENT TIE-DOWN POINTS.
UNIFIED FACILITIES CRITERIA (UFC) 3-260-01 REQUIRED MOORING
ANCHORS FOR FIXED-WING AIRCRAFT THAT WILL RESIST A
15,250-POUND FORCE APPLIED AT 19 DEGREES RELATIVE TO THE
PAVEMENT SURFACE.
UNLESS SPECIFICALLY WAIVED IN WRITING BY THE FACILITY
COMMANDER, NEWLY CONSTRUCTED AIRCRAFT PARKING
APRONS WILL INCLUDE AIRCRAFT MOORING POINTS DESIGNED
FOR A 67,800-NEWTON (15,250-POUND) LOAD, AS SPECIFIED IN
TM 1-1500-250-23 AND APPLIED AT 19.15 DEGREES (19.15°) FROM
THE PAVEMENT SURFACE. TESTING OF NEW MOORING POINT
INSTALLATIONS IS NOT REQUIRED; HOWEVER, IF TESTING IS
PERFORMED FOLLOW UFC 3-260-01 FIGURE B11-2.
MOORING POINTS FOR RIGID PAVEMENTS WILL BE PROVIDED BY
EMBEDDING THE MOORING DEVICES IN STANDARD ELMENDORF
AIRFIELD CONCRETE MIX REQUIREMENTS. MOORING POINTS
SHALL BE AT LEAST 3-FEET FROM THE EXISTING JOINTS.
MOORING POINTS LESS THAN A MINIMUM OF 3-FEET FROM ANY
PAVEMENT EDGE OR JOINT THE CONTRACTOR SHALL REMOVE
CONCRETE TO THE EXISTING JOINT REPLACE. REINFORCING
STEEL REBAR SHOULD BE PLACED AROUND THE MOORING
POINTS AS ILLUSTRATED.
THE TIEDOWNS ARE DESIGNED TO BE INSTALLED AT THE
EXISTING 176TH WING ALASKA AIR NATIONAL GUARD PARKING
APRONS.
[*THESEcoNsrRITCfior~fooCl.JrV1ENrs weRE cREATED AND scALE:o To sE PRINTED AT 100% oN 11"x11" PAPER 1 100% DESIGN
~"''""'''{<6,.i A~. qf. A~:1&'\t<o ,~'t·· ~;)t,•, ~.:..-49 TH ~ "-. * ~
~~~/Ii;; · ···~ ~ . . ...... ??.:-:- l ~ · · : .... p~;rick LeMay :~ ~ f! {b ·. CE-11007 . ·~;
'• 64>;;.. . . · ~<§ .-~-\~tLipROFES0SiG~~.:
LeMay Engineering & Consulting, Inc.
4272 Chelsea way Anchorage, AK 907,250.9038
0:: 0:::
LU Cl) :::> C>
0... LU _J
:::::> _J z
(/) :::::> 0 z
0 0:: 0:::
~ LU <{
"";- I ~ en (.) ::i
REVISION SCHEDULE
# l DESCRIPTION l DATE
IW~&Y II°"' I ;Rl 04/01/2020
1::'"" 11:~3ANGC130 I
1;:RSHEET I
SHEET NO.
T-1.0
I
NOTES - - 330" - -
I 30"
• RAMP MOORING POINT
0 AIRPLANE MOORING POINT I
f I 131"
11294" --~
360" t I
143"
I
360"
I I t "'\ ' I - .
I
> I
360"
360"
180" 180" - +- 180" 180" 180" - 180" 180"
30' 30' 30' ----
I I G) MOORING POINT PLAN 100% DESIGN
II
~""'-'-"-'\:\•r /a/ -.""OF A '\~> .. ::~~. · ..... ~1& \.~co
,,.~~· •. t•j '0. '.T ' 1~*-'4 TH · ..• ~ ~ . ........ : ... ~ .. l ~J ·.. Patrick LeMay :~ ~
'#6°\·.. CE-11007 .. ·~,:
'• .,,~ • • • • .• ~<§ ,-'\{to PROFEs.s\o~~'-::-
LeMay Engineering & Consulting, Inc.
4272 Chelsea way Anchorage, AK 907,250.9038
I 0::
0:::
II wen ::> a.. UJ
:::> _J z en :::> 0 I-z
0 0:: 0::::
('*') UJ <(
~I ;2 Cl)
II () ::s
REVISION SCHEDULE
# DESCRIPTION l DATE
1-·, II"'" l BRL 04/01/2020
1-···· r ., I PML 020003 ANG C130
1:~;ING POINT PLAN _I
S-1.0
MOORING PROFILE NOTES
1. CONTRACTOR TO REMOVE ADDITION EXISTING CONCRETE AND
REPLACE WHEN THE MINIMUM DISTANCE FROM SAW CUT TO AN
UN-DOWELED JOINT IS 3'.
2. BAR WILL BE NUMBER 7 (0.875") NON-DEFORMED AISI 8620H
STEEL.
3. FOR INSTALLATION IN PREEXISTING SLABS, INSTALL 1"0 X 16"
DOWEL RODS CENTERED AT HALF SLAB DEPTH, ALL FOUR SIDES
AS SHOWN IN THE PLAN VIEW.
REBAR DETAIL NOTES
1. EDGE OF RETROFIT PATCH WILL BE MINIMUM 3' FROM NEAREST JOINT IN BOTH
DIRECTIONS TO REDUCE RISK FOR SYMPATHETIC CRACKS IN EXISTING SLAB. IF
TIE-DOWN MUST BE CLOSER TO JOINT, THEN EXPAND RETROFIT PATCH TO THE
NEAREST JOINT.
EXISTING MOORING AND GROUNDING POINT NOTES
1. THE EXISTING PARKING PADS ON ELMENDORF FOR THE C-130J ALREADY HAVE
INSTALLED GROUNDING POINTS. EXISTING GROUNDING POINTS TO REMAIN.
2. TO BE FULLY COMPLIANT WITH UFC GUIDELINES AND TO ENSURE THAT NEW
MOORING POINTS ARE A MINIMUM OF 3-FEET AWAY FROM ANY EXISTING
PAVEMENT JOINTS, ALL EXISTING MOORING POINTS BE FILLED AND LEVELED
OFF WITH EPOXY. MEDIUM-VISCOSITY PRIME BOND 3000 EPOXY OR BITTER
SHOULD BE USED TO FILL EXISTING MOORING POINTS.
CONCRETE AND BONDING POINTS
1. THE EIGHT REBAR DOWELS USED TO SECURE THE REBAR CAGE
SHALL BE BOUND WITH EPOXY IN THE CORE-DRILLED HOLES
WITHIN THE EXISTING CONCRETE PAD. NEW CONCRETE SHOULD BE
POURED WHILE THE EPOXY IS STILL TACKY. IF EPOXY IS ALLOWED
TO CURE FOR MORE THAN 24-HOURS, THE SURFACE EPOXY
SURROUNDING THE DOWEL SHALL BE ROUGHENED TO HELP
INCREASE BOND STRENGTH. LOW-VISCOSITY PRIME BOND 3900
EPOXY OR BETTER SHOULD BE USED IN SECURING THE REBAR
DOWEL.
2. ALL CONCRETE SAW CUTS SHALL BE FILLED USING STANDARD
ELMENDORF AIRFIELD JOINT SPECIFICATIONS. CONTRACTOR
SHALL VERIFY REQUIREMENTS WITH THE AIRFIELD MANAGER.
3. CONTRACTOR SHALL USE STANDARD ELMENDORF AIRFIELD
SPECIFICATIONS FOR CONCRETE. CONTRACTOR SHALL VERIFY
REQUIREMENTS WITH THE 673 CES PAVEMENTS ENGINEER.
5"
I
DOWEL PRE-EXISTING SLABS. \ I I " #5 REBAR, SIX
DOWEL CAGE -"\ I r- RADIUS = 3 ,,,- EACH WAY, TYP.
L.l Lj <J m==~=~=~~\~~://; ___ ~ <J Lj 10" MINIMUM
<J I
G) MOORING PROFILE
3'-6"
® REBAR DETAIL
SCALE: 1 1/2" = 1'-0"
I
WIRE TIE
2'
<J
"" 4 ·'
. "4 "
" v " .
·11 / <J I
~ 7 .. _j Lj l- 6" L'.J I . 5"
3'
3'-6"
_J
8"
L REBAR D
" 8" ~
~ ALLJOIN
/ TIED.
v " T., ~ t " -~
~ 1'
~ (-\ ,," " i "
" 7" \__ _/ - r - 3"MIN " 4"' " . " " .
. f I., 7" t
4 12" MIN
" 4 ~
- 6" ~
- 1· -ii .
Lj
OWELCAGE,
TS ARE WIRE
100% DESIGN
A~.9f.~~1&\~~~ ---.L~.· *.t•j '-0"· ._, 'I, ; *:. 4~ -~~ ........ .": ~- ~ ~··~ ~~ ~ ~ .e~'tf? ... ~;~.~ ~J •. Patrick LeMay :~ ~ '#t~··. CE-11007 . . ·~...:
'• ~~·· .. . . · ·~r$ --\,{to PROFEs.s10~~..?'
LeMay Engineering & Consulting, Inc.
4272 Chelsea way Anchorage, AK 907,250.9038
0::: 0:::
<( w en :J <.9 a.. w _J
:::::> .....I z en :::::> 0 I-z
0 0::: 0:::
('I') w <(
"-;- I ~ en
REVISION SCHEDULE
11 l DESCRIPTION l
DATE
l'"'M"' II"" I BRL 04/01/2020
1:7'°" 11::03ANGCBO I
1~;T;LS I
S-2.0