Accreditation of Mexico Federal and State Prison Facilities
Solicitation number
191NLE21N0008
Issued by

About this file

This scope of work document outlines requirements for a firm fixed price contract to perform audits and accreditation services for Mexican prison facilities. The selected contractor will conduct up to fifty audits per year of federal and state prisons and central offices in Mexico to evaluate compliance with American Correctional Association standards. The contractor must provide qualified auditors including at least one Spanish speaker for each audit. The contractor will prepare reports on findings and accreditation documents in both Spanish and English. The contract will have a one year base period and three one-year option periods. Performance standards include timely delivery of required documentation and reports to ensure Mexico's pace of corrections improvements. The contractor must designate a dedicated Accreditation Specialist meeting qualifications for the role.

View the file

Other files

File Type Posted
191NLE21N0002 SourcesSought.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of International Narcotics and Law Enforcement Affairs (INL)

INL-MEXICO CITY, MEXICO

Accreditation of Mexico Federal and State Prison Facilities October 2020

1. GENERAL

The Contractor shall provide all labor, services, materials, equipment, transportation, supervision, and all requirements necessary to accomplish the efforts described in this Scope of Work (SOW).

2. BACKGROUND

The Bureau of International Narcotics and Law Enforcement Affairs (INL) leads the Department of State’s anticrime and counter-narcotics efforts. INL’s mission is to minimize the impact of international crime and illegal drugs on the United States, its citizens, and partner nations by providing effective foreign assistance and fostering global cooperation. INL supports our partner nations on stabilization and strengthening of security institutions to build a global security capacity for combating drug trafficking and other transnational crimes such as money laundering and criminal gangs. INL also provides assistance to the Government of Mexico (GOM) to improve prisons conditions to more effectively manage its inmate population to prevent transnational criminal organizations from operating inside prisons.

The accreditation project is being sponsored under the Merida Initiative. The Mexican Penitentiary System is continuing with the accreditation process utilizing the International Core Standards. Under the Merida Initiative, the U.S. Department of State (DOS), as well as other agencies, is supporting the professionalization of the Mexican Penitentiary System at the federal, state, and local levels. The Bureau for International Narcotics and law Enforcement Affairs (INL) US Embassy in Mexico City has been designated the lead agency within the DOS to implement the Merida Initiative programs. The Government of the United States and the Government of Mexico (GOM) have agreed to continue a national accreditation program for the Mexican Federal and State Penitentiary system with the objective of assisting the GOM in significantly reducing the levels of violence in the local, state, and federal correctional facilities.

One of the Mexican Penitentiary System’s challenges is to ensure that there is significant control of correctional environments that are free from corruption, providing a safe and secure environment, which allows reinsertion back into their communities. To fulfill this mission, Mexico needs to correct physical conditions, develop personnel who can do their jobs effectively, apply and standardize appropriate procedures, implement treatment programs, evaluate progress, and generate feedback mechanisms for prison operations.

3. OBJECTIVE

The overall objective of this effort is to enhance prison conditions by achieving compliance of the International Core Standards developed by American Correctional Association (ACA), which is evaluated by an audit performed by experienced auditors from ACA. An audit involves a thorough assessment of every facility in the process of accreditation or re-accreditation, it will determine if the facility is compliant with the series of mandatory standards involving administration and management, physical plant, institutional operations and services, and inmate programs. In this audit, the auditors have the responsibility of raising issues and concerns that may influence the quality of life of inmates and staff. If the penitentiary facility successfully approves said audit, they will be moved to the next phase, which involves a panel hearing that will determine the acquisition of accreditation or reaccreditation for five years for the institution.

Specific objectives of this project are to:

• Accredit / reaccredit up to fifty (50) prisons, including central offices, per year (allocated between federal and state facilities)

• Perform three (3) technical assistance visits (TAV) per year

4. SCOPE

The scope of this project will be to perform audits to evaluate Mexican prisons, and central offices that are in the process of receiving accreditation and re-accreditation by the American Correctional Association. An audit consists in the assessment of a penitentiary facility and it will cover a variety of subjects involving, but not limited to, administration and management, institutional operations and services, the physical state of the facility, as well as the quality of life conditions for staff and inmate population. The acquirement of accreditation or re-accreditation is dependent upon the successful approval of said audit. Audits shall be based on the compliance of accreditation standards developed by the American Correctional Association and the contractor will perform them. The contractor shall provide all required services, logistics and supplies/equipment necessary to accomplish the objectives of this contract.

5. PERFORMACE REQUIREMENTS

• Provide technical assistance in case INL requires clarification on policies and procedures related to the applicability of particular standards or expected practices.

• Select and assign visiting committee auditors, including at least one Spanish speaker at a 2/2 level for each audit requested.

• Conduct up to fifty (50) audits per year based on a firm fixed price (claim per audit).

• Prepare visiting committee reports in both Spanish and English for each audit within 10 business days of visit.

• Review and respond to plan of actions for non-compliance standards within 10 business days of receipt.

• Conduct panel hearings for each audit.

• Conduct technical assistance and or monitoring visits, if needed.

• Track and review annual facility reports.

• Provide translation into Spanish of all relevant documents/reports, including, but not limited to audit reports, conference materials, and other documents as necessary.

INL/Mexico will not provide translation services.

The table that follows lists the specific tasks, actions, audits and reports required under this SOW.

A quarterly report template is provided in Annex A.

Table 1

Task Description Duration/Outcome Completion/Timeframe Distribution

001 Perform up to fifty

(50) facility audits per year with at least one Spanish speaking auditor at a 2/2 level, available at each audit.

2-3 days each 2 audits / week GOM, COR, SLE

Corrections Program

002 Perform a total of 3 TAVs per year in state and federal facilities

1-2 days each TAVs / week GOM, COR, SLE

Corrections Program

003 Deliver preliminary documentation in Spanish and English to INL for facility visits/audits including name of both auditors, and copies of passport, ticket details, and hotel reservation information. INL will provide a specific format to provide this information following contract award.

Required for each facility visit/audit

Deliver at least 10 business days before facility visit/audit

COR, SLE

Corrections Program

004 Deliver completed written reviews of documents for each facility audited in Spanish and English

1 per audit 10 business days after completion of audit(s)

COR, SLE

Corrections Program

005 Deliver completed documents and forms required for facility accreditation

1 per audit 10 business days after completion of audit(s)

COR, SLE

Corrections Program

006 Produce complete audit reports with recommendations for the Commission on Accreditation for Corrections (CAC)

2 weeks prior to panel hearing

10 business days prior to panel hearing

COR, SLE

Corrections Program

007 Conduct and attend panel hearings with review materials in items 004, 005, and

006. Deliver 4 accreditation certificates per facility during each hearing

2 panel hearings per year during ACA Summer or Winter Conference, covering up to 20 facilities each time

At conclusion of hearing COR, SLE Corrections Program

008 Submit an annual project plan. (PMP)

1 per year Within 30 days of notice to proceed/contract signing

COR, SLE

Corrections Program

009 Submit receipts, invoices, and other receipts for travel cost reimbursement to INL within 10 business days of the end of the completed travel

Required for each facility visit/audit

Within 10 business days of completed travel

COR

010 Submit comprehensive budget accruals and expenditure report

Quarterly Within 30 calendar days of the end of the quarter

COR

011 Submit Performance Report

Quarterly Within 30 calendar days of the end of the quarter

COR

012 Submit Monitoring & Evaluation (M&E) Report

Quarterly Within 30 calendar days of the end of the quarter

COR, SLE

Corrections Program

All documentation and reports shall be delivered in electronic format in Spanish and English.

All documentation and reports developed or provided by the contractor shall become property of the U.S. Government.

All deliverables, including attachments, shall comply with the data right clauses incorporated in the contract. The Government will reject all deliverables containing markings contradicting said clauses.

All deliverables shall include a cover page incorporating the following information:

• Deliverable name and number

• Contract number

• Project title

• Date of submission

• INL Recipient

• Document version number

• Contractor’s name

Deliverables longer than five (5) pages shall include a table of contents. All attachments shall include the attachment number, deliverable name and number, and contract number.

6. PERIOD OF PERFORMANCE

The contract will have one (1) base year plus three (3) option years. The Contractor shall complete all work and documentation, no later than twelve (12) months from date of contract award or the execution of the optional years.

7. PLACE OF PERFORMANCE

Audits will take place in state or federal prisons, or central offices located within Mexico (audits/TAVs), and at conference centers in the U.S. (panel hearings during the ACA conferences).

8. INCENTIVES AND RELATED CONSIDERATIONS

Timely completion and submission of reports and audits is critical to GOM maintaining the pace and flow of its corrections standardization and improvement. Therefore, the initial contract will be for a period of one (1) year with up to three (3) one-year optional years, renewable every year.

The U.S. Government may or may not exercise its right to extend for any/all option years. In addition, the GOM and INL may re-tender the contract following more than three late reports or audit result submissions. Therefore, the following provisions apply to this project:

• Deliverables provided in accordance with the scheduled date or timeframe are considered acceptable under the terms of the contract and fully agreed-upon payments will be made to the contractor.

• Any deliverables submitted late will result in a negative CPARS rating.

• Poor performance on this contract will determine whether the government will exercise an optional year.

9. SPECIAL REQUIREMENTS

Project Management. The Contractor shall provide project management services to ensure all services are accomplished in accordance with contract requirements and performed in a timely manner.

Project Management Plan. The contractor shall provide a Project Management Plan (PMP) after award of contract or execution of year notice in annual basis. The PMP shall include a detailed representation of tasks, and required subtasks, to be performed (cross-referenced to the requirements of this SOW and the contractor’s technical proposal) for timely completion of the project. The plan shall define in detail all project milestones and associated completion schedules.

Quarterly Project Report. The contractor shall provide (electronically) quarterly project reports on activities completed, pending action items, and activities planned for the following week on each Tuesday during the duration of the project. The Quarterly Project Report shall follow the example given in Annex A, “Quarterly Report Template” and should be structured in such a way to permit cross-reference to the SOW and contractor’s technical proposal, and shall include at the minimum the following sections:

• Document Control Section. Shall include contract number, recipient organization, program/project/activity title and location.

• Report Details. General objective, specific objectives, activities performed, goals, performance/outcome measures, problems/success to report and follow up to be done.

• Technical Progress Section. This section shall compare actual to planned performance and indicate the progress made in accomplishing each contract task. The report shall include relevant details for assessing the status of performance, i.e., a brief, factual summary description of the technical progress made. The section shall identify any unforeseen technical difficulties, which may threaten on-time completion of the contract. The section shall indicate the specific task that is not progressing according to plan; the reasons for the difficulty; and specific recommendations for remedial action.

Monitoring and Evaluation. The project includes a monitoring and evaluation component to measure the impact of the activities undertaken, as well as the continuous monitoring of the activities by the INL Program Office and M & E team.

The contractor will also comply with INL reporting requirements, including but not limited to, providing and/or inputting basic biographical data on correctional facilities visited, submitting diagnostic, follow-up, pre-audit and audit reports into INL’s online “facility tracker” system, collection and submission of all data required for INL to conduct Leahy Vetting as legally obligated, and any other reports that INL may require throughout the period of performance of this project.

Project Closeout. The contractor shall provide complete documentation for all deliverables under this contract. At a minimum, the closeout documentation must include:

• Final Reports and billing invoices.

10. QUALITY ASSURANCE

Quality Assurance and Surveillance Plan. The Quality Assurance and Surveillance Plan (QASP) is designed to provide an effective surveillance method to promote effective Contractor performance. The QASP provides a method for the INL to monitor Contractor’s performance and advise the Contracting Officer of unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to conduct quality assurance to ensure that contract standards are achieved.

Performance Objective

Standard and Acceptable Quality Level (Maximum allowable deviation)

Incentive/ Disincentive

Calculation

Performs all services set forth in the scope of work (SOW).

All required work is properly performed and no more than one (1) complaint is received per month.

Negative Incentive:

Low rating in CPARS;

appropriate action under the inspection and termination clauses of the contract.

Performance: number of valid written complaints during the month.

Deliverables and reports are high quality, complete, and timely.

Deliverables and reports are written clearly and concisely, comply with all contract requirements, and are professionally sound.

Deliverables and reports are timely distributed to all parties identified in the contract.

Spell and grammar checks are accomplished on all deliverables.

No deliverables or reports are submitted late or not in accordance with contract requirements.

Negative Incentive:

Low rating in CPARS;

appropriate action under the inspection or termination clauses of the contract.

Number of deliverables or reports that are either untimely or not in accordance with purchase order requirements.

Surveillance. INL will receive and document all complaints from Government personnel regarding the services provided. If appropriate, INL will send the complaints to the Contracting Officer for transmittal to the Contractor for corrective action.

Standard. The performance standard is that the Government receives no more than one (1) complaint per month. INL shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the applicable inspection clause, if any of the services exceed the standard.

Procedures.

1. If personnel observe unacceptable services, either incomplete work or required services not being performed, they should immediately contact INL.

2. INL will complete appropriate documentation to record the complaint.

3. If INL determines the complaint is invalid, INL will advise the complainant. INL will retain the annotated copy of the written complaint for his/her files.

4. If INL determines the complaint is valid, INL will inform the Contracting Officer who will contact the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The Contracting Officer shall determine how much time is reasonable.

5. The Contracting Officer shall, as a minimum, notify the Contractor by email of any valid complaints.

6. If the Contractor disagrees with the complaint and challenges the validity of the complaint, the Contractor shall notify the Contracting Officer. The Contracting Officer will review the matter to determine the validity of the complaint.

7. The Contracting Officer will consider complaints as resolved unless notified otherwise by the complainant.

8. Repeat complaints are not permitted for any services. If a repeat complaint is received for the same deficiency during the service period, INL will contact the Contracting Officer for appropriate action under the Inspection clause.

9. If the contractor fails to meet the performance standard, the Government reserves the right to take action under the Inspection clause, including a deduction from the invoice.

11. NONPAYMENT FOR UNAUTHORIZED WORK

No payments will be made for any unauthorized supplies or services or for any unauthorized changes to the work specified herein. This includes any services performed by the Contractor of his own volition or at the request of an individual other than a duly appointed CO. Only a duly appointed CO is authorized to change the specifications, terms, and/or conditions of this contract.

12. KEY PERSONNEL

The U.S.-based Accreditation Specialist must be fully dedicated to the INL Mexico contract and will be the main point of contact between the contractor and the INL corrections team.

Accreditation Specialist must also possess the following qualifications:

• Strong organizational skills.

• Experience performing audits in correctional facilities with ACA, or with a state or federal government correctional department.

• Must have a demonstrated record of accomplishment in correctional subject matter areas of expertise.

• Working knowledge of the INL correction program strategy and cooperation with the

ACA.

• BA/BS (University degree equivalent) required.

• Previous corrections, law enforcement or project management experience. Experience with the GOM or other Latin American governments preferred.

• Working knowledge of the Microsoft Office suite to include Word, Excel, and Power Point.

• Ability to learn new software: INL Facility Tracker, S@mepage planning software for vetting, etc.

• Must be able to effectively communicate in English and Spanish.

• FSI level 4/4 English.

• FSI level 2/2 Spanish.

The Accreditation Specialist description will be reviewed with INL Mexico and approved in writing. An INL representative will participate in interviews for the Accreditation Specialist, on a discretionary basis. INL Mexico reserves the right to review and provide final written approval for the position listed above.

13. TYPE OF CONTRACT

This will be a firm-fixed price, One Base Year plus up to three option years. No additional amounts will be paid to the contractor based on fluctuations in prices of proposed items or incurred costs for actual work performed.

Annex A: Quarterly Report Template Narrative Quarterly Report

Month-Month Year

Contract Number:

COR Name:

Recipient Organization:

Program/Project/Activity Title:

Location of the Project/Activity:

REPORT for the QUARTER (please check appropriate box)

Quarter 1 Quarter 3

Quarter 2 Quarter 4

Final Evaluation Report Other (specify):

Recipient Program and Financial Reports Received

Recipient Program and Financial Reports Not Received

Provide parameters for performance monitoring to include inputs, outputs, outcomes, and performance interventions. (Performance objectives, goals, and indicators based on the Statement of Work (objectives) from the Notice of Award)

GOALS AND OBJECTIVES

General Objective:

Specific Objectives:

Activities Performed:

Goals:

Performance / Outcome Measures:

Management:

Monitoring Site Visit Conducted (Provide date and description of performance and progress and any issues/problems related to the agreement)

Telephone or Desk Audit Conducted (Provide date and description of performance and progress and any issues/problems discussed related to the agreement)

Problems/Successes to Report:

Successes

Problems

Follow-up to be done:

Additional Questions/Comments: