Draft RFP_N6852024R0020_LIIS CMDS MAC.pdf
PDF 1014 KB Posted
- Attached to
- Logistics (LOG) Information Technology (IT) Capability Modernization, Deployment, and Support (CMDS) Federal contract opportunity
- Solicitation number
- N68520-24-R-0020
About this file
This document is a draft solicitation for a multiple award Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Logistics Information Technology (LOG IT) Capability Modernization, Deployment, and Support (CMDS) services. The contract will provide continuous CMDS of Naval Maintenance, Repair and Overhaul (N-MRO), Naval Supply Chain Management (N-SCM), Naval Product Lifecycle Management (N-PLM), Logistics Integrated Data Environment (L-IDE), and Integration and Infrastructure (I&I) capability solutions. The solicitation will be issued in two lots, one full and open and one small business set-aside, under NAICS code 541512 with a $34 million size standard. The contract type is anticipated to be a mix of Firm-Fixed Price, Cost-Plus-Fixed-Fee, and Cost CLINs. The period of performance is a five-year ordering period. The government is requesting industry feedback on the draft solicitation by September 11, 2024 and plans to issue the formal solicitation in the 1st quarter of fiscal year 2025, with contract award in the 2nd quarter of fiscal year 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Response to Questions Submitted.pdf | ||
| Draft_CMDS_PWS_30MAY2024.docx | DOCX document | |
| N6852024R0020_LIIS CMDS MAC _ DRAFT Solicitation QA Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A
X B
X C X D
EX
X
G
F 44 - 52
X H
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 52
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N68520 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2
3 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
7 - 10
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
12 - 13
14 - 15 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 16 - 22
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 23 - 30 M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
31 - 42
PART II - CO NTRACT CLAUSES
COMFRC PROCUREMENT GROUP
47038 MCLEOD ROAD; BUILDING 448
PATUXENT RIVER MD 20670
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6852024R0020
Section A - Solicitation/Contract Form
SECTION A INFORMATION
A.1 NOTICE TO OFFERORS
a) This solicitation is for the Logistics IT Integration and Support (LIIS) Capability Modernization, Deployment, and Support (CMDS) Multiple Award Contract (MAC).
b) Throughout this document, this procurement will be referred to as “LIIS CMDS MAC.”
c) Offerors must follow the instructions set forth in this solicitation to be considered for award. Any amendment(s) to this solicitation will be posted to https://www.sam.gov.
d) This solicitation is a partial Small Business Set-Aside in accordance with FAR 19.502-4.
e) This solicitation’s small business size standard is thirty-four (34) million dollars, and covers North
American Industry Classification System (NAICS) code 541512.
https://www.sam.gov/
Section B - Supplies or Services and Prices
SECTION B INFORMATION
B.1 BACKGROUND
a) The LIIS CMDS MACs are designed to address the need for a full range of Logistics Information Technology
(LOG IT) requirements by providing continuous CMDS of the Naval Maintenance, Repair and Overhaul (N-MRO), Naval Supply Chain Management (N-SCM), Naval Product Lifecycle Management (N-PLM), Logistics Integrated
Data Environment (L-IDE), and Integration and Infrastructure (I&I) capability solutions as part of or within the integrated platform and DevSecOps pipeline.
b) The intent is to award contracts for two lots, one open lot and one set aside lot for small business. The contracts that will result in task order awards to support NAVAIR, and United States (US) Government agency customers that cover NAICS Code 541512 and Products and Services Codes (PSC) DA01.
c) The full scope of services for the LIIS CMDS MAC is defined in Section C.
B.1.1 CONTRACT TYPE
a) This IDIQ/MAC allows for various Contract Line Item Number (CLIN) types at the TO level to include firm-fixed price (FFP), cost-plus fixed fee (CPFF), and Cost. TOs may also combine more than one CLIN type (e.g., FFP/Cost). Additionally, TOs may include performance based measures, and option periods.
B.1.2 MINIMUM GUARANTEE AND MAXIMUM CEILING
a) The Government will award a TO for $1,000.00 to attend a post award conference; this will satisfy the minimum guarantee price to each Offeror selected for an IDIQ award under the LIIS CMDS MAC.
b) The cumulative total of all TOs issued pursuant to all multiple award contracts issued under this solicitation
N68520-24-R-0020 shall not exceed $250,000,000.00.
B.2 TASK ORDER PRICING
a) This IDIQ/MAC provides the flexibility to determine fair and reasonable pricing tailored to the requirement dependent upon the level of competition, uncertainties, complexity, urgency, and contract type. The Task Order
Contracting Officer (TOCO) has the authority and responsibility for the determination of cost/price reasonableness for the TO requirements.
b) The TOCO will identify the applicable contract type for all CLINs in each IDIQ/MAC TO.
B.2.1 Fixed Price Task Orders
a) Fixed price is described under Federal Acquisition Regulation (FAR) Subpart 16.2, Fixed-Price Contracts, and other applicable agency-specific regulatory supplements.
B.2.2 Cost Reimbursement Task Orders
a) Cost Reimbursement is described under FAR Subpart 16.3, Cost-Reimbursement Contracts, and other applicable agency-specific regulatory supplements.
b) To be eligible for a cost reimbursement task order, the Contractor shall have and maintain an acceptable accounting system that will permit timely development of all necessary cost data in the form required by the proposed contract type. See DFARS 252.242-7006.
c) The Contractor may be required to provide a cost submission with supporting information for each cost element, including, but not limited to, direct labor, fringe benefits, overhead, general and administrative (G&A) expenses, facilities capital cost of money, other direct costs, and fee consistent with their cost accounting system, provisional billing rates, and forward pricing rate agreements.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
LIIS CMDS FFP
FFP
In accordance with the Performance Work Statement, Attachment 1
ORDERING PERIOD (Year 1-5)
FOB: Destination
PSC CD: DA01
NET AMT
LIIS CMDS CPFF
CPFF
In accordance with the Performance Work Statement, Attachment 1
ORDERING PERIOD (Year 1-5)
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
LIIS CMDS COST
COST
In accordance with the Performance Work Statement, Attachment 1
ORDERING PERIOD (Year 1-5)
ESTIMATED COST
DATA
FFP
In accordance with the Performance Work Statement, Attachment 1
ORDERING PERIOD (Year 1-5)
NET AMT
CLAUSES INCORPORATED BY FULL TEXT
BTXT.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR) (DEC 2012)
To be completed at task order level
(a) The level of effort estimated to be ordered during the term of this contract is [Insert man-hours] man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor by classification is as follows:
Labor Category Man-hours Total Man-hours
[insert the man-hours per labor category]
(Also list Options Man-hours if applicable)
Totals
* denotes Key Personnel labor categories
(b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.
(c) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of:
(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or
52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort; or
(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.
(d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.
(e) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order.
Section C - Descriptions and Specifications
SECTION C INFORMATION
C.1 DESCRIPTION OF WORK STATEMENT
a) Performance Work Statement (PWS), Attachment 1 defines and provides the basic requirement of the general tasks to be performed under the LIIS CMDS MAC contract. This contract may procure a broad range of LOG IT services within the scope of the contract. The tasks and detailed requirements for LOG IT services will be defined in the requirement documents for each individual TO.
CTXT.204-9502 REQUIREMENTS FOR LOCAL SECURITY SYSTEM (NAVAIR)(OCT 2005)
The contractor agrees to provide locator information regarding all employees requiring a permanent badge for authorized entrance to the [identify installation]. Entrance is authorized by this contract as a result of tasks associated with performance of the Section C - Statement of Work only. Initial information shall be provided as each individual is assigned to this contract by using the Locator Form provided as an attachment to this contract.
Thereafter, quarterly reports (due at the beginning of each quarter by the fifth day of the month) will be provided with gains/losses (identification of new and replaced or added individuals) and any changes to current personnel
(such as telephone number, building number and room number). A point of contact is to be named on each quarterly report for any questions/additional information needed by the Government recipient. The quarterly reports are to be addressed to [insert address]. All losses are to have the permanent badges returned to [insert address] on the last day of the individual's task requirement.
CTXT.204-9505 SYSTEM AUTHORIZATION ACCESS REQUEST (SAAR) REQUIREMENTS FOR
INFORMATION TECHNOLOGY (IT) (NAVAIR) (FEB 2024)
(a) Contractor personnel assigned to perform work under this contract may require access to Navy Information
Technology (IT) resources (e.g., computers, laptops, personal electronic devices/personal digital assistants
(PEDs/PDAs), NMCI, RDT&E networks, websites such as MyNAVAIR, and Navy Web servers requiring Common
Access Card (CAC) Public Key Infrastructure (PKI)). Contractor personnel (prime, subcontractor, consultants, and temporary employees) requiring access to Navy IT resources (including those personnel who previously signed
SAAR DD Form 2875) shall submit a completed System Authorization Access Request (SAAR) DD Form 2875 or latest version thereof, and have initiated the requisite background investigation (or provide proof of a current background investigation) prior to accessing any Navy IT resources. The form and instructions for processing the
SAAR form are available at: https://www.esd.whs.mil/Directives/forms/dd2500_2999/DD2875/.
(b) SAAR forms will be submitted to the Government Sponsor or Technical Point of Contact (TPOC) via the contractor's Facility Security Officer (FSO). The designated SAAR Government Sponsor or TPOC for contractor employees requiring IT access, [fill-in name] shall be responsible for signing and processing the SAAR forms. For those contractors that do not have a FSO, SAAR forms shall be submitted directly to the designated SAAR
Government Sponsor or TPOC. Copies of the approved SAAR forms may be obtained through the designated
SAAR Government Sponsor or TPOC. Requests for access should be routed through: navair_saar-n.gm.fct@navy.mil. SAAR forms may also be submitted online via the Nation Help Desk Service Management Self
Service Catalog: https://nhdsm.navair.navy.mil/.
(c) In order to maintain access to Navy IT resources, the contractor shall ensure completion of initial and annual
IA/Cyber Awareness training, monitor expiration of requisite background investigations, and initiate re-https://www.esd.whs.mil/Directives/forms/dd2500_2999/DD2875/ mailto:navair_saar-n.gm.fct@navy.mil mailto:navair_saar-n.gm.fct@navy.mil https://nhdsm.navair.navy.mil/ investigations as required. If requested, the contractor shall provide to the designated SAAR Government Sponsor or TPOC documentation sufficient to prove that it is monitoring/tracking the SAAR requirements for its employees who are accessing Navy IT resources. For those contractor personnel not in compliance with the requirements of this text, access to Navy IT resources will be denied/revoked.
(d) The SAAR form remains valid throughout contractual performance, inclusive of performance extensions and option exercises where the contract number does not change. Contractor personnel are required to submit a new
SAAR form only when they begin work on a new or different contract.
CTXT.232-9509 TRAVEL APPROVAL AND REIMBURSEMENT PROCEDURES (NAVAIR) (OCT 2013)
(a) General. Performance under this contract may require travel by Contractor personnel. If travel, domestic or overseas, is required, the Contractor is responsible for making all necessary arrangements for its personnel. These include but are not limited to: medical examinations, immunizations, passports/visas/etc., and security clearances.
(b) Travel Approval Process. Prior approval is required for all travel under this contract. Travel shall be reviewed and approved/disapproved as follows:
(1) The Contractor shall provide the [Insert Procuring Contracting Officer (PCO) or Contracting Officer's
Representative (COR)] a written request for authorization to travel at least 30 days in advance of the required travel date, when possible. The request should include: purpose of travel, location, travel dates, number of individuals traveling, and all estimated costs associated with the travel (e.g., lodging, meals, transportation costs, incidental expenses, etc.).
(2) The [Insert PCO or COR] will review the travel request and provide, in writing, an approval or disapproval of the travel request to the Contractor [Insert "and the Procuring Contracting Officer." if the COR is reviewing and approving the request.]
(c) Travel Policy.
(1) Travel arrangements shall be planned in accordance with the Federal Travel regulations, prescribed by the
General Services Administration for travel in the conterminous 48 United States, (hereinafter the FTR) and the Joint
Travel Regulation, Volume 2, DoD Civilian Personnel, Appendix A, prescribed by the Department of Defense
(hereinafter the JTR).
(2) The Government will reimburse the Contractor for allowable travel costs incurred by the Contractor in performance of the contract in accordance with FAR Subpart 31.2.
(3) For purposes of reimbursement of travel expenses, the Contractor's official station is defined as within 50 miles of the Contractor's regular work site. (If Contractor has more than one regular work site, the official station is defined as within 50 miles of each of its regular work sites.)
(4) The Contractors documentation for the reimbursement of travel costs (e.g., receipts) shall be governed as set forth in FAR Subpart 31.2, the FTR, and the JTR.
(5) Car Rental for a team on temporary duty (TDY) at one site will be allowed provided that only one car is rented for every four (4) members of the TDY team. In the event that less than four (4) persons comprise the TDY team, car rental will be allowed if necessary to complete the mission required.
(6) Whenever work assignments require TDY aboard a Government ship, the Contractor will be reimbursed at the per diem identified in the JTR.
CTXT.237-9501 ADDITION OR SUBSTITUTION OF KEY PERSONNEL (SERVICES) (NAVAIR) (FEB
2024)
(a) A requirement of this contract is to maintain stability of personnel proposed in order to provide quality services. The contractor agrees to assign only those key personnel whose resumes were submitted and approved, and who are necessary to fulfill the requirements of the effort. The contractor agrees to assign to any effort requiring non-key personnel only personnel who meet or exceed the applicable labor category descriptions. No substitution or addition of personnel shall be made except in accordance with this clause.
(b) If personnel for whatever reason become unavailable for work under the contract for a continuous period exceeding thirty (30) working days, or are expected to devote substantially less effort to the work than indicated in the proposal, the contractor shall propose a substitution to such personnel, in accordance with paragraph (d) below.
(c) The contractor agrees that [insert “during the term of the contract” or “during the first ____ months of the contract”], no key personnel substitutions or additions will be made unless necessitated by compelling reasons including, but not limited to: an individual’s illness, death, termination of employment, declining an offer of employment (for those individuals proposed as contingent hires), or family friendly leave. In such an event, the contractor must promptly provide the information required by paragraph (d) below to the Contracting Officer for approval prior to the substitution or addition of key personnel.
(d) All proposed substitutions shall be submitted, in writing, to the Contracting Officer at least fifteen (15) days
(thirty (30) days if a security clearance must be obtained) prior to the proposed substitution. Each request shall provide a detailed explanation of the circumstances necessitating the proposed substitution, a complete resume for the proposed substitute, information regarding the full financial impact of the change, and any other information required by the Contracting Officer to approve or disapprove the proposed substitution. All proposed key personnel substitutes (no matter when they are proposed during the performance period) shall have qualifications that at a minimum meet contract requirements for the applicable labor category, except that substitutes for a key personnel position that exceed the minimum contract requirement for the applicable labor category shall also exceed the minimum qualification requirements for the applicable labor category.
(e) In the event a requirement to increase the specified level of effort for a designated labor category, but not the overall level of effort of the contract occurs, the offeror shall submit to the Contracting Officer a written request for approval to add personnel to the designated labor category. The information required is the same as that required in paragraph (d) above.
(f) The Contracting Officer shall evaluate requests for substitution and addition of personnel and promptly notify the offeror, in writing, of whether the request is approved or disapproved.
(g) If the Contracting Officer determines that suitable and timely replacement of personnel who have been reassigned, terminated or have otherwise become unavailable to perform under the contract is not reasonably forthcoming or that the resultant reduction of productive effort would impair the successful completion of the contract or the task order, the contract may be terminated by the Contracting Officer for default or for the convenience of the Government, as appropriate. Alternatively, at the Contracting Officer’s discretion, if the
Contracting Officer finds the contractor to be at fault for the condition, he may equitably adjust (downward) the contract price or fixed fee to compensate the Government for any delay, loss or damage as a result of the contractor’s action.
(h) Noncompliance with the provisions of this clause will be considered a material breach of the terms and conditions of the contract for which the Government may seek any and all appropriate remedies including
Termination for Default pursuant to FAR Clause 52.249-6, Alt IV, “Termination (Cost-Reimbursement)”.
CTXT.245-9520 ASSOCIATE CONTRACTOR CLAUSE (NAVAIR) (OCT 2005)
(a)(1) This clause is intended to ensure that there will be appropriate coordination/integration of work by the
[specify weapons systems] associate contractors to ensure complete compatibility between equipment, data, and services for the [specify weapons systems] to prevent unnecessary duplication of effort and in order to maximize commonality.
(2) The price of this contract makes provision for the performance of the work called for in the Associate
Contractor Agreements as required by this clause, in support of this contract.
(b) The Associate Contractors are as follows:___________________________________
(c) The contractor shall work and maintain close liaison with the associate contractors listed in paragraph (b) above. In order to assure accomplishment of this objective, the contractor shall enter into a written Associate
Contractor Agreement with each of the other applicable associate contractors.
(d) Each Associate Contractor Agreement between the contractor and an associate contractor shall provide for complete and unbiased exchange of technical information and interface data (data) relating to their detailed responsibilities and procedures. The following is a guide to be used in the development of each agreement:
(1) Identification of the data to be furnished among the associate contractors to facilitate procedures/schedules for the exchange of data. Descriptive detail of the data to be furnished or exchanged, with a specific date for delivery of each item thereof and containing such other mutual covenants and agreements that may be desirable or required to assure delivery or exchange of said data in a timely manner and in a condition suitable for use by the recipient.
(For example, this may extend to all information pertaining and essential to the design, development, fabrication, test, interface, modification and installation of equipment and provision of services hereunder to the extent that each party may require such information to ensure the compatibility of their respective equipment, data and services.)
(2) Services to be provided by one contractor to another (including such services as clerical support to visiting associate contractor personnel, unscheduled maintenance and technical support for equipment, etc.) to facilitate the performance of the respective contracts and the period(s) of time the services are to be provided to assure necessary interface actions and support activities.
(3) The materials to be provided to each other by the respective contractors in performance.
(4) The facilities and their location to be provided by each contractor to accommodate personnel assigned to provide the associate contractor's integration and support services, assurance of adequate working areas, power requirements, office space and communication equipment which are essential for timely completion of the integration/support services.
(5) Delineation of respective interface responsibilities.
(6) Provision for furnishing copies to communications relative to performance of associate contractor responsibilities.
(e) In the event this exchange of data results in the need to obtain access to proprietary information, the contractor agrees to include in the Associate Contractor Agreements the terms and conditions under which the contractor and associate contractors agree to exchange such proprietary information. The Contractor hereby agrees not to use, modify, reproduce, release, perform, display, or disclose such proprietary information unless specifically authorized in writing to do so under the Associate Contractor Agreements.
(f) The Associate Contractor Agreements shall permit the exchange of data between the associate contractors. The
Agreements shall be structured so that all contractors and associate contractors are obligated to protect proprietary information from all unauthorized use or disclosure for as long as such information remains proprietary.
(g) "Proprietary Information" means information that embodies trade secrets developed at private expense or business, commercial, or financial information that is privileged or confidential provided that such information:
[_____] is not known or available from other sources without obligations concerning its confidentiality;
[_____] has not been made available by the owners to others without obligation concerning its confidentiality;
[_____] is not already available to the Government without obligation concerning its confidentiality; and
[_____] has not been developed independently by persons who have had no access to the information.
(h) Each Associate Contractor Agreement shall be submitted to the Government for review prior to execution.
Following Government concurrence and execution by both associate contractors, each Associate Contractor
Agreement may be made an attachment to this contract. The Associate Contractor Agreements are for information purposes only and shall not be subject to or governed by this contract. In the event of a conflict between the terms of this contract and terms of the aforesaid agreement, the terms of this contract shall control.
(i) Where the contractor and an associate contractor fail to agree upon action to be taken in connection with their respective responsibilities, each contractor shall promptly notify the cognizant PCO and furnish the contractor's recommendations for a solution. The contractor shall not be relieved of its obligations to make timely deliveries or be entitled to any other adjustment because of the contractor and its associate failure to: (1) resolve Associate
Contractor Agreements disputes; (2) promptly refer matters to the PCO; or (3) to implement PCO directions.
Section D - Packaging and Marking
SECTION D INFORMATION
D.1 PACKAGING AND MARKING
a) Packaging and marking of all deliverables must conform to normal commercial packing standards to assure safe delivery at destination. Clauses and other requirements regarding packing and marking shall be designated by the
TOCO at the TO level.
DTXT.247-9507 PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2021)
(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry
Security Program Operating Manual, 32 CFR Part 117.
(b) The contractor shall prominently display on the cover of each report the following information:
(1) Name and business address of contractor.
(2) Contract Number/Delivery/Task order number.
(3) Contract/Delivery/Task order dollar amount.
(4) Whether the contract was competitively or non-competitively awarded.
(5) Name of sponsoring individual.
(6) Name and address of requiring activity.
DTXT.247-9508 PROHIBITION AND LIMITATIONS FOR PACKAGING MATERIALS
(NAVAIR) (AUG 2019)
The use of loose fill materials, asbestos, excelsior, newspaper and shredded paper (all types) are prohibited. In addition, all Wood Packaging Materials (WPM) shall be heat treated or chemically treated in accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15:2009, "Regulation of Wood
Packaging Material in International Trade."
DTXT.247-9514 TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999)
Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M.
Section E - Inspection and Acceptance
SECTION E INFORMATION
E.1 INSPECTION AND ACCEPTANCE
a) Clauses and other requirements regarding inspection and acceptance shall be designated by the TOCO at the TO level.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-2 Alt I Inspection Of Supplies Fixed Price (Aug 1996) - Alternate I JUL 1985
52.246-3 Inspection Of Supplies Cost-Reimbursement MAY 2001
52.246-4 Inspection Of Services--Fixed Price AUG 1996
52.246-5 Inspection Of Services Cost-Reimbursement APR 1984
52.246-15 Certificate of Conformance APR 1984
52.246-16 Responsibility For Supplies APR 1984
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard selected below.
[The Contracting Officer insert the title, number, date, and tailoring (if any) of the higher-level quality standards.]
Title Number Date Tailoring
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-- (i) Control of such things as design, work operations, in-process control, testing, and inspection; or (ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
ETXT.246-9512 INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by [insert the accepting authority].
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
ETXT.246-9514 INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION
(NAVAIR)(FEB 1995)
Inspection and acceptance of technical data and information will be performed by the Procuring Contracting
Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements
List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled [insert title of attachment, e.g., NAWCTSD 4330/60 Data Item Transmittal/Acceptance/ Rejection Form].
The attached form will not be used for high cost data such as drawings, specifications, and technical manuals.
Section F - Deliveries or Performance
SECTION F INFORMATION
F.1 PLACE OF PERFORMANCE
a) The services to be provided under this IDIQ/MAC shall be accomplished at the locations identified in the
TO.
F.2 ORDERING PERIOD
a) This IDIQ/MAC will have a five year ordering period.
b) The period of performance for each TO awarded under this IDIQ/MAC shall be specified in the TO. TOs must be requested and awarded prior to the IDIQ/MAC ordering period expiring and may extend up to one year after the IDIQ/MAC ordering period ends.
c) TO option periods may be exercised after the IDIQ/MAC ordering period expires as long as the final TO option period does not extend the cumulative period of performance of the TO beyond one year after the
IDIQ/MAC ordering period expires.
d) After the IDIQ/MAC ordering period expires, the IDIQ/MAC will remain an active contract until the final
TO is closed-out and shall govern the terms and conditions with respect to active TOs to the same extent as if it were completed during the IDIQ/MAC ordering period.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 31-JAN-2025 TO
30-JAN-2030
N/A N/A
0002 POP 31-JAN-2025 TO
0003 POP 31-JAN-2025 TO
0004 POP 31-JAN-2025 TO
52.242-15 Stop-Work Order AUG 1989
52.242-15 Alt I Stop-Work Order (Aug 1989) - Alternate I APR 1984
52.242-17 Government Delay Of Work APR 1984
52.247-29 F.O.B. Origin FEB 2006
52.247-34 F.O.B. Destination NOV 1991
52.247-55 F.O.B. Point For Delivery Of Government-Furnished
Property
JUN 2003
FTXT.211-9507 PERIOD OF PERFORMANCE (NAVAIR) (MAR 1999)
(a) The contract shall commence on [insert effective date] and shall continue [insert “for a period of months” or provide a calendar date]. However, the period of performance may be extended in accordance with the option provisions contained herein.
(b) If FAR Clause 52.216-18, “Ordering”, is incorporated into this contract, then the period in which the
Government can issue orders under the contract will be extended at the exercise of an option, and extended to the end of that option period.
FTXT.247-9505 TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data
Requirements List, DD Form 1423, Exhibit [insert exhibit number(s)], attached hereto, and the following:
(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13
(date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below.
Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the
DD Form 1423.
(1) PCO, Code [insert code].
(2) ACO, Code [insert code].
[insert additional code addresses, as necessary]
(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.
(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.
(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements
(i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.
(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.
(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.
(g) DD Form 1423, Block 14 Mailing Addresses: [insert the abbreviation and mailing address to match]
Section G - Contract Administration Data
SECTION G INFORMATION
G.1 BACKGROUND
a) This section provides roles responsibilities, and contract administration requirements for this IDIQ/MAC and each TO placed under this IDIQ/MAC. Clauses and other requirements regarding contract administration may be designated by the TOCO at the TO level.
252.204-7006 Billing Instructions--Cost Vouchers MAY 2023
252.231-7000 Supplemental Cost Principles DEC 1991
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of
Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-
7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
https://www.sam.gov/ https://wawf.eb.mil/
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting
Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the
Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC ____ https://wawf.eb.mil/
Issue By DoDAAC ____
Admin DoDAAC** ____
Inspect By DoDAAC ____
Ship To Code ____
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert
“See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the
DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition
Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s
WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
GTXT.201-9500 TECHNICAL POINT OF CONTACT (TPOC) (NAVAIR) (APR 2022)
(a) The Technical Point of Contact (TPOC) for this contract is: [insert name, code, mailing address (optional), email address, and telephone number]
(b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order
COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order.
Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO).
(c) The contractor may use this TPOC for technical questions related to the existing contract or order. Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires.
(d) The contractor shall immediately notify the PCO in writing if the contractor interprets any action by the TPOC to be a change to the existing contract.
GTXT.201-9501 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE (COR)
(NAVAIR)(APR 2022)
(a) The Contracting Officer has designated [insert name, mailing address (optional), email address, code, and telephone number] as the authorized Contracting Officer's Representative (COR) to perform the following functions, duties, and/or responsibilities:[Insert functions, duties, and/or responsibilities of the COR].
(b) The effective period of the COR designation is [insert "the period of performance of this contract" OR "from
_______ to ________."]
GTXT.232-0001 PAYMENT INSTRUCTIONS (NAVAIR) (MAY 2023)
For Government Use Only
Contract/Order
Payment Clause
Type of
Payment
Request
S u p p ly er v ic e
C o n st ru ct io n
Payment Office
Allocation Method
52.212-4 (Alt I), Cost Voucher X X N/A Line item specific proration.
Contract Terms and If there is more than one ACRN
Conditions— within a deliverable contract line
Commercial Products item, the funds will be allocated in and Commercial the same proportion as the
Services; amount of funding currently
52.216-7, Allowable unliquidated for each ACRN on
Cost and Payment; the line item billed.
52.232-7, Payments
Under Time-and-
Materials and Labor-
Hour Contracts
52.232-1, Payments, Navy X X N/A Line item specific by fiscal year.
252.217-7007, Shipbuilding If there is more than one ACRN
Payments Invoice (Fixed within a deliverable line or
(vessel repair and alterations) Price) deliverable subline item, the funds will be allocated using the oldest funds first. In the event of a deliverable line or deliverable subline item with two or more
ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-1, Payments; Invoice X X N/A Line item specific proration.
52.232-2, Payments If there is more than one ACRN
Under Fixed-Price within a deliverable line item or
Research and deliverable subline item, the
Development funds will be allocated in the
Contracts; same proportion as the amount
52.232-3, Payments of funding currently unliquidated
Under Personal for each ACRN on the deliverable
Services Contracts; line or deliverable subline item for
52.232-4, Payments which payment is requested.
Under Transportation
Contracts and
Transportation-Related
Services Contracts; and
52.232-6, Payments
Under Communication
Service Contracts With
Common Carriers p v n st ru ct
52.232-5, Payments Under
Fixed-Price Construction
Contracts
Construction
Payment
Invoice
N/A N/A X Line item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds first. In the event of a deliverable line or deliverable subline item with two or more
ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.
52.232-16, Progress Progress X X N/A Contract-wide proration.
Payments Payment* Funds shall be allocated in the
(excluding contracts same proportion as the amount with multiple lot of funding currently unliquidated progress payments) for each ACRN. Progress payments are considered contract level financing, and the
“contract price” shall reflect the fixed-price portion of the contract per FAR 32.501-3.
52.232-16, Progress
Payments;
252.232-7018, Progress Payments—
Multiple Lots
Progress
Payment*
X X N/A Lot-wide proration (applies to lots specifically identified in the contract).
If there is more than one ACRN within a lot, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the lot for which payment is requested.
See PGI 204.7108 paragraph (c) for multiple lot CLIN structure.
p v n st ru ct
52.232-29, Terms for
Financing of Purchases of
Commercial Products and
Commercial Services;
52.232-30, Installment
Payments for Commercial
Products and Commercial
Services
Commercial
Product and
Commercial
Service
Financing*
X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2).
52.232-32, Performance-Based Payments
Performance-
Based Payments*
X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.1007(b)(2).
252.232-7002, Progress Payments for Foreign
Military Sales Acquisitions
Progress
Payment*
X X N/A Allocate costs among line items and countries in a manner acceptable to the administrative contracting officer.
*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial product and commercial service financing).
Section H - Special Contract Requirements
SECTION H INFORMATION
H.1 LIIS CMDS TASK ORDER PROCEDURES
a) Authorized Contracting Officers
1. The following activities or individuals are designated as Ordering Officers: TBD
2. The above activities are responsible for soliciting proposals for work under TOs, evaluating proposals, issuing TOs, and administering any TOs placed hereunder. TOCOs may negotiate revisions/modifications to TOs, but only within the scope of this basic IDIQ/MAC. TOCOs have no authority to modify any provision of this contract. Any deviation from the terms of the IDIQ/MAC must be submitted to the PCO for contractual action. TOCOs may enter into mutual no cost cancellations of TOs under this contract and may reduce the scope of orders/tasks, but a Termination for Convenience or Termination for Default may only be issued by the PCO.
b) Task Order Terms and Conditions
1. All TOs issued hereunder are subject to the terms and conditions of the LIIS CMDS IDIQ/MAC contract.
2. Individual TOs may incorporate the fill-in clauses contained in the LIIS CMDS IDIQ/MAC contract that require additional language and applicable clauses not incorporated in the LIIS CMDS IDIQ/MAC contract. Such applicable clauses will pertain only to the individual TO and will be identified in the
FOSR issued for that TO.
3. The LIIS CMDS IDIQ/MAC contract allows for TOs to be issued using the following contract types:
FFP, CPFF, and Cost, or any combination of these contract types.
4. LIIS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .