This is a Statement of Work (SOW) for the Air Force Cyberspace and Communications (AFCC) Heritage Center renovation project at Scott Air Force Base, Illinois. The project encompasses eight distinct exhibits and renovations to be completed within 18 months, including: 1) a Tactical Communications Exhibit with outdoor satellite and communications equipment, 2) a Ground Control Station Exhibit featuring a modified unmanned aerial vehicle station and scale models, 3) a Hall of Fame Exhibit with an interactive 85" touchscreen display, 4) an updated Switchboard Exhibit with historical World War II era communications equipment, 5) a new Lt Gen Harold W. Grant Exhibit, 6) a website with digital walkthrough, 7) a broadcasting solution for event recording and streaming, and 8) interior materials and finishes updates.
The total project period is approximately 365 calendar days from the Notice to Proceed, with a phased design review process including 35%, 65%, 95%, and 100% design submissions. The contractor will be responsible for researching, designing, fabricating, transporting, and installing exhibits, developing digital content, providing maintenance budgets, and ensuring code compliance. The project aims to enhance the AFCC Heritage Center's ability to tell the story of Air Force cyberspace, communication, and information technology through modernized, interactive exhibits and digital experiences.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document Effective: 17 March 2025; Revision No.: 2
STATEMENT OF WORK
OPPORTUNITY # 1149057
REPAIR-CONST, Interior and Exterior Renovations (Heritage Center), HQ CCC; B1700
Design-Build
SCOTT AIR FORCE BASE, ILLINOIS
3 July 2025
1 GENERAL
1.1 BACKGROUND: Over 35 years ago a collection of artifacts dedicated to telling the story of the United States Air Force mission of cyberspace, communication, and information technology began to coalesce at Scott AFB. What started as a visitor’s center in the major command headquarters, was added to, upgraded, and invested in culminating in the 2020 creation of the Air Force Cyberspace and Communications (AFCC) Heritage Center. The AFCC Heritage Center serves as the one and only heritage center in the USAF dedicated to telling this important story.
1.2 OBJECTIVES: The AFCC Heritage Center serves as the only heritage center in the USAF dedicated to highlighting the artifacts and stories of the Cyberspace and Information Technology (C&IT) community. The Heritage Center developed a master plan in 2024 that call for eight individual projects that range from developing new exhibits utilizing existing artifacts, modifying government furnished equipment, updating existing finishes and signage, developing a website with content, etc. These eight projects need to be individually researched, designed, fabricated and/or modified, transported, and installed.
The eight projects will support the AFCC Heritage Center which is managed by Headquarters, Cyberspace Capabilities Center (HQ CCC). The curator will ensure the projects conform to the contract as well as the existing heritage center master plan (See 3.0 Master Plan).
The contractor is to Commission a museum/exhibit design firm to research, plan, design, update, modify, fabricate, transport, install, program where necessary, and budget for future updates/upkeep eight projects and exhibits as outlined in the attached existing Air Force Cyberspace and Communications (AFCC) Heritage Center Master Plan.
1 Tactical Communications Exhibit: Install concrete pad with artifacts modified for outdoor display.
2 Ground Control Station (GCS) Exhibit: An exhibit containing a modified unmanned aerial vehicle ground control station, a scale model hanging communications satellite, and a scale model hanging remotely piloted aircraft.
3 Hall of Fame Exhibit: An exhibit with large multimedia touch panel displays and cabinetry for a Hall of Fame.
4 Update Switchboard Exhibit: Renovate and update existing World War II era switchboard exhibit.
5 New Grant Exhibit: Relocate, renovate, and update existing Lt Gen Harold W. Grant exhibit.
6 Website with Digital Walkthrough: Create a digital version of the heritage center with digital walkthroughs and information for posting and creating an online website.
DRAFT
7 Broadcasting Solution: Develop a multimedia solution allowing recording and broadcasting events from within the heritage center.
8 Update Materials & Finishes: Update and unify existing interior finishes including flag removal, new graphics, paint, lettering, etc.
The end product will be eight completed projects fully designed, fabricated to include modifying government furnished equipment, transported, installed, training provided, as well as future budget requirements for updating and maintaining the exhibit/project. Delivery of final product can be phased as projects are accomplished but all eight projects must be completed no later than 18 months from the award of this contract.
1.3 STANDARDS, REGULATIONS, AND CODES – The work associated with this project shall adhere to all applicable standards, regulations, and codes, in effect as of this date of this statement of work (SOW), as detailed in the:
1.3.1 Scott AFB General Requirements (04 AUG 2023) - Section 01010 General Requirements.
1.3.2 UFC 1-200-01 DoD Building Code (with Change 4), and all other applicable UFC’s and current codes not referenced.
1.3.3 Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, any regulations (with supplements) and installation’s regulation. The contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders and any specifications within this contract to the Contracting Officer Representative (COR).
2 PROJECT ADMINISTRATION
2.1 SITE VISIT
2.1.1 Contractor is responsible to verify all measurements and conditions pre-bid. The Government intends to only hold one official site visit. Requests for additional site access must go through the 375th Contracting Squadron (375 CONS) point of contact (POC) listed in the Request for Proposal (RFP) letter. Any additional site access will be made available to all Contractors solicited for this project.
2.1.2 Contractor to be advised, some areas of work occur over and near secure/sensitive areas where cell phones and other electronic devices will not be allowed.
2.1.3 Contractor shall field verify all measurements/quantities provided in the SOW. All sizes and quantities of materials shall be confirmed at the site visit. The contractor shall examine the full work area and complete all investigations required to become familiar with existing site conditions and requirements to complete all the work associated with this project. Contractor shall furnish all equipment, materials, and labor required for completion of this project.
2.2 MEETINGS
2.2.1 Kick-Off Meeting/Project Schedule – Kick-off meeting to occur within one week of NTP. Overall project schedule with milestone markers and 2-week look ahead to be completed at kick-off meeting.
2.2.2 Contractor shall coordinate with the 375th Contracting Squadron (375 CONS) on bi-weekly meetings once the construction phase begins. This meeting shall include the review of an updated 2-week look ahead schedule. Contractor shall provide meeting minutes within 24 hours of each meeting and allow the Government up to 24 hours to accept or request changes to the minutes.
3.1 PROJECT #1: Tactical Communications Exhibit: DESIGN & INSTALL: an outdoor tactical communications exhibit which includes:
3.1.1 A government furnished AN-TSC-100A Satellite Terminal. Contractor to transport satellite terminal from New York to Scott AFB location. Modification of the item to be accomplished on new concrete pad. Modification includes painting appropriate desert Mil spec color, modifying and bracing door and install a separate ultraviolet blocking glass locked door to view the interior, power and modify/display appropriate communications equipment lighting, weatherize the object for the environment. Install structural mounts as required for exhibit.
3.1.2 An interpretive Reader Rail to explain the exhibit for visitor explanation of exhibit.
3.1.3 A government furnished 20-foot or equivalent satellite dish (yet to be acquired). Item to be transported by contractor from a location within the Continental United States to the Scott AFB location.
Modification of the item can be accomplished where the contractor sees fit. Modification includes painting appropriate desert Mil spec color, welding/locking/securing the dish to prevent movement in high winds, weatherizing the dish for the environment.
3.1.4 Install a 15KW MEP 804-A or equivalent/appropriate power supply for the exhibit. This does not need to be functioning as a power source. Paint appropriate desert Mil spec color, provide all of the appropriate cabling to the control van and dish as would be appropriate in actual use.
3.1.5 Design, develop, install the exhibit on a concrete pad similar to pictures with integrated embedded lighting as outlined in the master plan, include a poured sidewalk connector to the existing sidewalk.
3.1.6 Designer to include a maintenance schedule and budget to include electrical, bulbs, repainting etc.
for user to provide the upkeep of the exhibit.
3.1.7 All soil to remain on site, keeping stormwater drains clear of construction debris, and compliance with the Occupational Safety & Health.
3.1.8 Follow the regulations at 40 C.F.R. Parts 1500-1508, in addition to the Dept. of the Air Force procedures/regulations NEPA at 32 CPR 989, to meet the agency’s obligations under NEPA, 42 U.S.C.
4321 et seq.
3.1.9 Site preparation and concrete pouring must follow Best Managed Practices (BMP’s) outlined in the SAFB Storm Water Pollution Prevention Plan (SWPPP).
3.1.10 Replace grass with seed. DRAFT
3.1 PROJECT #1: Tactical Communications Exhibit:
Document Effective: 17 March 2025; Revision No.: 2
Tactical Communication Exterior Plan
Tactical Communication Exterior 3D Model
Document Effective: 17 March 2025; Revision No.: 2
Tactical Communication Exterior Graphic
Existing Area Conditions Existing Conditions from Atrium DRAFT
Interior of AN-TSC-100A Satellite Terminal Exterior of AN-TSC-100A Satellite Terminal
Reference picture of a Quick Reaction Reference picture Quick Reaction Satellite Antenna Satellite Antenna
Reference picture of a 15 KW MEP 804-A
3.2 PROJECT #2: Ground Control Station (GCS) Exhibit: DESIGN & CONSTRUCT: An exhibit containing a modified Unmanned Aerial Vehicle Ground Control Station (GCS), a 1/6 scale model hanging communications satellite, and a 1/6 scale model hanging remotely piloted aircraft.
3.2.1 Contractor to transport Ground Control Station from Creech AFB, NV (approximately L 288in x H 99in x W 96in), (Weight: 17,000 lbs. Empty and 24,000 lbs. Transport) to the Scott AFB. Modification of the item can be accomplished where the contractor sees fit. Disassemble to ensure each side can pass through the Atrium double door (6’-0”W x 7’-0”H opening) and then reassembled once inside atrium.
3.2.2 Modification includes cutting the front 1/3 of the station for use as the exhibit. Expose the back, side, and false floor, enclosing open sections with ultraviolet blocking glass. Provide power to the display. Add video production to be displayed on the screens on a loop, lighting appropriate dials and switches and interior lights. Provide an interpretive rail panel inside the display to explain the object to visitors. Develop audio/video production for display on Ground Control Station screens representative of actual mission video.
3.2.2 Adjacent to the GCS design, fabricate, install a scale model of a full GCS cut out to accurately reflect the entire inside to include communications equipment, miniature maintenance personnel working on that equipment on a plinth base with ultraviolet blocking glass or acrylic. Above the model include an interpretive panel to explain the communications maintenance mission regarding the GCS.
3.2.3 Acquire or design/construct and install a 1/6 scale Wideband Global SATCOM (WGS) satellite with solar panels fully extended. Model to be representative of the actual article. Consider the weight of model on existing structural joists when designing. WGS model will hang from the ceiling of a three-story interior space. All necessary load requirements will be accomplished by the designer/contractor.
Provide a small interpretive panel on a wall in proximity to explain the WGS to visitors.
3.2.4 Acquire or design/construct and install a 1/6 scale MQ-9 remotely piloted aircraft model. Model will be representative of the actual article. Consider the weight of model on existing structural joists when designing. MQ-9 model will hang from the ceiling of a three-story interior space. All necessary load requirements will be accomplished by the designer/contractor. Provide a small interpretive panel on a wall in proximity to explain the MQ-9 to visitors.
3.2.5 Provide budget and schedule for future maintenance upkeep to include electrical, bulbs, screens, repainting etc. for facility’s use.
3.2.6 Provide 98” AV Monitor DRAFT
3.2 PROJECT #2: Ground Control Station (GCS) Exhibit:
Ground Control Station Plan
Ground Control Station Exhibit (Back left corner)
Ground Control Station Exhibit (Center of picture)
Ground Control Station Exhibit (Enlarged picture)
Reference picture of an actual Ground Control Station
Reference picture of an actual Ground Control Station Reference picture of WGS Satellite
Reference picture of Scale Model Reference picture of actual MQ-9
3.3 PROJECT #3: Hall of Fame Exhibit: Multi-User Interactive Database: Develop, custom interactive software and audio video material for display and interactive engagement with 85” touch panel display to support the Air Force Cyberspace Operations and Support Hall of Fame, which includes:
3.3.1 New exhibit structure on 18 linear feet of wall, which includes audio visual housing, graphics, and six embedded cases. Graphic should be backlit, and embedded cases lit with ultraviolet blocking glass doors with hinges to allow for changing the objects on display. Included in the cabinetry will be a Hall of Fame Interactive with Content Management System (CMS), both software and hardware, to include an 85” touchscreen, plus develop the content for each existing Hall of Fame member (approx. 105 to date).
Provide user training so updates for future inductees can be accomplished in-house.
3.3.2 Design, develop, install the exhibit and budget future maintenance upkeep to include electrical, bulbs, screens, repainting etc. for facility’s use.
3.3 PROJECT #3: Hall of Fame Exhibit: Multi-User Interactive Database
Hall of Fame Plan
Hall of Fame Exhibit
Hall of Fame Exhibit
Reference: The Sailing Museum Reference: Museum of the American Revolution
Reference: National Soccer Hall of Fame
Default Screen
One Section Activated
Inductee Spotlight
3.4 PROJECT #4: Update Switchboard Exhibit: Develop audio/video production for two reader rail mounted video displays regarding the attack on Pearl Harbor and communications personnel’s actions during that event
3.4.1 Demo of existing non-structural wall, casework, etc. removing the switchboard artifact and parts and middle floor section.
3.4.2 Install new switchboard display, casework, lighting with ultraviolet blocking glass for existing switchboard and associated equipment.
3.4.3 Replace existing/removed 31 ft x 28 ft carpet with a new carpet.
3.4.4 Add two reader rails to the sides of each display each having a 24” or larger video screen. Develop content for the reader rail to include the historical audio-visual video.
3.4.5 Add a new museum quality figure for the switchboard. The figure will be of high quality on par or better than those produced by Studio EIS (https://www.studioeis.com/museum-figures) as an example.
Clothing will be WWII era appropriate.
3.4.6 Design, develop, install the exhibit and budget future maintenance upkeep to include electrical, bulbs, screens, repainting etc. to budget with.
3.4 PROJECT #4: Update Switchboard Exhibit:
Project #4: Update Switchboard Exhibit Enlarged Plan:
Project #4: Update Switchboard Graphic
3.4 PROJECT #4: Update Switchboard Exhibit
Project #4: Update Switchboard Enlarged Graphic
REFERENCE: Switchboard Artifact REFERENCE: Switchboard Artifact
3.4 PROJECT #4: Update Switchboard Exhibit:
REFERENCE: Switchboard Artifact REFERENCE: Switchboard Artifact
REFERENCE: Switchboard Artifact
3.5 PROJECT #5: New Grant Exhibit: Relocate, renovate, and update existing Lt Gen Harold W Grant exhibit from existing artifacts, which includes:
3.5.1 Removing a double door entry and walling in, adding a new access door from an adjacent hallway.
3.5.2 New cabinetry with full ultraviolet protection and hinged to open from the front glass side to load display.
3.5.3 Develop and install case graphics, display risers, and artifact mounting.
3.5.4 Design, develop, install the exhibit and budget future maintenance upkeep to include electrical, bulbs, screens, repainting etc. for facility’s use.
3.5 PROJECT #5: New Grant Exhibit
ENLARGED Plan: New Grant Exhibit:
New Grant Exhibit:
3.5 PROJECT #5: New Grant Exhibit
REFERENCE: New Grant Exhibit REFERENCE: New Grant Exhibit
REFERENCE: New Grant Exhibit REFERENCE: New Grant Exhibit
3.6 PROJECT #6: Website with Digital Walk-through: Create a digital version of the heritage center with digital walkthroughs and information for posting and creating an online website, to include:
3.6.1 A new website with multiple pages which include, general information, links to social media, and the development of a collections explorer web application to highlight and feature artifacts.
3.6.2 The contractor will develop a minimum of 40 artifact highlights and will develop the content which will include images, audio, text, video, graphics, etc. to explain the artifact and its significance in detail.
The government will provide the list of 40 artifacts. Ensure each of the items has a unique way to access the specific item from a QR code or similar method.
3.6.3 Ensure the site is personal computer, desktop, laptop, tablet, or phone compatible.
3.6.4 Provide the training and template to allow for future updates to the collections explorer in house.
3.6.5 A digital walk-through of the heritage center after all of the other seven projects are complete.
3.6.6 Design, develop, and program the website factoring budgets for future maintenance upkeep, web hosting cost, inflation, etc. to budget with.
3.6 PROJECT #6: Website with Digital Walkthrough:
REFERENCE: Virtual walk-through: National Museum of Natural History
REFERENCE: Virtual walk-through: National Museum of Natural History
REFERENCE: Collections Explorer: Smithsonian Air & Space Museum
REFERENCE: Virtual Tour: National Museum of the U. S. Air Force
REFERENCE: Scanning a QR Code
REFERENCE: Sample web page with Digital Walk-through / Collections Explorer
Enigma artifact:
3.7 PROJECT #7: Broadcasting Solution: Fully develop, design, procure, install a multimedia solution allowing for recording and broadcasting events from within the heritage center, to include:
3.7.1 Two separate room orientations with a minimum of two broadcast cameras, six new speakers, moveable podium with wireless microphones, touchscreen, applicable electronic equipment and cabinet, 98” video screen to be corner wall mounted, commercial internet equipment.
3.7.2 Capabilities must include, but are not limited to, live streaming, recording, interaction on 98” screen from online remote guests, full touchscreen control from the podium.
3.7.3 Installation and building integration, training on equipment
3.7.4 Design, develop, acquire, install, program, train, and factor budgets for future maintenance upkeep, web hosting cost, internet fees, inflation, etc. to budget with.
3.7 PROJECT #7: Broadcasting Solution:
Event Setup “A” Plan
Event Setup “A” 3D Graphic
3.7 PROJECT #7: Broadcasting Solution:
Event Setup “B” Plan
Event Setup “B” 3D Graphic
3.8 PROJECT #8: Update Materials & Finishes: Fully develop, design, procure, install to update and unify existing interior finishes including flag removal, new graphics, paint, lettering, etc, to include:
3.8.1 Removal of 50 flags (turn over to Gov’t) and repair to existing brickwork
3.8.2 Eight new Silicone-Edge Graphics in wall-mounted frames (approx. 70 sq ft each)
3.8.3 New dimensional lettering throughout
3.8.4 Paint walls and install new materials on existing exhibits
3.8 PROJECT #8: Update Materials & Finishes:
Existing Casework / Display
Existing Brick Walls Existing Brick Floor
Dark Wood Light Metal to match Benjamin Moore Benjamin Moore Existing Cases Moonlight White Symphony Blue
2143-70 2060-10 Proposed Materials
3.8 PROJECT #8: Update Materials & Finishes:
Update Materials & Finishes Graphic
Update Materials & Finishes Graphic DRAFT
3.1 OPTION(S) Contractor shall provide a price for all optional items listed below. Optional items are listed in no particular order. All, none, or any combination of the optional items may be selected or awarded.
3.2 An alternate method can be proposed for any of the above tasks and will be reviewed. Any alternate methods or deviations from the requested work shall be called out or highlighted in the Contractor’s proposal in a manner that is clearly identifiable. Any approved alternate methods will result in a SOW modification prior to the commencement of work. The Government will assume any additional design or construction costs associated with the approved alternatives but will not assume any costs associated with the Contractor processing this required modification.
3.3 REVISIONS: Revisions will be shown via altered text (different text color and/or highlighted) corresponding to the date entered at the top of the SOW. Strikethrough to be applied to items no longer required as part of any REV, and the details should be listed below.
4 DELIVERABLES
4.1 Contractor shall provide deliverables as detailed in Scott AFB General Requirements (04 AUG 2023) - Section 01010 General Requirements unless otherwise noted below.
4.1.1 In addition to the items detailed in Scott AFB General Requirements (04 AUG 2023) - Section 01010 General Requirements, Schedule of Materials Submittal has been outlined, and the items listed are required for submittal as a part of this project. Contractor shall add any additional items required to complete project and submit a revised Schedule of Materials as Submittal #1.
4.1.2 Provide copies of licenses and certifications required by Federal, State, and Local environmental laws and regulations.
4.1.3 Design: In addition to the requirements detailed in Scott AFB General Requirements (04 AUG 2023)
– Section 01010 General Requirements, the development and submittal of the 35%, 65%, 95% and 100% design drawings are required as detailed below. The design of materials shall be of high quality, durable, and easily maintained. The Architect & Engineering (A/E) firm shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based. It shall be the responsibility of the A/E to verify the accuracy of the documents provided and to coordinate with all necessary on-site and base personnel to meet applicable codes/regulations including but not limited to 375 CONS, 375 CES, security, base fire department, 375 CS, environmental, etc. All design work must be 100% completed and accepted by the government.
4.1.3.1 35% Design Review Requirements for all 8 projects as shown in Master Plan (ATCH 2).
4.1.3.1.1 Design concept drawings showing demolition and new exhibits as applicable.
4.1.3.1.2 Provide outlined work plan. This plan shall include a detailed schematic showing all 8 projects with exhibit and artifacts being installed or modified as part of this project’s scope.
4.1.3.2 65% Design Review Requirements for all 8 projects as shown in Master Plan (ATCH 2).
4.1.3.2.1 Design concept drawings showing demolition and new exhibits, schedules, and all 35% design review meeting minutes incorporated.
4.1.3.3 95% Design Review Requirements for all 8 projects as shown in Master Plan (ATCH 2).
4.1.3.3.1 Design drawings showing all demolition and new exhibits, complete schedules with details, and all 65% design review meeting minutes incorporated.
4.1.3.3.2 Material submittal register
4.1.3.3.3 Construction schedule
4.1.3.4 100% Design Review Requirements
4.1.3.4.1 Provide signed and sealed drawings and specifications. The 100% design drawing will be used for Construction once the NTP is given.
4.1.3.5 Contractor shall provide meeting minutes within 24 hours of each design review meeting and allow the Government up to 48 hours to accept or request changes to the minutes.
5 SCHEDULE
5.1 The period of performance (PoP) for this project is approximately 365 calendar days from the date that Notice to Proceed (NTP) is issued. All work must be scheduled to be completed within this timeframe. Any modifications or extensions must be requested through the 375 CES and the Contracting Officer (CO) for review and discussion. All exhibits can be developed and installed at one time to reduce costs and repeat visits for installation.
5.2 Design schedule shall be as follows:
5.2.1 35% Submittal: 60 calendar days after NTP. Allow Government 14 calendar days to review 35% design submittal and schedule a design review meeting, over Teams, to include A/E, contractor and government representatives after comments are compiled and sent to contractor.
5.2.2 65% Submittal: 30 calendar days after 35% submittal and NTP issued. Allow Government 14 calendar days to review 65% design submittal and schedule a design review meeting, over Teams, to include A/E, contractor and government representatives after comments are compiled and sent to contractor.
5.2.3 95% Submittal: 30 calendar days after 65% submittal and NTP issued. Allow Government 14 calendar days to review 95% design submittal and schedule a design review meeting, over Teams, to include A/E, contractor and government representatives after comments are compiled and sent to contractor.
5.3 Prior to beginning construction, Contractor shall provide to the CO and 375 CES construction milestones in sufficient detail, for all 8 projects, to accurately identify all phases/disciplines of work to be performed as detailed below:
5.3.1 Contractor shall provide detailed progress schedule including completion percentages for each line item.
5.3.2 Contractor shall provide general construction schedule, showing, at a minimum, the critical path items.
5.4 Contractor will be required to provide 2-week look ahead at each meeting described above.
5.5 Construction may be authorized by the Contracting Officer upon acceptance and approval of the schedule and equipment/material submittal approvals.
6 GENERAL REQUIREMENT ADDENDUM:
6.1 Contractor shall adhere to Scott AFB General Requirements 04 AUG 2023) - Section 01010 General Requirements unless otherwise noted below.
6.1.1 Clarification to Scott AFB General Requirements (04 AUG 2023) – Section V.D – Enabling/Disabling Fire Alarm Panels, the contractor shall bear all costs associated with enabling/disabling fire alarm panels to include the use of the base fire alarm maintenance contractor or use of another fire alarm contractor of its choice. All requirements for an alternative contractor listed in the General Requirements must still be met.
6.1.2 For projects that require the sprinkler system to be disabled, the Contractor shall be responsible for the system drain down and recharging. Contractor shall also notify the Scott Air Force Base Fire Department no later than 48 hours in advance of the system being taken out of service, and upon restoration of service.
7 PROJECT MANAGER: The 375 CES Project Manager (PM) for this project is Ms. Carol Voyles at (618) 256-4012 or carol.voyles.1@us.af.mil. The PM is the point of contact for all matters of design and, unless a construction inspector is designated, construction. For matters concerning terms and conditions of the contract with the Government, the 375 CONS designated official is the point of contact.
8 ATTACHMENTS
8.1 SOW ATCH 1 – 1149057 – Schedule of Material Submittals
8.2 SOW ATCH 2 – 1149057 – AFCC Heritage Center Master Plan
8.3 SOW ATCH 3 – 1149057 – Location Map
8.4 SOW ATCH 4 –1149057 – Existing Drawings
8.5 SOW ATCH 5 - 1149057 – Contractor Requirements DRAFT
File details come from the government source that posted it. Updated .