This is a Performance Work Statement (PWS) for solid waste collection and disposal services at Tobyhanna Army Depot (TYAD) in Tobyhanna, Pennsylvania.
The contractor shall furnish all labor, tools, materials, equipment, transportation, and supervision necessary to manage and perform collection and off-post disposal of solid waste generated at TYAD. Services include refuse collection from 86 numbered collection sites containing 8 cubic yard containers (except specialty containers) on twice-weekly schedules, weekly recyclable pickups from six containers using single-stream methodology (glass, plastics, cardboard, and paper), and weekly on-call maintenance collection within 48 hours of request. Collection operations must occur between 5:30 AM and 10:30 AM, with all collections completed by 3:00 PM, Monday through Friday, during first shift hours (8:00 AM to 2:00 PM for recyclables). Specialized collections include bulky items (60 times annually using 10-40 cubic yard open-top roll-offs), coatings/paint waste (15 times annually using 40 cubic yard leak-proof roll-offs), garnet sludge (6 times annually using 10 cubic yard leak-proof roll-offs), sewage sludge (15 times annually, April-October, using 20 cubic yard leak-proof roll-offs), infectious waste (minimum 13 pickups annually or within 24 hours of notification), and expedited sludge removal (up to two roll-offs daily for up to five consecutive days annually). All collection vehicles must be specifically designed for refuse collection, compatible with government containers, painted with contractor name affixed, in fully operable condition meeting federal/state/local safety requirements and 40 CFR 243, equipped with enclosed tight bodies to prevent spillage, and maintained to prevent oil/hydraulic fluid leaking. The contractor must notify the Fire Department and Contracting Officer's Representative (COR) immediately of any spills and clean up at contractor expense. Inoperative vehicles must be moved off-post within four hours with only minor repairs permitted on-post. Disposal must comply with Pennsylvania Act 101, Pennsylvania Act 90, and Monroe County Solid Waste Management Plan at PADEP-approved and Monroe County-authorized landfills; the contractor is responsible for obtaining all required licenses and permits with no transfer facility usage permitted. Monthly invoicing occurs within Net 30 days via the Wide Area Work Flow (WAWF) electronic system, with firm fixed-price compensation. Performance is monitored via Quality Assurance Surveillance Plan (QASP), physical inspection, report/documentation review, and customer complaints, with final inspection and acceptance at TYAD by the COR.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Solicitation - W51AA126QA043.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE OF WORK STATEMENT
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Scope of Work (SOW). The contractor shall furnish all labor, tools, materials, equipment, transportation and supervision, except as specified hereinafter as government-furnished, to manage and perform all operations for the collection and off-post disposal of solid waste generated at Tobyhanna Army Depot (TYAD), Tobyhanna, Pennsylvania. Performance shall be according to the terms, conditions, specifications and standards contained herein and the contractor shall comply with all laws, ordinances, statutes and regulations pertaining to the collection, transportation and disposal of refuse and shall obtain such permits, licenses or other authorizations as may be required. The contractor shall be bound by any and all laws which bind
TYAD.
The contractor is also to provide weekly recyclable pickups from several collection points. Weekly collection shall occur during first shift, between 8:00 a.m. and 2:00 p.m., on weekdays when TYAD is open. Should on-call maintenance or collection be needed, it shall occur during the same hours of first shift, and it shall occur within 48 hours of the request. Materials that needs to be collected for recycling includes: glass, plastics, cardboard, and paper. The contractor is to provide six (6) containers for this collection process, a single stream collection method is preferred.
No government personnel will be furnished to perform work determined to be the contractor's responsibility or to operate equipment or facilities provided under this contract. All fuel and lubricants shall be furnished by the contractor. The contractor has the sole responsibility for providing personnel and equipment necessary for the performance of this contract. The contractor has the sole responsibility for assuring all operators and other personnel employed by him are competent and qualified to perform the services required hereunder.
Quality Assurance (QA). The government will monitor the contractor's performance under this contract using a Quality Assurance Surveillance Plan (QASP).
Damages Caused by the Contractor. The contractor shall be held accountable and liable to the government for any damages to government facilities, fixtures, furnishings, equipment or grounds caused by the contractor or his employee.
CONTRACTOR-FURNISHED ITEMS.
It is the responsibility of the contractor to furnish all parts, materials, supplies, tools, equipment and safety clothing necessary to meet the requirements of this contract, except for the front load containers already on-site.
Contractor's Collection Equipment.
All refuse collection vehicles shall be specifically designed for the purpose and must be compatible with the government containers on site. Vehicles shall be painted to present a neat
DRAFT
appearance and have the contractor's name affixed on both sides of the vehicle.
All vehicles shall be in fully operable condition and meet all federal, state and local safety requirements, as applicable and 40 CFR 243. Vehicles shall be equipped with enclosed type bodies sufficiently tight to prevent spillage and must be maintained to prevent dripping or leaking of oil and hydraulic fluids. The contractor shall carry sufficient materials on vehicles that enter TYAD to contain and clean up any spilled petroleum products, oil, hydraulic fluid or other toxic material.
The contractor shall notify the Fire Department and the COR immediately if any oil, hydraulic fluid or other toxic material is spilled onto the pavement or ground. Clean up of spilled materials from contractors vehicles shall be at the contractor’s expense.
Contractor vehicles which become inoperative or break down shall be moved off-post within four hours. The contractor will be allowed to perform only minor repairs to vehicles on-post.
Vehicles shall be operated in a safe manner in compliance with the federal, state and TYAD regulations. (TYAD Regulation 190-5.)
Vehicles for the collection, storage and transportation of solid waste shall be in compliance with
ANSI Z245.1.
APPLICABLE DOCUMENTS.
Documents applicable to the Statement of Work/Specification under the contract are listed below, all documents are mandatory unless otherwise stated. The contractor is only obligated to follow those coded as mandatory and only to the extent stated in the specification/Statement of Work when a specific part of the document is referenced herein. The contractor is responsible to obtain copies of all referenced documents at his own expense except for those mentioned in 5.3 these regulations will be provided upon award. Supplements and amendments to mandatory publications shall be considered to be in full force and effective immediately upon receipt by the contractor. It is the contractor's responsibility to ensure that the current copies of all mandatory publications are complied with, as applicable.
Advisory Documents.
AR 58-1 Management, Acquisition and Use of Motor Vehicles
TM 5-634 Solid Waste Management
Code of Federal Regulations.
40 Code of Federal Regulations (CFR) Subchapter I - Solid Wastes Parts 240 through 258
29 Code of Federal Regulations (CFR) 1910
Pennsylvania Department of Environmental Protection (PA DEP) Regulations.
Pennsylvania Act 101: Municipal Waste Planning, Recycling and Waste Reduction Act of 1988
Pennsylvania Solid Waste Management Act Title 25, Chapter 273, Infectious and Chemotherapeutic Waste Disposal 1988*
Title 25, Pennsylvania Code, Chapters 271 through 285 Municipal Waste
Title 25, Pennsylvania Code, Chapters 287 through 299 Residual Waste
Monroe County Solid Waste Management Plan of 1990
Waste Transportation Safety Act (Act 90)
Commercial.
Mandatory Document.
American National Standard Institute (ANSI) Z245.1 Safety Standards for Refuse Collection Equipment
SPECIFIC TASKS.
Personnel and Collection Methods. The contractor shall have sufficient manpower to carry out all the terms of this contract.
Collection Requirements.
Containers. All containers shall be emptied in accordance with specifications listed, except as outlined in Special Collections described hereinafter. Definite routes shall be assigned each collection vehicle, and those vehicles will traverse those routes each day and empty all containers scheduled for disposal that day.
NOTE: The contractor must be able to adapt to TYADs ever changing workload. The COR will occasionally request that front-loading cans be moved from one location to another depending on request from shops for shifts in workloads, construction projects, special events, etc. The contractor will have 48 hours to meet the COR requests.
Schedule and Points of Collection. The contractor shall provide necessary services for refuse collection and disposal as described herein.
Route and Collection Schedules.
Upon award, the contractor will establish vehicle routes and collection schedules and submit these routes and schedules to the COR for approval. Once the routes and collection schedules have been approved, the contractor shall be required to follow these approved routes and schedules unless otherwise directed by the COR. In the event that the contractor wants to change the approved vehicle routes and/or collection schedules, such changes must be approved in writing by the COR prior to any changes.
Upon arrival the contractor will notify the COR so the initial vehicle weight can be recorded, the contractor will then begin the daily collection service. Once the contractor is done with that day’s pickups they will then notify the COR. The contractor is required to provide a monthly tabulation of all solid waste disposed of broken down per day for daily refuse removal and for each roll off emptied at the end of each month. The COR can provide a spreadsheet template for this record keeping.
The collection schedule shall be established so that operations will not start earlier than 5:30 AM but not later than 10:30 AM. The contractor must be done will all the necessary collections no later than 3:00 PM, Monday through Friday. Collection operations outside these hours will require prior approval of the COR. Where pickup is required twice a week, containers shall be picked up either Mondays and Thursdays or Tuesdays and Fridays. Where pickup is required three times a week, containers shall be picked up Mondays, Wednesdays and Fridays. Where pickup is once a week, containers shall be picked up on Wednesdays.
The frequency of collections will be as indicated on Tabulation of Solid Waste Collection Sites as listed in this statement of work.
The contractor shall execute the collection and disposal operations to result in minimum delay or divergence from the schedule.
Points of Collection. Points of collection are as indicated and numbered on the attached Solid Waste Collection Site listed.
NOTE: Points of collection may be changed from time to time as required by the needs of the government. The COR reserves the right to direct the contractor to relocate any or all refuse collection points, residual waste collection points and/or all roll offs.
Bulky Item Collection Requirements. The contractor shall furnish an adequate number of roll-off containers at the start of performance of this contract as requested by the COR for use in bulky item collections. Prior to the start of the contract, the COR will coordinate with the contractor on locations. These containers are usually open-top and approximately 10- 40 cubic yards in size. Bulk Collection will be required 60 times per year.
Coatings/Paint Waste Collections. Coatings/paint waste shall be collected by using contractor-furnished containers and contractor-owned collection trucks. A leak-proof 40 cubic yard roll-off must be provided for the collection of this waste or the contractor must place a liner in the container before use. Collection of paint waste will be required fifteen (15) times per year.
Garnet Sludge. Garnet sludge collection shall be collected using contractor-furnished containers and contractor-owned collection trucks. A leak-proof 10 cubic yard roll-off for the collection of this waste must be provided for the collection of this waste or the contractor must place a liner in the container before use. Garnet sludge will be picked up 6 times per year.
Sewage Sludge. Sewage sludge collection shall be collected using contractor-furnished containers and contractor-owned collection trucks. A leak-proof 20 cubic yard roll-off for the collection of this waste must be provided for the collection of this waste or the contractor must place a liner in the container before use. Collection is usually required between April – October and 15 pickups will be required.
Infectious Waste. The contractor shall provide properly labeled containers and requisite disposable red bags on an as required basis. Upon award, the contractor must provide a pickup schedule within seven days. The contractor shall arrange a pickup schedule that leaves pick up a minimum of 13 pickups per year or within twenty-four (24) hours after notification by the COR.
The contractor shall be responsible for the proper completion and disposition of waste manifest(s) in accordance with all applicable federal, state and municipal laws, codes and regulations including changes thereto. The contractor shall be responsible for obtaining all necessary licenses and permits and shall furnish copies of such to the KO as they become available. Removal, transportation and disposal of the waste shall be the responsibility of the contractor. The contractor shall dispose of the waste at a disposal facility which has all the valid and current licenses/permits required by federal, state or local agencies. The contractor must be able to provide validation of disposal upon the CORs request.
NOTE: The contractor shall furnish an empty replacement roll-off container each time a filled container is removed from TYAD unless otherwise requested. The COR will notify the contractor when a container needs to be switched out. The contractor then has 24 hours to replace the filled container with an empty one.
Positioning of Containers. The contractor shall position all containers at collection stations to best aid the use in disposing of solid wastes. The contractor shall also position containers so as to minimize interference with adjacent parking areas, sidewalks, roadways, etc. The positioning of the containers must meet the approval of the COR. The contractor shall not combine or relocate collection stations, revise or in any way modify route diagrams without prior approval of the COR.
When more than one container is positioned at one collection station, containers shall be placed as close together as feasible for user convenience and organized appearance, subject to the approval of the COR.
The contractor shall return non-disposable containers to their proper station in an upright position with the lids securely in place and the doors closed.
Unconfined Excess Refuse. The contractor must collect any refuse within five feet of each collection site. Refuse placed at the collection site in sacks, cartons, bags, cans, etc. or loose shall be removed by the contractor in the same manner and at the same time as if it were placed in the regularly provided containers.
The contractor shall not pick up any empty 55-gallon drums that may be placed in the vicinity of any of the collection sites. Such drums may or may not have contained hazardous materials. If the contractor sees a 55-gallon drum in any of the collection containers they are to notify the COR immediately.
Blocked Containers. Any container that needs to be emptied that is blocked by vehicles, equipment, snow, etc. shall be reported to the COR immediately. The COR will attempt to get the car, equipment, etc. moved. The contractor shall return to check the blocked container for pickup at least one more time that day.
Expedited Removal of Non-Hazardous Sludge – Annually: The purpose of this annual expedited removal is to accommodate collection of dewatered sludge as it is processed by a sludge dewatering unit. The contractor must have the ability to send up to two roll offs into the sewage treatment plant per day for up to five consecutive days as demanded by the treatment plant.
Regulations. The site of the contract work is on federal property and all rules and regulations issued by the Commander of TYAD covering topics such as, but not limited to, fire, safety, sanitation, admission to the installation and conduct of operations shall be observed by the contractor and his employees.
In order to provide safety controls for protection to the life and health of employees and other persons; for the prevention of damage to property, materials, supplies, and equipment; and to avoid work interruptions in the performance of this contract, the contractor shall conform to all rules and requirements prescribed in all applicable Occupational Safety and Health Administration (OSHA) regulations.
The contractor shall take all steps and precautions to prevent accidents and to preserve the life and health of contractor and government personnel performing or in any way associated with or resulting from the performance of this contract.
Noise Prevention. All of the contractor's equipment shall be equipped with properly maintained noise limiting devices.
Backup Warning Devices. All contractor vehicles used in the performance of this contract shall be equipped with audible and flashing backup warning devices.
SAFETY PROVISION FOR SERVICE CONTRACTS PERFORMED AT TYAD.
Safety: Incidents or Accidents on the installation: Any incident or accident resulting in any (minor or major) damage or injury, whether or not it involves the contractor’s policy or employees, or it involves government property or employees, shall immediately be reported to the COR. The contractor and any other persons involved shall remain at the site of the incident until the COR arrives to assess and to notify the proper authorities. Failure to report any incident or accident resulting in any damage or injury is not acceptable.
DoD, DA, OSHA and local TYAD rules and regulations shall govern contractors, sub-contractors, suppliers and their employees. Contractors and subcontractors shall comply with
TYAD Safety Regulation 385 as applicable. The TYAD Safety Regulation 385 Safety Manual may be made available by contacting the TYAD Safety Division (570) 615-7027.
Contractors shall comply with Title 29 Code of Federal Regulations-1910 (OSHA General Industry Standards), Title 29 Code of Federal Regulations-1926 (Construction Industry Standards) and National Fire Protection Association Codes as applicable.
All contractor and subcontractor employees on site at TYAD shall be required to view a 15-minute Safety film upon TYAD entry and prior to performance of any on-site work. Contractors shall also comply with any and all Safety requirements as stated in the specific statement of work or technical specifications applicable to the contract/order.
DISPOSAL.
The contractor shall comply with PA Act 101, PA Act 90, and the Monroe County Solid Waste Management Plan. The contractor shall be licensed as required by PA Act 90 and the Monroe County Solid Waste Management Ordinance and shall submit semi-annual and annual reports (on the proper forms) to the Monroe County Municipal Waste Management Authority.
The municipal solid waste and generic residual waste generated at TYAD shall be collected on the same front loading refuse truck and treated as both municipal solid waste and generic residual waste. The contractor shall dispose of all municipal solid waste and generic residual waste under this contract at a Pennsylvania Department of Environmental Protection (PADEP) approved and Monroe County Municipal Waste Management Authority authorized landfill.
Disposal of all solid waste collected under this contract shall be in strict accordance with federal, state, county and local regulations as applicable. The contractor shall obtain such permits, licenses or other authorization as may be required at no additional cost to the government. The disposal site (sanitary landfill) must have valid permits issued by the appropriate government agency for each type of waste being disposed.
All coatings/paint waste, garnet sludge, and sewage sludge shall be disposed of at a PADEP approved and Monroe County Municipal Waste Management Authority authorized landfill. The Keystone Sanitary Landfill has approved form U’s for these waste streams and currently receives this waste.
The contractor shall be solely responsible for using an approved disposal facility. In the event of revocation of the landfill permit or landfill enclosure, the contractor remains responsible for the removal and approved disposal of solid waste from TYAD without deviations from the provisions contained herein, unless prior written approval is granted by the KO. The contractor may identify a secondary disposal facility if so desired. However, the secondary disposal facility must be a Monroe County Municipal Waste Management Plan approved site. Also, the contractor must give adequate notice and also coordinate this with the COR so the proper forms can be filled out and approved with the landfill.
The contractor shall provide trucks or similar hauling equipment designed to prevent blowing, spilling and otherwise scattering refuse, solid waste, trash, garbage, etc., on government property, on and along roads, on streets and on any surrounding and adjacent areas en route to the disposal site. All roll-offs that are taken off post are required to be covered before leaving
TYAD.
NOTE: TYAD has cradle-to-grave responsibility for the disposal of all solid waste generated on-site. Generic residual waste must be disposed of at a PADEP approved landfill. Transfer facilities generally do not send solid waste received to the same facility each day. Therefore, TYAD will not approve a proposal to send municipal solid waste and/or generic residual waste to a transfer facility, even if the transfer facility is a Monroe County Municipal Waste Management Plan approved site.
Salvageable Materials. The contractor shall not salvage any material unless specifically designated and approved by the COR. If the contractor discovers a questionable item or material which they believe has a salvageable value or for which there is doubt as to whether the item(s) were intended for refuse pickup or disposal, the COR shall be notified immediately.
Hazardous Materials. The contractor shall not collect or dispose of any hazardous materials. If the contractor or his employees discover material, which they believe may be hazardous, the COR shall be notified immediately. In the event the COR is not available, the contractor shall notify the TYAD EMD, who will then contact the appropriate personnel to provide guidance.
Military Materials. The contractor shall not collect or dispose of any military equipment.
Should a load include military equipment (e.g., army-green or desert-beige painted items), the contractor shall immediately notify the COR. Per the decision of the COR, either TYAD personnel shall immediately retrieve the item(s) from the contractor’s facility, or the contractor shall return the material during their next trip to TYAD. In the event the COR is not available, the contractor shall notify the TYAD Security Office (phone number to be provided at time of award), who will then contact the appropriate personnel to provide guidance.
Retention of Discarded Items. Any type of refuse collected by the contractor under this contract may be retained by the contractor for disposition off-post if approved by the KO and provided the requirements of this contract are fulfilled. If any item(s) is requested to be returned, the contractor shall do so while the items(s) is in his possession. The government reserves the right to inspect the landfill site, recycling center or other sites that might contain the refuse collected at TYAD, and recover any material originating from TYAD. If the landfill or recycling center is not owned and/or operated by the contractor, the contractor shall make provisions with the landfill or recycling center owner and/or operator for government inspection and recovery privileges
Solid Waste Collection Sites
Container Type of Frequency of
Site# Size (cu.yd.) Solid Waste Pickup 1 8 Refuse 2W
2 8 Refuse 2W
3 8 Refuse 2W
4 8 Refuse 2W
5 8 Refuse 2W
6 8 Refuse 2W
7 8 Refuse 2W
8 8 Refuse 2W
9 8 Refuse 2W
10 8 Refuse 2W
11 8 Refuse 2W
12 8 Refuse 2W
13 8 Refuse 2W
14 8 Refuse 2W
15 8 Refuse 2W
16 8 Refuse 2W
17 8 Refuse 2W
18 8 Refuse 2W
19 8 Refuse 2W
20 8 Refuse 2W
21 8 Refuse 2W
22 8 Refuse 2W
23 8 Refuse 2W
24 8 Refuse 2W
25 40 Coatings /Paint
AS
26 8 Refuse 2W
27 8 Sawdust 1W
28 8 Refuse 2W
29 40 Bulky Items
AS
30 40 Bulky Items
AS
31 8 Refuse 2W
32 8 Refuse 2W
33 8 Refuse AS
34 20 Garnet Sludge
AS
35 8 Refuse 2W
36 8 Refuse 2W
37 8 Refuse 2W
38 3 Sawdust 1W
39 3 Sawdust 1W
40 8 Refuse 2W
41 8 Refuse 2W
42 8 Refuse 2W
43 8 Refuse 2W
44 8 Refuse 2W
45 8 Refuse 2W
46 8 Refuse 2W
47 8 Refuse 2W
48 8 Refuse 2W
49 8 Refuse 2W
50 N/A Medical Waste
AS
51 8 Refuse 2W
52 8 Refuse 2W
53 8 Refuse 2W
54 8 Refuse 2W
55 8 Refuse 2W
56 8 Refuse 2W
57 8 Refuse 2W
58 8 Refuse 2W
59 8 Refuse 2W
60 8 Refuse 2W
61 8 Refuse 2W
62 8 Refuse 2W
63 8 Refuse 2W
64 8 Refuse 2W
65 8 Refuse 2W
66 8 Refuse 2W
67 8 Refuse 2W
68 8 Refuse 2W
69 8 Refuse 2W
70 8 Refuse 2W
71 8 Refuse 2W
72 8 Refuse 2W
73 8 Refuse 2W
74 8 Refuse 2W
75 8 Refuse 2W
76 8 Refuse 2W
77 8 Refuse 2W
78 8 Refuse 2W
79 8 Refuse 2W
80 8 Refuse 2W
81 8 Refuse 2W
82 8 Refuse 2W
83 8 Refuse 2W
84 8 Refuse 2W
85 8 Refuse 2W
86 8 Refuse 2W
ABBREVIATIONS:
AS- As Scheduled 1W – Once a week (Wednesday)
2W- Twice a week (Mon & Thurs, or Tues & Fri)
Inclement Weather Schedule. The contractor shall collect refuse during periods of inclement weather unless otherwise approved by the COR in the case of extreme weather conditions.
The COR will approve the delay in collection during periods of extreme weather conditions on a day- by-day basis. When exceptions are granted, the contractor shall accomplish all collections for each day missed in order to "make up" all missed collections within 24 hours after re- commencement of services. In the event the following day is Saturday, such make up will be performed on Monday. If all "make up" collections cannot be made in 24 hours, the Contractor shall submit a revised schedule to the COR for approval. Rescheduling to provide "make up" collections shall not be the basis for a claim by the contractor for additional compensation.
Holidays. If the daily collection schedule falls on a legal holiday, the contractor shall plan additional pickup time for the next work day. Upon award, the contractor shall notify the COR of their holiday schedule if it differs from the government’s schedule. Any holiday rescheduling shall be at no additional cost to the government and under no circumstances will the collection interval exceed the three-day requirement. Refuse collection will not be made on the following holidays due to TYAD being closed.
New Year’s Day January 1 Martin Luther King Day 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day November 11 Thanksgiving Day 4th Thursday in November Christmas Day December 25
INSPECTION AND ACCEPTANCE.
The government will inspect the contractor's performance under the contract in accordance with the terms of the contract clauses and the standards and procedures specified in the QASP.
Final inspection and acceptance will be performed at the site of performance at Tobyhanna Army Depot by the COR.
The KO will conduct such inspection and surveillance of the contractor's performance under the contract as he determines appropriate and necessary. The government will monitor the contractor's performance by physical inspection, review of reports/documentation and customer complaints.
PAYMENT FOR ACCEPTED SERVICE.
The contractor will be paid a firm fixed price on a monthly basis. All payments will be made electronically within Net 30 Days of acceptance of invoice in WAWF by the COR.
Submittals: The contractor shall provide the following submittals to the COR via the Wide Area Work Flow (WAWF) electronic invoicing system: monthly invoice for services performed under this contract.
ACCESS TO RECORDS, DATA AND FACILITIES.
The contractor shall permit the KO or his authorized representatives to have access at any reasonable time to all records, data and facilities used in contract performance.
END WORK STATEMENT
SERVICE or EQUIPMENT INSTALLATION CONTRACTOR SAFETY
STANDARDS FOR TYAD
Below are some “installation specific” safety standards which contractors are required to adhere to while performing any work on Tobyhanna Army Depot. It is the contractor’s responsibility to always incorporate these particular requirements into their daily operations while under contract and to institute these specifics into their overall site safety controls. These do not substitute or deflect in any way the requirement to institute and adhere to all OSHA 29 CFR 1910 & 1926 and USACE EM385-1 safety standards, as well as all applicable contractual Federal Acquisition Regulations while performing the work under this contract on Tobyhanna Army Depot.
It is the responsibility of the contractor to enforce the below requirements as well as all current revisions of the above referenced standards. Failure to enforce safety requirements on the depot can result in immediate stop works, safety stand down orders and even complete termination of the contract.
S1.0 THE CONTRACTOR IS SOLELY RESPONSIBLE AND
LIABLE FOR JOB- SITE SAFETY
1. Review of the project plans and other documents by any government appointed official does not constitute an acceptance of Federal responsibility or liability for the adequacy of the safety measures identified for the job or for the Contractor's compliance with all applicable safety rules and regulations.
2. The Contractor remains solely responsible and liable for job-site safety at all times during the term of the contract. No outside personnel (other than ET, COR, TYAD Safety, or other government appointed contract personnel) are allowed onto the job site at any time during contract without prior permissions and/or escort by the ET, COR or KO.
3. Tobyhanna Army depot has restrictions on the use of fossil fuels in all buildings.
When it is determined that electric or other alternatively fueled vehicles are insufficient or unavailable for movement of material within the buildings on the installation, fossil-fueled vehicles can be used only when all alternatives of accepted electric material movement equipment have been considered, and the last option is use of a fossil fuel vehicle or project failure. This includes any situations where safety of employees and equipment may be jeopardized. Convenience will never be an acceptable justification to utilize fossil-fueled vehicles. The Government Designated Representative (GDR) will notify the appropriate supervisor(s) or leader(s) in the area where the need to utilize a fossil fuel vehicle is required. The supervisor / leader will take the necessary steps to notify the employees in the work area of the option to leave the area during the material movement process. The GDR and Contractor will also document all actions the Contractor took to utilize electric or other alternatively fueled vehicles. The documentation will specifically state why electric or alternatively fueled vehicles are insufficient and all mitigation efforts used to minimize the effects of fossil-fueled vehicles to include information as to any appropriate scrubbers that can be utilized along with any ventilation or exhaust systems that can be used to externally vented to the outside of the facility.
The documentation must be submitted to the TYAD Safety office for approval prior to any equipment being used. A final copy of the Approved documentation will be provided to the TYAD Safety Division.
4. All direct construction supervision, including subcontractors, must as a minimum, complete an OSHA 30-hour safety course for construction. These certificates must be submitted as part of the site safety plan BEFORE construction activities start.
5. RED CARD PROGRAM - Tobyhanna Army Depot utilizes a program to allow employees to stop an action which is considered unsafe. Employees carry small red cards that can be thrown down when employee sees any action they consider unsafe. Work ceases until TYAD management can decide if it is safe or not.
Contractors are required to comply with this program. If a TYAD employee presents the red card to the contractor, the contractor must stop working until the COR and Safety Office can determine if there is a safety hazard or not.
6. All contractor personnel, to include subcontractors, vendors, suppliers, or visitors, when performing any type of work activity, or gaining access through an occupied area or shop - must have all applicable PPE that is required for the area to include, but not limited to, hardhats, safety glasses, hearing protection, and respirator protection. Notify both COR & Area Supervision, for access approval and prior to any work activities being performed.
S13.0 IF AN INCIDENT HAPPENS
1. Any serious injury or medical emergency:
• Immediately call emergency responders
• Dial 911 and give accurate location and nature of emergency. Make sure to tell the operator that you are calling from Tobyhanna Army Depot.
• Send someone to the nearest exit to assist responders.
• Treat victims to the best of your ability.
• Notify COR / call work order desk at 570-615-7805 if there is any blood or body fluids that must be cleaned up.
2. In the event of the smell of natural gas:
• Call dial 911and give accurate location and nature of emergency. Make sure to tell the operator that you are calling from Tobyhanna Army Depot.
• Have all personnel evacuate the area if the smell is significant.
• Upon arrival of fire personnel, provide information as to specific equipment and exact location of potential leak.
3. In the case of a fire:
• If the fire is small, use a fire extinguisher and call 911.
• Otherwise, dial 911 and pull the fire alarm.
• Evacuate the building.
IF ANY CONFLICT BETWEEN STANDARDS, THE STRICTER OF THE TWO SHALL
APPLY. IF UNSURE CONTACT THE COR / ET VIA PROPER RFI PROTOCOLS FOR
VERIFICATION THROUGH THE TYAD SAFETY OFFICE.
The information below is mandatory security requirements that must be incorporated into all Statements of Work and Performance Work Statements.
All Tobyhanna Army Depot (TYAD) contracts and other acquisition-related documents must ensure privacy and security controls follow this information, and that contractors, subcontractors, and service providers protect Privacy Act information in the same way the organization adhering to the Federal Acquisition Regulations (FAR) Privacy Act provisions (Subparts 24.1 and 24.2) and include the specified contract clauses (Parts
52.224-1 and 52.224-2), as appropriate, to ensure that personal information is protected as mandated.
Force Protection Condition (FPCON) Should the Force Protection Condition (FPCON) at the installation change, the Government may require changes in contractor security matters and/or processes.
If based on the requirements of this contract, contractor employees may be designated as mission essential. Mission-essential contractor employees are required to report for duty and remain on duty during declared emergencies and/or elevated FPCON levels unless otherwise directed by the Contracting Officer (KO) via the appropriate Contracting Officer's Representative (COR).
Unscheduled gate closures by Law Enforcement may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays.
Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
The contractor’s employees shall become familiar with and obey the regulations of the installation, including law enforcement, fire, traffic, safety and security (protecting National security) regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance.
(If Required) The contractor shall provide support during contingencies, exercises, heightened operations, and adverse weather or security closures in the accomplishment of performance requirements. From time to time, the Base Commander may decide to close all or part of a base in response to an unforeseen emergency or similar occurrence. Such emergencies include adverse weather such as snow, or ice, "an act of God,” such as tornado or earthquake, or a base disaster such as a gas leak or fire.
Emergency Communications and Services. If assigned to TYAD for (7) seven days or longer, contractors and subcontractor employees will enroll in the ALERT! Mass Warning Notification System (MWNS). Common Access Card (CAC) is required to register for ALERT!. If a CAC has not been deemed necessary for the contractor or subcontractor, the COR will provide the necessary information to TYADs Antiterrorism Officer or TYADs Emergency Manager in the Security Operations Branch for manual input into the ALERT! System.
ALERT! MWNS is NOT optional - it is a Headquarters Department of the Army (HQDA) requirement to be a registered user.
Due to the life-safety implications of the information being relayed and the requirement to provide immediate alerts and warnings, personnel assigned to TYAD must ensure that their personal contact information, including after-duty hours contact information, as appropriate (e.g., personal cellular phone numbers or landline phone numbers), e-mail addresses, home address, etc., are entered into the system and regularly updated or verified every 90 days to remain current and accurate.
In the event of a life-threatening emergency or natural disaster, COR will account for assigned contractors. COR will send personnel accountability report to Emergency Operations Center (EOC).
Base closure announcements will be disseminated via ALERT! MWNS.
Antiterrorism (AT) Level I Training. In accordance with AR 525-13, all contractor and subcontractor employees requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training annually. This training must be completed prior to being granted installation access and beginning work. The contractor is responsible for ensuring this requirement is met and for providing certificates of completion for each employee to the COR upon request. The web-based training is available at https://jko.jten.mil (Course: JS-US007).
AT Level I and iWATCH training is not required to be in person. While in-person training is an option, the most common and widely accepted method is web-based.
Army regulations explicitly provide multiple ways to meet the training requirement to ensure flexibility for all personnel, regardless of their location or access to a classroom setting.
iWATCH Army Training. This training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.
This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award. Contractors and all associated sub-contractors will be briefed by the TYAD Antiterrorism/Force Protection officer. It is recommended this training be conducted as part of an initial entry briefing or unit/organization newcomer’s briefings. Send training requests to TYADs Antiterrorism Officer. Contractor employee training will be documented on a local form.
Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by TYAD Law Enforcement. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy.
Contractor and all associated sub-contractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
A background check and approval from TYAD Law Enforcement is required for all contractor and subcontractor personnel prior to on-site access at TYAD. All persons seeking entrance to TYAD shall submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD security personnel prior to being granted access to TYAD. This https://jko.jten.mil/ security screening process may be time consuming, and access may be delayed or denied. The contractor shall ensure the required government access request form is completed. COR will provide specifics to the contractor after award and at least ten days prior to the expected visit date for completion. All the required fields on the form shall be accurate and complete. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on-site who fail screening will not be permitted further access to TYAD.
Submit the completed local form(s) to the COR. Ensure contracts include the provisions that check for the possibility of and prevent undocumented workers for inclusion in contracted work related to Army missions.
The company will ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.
Pre-Bid Site Visit Controls: Any pre-bid site visits held before the contract award will be conducted under strict security controls. These protocols—including mandatory pre-registration for baseline vetting and constant escorting—apply to all potential bidders, regardless of any previous work history with TYAD or current installation access. During this public solicitation phase, a contractor's prior access or familiarity with the installation does not grant them a "need-to-know" for a new requirement. All bidders will be treated as external entities, and the site visit is strictly for a visual inspection of physical conditions only.
Post-Award Information Release: Conversely, all project specifics—including exact locations, detailed plans, and mission context—can and must be provided to the contractor only after the contract is awarded and their personnel have completed all mandatory security training (AT, OPSEC, CUI). At this stage, the contractor has an established "lawful government purpose," and the controlled release of detailed information is appropriate and necessary for the performance of the contract.
Common Access Card (CAC): [If applicable.] Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
Contractors shall be identified with Government issued identification card (e.g., Common Access Card (CAC) or unit specified identification card). When required, contractor personnel shall comply with local security policies to wear their identification card in a standardized manner, clearly visible attached to the torso of the exterior garment above the belt and below the shoulders except when in use (i.e., inserted in a computer CAC reader) or when in controlled areas requiring other credentials as the primary method of identification. To access any Government base and certain facilities, the contractor shall present required identification card upon demand. Upon exit from Government facilities, the contractor shall conceal their credentials (CAC or other credentials) from plain view. The contractor and Contractor Security Manager/Officer shall coordinate with the COR for Government credential issues.
For contractors that do not require CAC, but require access to a DoD facility or installation: Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13); applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.
Collection of Badges: The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:
1. When no longer needed for contract performance
2. Upon completion of the Contractor employee’s employment
3. Upon contract completion or termination
The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements. The Contractor shall insert the substance of this clause, including this paragraph, in all subcontracts when the subcontractor’s employees are required to have routine physical access to a federally controlled facility and/or routine access to a federally controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in of this section, unless otherwise approved in writing by the Contracting Officer. The company will return all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR when the contract is completed or when a contractor employee no longer requires access to the installation or facility. Contractor personnel will obtain a vehicle pass for access to the military installation and Common Access Cards (CAC) for computer access, if applicable.
Threat Awareness and Reporting Program (TARP). [If applicable.] For all contractors with security clearances, per AR 381-12, TARP contractor employees must receive initial and annual TARP training by a CI Agent or other trainer as specified.
Insider Threat Program. The contractor will establish and maintain an insider threat program to gather, integrate, and report relevant and available information indicative of a potential or actual insider threat, consistent with E.O. 13587 and Presidential
Memorandum “National Insider Threat Policy and Minimum Standards for Executive Branch Insider Threat Programs.”
Operational Security (OPSEC). OPSEC is not a one-time checklist, it is a dynamic, ongoing process embedded in every phase of planning, execution, and daily operations.
It requires continuous critical thinking and vigilance from everyone who interacts with government information or operates on a government installation. This includes military personnel, Department of Defense civilians, contractors, subcontractors, and family members. OPSEC is not just a policy, it’s a mindset. Its success depends on consistent awareness and execution by every member of the TYAD community.
At TYAD, all observations, communications, and experiences must be protected and must not be shared with anyone lacking a lawful government purpose or a validated business need-to-know. This disciplined approach ensures that emerging threats, evolving vulnerabilities, and shifting mission parameters are constantly reassessed and addressed to safeguard critical information.
OPSEC applies across the full spectrum of DoD missions, functions, programs, and activities under this contract. Practicing OPSEC daily is a requirement that is essential to mission success and the protection of national security assets.
Failure to properly safeguard sensitive or classified information—whether through negligence, willful misconduct, or ignorance—may result in administrative, disciplinary, contractual, or criminal consequences.
Applicability and Management of the Contractor OPSEC Plan The requirement for an Operations Security (OPSEC) Plan or an OPSEC Standing Operating Procedure (SOP) is based on the contractor's access to and handling of Critical Information and/or Controlled Unclassified Information (CUI), regardless of where that information resides.
It is essential to distinguish between Information Security (INFOSEC), which protects data "at rest" within a system, and OPSEC, which protects data "in use" by governing the procedures and actions of personnel.
When contractor personnel access or handle CUI—such as building floor plans, technical manuals, or operational schedules—they are required to have an approved OPSEC Plan/SOP. This plan is the formal, documented agreement that outlines how the contractor will protect the government's sensitive information. Even when CUI is handled exclusively on Government Furnished Equipment (GFE), the contractor remains responsible for the "human factor." The OPSEC Plan transfers the responsibility for protecting this information from the Government to the contractor by legally obligating them to establish internal procedures for everything from secure physical storage and controlled discussions to the proper destruction of materials.
Without this plan, the Government retains all risk for how a contractor safeguards its data.
The management and approval of the contractor's OPSEC Plan is a shared responsibility, with defined roles at each stage.