DRAFT PWS DONRCO Mission Advisory and Operating Partner Services.pdf
PDF 375 KB Posted
- Solicitation number
- N63394-26-RFPREQ-NSWCPHD-0063
About this file
This is a Performance Work Statement (PWS) for the Department of the Navy Rapid Capabilities Office (DONRCO) Mission Advisory and Operating Partner Services contract, dated June 17, 2026 (Version 1.0).
The contractor shall deliver integrated mission advisory and operating-partner support across three core workstreams: (1) DONRCO 1.0 Portfolio Performance, which involves continuously assessing, optimizing, and tracking active and candidate capability investments through capability shaping, performer diligence assessments, MOE/MOP design, ROI assessments, and quarterly portfolio performance assessments; (2) DONRCO 2.0 Mission Planning, which requires translating lessons learned into platform architecture, standard operating procedures, capital coordination frameworks, and SECNAV-grade reporting; and (3) Navy Office of Small Business Programs (OSBP) Strategic Deal Support, providing strategic transaction architecture, contract structuring recommendations, partner and vendor sourcing, and Strategic Deal Architecture Memoranda. All deliverables feed into the Monthly Contract Activity Report (CDRL A001). The contractor must maintain 100% accuracy in monthly progress reporting submitted within 5 business days of month-end. Portfolio performance assessments must achieve 90% first-submission acceptance rates with revisions completed within 10 days. Mission planning deliverables must align fully with SECNAV acquisition mandates with no more than one major revision required. OSBP strategic deal recommendations must be actionable and compliant with DoD acquisition guidelines. All personnel performing classified work must hold active Top Secret/Sensitive Compartmented Information (TS/SCI) clearances, with classified tasks restricted to contractor facilities following Facility Clearance (FCL) completion. The base period of performance is twelve months from contract award, with one optional twelve-month extension. Travel is reimbursable in accordance with Joint Travel Regulations (JTR) within established CLIN ceilings, subject to advance government coordination and approval. Key Personnel identified in Section H require advance written Contracting Officer approval for any substitutions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DONRCO Mission Advisory PWS | Version 1.0
PERFORMANCE WORK STATEMENT (PWS)
DONRCO Mission Advisory and Operating Partner Services
Document Type: Performance Work Statement (PWS)
Sponsor: Department of the Navy Rapid Capabilities Office (DONRCO)
Version: 1.0
Date: June 17, 2026
1.0 BACKGROUND AND INTRODUCTION
The Department of the Navy Rapid Capabilities Office (DONRCO) is the single accountable organization spanning all naval warfare domains, responsible for converting capital into fielded capability at the speed of relevance. DONRCO’s mission is to bring together people, tools, and processes to drive rapid delivery of transformative solutions to the hardest Department of the Navy (DON) operational problems, leveraging existing technologies in new ways and adapting emerging technologies and unconventional concepts to ensure the DON can win decisively, now and in the future.
This Performance Work Statement (PWS) defines the requirements for non-personal mission advisory and operating-partner services to support DONRCO’s mandate for immediate acquisition reform, the
Budget Execution-Year Technology Selection (BETS) portfolio model, and the imperative to prioritize timely capability over perfection. The contractor’s services shall be integrated with DONRCO and DON
Portfolio Acquisition Executives (PAE) funding decisions and with rapid capability cells embedded at
PAEs and across the operating fleet.
2.0 OBJECTIVE
The objective of this contract is to obtain high-quality, outcome-focused mission advisory and operating-partner capabilities. These services will enable DONRCO to accelerate the rapid assessment, execution, fielding, and transition of urgent naval capability solutions within a one-to-three-year delivery horizon.
3.0 SCOPE OF WORK
The contractor shall deliver integrated support across three core workstreams:
1. DONRCO 1.0 Portfolio Performance: Continuously assessing, optimizing, and tracking active and candidate capability investments.
2. DONRCO 2.0 Mission Planning: Translating lessons observed into an institutionalized platform architecture, standard operating procedures, and capital coordination frameworks.
DRAFT
3. DON Office of Small Business Programs (OSBP) Strategic Deal Support: Providing strategic transaction architecture, contract structuring recommendations, and vendor sourcing strategies.
4.0 APPLICABLE DOCUMENTS
The following documents form a part of this PWS to the extent specified herein:
• DoW Acquisition Transformation Strategy, Nov 2025
• DoW Memorandum, Transforming the Defense Acquisition System into the Warfighting Acquisition
System to Accelerate Fielding of Urgently Needed Capabilities to Our Warriors, 7 Nov 25
• DoDI 5000.02, Operation of the Adaptive Acquisition Framework
• DoDI 5000.74, Defense Acquisition of Services
• DoDI 5230.24, Distribution Statements on DoD Technical Information
• DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM)
• SECNAV and DONRCO acquisition reform guidance applicable to the BETS Board portfolio model
• DONRCO charter and operating directives
• DD Form 254, Contract Security Classification Specification
• DD Form 1423-1, Contract Data Requirements List (CDRL)
5.0 ACRONYMS AND DEFINITIONS
5.1 Acronyms
Acronym Definition
BETS Budget Execution-Year Technology Selection
CDRL Contract Data Requirements List
CLIN Contract Line Item Number
DD Department of Defense (Form)
DoDI Department of Defense Instruction
DON Department of the Navy
DONRCO Department of the Navy Rapid Capabilities Office
DoW Department of War
FCL Facility Clearance
FFP Firm-Fixed-Price
MOE Measure of Effectiveness
MOP Measure of Performance
OSBP Office of Small Business Programs
PAE Portfolio Acquisition Executive
PEO Program Executive Office
ROI Return on Investment
SOP Standard Operating Procedure
Acronym Definition
TS/SCI Top Secret/Sensitive Compartmented Information
5.2 Definitions
• Bet Thesis: The articulated hypothesis underlying a DONRCO portfolio investment, including the operational problem addressed, the proposed solution approach, the success criteria, and the anticipated transition pathway.
• Performer Diligence: Structured assessment of a candidate solution provider’s technical, programmatic, and organizational ability to deliver against a bet thesis within DONRCO’s delivery horizon.
• Rapid Capability Cell: A small, mission-focused team embedded at a PAE, PEO, or fleet operational command to identify, shape, and accelerate the fielding of urgent capability solutions.
6.0 PERFORMANCE REQUIREMENTS, STANDARDS,
AND DELIVERABLES
6.1 Program Management
The contractor shall plan, manage, and report on all work performed under this contract.
• Performance Standard: Monthly Progress, Status, and Management Reports must be submitted on time, accurately tracking progress by workstream, identifying issues/risks, significant events, and schedule status with 100% accuracy.
• Deliverable: Monthly Contract Activity Report, CDRL A001
6.2 DONRCO 1.0 Portfolio Performance Support
The contractor shall provide mission advisory support to the current DONRCO portfolio of bets.
6.2.1 Capability Shaping
Support DONRCO in shaping candidate capability bets, including refinement of the bet thesis, operational problem framing, and solution-space analysis.
6.2.2 Performer Diligence
Conduct structured performer diligence assessments for candidate and active portfolio bets, evaluating technical feasibility, programmatic execution capacity, and transition readiness.
6.2.3 MOE and MOP Design
Design Measures of Effectiveness (MOE) and Measures of Performance (MOP) tailored to each bet thesis, suitable for tracking portfolio-level outcomes.
6.2.4 Return on Investment (ROI) Assessment
Conduct ROI assessments for individual bets and for the aggregated DONRCO 1.0 portfolio.
6.2.5 Quarterly Portfolio Performance Assessment
Support production of a Quarterly Portfolio Performance Assessment scoring active bets against their respective thesis using the established MOE/MOP framework.
• Performance Standard: Assessments and frameworks must be data-driven, objective, and completed within agreed schedules to support acquisition decision points.
• Deliverable: Monthly Contract Activity Report, CDRL A001
6.3 DONRCO 2.0 Mission Planning Support
The contractor shall translate lessons observed under DONRCO 1.0 into the architecture and operating model for DONRCO 2.0.
6.3.1 Platform Architecture and SOP
Develop the DONRCO 2.0 Platform Architecture and accompanying Standard Operating Procedure
(SOP) describing the integrated operating model, governance, decision rights, and process flows.
6.3.2 Capital Coordination and Stakeholder Engagement Framework
Develop a framework addressing internal Navy and DoD capital sources, external capital partners, and the corresponding stakeholder engagement model.
6.3.3 Portfolio-Level Performance Metrics and SECNAV-Grade Reporting
Design portfolio-level performance metrics suitable for SECNAV-level reporting and produce a
SECNAV-grade ROI and Performance Metrics Reporting Package.
• Performance Standard: Deliverables must be comprehensive, executable, and tailored to senior leadership standards (SECNAV-grade).
• Deliverable: Monthly Contract Activity Report, CDRL A001
6.4 Navy OSBP Strategic Deal Support
The contractor shall provide strategic deal support to the Navy OSBP in coordination with DONRCO.
6.4.1 Strategic Deal Architecture
Develop strategic deal architecture options for designated DON transactions, including structure, pathway, and risk considerations.
6.4.2 Contract Structuring
Provide contract structuring recommendations for designated transactions, including pricing structure, period of performance, and option strategies.
6.4.3 Partner and Vendor Sourcing
Identify and assess prospective partners and vendors across the naval industrial base.
6.4.4 Strategic Deal Architecture Memoranda
Produce Strategic Deal Architecture Memoranda for each assigned task, documenting recommendations and supporting analysis.
• Performance Standard: Memoranda must contain thoroughly vetted regulatory and business recommendations, completed within specified government timelines.
• Deliverable: Monthly Contract Activity Report, CDRL A001
7.0 PERFORMANCE REQUIREMENTS SUMMARY
(PRS)
Performance
Requirement (PWS Ref) Performance Standard
Acceptable Quality
Level (AQL) Method of Surveillance
Program Management
(6.1)
Accurate, timely Monthly
Reports (CDRL A001).
Submitted within 5 business days after end of month; no more than 1 revision required.
100% Inspection
Portfolio Performance
Support (6.2)
Highly rigorous, analytical assessments and
MOE/MOP frameworks
(CDRL A001).
Accepted by the
Government on first submission 90% of the time; revisions completed within 10 days.
Periodic Inspection /
Government Review
Mission Planning
Support (6.3)
Comprehensive, implementable DONRCO
2.0 architecture and
SECNAV-grade reports
(CDRL A001).
Deliverables align fully with SECNAV acquisition mandates; no more than 1 major revision.
100% Inspection /
Executive Review
OSBP Strategic Deal
Support (6.4)
Sound, regulatory-compliant transaction architectures (CDRL A001).
Recommendations are actionable and compliant with DoD acquisition guidelines.
Government Review
8.0 GENERAL REQUIREMENTS
8.1 Security Requirements
The contractor shall comply with all security requirements specified on the DD Form 254 issued at contract award.
• All personnel performing classified work shall hold active TS/SCI clearances.
• Unclassified-scope tasks will begin at contract award.
• Classified-scope tasks shall only occur at a contractor’s facility following completion of the Facility
Clearance (FCL) process.
8.2 Deliverable Acceptance
The Government will review each deliverable for acceptance against criteria specified by the
Government. The Government will provide written acceptance or comments. The contractor shall address
Government comments and resubmit within ten (10) calendar days of receipt.
8.3 Travel
The contractor shall perform travel as required to execute tasks. All travel shall be coordinated in advance and approved by the Government. Travel will be reimbursed in accordance with the Joint Travel
Regulations (JTR) and shall not exceed the travel CLIN ceiling.
8.4 Period of Performance
The base period of performance is twelve (12) months from the date contract award. The Government may exercise one (1) twelve-month option period.
8.5 Key Personnel
The contractor shall provide the Key Personnel identified in Section H. Substitution of Key Personnel requires advance written approval of the Contracting Officer.
File details come from the government source that posted it. Updated .