DRAFT PPC Hill AFB PWS.pdf

PDF 657 KB Posted

Attached to
Services to Provide Personal Protective Clothing to the Ogden Air Logistics Complex, Hill AFB, Utah
Solicitation number
FA822426R0160DL
Issued by

About this file

This is a Performance-Based Work Statement (PWS) for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Personal Protective Clothing (PPC) services at Hill Air Force Base, Ogden Air Logistics Complex (OO-ALC), Utah, effective January 23, 2026.

The contractor shall provide leasing, pickup/delivery, cleaning, repairing, replacement, and tracking of contractor-owned PPC to designated drop stations across multiple maintenance groups (AMXG, CMXG, EMXG, MMXG, MXSG). Services include weekly pickup of soiled garments and delivery of clean items, with a standard seven-calendar-day turnaround time. The Government may increase PPC types by ten style/types during the basic contract level. All PPC must comply with the Berry Amendment and meet or exceed current industry standards per Technical Order 00-25-203. The contractor must provide sizing per standardized charts (Table 1) and deliver new task orders within 45 calendar days of award. Follow-on task orders require implementation within five business days. Cleaning specifications include cleanliness, dryness, lint-free conditions, odor removal, and retention of original shape and fit. Clean room PPC requires individual packaging with labels and must meet Air Force standard specifications. Service life expectancy and repair/replacement protocols are defined, with the contractor responsible for identifying industry standards for each garment type. Tracking and accountability require weekly digital reports with individual inventory control numbers, service start dates, garment codes, and remaining life cycle percentages. Bi-annual full inventory with Government representatives is mandatory. The contractor must provide multiple CDRLs including proof of order (A001), garment verification reports (A002), delivery schedules (A003), malicious damage reports (A004), loss/damage reports (A005), monthly life cycle reports (A006), quality assurance program plan (A007), TCIR/DART reporting (A008), transition plan (A009), and mishap/incident reports (A00A). Performance thresholds include 95% accurate delivery accuracy, zero Berry Amendment discrepancies, 100% compliance on repair tag provision and coordination, and no more than two validated customer complaints per quarter. The contract requires compliance with OSHA standards, safety protocols, environmental regulations, VPP requirements for contractors exceeding 1,000 hours quarterly, communications security procedures, and security badge requirements per Hill AFB Instruction 36-812.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE-BASED

WORK STATEMENT

(PWS)

FOR

PERSONAL PROTECTIVE CLOTHING (PPC)

INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ)

HILL AIR FORCE BASE (AFB), UTAH (UT)

OGDEN AIR LOGISTICS COMPLEX (OO-ALC)

23 January 2026

TABLE OF CONTENTS

SECTION 1 – SCOPE

SECTION 2 – DESCRIPTION OF SERVICES

SECTION 3 – SERVICES SUMMARY

SECTION 4 – CONTRACT DATA REQUIREMENTS LIST

SECTION 5 – ANNUAL MANPOWER REPORT

SECTION 6 – QUALITY SYSTEM PLAN & MISHAP/INCIDENT REPORT

SECTION 7 – MISHAP/INCIDENT REPORT

SECTION 8 – GENERAL INFORMATION

SECTION 9 – COMMUNICATIONS SECURITY

SECTION 10 – CONTRACTOR EMPLOYEES

SECTION 11– HOURS OF OPERATION

SECTION 12– ENVIRONMENTAL CONTROLS

SECTION 13– SAFETY REQUIREMENTS

SECTION 14– INSTALLATION SAFETY/HEALTH STANDARDS

SECTION 15– PUBLICATIONS

SECTION 16– TRANSITION

SECTION 17– RAMP-UP

SECTION 18– PHASE OUT

APPENDICES

APPENDIX A – ACRONYMS AND ABBREVIATIONS

APPENDIX C – SAFETY FIRE PROTECTION & HEALTH SPECIFICATIONS…

APPENDIX D – CLEAN ROOM CLOTHING DESCRIPTIONS

APEENDIX E – DROP STATION HISTORICAL LOCATION…

APPENDIX F- CONTRACTOR PRICE LIST

APPENDIX G- PUBLICATIONS & WEBSITES…

1. Scope

The purpose of this contract is to provide compliant protective clothing services to the Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base (HAFB), Utah.

Services include leasing, pickup/delivery, cleaning, repairing, replacement, and tracking of Contractor owned protective clothing. The Government may increase the different types of Personal Protective Clothing (PPC) by ten (10) style/types at the Basic contract level during the life of the contract. The Contractor shall provide all personnel, equipment, material, supervision, facilities, transportation, and other items and services necessary to provide and maintain PPC. The Contractor shall provide and maintain contractor owned PPC In Accordance With (IAW) PPC types in Appendix B, to designated drop stations in a clean and serviceable condition.

2. Description of Services

2.1. Leasing. PPC provided by the Contractor shall meet the specifications listed in

Appendix B and meet or exceed current industry standards. All PPC including components and end items provided by the contractor shall be in compliance with the Berry Amendment (USC, Title 10, and Section 2533a). The Contractor shall provide industry standard color for provided PPC (i.e., navy blue, tan, grey, white, or dark green); if a specific color is required, it will be identified at the Task Order (TO) level.

The Contractor shall provide and maintain Contractor owned types of PPC listed in Appendix B for both the basic contract and new task orders. The Contractor shall coordinate with the assigned Contracting Officer Representative (COR) for initial drop station deliveries for both follow-on and new Task Order. (See Appendix E)

2.1.1. The Government will provide PPC sizes to the Contractor at time of award of the task order. The Contractor shall deliver PPC IAW Appendix B. If the Contractor is unable to obtain PPC IAW Appendix B the Contractor must notify the Contracting Officer (CO) and/or COR and provide an estimated date of delivery based on delivery date of clothing supplier, the contractor shall provide proof of order when requesting additional time to complete. (Contract Data Requirements List (Proof of Order CDRL) A001)

2.1.2. Follow-on Task Orders. The Contractor shall validate the updated follow-on Task Order requirement by identified drop stations from the previous Task order, to include quantities of PPC by size and type. The updated requirements shall be implemented within 5 business days of the follow-on Task Order Period of Performance (PoP). The Contractor shall contact the COR for first delivery at drop station(s) within one (1) business day of PoP start. Drop-off/pick-up inventory must be conducted IAW para 2.5.1.

2.1.3. New Task Orders. The Contractor shall provide the required inventory of all PPC listed at the Task Order level not to exceed 45 calendar days after contract award. The Contractor shall validate the Task Order requirement by identified drop stations to include quantities of PPC by size and type. The Contractor shall provide and coordinate the delivery schedules and times to/with the COR, for identified stations, no later than five (5) calendar days prior to first delivery for each new Task Order. (Delivery Schedule CDRL A003). The Contractor shall contact the COR prior to first delivery at new drop station within one (1) business day of PoP start. Drop-off/pick-up inventory must be conducted IAW para 2.5.1.

2.1.4. The Contractor shall provide the specified compliant/serviceable sizes of each

PPC, IAW sizing chart (See TABLE 1). Specified quantities and sizes will be identified at the Task Order level. The Contractor shall not increase/decrease quantities without a contract modification signed by the CO.

TABLE 1 (Government Standard Sizes)

SHIRTS, LAB COATS, and SMOCKS

XSM SM MD LG XL 2XL 3XL 4XL 5XL 6XL 7XL

CHEST 30-32 34-36 38-40 42-44 46-48 50-52 54-56 58-60 62-64 66-68 70-72

COVERALLS

XSM SM MD LG XL 2XL 3XL 4XL 5XL 6XL 7XL

CHEST 30-32 34-36 38-40 42-44 46-48 50-52 54-56 58-60 62-64 66-68 70-72

Regular Inseam 6 feet 3 inches and below

Tall Inseam 6 feet 4 inches and above

PANTS and JEANS

WAIST 30 32 34 36 38 40 42 44 46 48 50

INSEAM 30 32 34 36 38

Women’s PANTS

WAIST 2-24

INSEAM 24 26 28 30 32 28 30 32

Women’s SHIRT

Size S M L XL

*Measuring inseam on pants- measure from belt line to floor, then subtract 10.

2.1.5. The Government may require changes in size requirements during the Task Order PoP. Changes to size requirements will be provided to the Contractor by the CO, COR, or PM, through a letter or email, and must be delivered within ten (10) business days. If the Contractor is unable to obtain PPC within ten (10) business days, the Contractor must notify CO and COR by mail or email and provide an estimated date of delivery based on delivery date of clothing supplier. The

Contractor shall provide proof of order when requesting additional time to complete. (Proof of Order CDRL A001)

2.1.6. Government workload has the potential to transfer from one area to another on Hill AFB requiring the move of a drop station during the Task Order PoP. The Government will provide seven (7) business days lead time for the removal and set up of adjusted drop stations. Government will send out updated Appx. E. If delivery schedule is affected, Contractor shall update delivery schedule. Historical drop stations are provided in Appx E. (Delivery Schedule CDRL 2.1.6)

2.2. Pick-up and Delivery. The Contractor shall be responsible for the pickup of soiled PPC and delivery of clean PPC IAW schedule on a weekly basis. The Contractor shall not pick-up/deliver PPC to any drop stations between 1100 and 1200. All PPC shall be picked up each week and returned the following week IAW the schedule. In case of extreme events (vehicle accidents, weather, natural disaster, etc.), the Contractor shall notify the COR prior to delivery schedule and provide estimated new delivery timeline.

In the event that any discrepancies in the quantity/type/size of PPC arise, the Contractor shall correct and deliver any inaccuracy No Later Than (NLT) the next business day and provide a corrected Government Verification Report (GVR) sheet to the Government Representative (GR) and the COR. The Contractor shall provide a GVR /invoice for all deliveries. All GVR/invoicing sheets shall be signed by appropriate GR. (Garment Verification Report (GVR) CDRL A002)

2.2.1. In the event a holiday falls on the established pick-up/delivery day, the Contractor shall perform service the business day prior to or the next business day. The amended schedule shall be coordinated through the COR seven (7) business days prior to the holiday. (Delivery Schedule CDRL A003)

2.2.2. The Contractor shall pick up soiled PPC from government provided bins IAW the weekly delivery schedule. The Contractor shall provide any required bags to contain PPC either individually or bundled. The Contractor shall request building hazards from the Government on a yearly basis. This will be for informational purposes only. The contractor shall perform their own industrial survey IAW OSHA 29 CFR 1910 Part I.

2.2.2.1. The Contractor shall provide water soluble bags for each PPC item with hazardous contaminants. The Contractor shall not pick up any water-soluble bags unless they are clearly marked with size, quantity, and PPC type by Government personnel. The Contractor shall notify the COR the same business day if PPC is not picked up at a drop station.

2.2.2.2. The Contractor shall provide mesh bags or some type of containment bag for the laundering of contaminated underclothing. Underclothing shall be marked with contractor proposed identification and be returned in same bag.

(See para 2.6.2.)

2.3. Cleaning. Cleaning of PPC shall be accomplished IAW applicable Commercial Industry

Standards.

2.3.1. Each processed PPC item shall be entirely clean, dry and free of lint. Minor discoloration of PPC as a result of fading and staining is acceptable. PPC shall be free of odor with no trace/residue of foreign materials or washing supplies in the fabric. The Contractor shall ensure all PPC retains original shape, fit, and cleanliness to meet or exceed current industry standards Technical Order 00-25- 203 sec VIII 8 paragraph 8.3.4 or current version.

2.3.2. Clean Room. Clean room PPC shall be laundered, sanitized and packaged individually, with label showing, grouped and bagged by drop station prior to delivery to ensure contents do not become contaminated. (See Appendix D)

2.3.2.1. Clean room PPC shall meet Air Force standard Technical Order 00-25-

203 sec VIII 8 paragraph 8.3.4. The Government reserves the right to sample and test any batch to confirm that PPC meet AF standards. When GR performs batch testing and articles are identified as contaminated, the entire batch may be rejected for re-cleaning at no additional expense to the Government.(Monthly Life Cycle Reports CDRL A006)

2.3.2.2. Clean room PPC shall be packaged individually with a label. Label on outside package shall mirror garment label on of inside package. Labels shall be a minimum of 1” H X 3” L, with a minimum of 8 pitch, Times New Roman font (or similar), written in English, and attached to garment in such a manner to remain with the PPC for the serviceable life of the PPC.

2.4. Repair/Replacement of PPC. The Contractor shall identify an industry standard (with supported rationale) service life expectancy for each article of PPC IAW Appendix B.

New PPC added during the PoP, to Appendix B, shall be provided ten (10) days after contract modification. The Contractor shall repair or replace damaged PPC.

2.4.1. “Repair tags” shall be provided, by the Contractor, at each drop station to allow individual employees to communicate the need for repair. If the Contractor determines damage is not due to normal wear and tear, then the Contractor shall clean damaged PPC and deliver to the COR for final disposition and then annotate the verification sheet and shall follow PWS para 2.4.2.2 for replacement.

2.4.1.1. The Contractor shall return the repaired items to the corresponding drop station within seven (7) calendar days of identification and pick up. The Contractor shall tag repaired PPC stating repair and date.

2.4.2. The Contractor shall replace PPC IAW the following guidance:

2.4.2.1. Expired service life expectancy. The Contractor shall replace with new PPC. The Government assumes no liability, and no payment will be made, for any PPC replaced after the PPC has reached its full-service life.

2.4.2.2. Malicious damage. If the Government causes PPC to be unserviceable due to malicious damage or lost PPC, then the Contractor shall use the following formula to calculate the replacement cost:

((A/B) x C)

A = Remaining life of garment B = Expected life of the garment C = Unit price of garment

Contractor shall provide supporting documentation, to include COR disposition, with the invoice when billing. (Malicious Damage Report

CDRL A004).

2.4.2.2.1. Malicious damage will be determined by the COR and the Contractor.

2.4.2.3. If any PPC item is damaged beyond repair, but PPC item is not determined to have been maliciously damaged by Government personnel, the Contractor shall replace the PPC item at no additional cost to the Government.

2.5. Tracking and Accountability. The Contractor shall implement a process for inventory control of PPC, to include:

Accounting and weekly digital reports for PPC items in the pickup and delivery to assigned drop stations to include size, individual inventory control number per each item of clothing, PPC service start date, corresponding PPC code, and Percentage of life left.

Delivered PPC articles are serviceable Meet or exceed industry standards Ensure that PPC article tags are stamped “Made In the USA” or similar marking the PPC is made in the USA All marked tags shall remain visible and legible during the life of PPC article All items are trackable and full history of service life can be provided within the Monthly Life cycle reports or upon request from COR or PM (Monthly Life Cycle Reports CDRL A006)

2.5.1. The Contractor shall provide a copy of the PPC GVRs (amount, size, color, PPC code, and individual inventory control number) to the drop station GR upon pick-up and delivery. The contractor shall, in coordination with a GR, conduct a joint inventory of items being picked-up and/or delivered each week. Repaired PPC will be verified during joint weekly inventory. The PPC GVRs will be verified/signed, with printed name and phone number of receiving GR at each designated drop off location. The GR for the GVR receipt shall be a government employee. A legible copy shall remain with the GR at the drop station, and the original shall be submitted each month with the contractors invoice and a copy to the COR. If no GR is present, the contractor shall not deliver PPC and notify the COR immediately. (Garment Verification Report (GVR) CDRL A002).

2.6. Inventory

2.6.1. The Contractor shall complete a full inventory of all PPC bi-annually. The inventory shall be conducted with the COR or designated GR present. The Contractor shall furnish a report of loss, for all PPC that were lost or maliciously damaged beyond normal wear and usage, within 15 days of completion of inventory. (Report of Loss/ Damaged Clothing CDRL A005) The Contractor shall replace and be reimbursed for missing and maliciously damaged PPC, unless the Government can demonstrate the PPC were not returned by the contractor.

The contractor shall schedule the inventory within 45 days of contract award. The contractor shall notify the COR prior to inventory to coordinate inventory days and times. The Contractor shall propose schedule by day, time and drop station and coordinate with COR. (Delivery Schedule CDRL A003)

2.6.1.1. The Contractor shall provide an accurate count of all PPC that are in

Contractor’s possession by email, i.e. being laundered, repaired, etc. one (1) business day prior to inventory start. The Government reserves the right to conduct inventories at the Contractor’s facility of PPC in conjunction with the required inventories.

2.6.2. Undergarments. The Contractor shall identify PPC articles by identification methods that will ensure that the end user receives the same articles that were turned in for laundering. The Contractor shall not identify any leased PPC by name, i.e. “John”.

3. Services Summary

Performance Objective PWS Performance Threshold All items must be compliant with Berry Amendment 2.1

Zero discrepancies for compliance with Berry Amendment requirements.

Contractor shall coordinate with COR for initial and follow-on drop station deliveries.

2.1, 2.1.2, 2.1.3

Contractor shall coordinate initial delivery with COR within one business day of POP start.

Contractor shall provide the required inventory of PPC items listed at the Task Order level no later than negotiated days at the Task Order not to exceed 45 calendar days after contract award

2.1.3

100% of items procured no later than (NLT) 45 days after contract award.

Contractor shall provide compliant/serviceable quantities, types, and sizes of all PPC IAW Task Order verification sheet/invoice and Table 1 Sizing Chart.

2.1.4, 2.2, Table 1

95% accurate delivery across all inspected drop stations monthly per Task Order. Inaccuracies shall be corrected and delivered NLT the next business day along with a corrected verification sheet to the GR and COR.

Contractor shall not pick-up any water soluble bags unless clearly marked with applicable info by Government personnel

2.2.2.1

Contractor shall notify the COR the same business day if PPC is not picked up at a drop station.

Cleaning of PPC items shall have a seven calendar day turnaround time

2.4.1.1, 2.5.1

95% accurate delivery across per all inspected drop station weekly per Task Order.

Contractor shall provide repair tags at each drop station, repair tagged items, and verify any/all repairs with Government personnel during joint weekly inventory

2.4.1, 2.4.1.1, 2.5.1

Contractor shall return repaired items to the corresponding drop station within seven (7) calendar days of identification and pick up. 100% compliance on providing repair tags, repairs, and coordinated weekly inventories.

Submit Contract Data Requirements List (CDRL) as required in the basic contract

Table 2

Performance is acceptable when CDRLs have no more than one error per quarter for all CDRL submissions and no more than one CDRL per quarter is submitted after the identified due date. Substantive mistakes shall be corrected within two business days and corrective action taken to prevent recurrence of inaccurate/late CDRLs

Customer Feedbacks 4.3, 4.3.1 Contractor shall receive no more than two (2) validated CARs

4. Contract Data Requirements List (CDRL)

4.1. The Contractor shall submit deliverables IAW the applicable CDRL. The Government will have the right to reject or require correction of any deficiencies found in deliverables. In the event of rejection of any deliverable, the Contractor will be notified in writing by the Government. Any changes/corrections shall be submitted IAW instructions in applicable CDRL.

Table 2

DATA ITEM TITLE DELIVERY DATE

A001 Proof of Order As Required

A002 Garment Verification Report

(GVR)

End of Each Month

A003 Delivery Schedule ARO of Task Order

A004 Malicious Damage Report As Required

A005 Report of Loss/ Damaged Clothing Bi-Annually

A006 Monthly Life cycle reports End of each month

A007 Quality Assurance Program Plan

(QAPP)

At time of proposal

A008 TCIR/DART By 15 January each year

A009 Transition Plan At time of proposal

A00A Mishap/Incident Report As Required

4.2. The Contractor shall submit a schedule to the COR, that includes a schedule for pickup and delivery times for corresponding buildings. The schedule shall be provided at Task Order award and must be incorporated into the contractors proposed schedule for each designated drop station listed in Task Order. The schedule shall be coordinated through the COR seven (7) business days after the start of the Task Order and any changes after the coordinated schedule shall be updated within five (5) business days prior to the change. (Delivery Schedule, CDRL A003)

The Contractor shall provide monthly reports, by drop stations, that will identify how many articles of PPC are at each drop station, the number of times each article of PPC has been laundered and remaining life cycle status for each article of PPC. The COR will review the monthly reports to ensure that any PPC items have not exceeded the life cycle of the item. (Monthly Life Cycle reports, CDRL A006).

4.3 Evaluation of Contract Execution

The Government COR will periodically evaluate the Contractor’s execution of this contract and task orders through inspections IAW with FAR 52.246-4 Inspection of Services-Fixed Price and 52.246-5 Inspection of Services-Cost-Reimbursement. The COR will perform monthly surveillance, may perform random surveillance, and will investigate all customer feedback. Government Quality Assurance Specialists (QAS) will also inspect the Contractor to ensure compliance with Government maintenance and safety practices. QAS inspections include, but are not limited to Personnel Evaluations (PEs), Quality Verification Inspections (QVI), Special Inspections (SI), Occupational Safety and Health Administration (OSHA) inspections, and tool kit inspections. All QAS violations by Contractor personnel will be reported to the COR and Government PM and result in a CAR or Performance Assessment Report (PAR) depending on the severity. Though this contract is considered non-performance based, performance-based evaluation methods will be used where feasible.

4.3.1 Customer Feedback

The COR will investigate all customer feedback from the Government to determine validity. All validated customer complaints will result in a Corrective Action Report (CAR) or PAR depending on the severity. Contractor shall receive no more than two (2) validated customer complaints per quarter during the performance period. Customer feedback may be in the form of LEAP findings from the QA division, COR findings, or submissions from the customer.

5. Annual Manpower Report

5.1. The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for leasing and cleaning of PPC via a secure data collection site. The Contractor is required to completely fill in all required data fields at https://sam.gov.

5.2. Reporting Period: Contractors are required to input data for the labor executed during the PoP for each Government Fiscal Year (FY), which runs 1 October through 30 September. While inputs may be recorded anytime during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the http://sam.gov.

5.3. Uses and Safeguarding Information: Information from the secure web site is considered proprietary in nature when the contract number and contractor identity are associated with direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and contract number associated with the data.

5.4. Website User Manuals: Data for Air Force service requirements must be input at the Air

Force CMRA link. However, user manuals for Government personnel and Contractors are available at the Army CMRA link at https://sam.gov.

6. Quality Assurance Program Plan (QAPP). This plan shall be provided as part of the proposal and shall be evaluated at the basic contract level. The plan shall be updated, provided, and evaluated as required. The Contractor shall make appropriate corrections and modifications to the plan and obtain acceptance of the plan by the CO. (Quality Assurance Program Plan (CDRL A007)

6.1. The Contractor shall establish and provide a complete contractor’s QAPP to ensure the requirements of this contract are provided as specified. The Contractor shall ensure quality service is maintained throughout the life of the contract.

6.1.1. The QAPP shall reflect the Contractor’s overall approach, internal management controls, processes, and procedures for reporting to the Government on identified aspects of quality issues, (i.e. clean room specifications and other AF regulation requirements). The plan shall identify the means by which the Contractor will ensure quality effectiveness and demonstrate comprehensive management and review of data. The plan shall describe what is measured, how often it is tracked and provided, who reviews and assures that appropriate action is initiated when trends are unfavorable, who the Government will contact for Contractor quality issues, what method and process is used to track and resolve issues, where reports are sent and maintained, and how often quality issues are reviewed and reported.

The plan shall identify how the Contractor identifies and resolves deficiencies, identifies potential improvements, and maintains and makes available to the Government, the documentation reflecting quality control inspections and any corrective actions taken. The Contractor shall provide copies of all discrepancies to the Government PM and the COR.

The Contractor shall advise the Government area supervisor and COR or PM of conditions/deficiencies and annotate in a Mishap/Incident Report. The contractor shall create an Incident/Mishap report in the event that any of the following occur while on the Government installation and notify the COR.

A condition or material fault that is a hazard to personnel, equipment and missions. When a prescribed installation or maintenance action cannot be accomplished. When operational characteristics or durability cannot be obtained because of faulty design or materials. When a contract employee causes damage to equipment. When a contract employee is involved in an accident or injury.

(Mishap/Incident Report, CDRL A00A)

7. General Information

7.1. Security Requirements. Compliance with all security and force protection requirements is mandatory and enforced at each installation.

7.2. Comply with local unit in and out processing procedures for all contractor personnel to ensure proper security related briefing and debriefs are accomplished.

7.3. Contractor Identification Badges.

7.3.1. Badge/Unescorted Entry Authorization, IAW Hill AFB Instruction 36- 812. The

Contractor’s security manager shall complete an “Unescorted Entry Authorization Certificate” (AF Form 2586) for each employee requiring entry into controlled areas.

The request shall be submitted to Security Forces (site location Visitor Center). The AF Form 2586 shall be returned to the Government security manager for accountability.

7.3.2. As required, the Contractor employee shall also obtain a Building ID and access card from the appropriate Building Security Manager.

7.3.3. When the PoP has ended or the task is considered complete, the Contractor shall have five (5) working days to return all access cards and base identification badges.

7.3.4. During performance of the contract and at the completion or termination of the contract, the Contractor shall be responsible for prompt return of credentials to the appropriate security manager for any employee who no longer requires access to the work site, and for obtaining required identification of newly assigned personnel. Lost badges shall be reported to the contractor’s assigned Facility Security Officer (FSO) within one working day of loss.

7.3.5. Should a security violation occur, the Contractor shall: immediately report to the site location Group Security Manager all available facts related to each instance; take such precautions as the Security Manager may reasonably require for security purposes; take reasonable and prudent action to establish control of the scene, prevent further violation, and to preserve evidence until released by proper authority; and cooperate fully and assist Government personnel as the Government conducts an investigation of the violation. Participation shall last until the investigation is completed.

8. Communications Security

8.1. All communications with Department of Defense (DoD) organizations are subject to

Communications Security (COMSEC) review.

8.2. The DoD authorizes the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.

8.3. The Government advises the contractor that at any time they place a call to, or receive a call from, a DoD organization, they are subject to COMSEC procedures.

8.4. The Contractor assumes the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DoD information.

9. Contractor Employees

9.1. The Contractor shall not assign to the contract or Task Order performance any person including any employee of the U.S. Government if employing that person would create a conflict of interest under any law, regulation or policy of the United States Government.

Additionally, the Contractor shall not assign to the contract or Task Order performance, any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DoD Directive 5500.7-R and any other applicable regulation or policy of the Department of the Air Force or its subordinate commands, as applicable, including but not limited to Air Force Materiel Command.

9.2. All Contractor Management Staff or Contractor personnel shall be clearly identified as such at ALL times. Contractor identification shall include conversations, mail, email, teleconferences, video teleconferences, faxes, and/or other electronic communication whether with Government personnel, other contractor personnel, or with the public when supporting this contract where their status as contractor employees might not otherwise be apparent or where they might be mistaken for civil service employees. Air Force issued identification badges and any contractor badges shall be worn at or above the waistline during the individual’s duty hours when not in a production or designated Foreign Object Damage (FOD) hazard area.

10. Hours of Operation

10.1. Normal hours of operation: The Contractor shall deliver PPC as required Monday through Thursday between the hours of 0600 and 1630. The Contractor shall not deliver PPC to any drop stations between 1100 and 1200 (unless otherwise specified by CO or COR). Schedule adjustments will be approved by the CO or COR. Shifts are susceptible to change during Task Order PoP due to Government worksite availability, i.e., Government furloughs. The Government is responsible for communicating required work hours and ensuring their employees are at their designated drop stations ready for pickup and delivery.

10.2. Initial delivery and final pickup hours of operation: The Contractor shall deliver PPC as required Monday through Friday between the hours of 0600 and 1630. The Contractor shall not deliver PPC to any drop stations between 1100 and 1200 (unless otherwise specified by CO or COR). Schedule adjustments will be approved by the CO or COR.

(Delivery Schedule, A003) Shifts are susceptible to change during Task Order PoP due to Government worksite availability, i.e., Government furloughs. The Government is responsible for communicating required work hours and ensuring their employees are at their designated drop stations ready for pickup and delivery.

10.3. Federal Holidays: Unless otherwise required by the Government, the contractor shall not have access to Government facilities on the following federal holidays: New Year’s Day, Martin Luther King’s Day, Washington’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. If a holiday falls on Saturday, it is observed on Friday and working hours are Monday through Wednesday for that week. If the holiday falls on a Sunday, it is observed on Monday. Any other circumstances that may prompt base closure, such as Days of National Mourning, may also restrict opportunity to perform the exchanges. In the event of a base closure, exchanges shall be performed on the next business day. There may also be up to six AFMC Goal Days and four Wingman Days per year awarded to Government civilian employees, as well as possible weather related days and Government directed holidays. On these days, the contractor shall not generally be required to work and the Government shall not be billed for work not performed.

NOTE: Good Friday is regarded as a holiday by the Utah Wage Determination;

however, Good Friday is not a Federal Holiday so the Government facilities will be open for work that day. The contractor shall plan on employees working business as usual on that day, unless the Government supervisor or section chief determines that such services are either unnecessary or will be less than a full normal workday.

10.4. Down Days/Weather Days: The Government will notify the contractor when official notice has been given for Energy/Weather Down days. The contractor is not expected to work on any Energy/Weather Down days.

10.5. Rescheduling: Down Days/Weather days may be rescheduled if surge/emergency operations require.

10.6. Weekends/Holidays: Not normally expected to work weekends or holidays.

11. Environmental Controls. The Contractor shall be certified by the State of Utah to handle and dispose of all waste material/waste regulated under applicable Federal and State environmental laws. The contactor's operations shall comply with all applicable Federal, State, and local statutory and regulatory guidance.

11.1. Compliance with Laws and Regulations. The Contractor shall be knowledgeable of and comply with applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event of a guidance conflict, the Contractor shall follow the most stringent requirement. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the Contractor shall inform the CO pursuant to notice requirements and negotiate a modification to the contract.

11.2. The Contractor shall ensure their employees are made aware that the performance of these services will occur in industrial areas. The OO-ALC industrial complex has the potential to expose workers to hazardous materials which may include, but is not limited to: hexavalent chrome, cadmium, beryllium, lead and others. While the contractor will not perform duties in a marked and signed regulated area [where exposures are expected to exceed the permissible exposure limits set by Occupational Safety & Health Administration (OSHA) 29 CFR 1910, there may be contact hazards with these materials during cleanup of dust, metal shavings, etc. It is the Contractor’s responsibility to identify such potential hazards to their contractor employees. The Contractor shall ensure proper protective measures and training is taken to ensure contracted employees are protected from these hazards. The site location’s Bioenvironmental Engineering Flights have produced industrial hygiene assessments of these areas which are for information only and will be provided at the contract level.

11.3. Notification of Environmental Spills. If the Contractor spills or releases any substance contained in 40 CFR 302 into the environment, the Contractor or its agent shall immediately report the incident to the Base Fire Department, as identified in each Task Order. If the incident location is Hill AFB, the Contractor shall contact the Hill AFB Fire Department at 911 and ask for Hill AFB Fire Dept. The liability for the spill or release of such substances rests solely with the contractor and its agent.

11.4. Material Storage and Use. The Contractor shall follow manufacturer’s guidelines and professional recommendations for humidity, temperature, cleanliness, and materials handling, storage, and disposal. This may include hazardous waste/materials. The Contractor shall work with and dispose of various hazardous material (HAZMAT), Hazardous Material Management, Waste Management, AFMC and Base Supplements, and locally developed operating instructions The Safety Data Sheet (SDS) will be maintained on file IAW OSHA 29 CFR 1910 and shall be available to employees for review of safety and health information. The Contractor shall have a hazardous communication program developed and implemented, IAW OSHA 29 CFR 1910, to inform employees of potential hazards if and when chemicals are used, inform their employees of the labeling system, ensure their employees are trained on how to read a MSDS, that the MSDS is available for their review, safety, and health information, and to determine the proper Personal Protective Equipment (PPE) required.

12.5 ISO 50001 requires Contractors be evaluated on the use/conservation of energy. The Contractor shall instruct employees in energy conservation practices. The Contractor shall be responsible for operating under conditions which prevent the waste of utilities/energy.

Reference: ISO 50001 4.5.7, AFSCMAN 21-100

12. Occupational health & Safety Requirements

12.1. In performing work under this contract, the Contractor shall:

12.1.1. Conform to all occupational health and safety requirements contained in the contract for all activities related to the accomplishment of the work. This includes the wearing of appropriate PPE as determined by the contractor. The contactor is responsible for conducting industrial hygiene surverys to identify all potential workplace hazards and corresponding PPE for all tasks performed during contract activites. All required PPE shall be furnished by the Contractor. PPE must meet or exceed OSHA 29 CFR 1910 Part I- “Personal Protective equipment” and ANSI standards. Failure to comply with these PPE requirements can result in a stop-work order and other contractual actions. Ensuring your personnel are properly equipped is essential for safe and successful contract execution.

12.1.2. Comply with all safety requirements including, but not limited to all those detailed in OSHA (Public Law 91-596) and OSHA 29 CFR 1910 DAFIs, local Operating Instructions, and process orders, Confined Space Standards, T.O.’s in relationship to occupational health and safety, and EPA instructions for the protection of their employees. The Contractor shall be responsible for the safety and accountability of all its employees. In the event there is conflicting guidance, the contractor shall follow the most stringent.

12.1.3. The Contractor shall always provide services in a manner which prevents mishaps, injuries and illnesses ensuring continuous OSHA compliance; DAFMAN 91-203, places OSHA compliance on the contractor. Be advised Government supervisors will contact the installation Contracting Office (or the COR) in the event Contractors are not in compliance with Air Force and/or OSHA requirements.

12.1.4. IAW OSHA 29 CFR 1910, the Contractor shall ensure their employees are made aware that the performance of these services will occur in industrial areas, the hazards of the area, and establish ways to mitigate the risks caused by the hazards. The industrial complex (OO-ALC) has the potential to expose workers to hazardous materials which may include, but is not limited to: hexavalent chrome, cadmium, beryllium, lead, and others. There may be contact hazards with these materials during cleanup of dust, metal shavings, and other operations.

12.1.5. Ensure proper protective measures and training is taken to protect contract employees from these hazards. The Contractor shall instruct his/her employees to recognize potential hazards, and where necessary, inform them how to avoid the dangers associated with them. The Contractor should be aware that there are specific requirements under OSHA 29 CFR 1910 under multi-employer work sites. IAW OSHA 29 CFR 1910, the Contractor should be aware that the contractor is responsible for their own OSHA violations occurring in the performance of this contract. Any costs associated with issued citation are not an allowable cost under the PPC contract or allocable to any other Government contract and production of any documentation as may be required by OSHA. The Contractor shall ensure these OSHA requirements are requirements of any subcontractors.

13. VOLUNTARY PROTECTION PROGRAM

13.1. The Air Force has adopted the OSHA Voluntary Protection Program (VPP).

Consequently, VPP impacts all “applicable contractors” operating on Air Force Installations. It is the contractor’s responsibility to ensure its employees and managers have a comprehensive understanding of VPP as well as full compliance with OSHA requirements. Contractors (to include applicable subcontractors), whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of the installation or VPP site. Detailed information on VPP is available on the OSHA website (http://www.osha.gov/dcsp/vpp/index.html). Contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of the installation or VPP site.

13.2. VPP requirements apply to Contractors who work more than 1,000 hours per quarter.

The Contractor shall flow down these requirements to all subcontractors who qualify as applicable contractors under this contract.

13.3. Total Case Incident Rate /Days Away, Restricted or Transferred (TCIR/DART)

Reporting. Contractors are required to provide from their OSHA 300 information the Total Case Incident Rate/Days Away Restricted or Transferred (TCIR/DART) rate by 15 January of each year to the COR for submission as part of the installation's annual OSHA VPP self-evaluation report. (TCIR/DART, CDRL A008).

14. PUBLICATIONS. Compliance with all publications, regulations and operating instructions provided by the Government or referenced in this PWS and subsequent Task Orders is required.

15. TRANSITION

15.1. Transition Plan – The Contractor shall have up to 60 days from date of contract award to ensure an orderly transition from the incumbent(s) or stand up manning for new workload without impact on Government operations. This transition shall be accomplished IAW the Transition Plan, which is incorporated into the proposal.

(CDRL A009).

15.2. The incoming Contractor is responsible for all efforts and material related to transition. Prior to cutover date, the incoming Contractor shall make all necessary efforts to provide a seamless transition to the user. The Transition Plan shall address how the Contractor shall accomplish Ramp-up and Phase out. The Contractor shall ensure all employees possess required training, qualifications, proficiency, security clearances, and satisfy all other access requirements prior to commencing PoP.

16. Ramp-up Phase – At a minimum, the following tasks shall be accomplished within the initial ramp-up phase of the program:

16.1. Upon contract award the Contractor shall implement their Transition Plan. Transition from each incumbent shall be completed no later than 30 days following contract award.

The Contractor shall ensure all employees possess required training, qualifications, proficiency, security clearances, and satisfy all other access requirements.

17. Phase Out

17.1. The incumbent contractor shall provide familiarization to the gaining organization if there is a change in Contractor, or if the operation reverts to the Government. During the phase-out familiarization period, the incumbent shall be fully responsible for continuation of their current Task Order.

17.2. The Government reserves the right to conduct site visits in all Contractor-operated facilities in conjunction with the solicitation of offers for the follow-on contract.

17.3. In the event the follow-on contract is awarded to other than the incumbent, the incumbent Contractor will cooperate to the extent required to permit an orderly change over to the successful contractor.

17.3.1. With regard to the successor Contractor’s access to incumbent employees, a recruitment notice may be placed in each facility.

17.4. The incumbent Contractor shall provide a written transition plan to the CO, COR, and workload gaining organization upon award to gaining organization.

APPENDIX A

ACRONYMS AND ABBREVIATIONS LIST

Acronym/Abbreviation Definition ARO After Receipt of Order ACO Administrative Contracting Officer AF Air Force AFB Air Force Base AFI Air Force Instruction AFMC Air Force Material Command AMXG Aircraft Maintenance Group APPX Appendix ARO After Receipt of Order CDRL Contract Data Requirements List CFR Code of Federal Regulations CMRA Contractor Manpower Reporting Application CMXG Commodities Maintenance Group CO Contracting Officer COR Contracting Officer Representative COMSEC Communications Security DART Days Away, Restricted or Transferred DoD Department of Defense

EMXG Electronics Maintenance Group

EPA Environmental Protection Agency

FAR Federal Acquisition Regulation

FOD Foreign Object Damage

FSO Facility Security Officer

FY Fiscal Year

GR Government Representative

GVS Government Verification Sheet

HAZMAT Hazardous Material

IAW In Accordance With

ISO International Standards Organization

MMXG Missile Maintenance Group

MSDS Material Safety Data Sheet

NLT No Later Than

NTE Not to Exceed

OO-ALC Ogden Air Logistics Complex

OPSEC Operations Security

OSHA Occupational Safety & Health Administration PoP Period of Performance PPC Personal Protective Clothing PPE Personal Protective Equipment PWS Performance Based Work Statement OO-ALC Ogden Air Logistic Complex QAS Quality Assurance Specialist QAP Quality Assurance Personnel QSP Quality System Plan SMXG Software Maintenance Group TCIR Total Case Incident Rate TO Task Order TO Technical Order USAF United States Air Force USC United States Code VPP Voluntary Protection Program (OSHA) WAWF Wide Area Work Flow

APPENDIX C

SAFETY, FIRE PROTECTION AND HEALTH

SPECIFICATION

INDUSTRIAL SAFETY REQUIREMENTS

OGDEN AIR LOGISTICS COMPLEX

UNITED STATES AIR FORCE

HILL AIR FORCE BASE, UTAH 84056

PERSONAL PROTECTIVE CLOTHING IDIQ

26 Feb 2026

OO-ALC/SE

Brock Salvesen

Control Number: SS262602

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements.

The contractor will implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:

1. Mishap reporting, as defined in paragraph B1 below.

2. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.

3. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.

4. All contractor personnel shall be trained and qualified to perform their duties safely.

5. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.

B. Mishap Notification

1. The contractor shall notify OO-ALC/SE (801-586-0477) or the Hill AFB Command Post (801-777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA COR (Contracting Officer's Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to OO-ALC/SE. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.

Mishap notifications shall contain, as a minimum, the following information:

(a) Contract, Contract Number, Name and Title of Person(s) Reporting

(b) Date, Time and exact location of accident/incident

(c) Brief Narrative of accident/incident (Events leading to accident/incident)

(d) Cause of accident/incident, if known

(e) Estimated cost of accident/incident (material and labor to repair/replace)

(f) Nomenclature of equipment and personnel involved in accident/incident

(g) Corrective actions (taken or proposed)

(h) Other pertinent information

2. The contractor shall cooperate with any and all government mishap investigations.

Additionally if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, or DCMA COR (Contract Officers Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.

3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.

4. The contractor shall support and comply with the safety investigation and reporting requirements of DAFI 91-204, Chapters 1 – 5.

C. General Safety Requirements:

The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees. All documents required as a result of OSHA 29 CFR 1910 and 1926 regulations, (i.e. certifications, training, respiratory protection program, workplace hazard assessments), shall be made available to the COR upon request.

The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels.

Contractor personnel must receive Explosive Safety Awareness Training if their duties require entry into the Explosive Clear Zone. This training will be provided by the OO-ALC Safety Office. Contact 75ABW/SEW at 586-0168.

A Risk Assessment will be required prior to any work being accomplished, if munitions will remain in the facility.

Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .