DRAFT_Performance Work Statement (PWS)_Omax Preventative Service.docx

DOCX document 73 KB Posted

Attached to
Intent to Sole-Source: OMAX Waterjet Service
Solicitation number
Not on record
Issued by

About this file

This is a Performance Work Statement (PWS) for annual preventative maintenance and emergency repair services on an OMAX water jet machine (bar code TY022738, serial number K511780) located in Building 1C Bay 2 at Tobyhanna Army Depot in Tobyhanna, PA. The contract is classified as non-personal services and requires the contractor to furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform the services. The contractor will be accountable solely to the government through the Contracting Officer and Contracting Officer's Representative (COR), with no government supervision or control over service providers.

The PWS specifies five primary service components: a five-day annual bridge machine service including inspection of ball screws and bearing assemblies, replacement of servo drive belts, pump rebuilds, filter replacements, software updates, and test cuts for accuracy; annual water treatment tasks including sump pump drainage, tank cleaning, filter cleaning, water sample collection, and TDS probe calibration; response requirements of 48 hours for non-emergency service calls on weekdays and within 96 hours for service scheduling, and 24-hour response for emergency service calls (defined as threats to employee safety or installation security) with service scheduling within 72 hours; written reports on equipment condition with cost estimates requiring COR or Contracting Officer approval before repairs commence; and Service Contract Reporting requirements via SAM.gov documenting all labor hours (prime and subcontractor) by October 31 of each fiscal year. The contractor must maintain on-site support between 0700-1700 Monday through Friday (excluding federal holidays), develop a Quality Control Plan within 10 days of award, complete required training including Anti-Terrorism Level I, OPSEC, iWATCH, and DoD Information Assurance training, comply with security and key control procedures, and maintain contractor identification badges and workspace signage. Performance standards require 100 percent compliance with zero deviation, including zero complaints regarding equipment failure due to improper preventative maintenance, with standard warranty terms applied in accordance with OMAX original equipment manufacturer warranty provisions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (Includes associated Performance Requirements Summary (PRS)

AUG 22

PERFORMANCE WORK STATEMENT (PWS)

Omax System Annual Machine Service 11/25/2025

Part 1 General Information

1. General: This is a non-personal services contract to provide annual machine service to the OMax Water Jet bar code TY022738 serial number K511780. The OMAX system is located in building 1C Bay 2 of Tobyhanna Army Depot. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide Preventive Maintenance on Tobyhanna’s Omax System.

1.2 Background: Tobyhanna Army Depot’s Omax system is an important part of the Depot’s total ability to meet production goals. This contract will ensure that the Omax System is maintained properly, the contractor will respond -within the Government’s timeline, to ensure there will only be minimal impacts on production

1.3 Scope: Contractor shall provide preventive maintenance and remedial services, as needed, as stated in Part 5: Specific Tasks.

1.4 Objectives: The objective of this contract to provide the following:

· Annual preventative maintenance on the Omax system

· Repairs as needed

· Detailed reports about the state of the system

1.5 General Information:

1.5.1 Quality Control Plan (QCP): The contractor’s existing quality assurance system shall be utilized in accordance with FAR 12.208. The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the

Contracting Officer’s Representative (COR) for review within ten (10) days after date of contract award

The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 10 days. If the Government has provided comments, the Contractor shall then have 10 days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than 10 Days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:

(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;

(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);

(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;

(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;

(e) How the Contractor will ensure all keys issued will remain controlled items (Paragraph 1.7 Key Control);

(f) How the Contractor will inventory and track maintenance of all Government Provided Equipment / Materials;

(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and

(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.

1.5.1.1 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 3 hours of identifying those issues. Verbal reports shall be followed up by written reports within 14 days

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1stM. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in FebruaryMemorial Day last Monday in May Juneteenth June 19thIndependence Day July 4th
Labor Day 1st Monday in SeptemberColumbus Day 2nd Monday in October Veteran’s Day November 11thThanksgiving Day 4th Thursday in November Christmas Day December 25th

1.5.3.2 Host Nation Holidays: NA

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.4.1 Government Facility Office Hours: The Government facility office hours are open 0700 to 1700, on days Monday through Friday, except U.S. Holidays identified in paragraph

1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0600 to 1800, days Monday through Saturday. The Government facility is open for operations during the recognized U.S. Holidays identified in paragraph

1.5.3.1 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.

1.5.4.3 Contractor Support Hours: The Contractor shall provide on-site support between the hours of 0700 to 1700, days Monday through Friday. The Government facility is open for operations during the recognized U.S. Holidays identified in paragraph 1.5.3.1 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.

1.5.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.). If the need for overtime is anticipated, the Contractor must receive approval from the Contracting Officer at a minimum seven (7) calendar days prior to execution.

1.5.5 Training Holidays: Tobyhanna Army Depot has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.

1.5.6 Place of Performance: The work to be performed under this contract will be performed in Building 1C Bay 2, Tobyhanna, PA.

1.6 Security Requirements: Please reference Attachment 4 for information on Tobyhanna Army Depot’s security requirements.

1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Quality Control Plan.

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any virtual post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may virtually meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled virtual meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend virtual meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:00 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12.1 Contractor workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance within 10 calendar days after contract award. Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.

1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). (For services at Child, Youth, and School Services where children are present, recommend personnel wear identification when children are present.) Contractor and sub-contractor personnel will be provided a with some form of identification with that will show that the they are allowed on base. Personnel must have provided identification on display on their person at all times in a way that can be clearly seen. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes

1.13 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the

Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.14 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.

1.15 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.16 Non-Disclosure Statements: NA

1.17 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.18 Phase In /Phase Out Period: NA

1.19 Safety: Please reference Attachment 2 for information on Tobyhanna Army Depot’s safety requirements.

1.20 Environmental Compliance: Please reference Attachment 3 for information on Tobyhanna Army Depot’s environmental compliance requirements.

1.21 Required Training: The following provides information on training requirements.

1.21.1 Anti-Terrorism (AT) Level I Training: Please reference Attachment 4 for information on the training and Tobyhanna Army Depot’s security requirements.

1.21.2 OPSEC Training: Please reference Attachment 4 for information on the training and Tobyhanna Army Depot’s security requirements.

1.21.3 iWATCH Training: Please reference Attachment 4 for information on the training and Tobyhanna Army Depot’s security requirements.

1.21.4 Information Assurance (IA) Training

1.21.4.1 All Contractor employees, including subcontractors, requiring access to Government information systems shall complete the DoD IA Cyber Awareness Training within 30 days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 15 days after employment of new personnel. Verification of the training shall be provided to the COR within 5 days after completion of the training.

1.21.4.2 All Contractor employees, including subcontractors, working information technology (IT)/IA functions shall comply with DoD and Army training requirements per Information Assurance Training Certification and Workforce Management DoD Directive (DoDD) 8570.01, Information Assurance Workforce Improvement Program DoD 8570.01-M, and Information Assurance AR 25-2 within thirty (30) calendar days of employment. Training is available at https://ia.signal.army.mil/DoDIAA/default.asp .

1.21.4.3 All Contractor employees, including subcontractors, performing services under this contract with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS), the web address is p (requires CAC to access. Verification of registration shall be provided to the COR within 5 days after registration. Contractor personnel must complete refresher training every twelve (12) months. Verification of the training shall be provided to the COR within 5 days after completion of the training.

1.21.5 Personally Identifiable Information (PII): NA

1.22 Authorization to Perform Services in Germany: NA

1.23 Notice to Proceed: NA

1.24 Electromagnetic Compatibility Directive: NA

1.25 Government Property and Services: NA

1.26 Conventional Forces Europe (CFE) Treaty Verification Inspection: NA

PART 2 DEFINITIONS & ACRONYMS

2. Definitions and Acronyms

2.1 Definitions: Although not inclusive of every term used within this PWS, the following provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered but may include non- manufactured things such as meeting minutes or reports.

Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract

Government Property - means all property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are similar to Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.

Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are similar to Level 3 in a Work Breakdown Structure.

Subcontractor – means one that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Work Day - The number of hours per day the Contractor provides services in accordance with the contract.

Work Week - Monday through Friday, unless otherwise specified.

2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.

ACORAlternate Contracting Officer's Representative
AEArmy in Europe
AFARSArmy Federal Acquisition Regulation Supplement AHAActivity Hazard Analysis
AORArea of Responsibility
ARArmy Regulation
ATAnti-terrorism
ATCTSArmy Training Certification Tracking System
CACCommon Access Card
CCEContracting Center of Excellence
CFEConventional Forces Europe
CFRCode of Federal Regulations
CONUSContinental United States (excludes Alaska and Hawaii) CORContracting Officer’s Representative
COTSCommercial-Off-the-Shelf
DADepartment of the Army
DD250Department of Defense Form 250 (Receiving Report) DD254Department of Defense Contract Security Requirement List DFARSDefense Federal Acquisition Regulation Supplement DMDCDefense Manpower Data Center
DoDDepartment of Defense
FARFederal Acquisition Regulation
FRGFederal Republic of Germany
GFPGovernment Furnished Property
HLOHigh Level Objective
HIPAAHealth Insurance Portability and Accountability Act of 1996 IAInformation Awareness
IACInstallation Access Control
IACOInstallation Access Control Office
IDIdentification
IGCEIndependent Government Cost Estimate
ITInformation Technology
JTRJoint Travel Regulation
JPASJoint Personnel Adjudication System
KOContracting Officer
OCIOrganizational Conflict of Interest
OCONUSOutside Continental United States (includes Alaska and Hawaii) ODCOther Direct Costs
OPSECOperations Security
PAProperty Administrator
PIIPersonally Identifiable Information
PIPOPhase In/Phase Out
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QAPQuality Assurance Program
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
RARequiring Activity
RCORegional Contracting Office
SIGESafety and Health Protection Plan
TETechnical Exhibit
USAGUnited States Army Garrison USAREURUnited States Army Europe UOMUnit of Measure

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3. Government Property and Services

3.1 Services: The Government will provide guidance as needed to assist in the maintenance of the Omax system.

3.2 Facilities: NA

3.3 Utilities: The Government will provide access to water and electric outlets to assist with the process of maintenance. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves, light switches, etc. after using the required amount to accomplish tasks requiring the use of the utilities.

3.4 Equipment: NA

3.5 Special Tooling and Test Equipment: NA

3.6 Materials: NA

3.7 Training: NA

3.8 Common Access Cards (CAC): NA

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Property and Services

4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services

4.2 Secret Facility Clearance: N/A

4.3 Materials: N/A

4.4 Vehicles and Equipment: N/A

4.5 Background Checks): The Contractor shall provide Background Checks in accordance with this PWS and as determined by the Government.

PART 5 SPECIFIC TASKS

5.1 Basic Services: The Contractor shall provide services for the OMAX system located in building 1C Bay 2 of Tobyhanna Army Depot Tobyhanna Army Depot, Tobyhanna, PA. The Contractor shall perform a five-day annual bridge machine service. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. A government Technical Point of Contact (TPOC) will be assigned for contractor’s main point of communication.

5.2 Tasks:

5.2.1 Annual (Water Treatment):

· Sump Pump Water out of Clean/Dirty Tanks into SRS Hopper

· Wipe Out Clean/Dirty Tanks

· Clean & Inspect Pump White Tank

· Remove and Clean WRS Pump Suction Screen

· Drain Filters Vessels, long handled Brush, and Rinse

· Clean Ozone Stone

· Clean & Calibrate TDS Probe

· Clean Laminar Flow Filter

· Replace all CLS, RO or Wall Mount Filters

· Collect Updated Water Sample(s) for Analysis

· Second sample to be collected at 60 days to monitor for changes

· phone call at two weeks from OMAX Phone Support to evaluate success

5.2.2 Annual (Three-Day Annual Bridge Machine Service):

· Inspect all ball screw and traction drive/bearing assemblies

· Replace all servo drive belts

· Scan servo card histories/confirm normal load limits

· Precision calibrate Z-axis motion (included for A-Jet or Tilt-A-Jet accessories, as may be present)

· Grease or oil all lubrication points

· Confirm/recalibrate steps per inch of motion in X, Y, and Z movement/square the equipment to primary HOME position

· Rebuild the OMAX pump (major pump rebuild kit included)

· Clean low-pressure plumbing side within OMAX or MAXIEM pump

· Inspect plungers, manifold, check valves and pump plumbing on ultra-high-pressure side

· Replace all filters

· Inspect/rebuild all swivels using swivel rebuild kits, including confirm torque settings for plumbing connections

· Inspect and clean nozzle and abrasive flow components

· Check and reset pressure settings

· Install the latest revision of OMAX software (when authorized by government IT protocols)

· Review changes in software and machine settings with client operating personnel; e-Learning Site Introduction

· Test cut for accuracy, re-adjust if necessary

5.2.3 SERVICE CALLS FOR REPAIR:

Contractor shall provide a response to the COR within 48 hours of all initial non-emergency service calls on a weekday and 48 hours after a weekend or holiday. Contractor shall provide the service date to the COR within 96 hours of the COR’s or KO’s acceptance of the repair quote provided in response to the notification of the non-emergency service.

Contractor must provide a report on the condition of the equipment, recommended repairs, cost estimate, and timeline for repairs to be completed. This report must be approved, in writing, by the contract COR or contracting officer prior to any repairs being made to equipment.

5.2.4 EMERGENCY SERVICE CALLS: Contractor shall provide a response to the COR within 24 hours to ensure notification of initial emergency service call. Contractor shall provide the service date to the COR within 72 hours of the COR’s or KO’s acceptance of the repair quote provided in response to the notification of the emergency service call.

An emergency shall be identified as a threat to employee safety or installation security.

The contractor shall provide COR a written report on the conditions and recommendations for all equipment at the completion of the scheduled service.

If extra work is required, the contractor shall provide to COR a written proposal with the costs for repairs including labor hour’s material and length of time required to make repairs.

All services shall be scheduled through the COR who, in turn, will be coordinated with the supervisor to avoid interference with normal operation before work begins.

The contractor shall invoice after each scheduled maintenance unless stated otherwise in writing with the COR.

COR for this contract will be provided at time of contract award.

5.3 Service Contract Reporting

0. System for Award Management (SAM) Service Contract Report (SCR): The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the via a secure data collection site. The Contractor is required to completely fill in all required data fields through the following web address: www.sam.gov. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk by clicking “View Assistance for SAM.gov” which is located at the top of the SAM.gov website. From there, you can the select “Contact Our Service Desk” which will allow you to contact SAM.gov directly. If contract period of performance ends prior to September 30, the Contractor has 30 calendar days from end date of the contract to complete the SAM SCR requirement.

Steps for Submitting a Service Contract Report (SCR)

0. Go to www.sam.gov and log in.

0. Select Entity Registrations and then select Service Contract Reporting.

0. SAM displays your entities which have service contracts and meet the reporting criteria. Select View by entity to see the service contracts for each entity.

0. Next, select Add for the service contract against which you want to create a Service Contract Report. Each service contract which meets the FAR Subpart 4.1703 reporting thresholds is displayed.

0. You will be taken to the Complete Service Contract Report page. SAM displays the contract details and allows you to report. You are required to enter the following information:

4. Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount).

4. Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.

0. Report any required Tier 1 subcontractor information by selecting the Add Tier 1 Subcontract Information button.

0. When you are ready to submit the report, select Submit. This saves your report and returns you to the Select Service Contract page where you can create other SCRs or edit an existing SCR.

Steps for Editing a Submitted Report

1. Follow steps 1-4 above. Any previously submitted SCR will have a View/Edit button instead of an Add button.

1. Select View/Edit. You will be able to view the current SCR, edit available fields, and resubmit the record. You can also delete previously entered information altogether.

STD: All information provided by the Contractor shall be accurate, complete, and not exceed suspense dates noted in corresponding paragraph above.

AQL: 100% Compliant

PART 6 APPLICABLE PUBLICATIONS

6. Applicable Publications (Current Editions): The following publications, manuals, regulations, etc. are mentioned in this PWS and are listed below.

6.1.1 Department Of Defense Contract Security Classification Specification (DD Form 254)

6.1.2 Department of Defense Security Agreement (DD Form 441)

6.1.3 National Industrial Security Program Operating Manual (DoD 5220.22-M)

6.1.4 Installation Access Control (AE Reg 190-16)

6.1.5 The Army Physical Security Program (AR 190-13)

6.1.6 Contractor Identification (AE Reg 27-715)

6.1.7 U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)

6.1.8 Information Assurance Workforce Improvement Program (DoD 8570-M)

6.1.9 Information Assurance Training Certification and Workforce Management Directive (DoDD 8570.01)

6.1.10 Information Assurance (AR 25-2)

6.1.11 Electromagnetic Compatibility Directive (2004/108/EC)

6.1.12 Policies and Procedures for Property Accountability (AR 735-5)

PART 7

ATTACHMENT AND TECHNICAL EXHIBIT LISTING

7. Attachment and Technical Exhibit List

7.1 Technical Exhibit A – Performance Requirements Summary

7.2 Attachment 2 - SERVICE OR EQUIPMENT INSTALLATION CONTRACTOR SAFETY STANDARD MARCH 2024

7.3 Attachment 3 - TYAD Environmental

7.4 Attachment 4 - TYAD Security Requirements

TECHNICAL EXHIBIT A

Performance Requirements Summary (PRS)

PERFORMANCE OBJECTIVE
STANDARD
PERFORMANCE THRESHOLD ACCEPTABLE QUALITY LEVELS (AQLs)
METHOD OF SURVEILLANCE

PRS#1 - PWS para (5.2.1 ) The contractor shall provide annual service to the Omax water jet machine and evaluate the current state of the equipment.

Contractors should perform their objective in a timely manner. Contractors should set realistic schedules to perform repairs and should keep an open line of communication with the COR about when the visit will take place.

If an unscheduled or emergency service call occurs within 1 month of the PM and requires a part replacement, the contractor will NOT be compensated (either labor or material) if the issue is determined to be the result of the Contractor’s fault or failure to perform proper preventative maintenance Repairs made to the Omax Water Jet machine during the PM should be done with quality materials and installed properly. The contractor must ensure that equipment like the pumps do not faulter within 1 month of the pm. Standard warranty terms will be applied to individual parts and services in accordance with OMAX OEM warranty terms. Whether that is due to poor installation of new equipment, or due to poor inspection of worn equipment.

100% Compliance Zero Deviation from standard No complaints that equipment faltered due to improper Preventative maintenance.

100% Inspection

File details come from the government source that posted it. Updated .