DRAFT MMPC PWS_V1.6_28 Feb 2025 MR.pdf

PDF 333 KB Posted

Attached to
TECOM Multi-Mission Parachute Course (MMPC)
Solicitation number
M00264-26-RFI-0013
Issued by

About this file

This is a Performance Work Statement (PWS) for the Multi-Mission Parachute Course (MMPC), a training program for United States Marine Corps personnel in Military Freefall (MFF) operations. The contractor shall deliver MMPC training in compliance with Marine Corps Orders and applicable federal regulations, with delivery scheduled across a base period (October 1, 2026 – September 30, 2027) and four option periods through September 30, 2031. The contract requires nine courses per fiscal year with 30 students per course (270 students annually), with specific course dates provided in detailed delivery schedules for each period.

The contractor must provide all materials, equipment, personnel, and facilities necessary to conduct training, including a fully staffed operation with a General Manager, Course Director, Master Rigger, Senior Riggers, minimum six Advanced Free Fall Instructors (AFFIs) with Military Freefall experience, licensed FAA pilots, and support personnel (Jumpmaster, Manifest Manager, Drop Zone Safety Officer, Malfunction Officer, Emergency Medical Technician, and Drop Zone Safety Driver). All key personnel are subject to government approval, with substitution restrictions during the first 90 days and advance notice requirements thereafter. The contractor must maintain USSOCOM Special Operations Forces Baseline Interoperable Standards (SOFBIS) certification throughout contract performance and obtain it within the base period if not already certified. Facilities requirements include a paraloft for maintenance, climate-controlled storage, classroom areas, an approved drop zone with proper airspace, aircraft support, and office space for government personnel and oversight. The contractor shall provide all specialized equipment including Parachute System-2 (PS-2) equipment in large and small sizes, helmets with night vision goggle mounts, altimeters, jumpsuits, oxygen systems, communications equipment, transportation, and aircraft. Deliverables include individual student records and logbooks (due within 24 hours of graduation), instructor certifications (due 10 business days prior to each course), incident and malfunction reports (immediate reporting per Marine Corps Orders), graduation certificates (due on graduation day), after-action reports (due within five business days of course completion), post-award conference (within 10 calendar days of award), and quarterly progress reviews (within 30 days of fiscal year quarter end). The Contracting Officer Representative (COR) will be collocated on-site for monitoring. No Government Furnished Equipment (GFE) will be provided. Performance objectives include safely conducting all courses without mishaps, maintaining POI certification, providing qualified MFF parachutists, maintaining qualified staff at 98% acceptable quality level, ensuring no course delays due to equipment or facilities (98% AQL), and submitting clear, accurate after-action reports (95% AQL).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION: DoD COMMUNITY ONLY

MULTI-MISSION PARACHUTE COURSE (MMPC)

PERFORMANCE WORK STATEMENT (PWS)

1. PROJECT TITLE: This PWS sets forth the work efforts required to provide training and technical support for the Multi-Mission Parachute Course hereafter referred to as the MMPC.

2. BACKGROUND: The MMPC trains Marines in Military Freefall (MFF) operations in compliance with Marine Corps Orders (MCO) to safely meet the United States Marine Corps (USMC) Training Input requirements by Fiscal Year (FY).

3. SCOPE: The contractor shall perform all tasks required and delineated in this PWS to deliver the MMPC in the quantities specified in the contract. The contractor shall provide all materials, equipment, personnel, and facilities necessary to deliver the types and quantities of deliverables specified by the PWS. The Contracting Officer Representative (COR), who will be collocated on site, shall monitor the contractor’s performance.

4. APPLICABLE DOCUMENTS: The following documents specified form a part of this PWS to the extent specified herein. The most recent revision of the referenced document at the time of contract shall be used by the contractor unless otherwise specified. In the event of conflict between the applicable documents and this PWS, the PWS shall take precedence. All second tier and below references cited in mandatory compliance documents shall be considered as guidance only. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

4.1 Marine Corps MMPC Program of Instruction (POI)

4.2 FAAR Title 14 CFR: Part 91 (General Operations and Flight Rules); Part 65 (Certifications:

Airman other than Flight Crew Members) Subpart A (General) and Subpart F (Parachute Riggers);

Part 105 (Parachute Operations), and AC-105-2_ (Sport Parachuting) (available upon request)

4.3 TM 1670-10/1 Operators Manual for Parachute System-2 Tandem Offset Resupply Delivery System (available upon request)

4.4 TM 13131-14&P/1 Operator and Field Maintenance Manual with Repair Parts List for Parachute System-2 (PS-2) (available upon request)

4.5 United States Parachute Association (USPA), Skydiver’s Information Manual (SIM) (available upon request)

4.6 MCO 3120.11A, Marine Corps Parachuting and Program Administration

4.7 MCO P5102.1E, Navy and Marine Corps Mishap and Safety Investigation Reporting, and Record Keeping Manual (available upon request)

4.8 MCO 13480.1D, Joint Airdrop Inspection Records, Malfunction/Incident Investigations, and Activity Reporting (available upon request)

4.9 Air Force Instruction 13-217 (Drop Zone and Landing Zone Procedures), Attachment 4: AF Form 3823 (Drop Zone Survey) (available upon request)

4.10 Naval Safety Center (NAVSAFECEN), Paraloft Inspection Checklist (available upon request)

4.11 Department of Defense (DoD) Instruction 4500.53, DoD Commercial Air Transportation Quality and Safety Review Program (available upon request)

4.12 MCO 5100.29C, Ch-2, w/Vol 1-9, Marine Corps Safety Management System (MCSMS) (available upon request)

4.13 USSOCOM Manual 350-3, Special Operations Forces Baseline Interoperable Standards for Airborne Operations (Parachuting)

5. PERFORMANCE REQUIREMENTS:

5.1 MMPC. The purpose of the MMPC is to train non-MFF qualified Marines in MFF techniques utilizing the USMC PS-2 in accordance with (IAW) the references listed in paragraph four (4) of this PWS. The contractor shall conduct the MMPC IAW the approved Marine Corps MMPC POI. The prerequisites to attend the course are: Basic Airborne School Qualified, current Flight Physical, and current High-Altitude Physiological Screening (HAPS). The USMC reviews the POI every three (3) years through a Course Content Review Board (CCRB). POI updates can include but are not limited to the following: Course length, curriculum, and/or equipment. If for any reason the USMC updates the POI, the Contracting Officer (KO)/COR shall notify the contractor via official correspondence within thirty (30) calendar days. The contractor shall then notify the KO and COR within thirty (30) calendar days whether or not they will be able to execute the updated POI under the terms and conditions of the contract or if the updated POI necessitates a change to the terms and conditions of the contract. In turn, the KO and COR and the contractor shall negotiate the most effective way to execute the updated POI.

5.2 Special Operations Forces Baseline Interoperable Standards (SOFBIS) Certification. The contractor and course must become certified by USSOCOM for meeting SOFBIS within the base period of the contract and maintain certification throughout the life of the contract. If the contractor or course loses certification, the contractor shall notify the KO and COR within five (5) business days via official correspondence with a plan of action to regain certification. The contractor shall regain certification within the current period of performance and notify the KO and COR within five (5) business days via official correspondence.

5.3 Personnel. The contractor shall provide and maintain qualified instructor staff pursuant to the requirements specified and as listed below. The contractor may require more personnel than listed to execute the MMPC POI.

5.3.1 Key Personnel and Qualifications.

5.3.1.1 General Manager. The contractor’s General Manager shall serve as the government’s primary point-of-contact for the MMPC. The General Manager shall be responsible for the quality and efficiency of the contract to include both technical issues and business processes. The General Manager shall assign tasking to contractor personnel, supervise on-going training efforts, and manage overall contract performance. This individual shall have the authority to commit the contractor’s organization and make decisions for the contractor’s organization in response to government issues, concerns, or problems. He/she shall have experience instructing civilian and military students in basic free fall techniques as an Accelerated Free Fall Instructor (AFFI, see definition below).

5.3.1.2 Course Director. A Course Director is defined as a person who is knowledgeable of military, civilian parachuting equipment, and the PS-2 and airborne operations in both tactical and training environments. He/she shall have five (5) years of experience instructing civilian and military students in basic free fall techniques as an Accelerated Free Fall Instructor (AFFI, see definition below). He/she shall have demonstrated ability to manage an airborne training curriculum, to lead a training organization (10 or more people), and to effectively communicate, both orally and in writing with military and non-military personnel. Additionally, this person shall coordinate all aspects of the curriculum and curriculum support (aircraft, refueling, instructor training and certifications, instructor assignments, support vehicles, facility management, etc.). Each MMPC course requires one (1) Course Director.

5.3.1.3 Master Rigger. A Master Rigger is defined as a person who has successfully completed the FAA Master Rigger licensing process IAW FAAR Title 14 CFR: Part 91 (General Operations and Flight Rules); Part 105 (Parachute Operations) and AC-105-2D (Sport Parachuting). The Master Rigger shall supervise all rigger duties to conduct the MMPC courses. Each MMPC course requires one (1) Master Rigger.

5.3.1.4 Senior Rigger. A Senior Rigger is defined as a person who has successfully completed the FAA Senior Rigger licensing process IAW FAAR Title 14 CFR: Part 91 (General Operations and Flight Rules); Part 105 (Parachute Operations) and AC-105- 2D. Senior Riggers shall supervise all student parachute packing throughout the courses IAW, TM 13131-14&P/1.

5.3.1.5 Advanced Free Fall Instructor (AFFI) Staff. AFFI is defined as a person who has successfully completed United States Parachute Association (USPA) rating process IAW the Skydivers Information Manual and holds a current USPA AFFI rating. The contractor shall maintain a Student to Instructor Ratio as outlined in the MMPC POI.

5.3.1.5.1 The AFFI staff shall have a mix of prior MFF experience and civilian Free-Fall experience. Each MMPC course shall require a minimum of six (6) AFFIs having MFF experience. The staff component having MFF experience shall be defined as follows: prior Military Free-Fall Instructors (MFFI); personnel with service in a US Armed Forces operational MFF billet; or a civilian AFFI having conducted MFF operational training exercises for a minimum of two years. MFFI certification is highly preferred to MFF experience alone.

5.3.1.5.2 The instructor staff shall conduct and assist in all students training.

All instructors shall be capable of conducting air to air videography and shall video all jumps. No one shall use videos or photographs outside of MMPC unless authorized in writing by the Contracting Officer (KO).

5.3.1.5.3 New instructors to the MMPC shall shadow another contractor AFFI for one course to learn the conduct of the course. During this shadow course, the general manager, course director, and shadow master AFFI observe and evaluate the new instructor on their instructional ability, Jumpmaster Personnel Inspections (JMPI), and air skills. The contractor shall take appropriate steps to minimize instructor turnover.

5.3.1.6 Aircraft Pilots. Licensed FAA pilots as required to pilot/copilot the aircraft supporting the MMPC; remain current IAW FAAR Title 14 CFR: Part 91 (General Operations and Flight Rules), Part 105 (Parachute Operations), AC-105-2D (Sport Parachuting), Part 105 (Parachute Operations), and AC-105-2D (Sport Parachuting)

SUBSTITUTION OF KEY PERSONNEL

5.3.1.7 The Contractor agrees to assign to the contract those persons identified as key personnel with its proposal and who are necessary to fulfill the requirements of this contract. No substitutions of key personnel shall be made except in accordance with this contract language.

5.3.1.8 Guidance on Substitutions. During the first ninety (90) days of the contractor’s performance period no key personnel substitutions by the Contractor will be made unless substitutions are necessitated by an individual's sudden illness, death, termination of employment or non-acceptance of an offer of employment. In any of these events, the Contractor shall promptly notify the Contracting Officer and provide the information required by Section 5.3.1.9 below. After the initial ninety (90) day period, all proposed substitutions must be submitted to the Contracting Officer and provide information required by Section 5.3.1.9 below, in writing, at least 10 days in advance of the proposed substitutions, when possible.

5.3.1.9 Request for Substitution. All requests for substitutions must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information requested by the Contracting Officer.

All proposed substitutes must have qualifications equal to or higher than the qualifications stated in the PWS. The Contracting Officer or his/her authorized representative will evaluate such requests and promptly notify the Contractor of his/her approval or disapproval thereof.

5.3.2 Required Duty Assignments for Jump Operations.

5.3.2.1 Jumpmaster (JM). A JM is defined as an AFFI responsible for the safe conduct of jump operations. The JM shall be knowledgeable and technically proficient in the conduct of all airborne operations conducted during the MMPC, IAW TM 1670-10/1. JMs shall conduct two Jumpmaster Personnel Inspections (JMPIs) of all personnel and equipment prior to boarding the aircraft. The assigned JM for the day shall conduct airspace coordination/deconfliction, wind calculations, spot the aircraft and dispatch jumpers. Each aircraft requires one (1) JM and one (1) Assistant JM to conduct parachute operations during each

MMPC.

5.3.2.2 Manifest Manager. A manifest manager is defined as a person who organizes each MMPC planeload to include boarding and exit order. He/she shall maintain electronic and paper copies of all manifests to include the total number and types of jumps. Each MMPC requires one (1) manifest manager to conduct parachute operations during each MMPC.

5.3.2.3 Drop Zone Safety Officer (DZSO). A DZSO is defined as a person who is an AFFI. He/she shall be knowledgeable and technically proficient in the conduct of all airborne operations conducted during the MMPC. The DZSO shall be responsible for the conduct of operations at the drop zone (DZ). The DZSO must be able to communicate via radio with the aircraft to relay wind speed and direction and ensure there are no hazards on the DZ during airborne operations. The DZSO shall account for all parachutists and all personnel working on the DZ are fulfilling their duties. Each MMPC requires one (1) DZSO to conduct parachute operations during each MMPC.

5.3.2.4 Malfunction Officer. A malfunction officer is defined as a qualified FAA Master/Senior rigger, who is technically proficient with the equipment being used.

This person shall be located on the DZ where he/she can best observe the entire DZ and airborne operation. This person shall personally observe all personnel and equipment drops. He/she shall photograph/investigate all equipment and interview all personnel involved in any malfunctions IAW MCO 3120.11A, MCO P5102.1B, and MCO 13480.1D. The Malfunction Officer shall submit all required malfunction reports and forms to the COR within the time frame outlined in the references. Each MMPC requires one (1) Malfunction Officer to conduct parachute operations during the MMPC.

5.3.2.5 Emergency Medical Technician (EMT). One (1) EMT with Advanced Life Support (ALS) qualifications and complete Emergency Medical Services (EMS) trauma kit to treat multi-system trauma within the ALS scope of practice shall be required to conduct parachute operations during each MMPC. The EMT with ALS qualifications shall be licensed and current in accordance with state standards where MMPC operations are being conducted. At a minimum, an Advanced Emergency Medical Technician

(AEMT) THRESHOLD or Emergency Medical Technician-Paramedic (EMT-P) OBJECTIVE shall be provided.

5.3.2.6 Drop Zone Safety Driver (DZSD). A DZSD shall have adequate vehicle support for the safe and timely transport of personnel with non-life-threatening injuries to the nearest appropriate medical facility (see 5.5.3.2). Each MMPC requires one (1) DZSD to conduct parachute operations during the MMPC.

5.3.2.7 Sharing of duty assignments. DZSO, Malfunction Officer, Manifest Manager, DZSD, Senior Rigger and JM duties may be held by instructors and other staff who meet the qualification requirements. During parachute operations, DZSO, DZSD, Malfunction Officer and EMT duty assignments are exclusive assignments and shall not be shared with any other duty assignment.

5.4 Facilities. The contractor shall provide all facilities to conduct the MMPC. The following facilities are not an all-inclusive list of facilities required to conduct each MMPC.

5.4.1 Place of Performance: Because adverse weather can present unsafe MFF operating conditions causing unexpected delays to the MMPC, the work shall be performed at the contractor’s site in an environment with optimal weather conditions (i.e., low winds, low precipitation, light fog, smoke or haze; etc.) equaling 320 days per year.

5.4.2 A Paraloft capable of performing preventive maintenance checks and services according to TM 13131-14&P/1 and other MMPC equipment’s manufacturers manuals as applicable. The following requirements are not an all-inclusive list of paraloft spaces to maintain equipment for conduct of each MMPC.

5.4.2.1 Oxygen storage & oxygen filling room for storage and maintenance of required oxygen systems IAW MCO 3120.11A.

5.4.2.2 Humidity and temperature climate-controlled parachute storage area for all parachute related equipment IAW MCO 3120.11A.

5.4.3 All classroom areas shall be climate-controlled to accommodate all students and required staff. The following areas are not an all-inclusive list of classrooms required to conduct each

MMPC.

5.4.3.1 Student staging area to prepare for parachute operations.

5.4.3.2 Student packing area with provisions for packing the PS-2 IAW TM 13131- 14&P/1.

5.4.3.3 Student classroom with equipment to conduct the MMPC.

5.4.3.4 Student debriefing room with adequate video equipment for each instructor and student.

5.4.4 A drop zone listed on a current and approved Form 3823 (Drop Zone Survey), Attachment 4 of Air Force Instruction 13-217, Drop Zone Landing Zone Procedures. The drop zone and landing area at the contractor’s site shall be suitable for elevator operations with consistent airspace de-confliction adequate to conduct the MMPC.

5.4.5 Local airfield shall be able to accommodate contracted aircraft.

5.4.6 Provide two (2) office spaces with furniture, landline telephone services, internet access and printing/scanning capability. One (1) office shall be for two (2) USMC Staff

Noncommissioned Officers (SNCOs) and one (1) office for the COR to conduct routine office work and student counseling in support of the contract.

5.4.7 Students do not require on site billeting. However, an approved lodging facility (i.e., hotel) in accordance with the Joint Travel Regulations (JTR) must be within a thirty (30) mile radius from the place of performance.

5.4.8 The vertical Wind Tunnel (VWT) must be located within a one (1) hour driving radius from the place of performance.

5.5 Instructor Equipment and Parachute/Support Equipment: No Government Furnished Equipment (GFE) will be provided. The contractor shall provide all equipment, equipment maintenance and services to meet the requirements outlined in the POI and PWS.

5.5.1 Instructor Equipment. The Contractor shall maintain an adequate amount of specialized instructor equipment (i.e., complete parachute system, altimeter, jumpsuits, gloves, helmet and camera; etc.) for onsite USMC staff and all members of the instructor staff as identified in paragraph 5.3 of this PWS. The contractor shall maintain all equipment and make it readily available to all members of the instructor staff during airborne operations to prevent any delays or interruption of the MMPC.

5.5.2 The contractor shall provide sufficient parachute equipment to accommodate the maximum number of students for each MMPC. The following equipment is not an all-inclusive list required to conduct each MMPC.

5.5.2.1 Parachute System-2 (Large) NSN 1670-01-673-3985.

5.5.2.2 Parachute System-2 (Small) NSN 1670-01-674-2912.

5.5.2.3 Helmet with night vision goggle mount authorized for parachute operations by USMC or US Navy (USN) such as the OPS-CORE non-ballistic Fast Bump High Cut Helmet.

5.5.2.4 Goggles compatible with helmet in 5.5.2.3.

5.5.2.5 Jumpsuit.

5.5.2.6 Wrist altimeter authorized for parachute operations by USMC or USN such as the Alti-2 Neptune Tactical MA-12.

5.5.2.7 Parachutist Drop Bag similar to the one described in TM 1670-0/1.

5.5.2.8 Rubber rifle similar in size and shape to M4 rifle.

5.5.2.9 Red and green lights, and strobe lights to conduct night parachute operations.

5.5.2.10 Student/Instructor two-way radio.

5.5.2.11 Night Vision Binocular such as the L3Harris Technologies (AN-PVS-31).

5.5.2.12 Parachutists Oxygen mask authorized for parachute operations by USMC or

USN.

5.5.2.13 Parachutists Oxygen bottle authorized for parachute operations by USMC or

USN.

5.5.2.14 Plate carrier with training plates similar to Ops-Core Jumpable Plate Carrier with radio pouches.

5.5.2.15 Over the ear headsets for inter/intra team communications, such as Gentex AMP or Peltor/Invisio T5.

5.5.2.16 Push to Talk that are compatible with over the ear headsets for inter/intra team communications.

5.5.2.17 Visual Navigation Aid such as compass.

5.5.2.18 Jumper log book.

5.5.2.19 GPS personnel tracker system

5.5.3 The contractor shall provide enough support equipment to accommodate the maximum number of students for each MMPC. The following support equipment is not an all-inclusive list required to conduct each MMPC.

5.5.3.1 Transportation for all students to and from the drop zone(s).

5.5.3.2 Covered 4x4 safety vehicle for drop zone support able to safely and timely transport personnel with non-life-threatening injuries to the nearest appropriate medical facility.

5.5.3.3 Parachute related expendables such as retainer bands, pull-up cords, closing loops, etc.

5.5.3.4 The contractor shall provide a rear exit style aircraft for all parachute operations with the following exception. A side door exit aircraft maybe substituted for up to fifty percent (50%) of the parachute operations for hand deployed pilot chute practical application outlined in the MMPC POI. The aircraft shall be approved IAW DoDI 4500.53, change 3 (DoD Commercial Air Transportation Quality and Safety Review Program), FAA Part 91 (General Operations and Flight Rules).

5.5.3.5 The contractor shall provide the ability for two (2) onsite USMC Staff Noncommissioned Officers to maintain jump currency without degrading the training to MMPC students. The minimum requirement would be four (4) jumps per quarter.

5.6 Post Award Conference: The contractor shall host a post award conference within ten (10) calendar days of contract award. The date and time of this conference shall be determined by mutual agreement between the contractor and KO/COR. At a minimum, the conference shall consist of a detailed brief of the training site and facilities, training plan, key personnel, and qualifications and support equipment used throughout the MMPC. A tour of the training site and facilities will be required as a part of the conference with the General Manager, Course Director, and Master Rigger in attendance.

5.7 Quarterly Progress Review (QPR): The contractor shall conduct QPRs with the KO/COR within thirty

(30) days at the end of each fiscal year quarter. The location shall be contractors' facility and/or electronic means (MS Teams, Zoom, etc.). The date and time of each QPR shall be determined by mutual agreement between the contractor, KO and COR. The primary purpose of these meetings is to review contract performance status and address any contract related issues. The QPR shall review at a minimum but not be limited to the following items.

5.7.1 Student graduation rate compared to Training and Education Command goals.

5.7.2 Reasons for student failures and possible corrective action to reduce failures.

5.7.3 Effect of weather on courses and possible corrective action to increase student graduation.

5.7.4 Average number of parachute operations per student and possible corrective action to achieve desired number of parachute operations per MMPC POI.

5.7.5 Any aircraft, facilities, maintenance, or equipment problems affecting the conduct of the MMPC since the last QPR.

5.7.6 Any malfunctions, incidents, or trends encountered since the last QPR and possible corrective action.

5.7.7 Any suggestions for the USMC to improve the MMPC POI during the next CCRB.

5.7.8 Compliance with staffing and key personnel requirements.

5.7.9 Other items noted in course after action reports since the last QPR.

5.7.10 Any Contract Line-Item Number (CLIN) related issues

5.7.11 Status of Invoice submission and payment

5.7.12 Status of contract deliverables

5.7.13 Status of Contractor Performance Assessment Report System (CPARS)

5.7.14 Any outstanding Government / Contractor required actions.

5.8 Meeting Minutes: Meeting minutes of the post award conference and any scheduled QPRs shall be provided by the contractor to the COR within five (5) business days from conclusion of the event.

5.9 Course Cancellations: The KO/COR shall notify the contractor within fifteen (15) calendar days of any course cancellations. In the event of a situation beyond Training & Education Command (TECOM) control, such as a pandemic (e.g., COVID-19), DOD travel restrictions or stop-movement order; etc., the KO/COR shall notify the contractor as soon as feasible without any contractual penalty. Furthermore, in the event of a cancellation due to equipment readiness/maintenance, safety concerns, incident investigations; etc., the Contractor shall notify the KO/COR as soon as possible. Based on the circumstances of the course cancellation, the KO reserves the right to discuss any affected CLINs with the contractor for reasonable reimbursement or equitable adjustment..

5.10 Naval Safety Command Inspections: With prior notice and coordination, the Parachute Safety Analyst from Naval Safety Command shall conduct a parachute program safety inspection on the MMPC at least once every two (2) years. Additionally, Naval Safety Command shall conduct safety surveys or assist visits as requested by Headquarters Marine Corps (HQMC) Plans, Policies & Operations (PP&O) or TECOM.

6. COURSE PERFORMANCE REQUIREMENTS: The contractor shall conduct training IAW with USSOCOM Manual 350-3 adhering to the tasks, conditions and standards outlined therein. The contractor shall maintain certification per the USSOCOM Military Freefall Tasks, Conditions, and Standards Assessment Form (see 5.2).

6.1 Assignments. The contractor’s General Manager shall assign staff members duties in writing to conduct each MMPC and verify all staff members have appropriate training, experience, and documented certifications on file. The contractor shall provide validation of certifications to the COR within ten (10) business days prior to the start of each MMPC. The COR shall notify the General Manager if there are any discrepancies within five (5) business day prior to the start of each MMPC. The General Manager shall correct all discrepancies prior to the start of each MMPC.

6.2 Course Conduct: The USMC MMPC COR will have the final approval on all matters concerning the operation of the MMPC.

6.2.1 Pre-Course documentation. The contractor shall provide documentation of instructor certifications and staff assignment qualifications to the government for approval (see 6.1).

6.2.2 Daily Pre-jump. The Course Director shall hold a pre-jump coordination meeting at the beginning of each training day. Instructors shall cover the dive flow with their students to ensure a clear understanding of the parachute operations to be conducted.

6.2.3 Daily Post-jump. The Course Director shall hold a post-jump critique and next day planning meetings at the end of each training day. Items to be covered shall include but not be limited to:

6.2.3.1 Each instructor conducts student debriefs with the use of video taken during the daily free fall jumps and provide corrective instruction - as required.

6.2.3.2 Jump manifests.

6.2.3.3 Student record/logbook update.

6.2.3.4 Status and coordination as required.

7. DELIVERABLES AND DELIVERY SCHEDULE:

7.1 Deliverables.

Title Format Delivery PWS 6.2.3.3: Individual Student Records / Logbook

Contractor General Manager provide hardcopy of student records / logbook

Due to COR within 24 hrs. of student graduation or separation.

IAW PWS 6.1, provide current certification documentation for each class of MMPC instructors.

Contractor General Manager provide hardcopy certification documentation or online version (i.e. MS Word or

PDF)

Due to COR within ten (10) business days prior to each MMPC as specified in 6.1

Report Incidents and Malfunctions Contractor General Manager report in accordance with applicable Marine Corps Orders (MCO)

Report to COR immediately and as required, situation dependent in accordance with MCO 3120.11A, MCO P5102.1B w/CH 1-2, and MCO 13480.1D.

Provide Individual Student Graduation Certificates

Contractor General Manager provide signed hardcopy MMPC graduation certificates.

Due to students on the day of graduation.

IAW PWS 7.2 provide MMPC After Action Reports

Contractor General Manager provide via MS Word or PDF.

Due to COR within five (5) business days of class graduation as specified in 7.2

IAW PWS 5.6, provide Post Award Conference

Contractor General Manager provide in person meeting or via online format (i.e., MS Teams).

Due to COR within ten (10) calendar days of contract award as specified in 5.6

IAW PWS 5.7 provide Quarterly Progress Review

Contractor General Manager provide in person meeting or via online format (i.e., MS Teams).

Due to COR within thirty (30) days at the end of each fiscal year quarter as specified in 5.7

IAW PWS 5.8 provide Meeting Minutes

Contractor General Manager provide via MS Word or PDF.

Due to COR within five (5) business days of Post Award Conference and/or Quarterly Progress Review as specified in 5.8

7.2 After Action Report. At the end of each course the contractor shall provide an activity report within five (5) business days to the COR. The contractor shall also conduct course critique and review student feedback forms. At a minimum, the after-action report of each course shall include:

7.2.1 Total number of jumps.

7.2.2 Total number of student jumps.

7.2.3 Total number of instructor jumps.

7.2.4 Total number of jumps in Hand Deployed Pilot Chute (HDPC) configuration.

7.2.5 Total number of jumps in Self-Set Drogue (SSD) configuration.

7.2.6 Total number malfunctions/incidents and reason.

7.2.7 Name of student drops, date of drops and reason for drops.

7.2.8 Student rosters, check-in, and graduation.

7.2.9 Student Course Critiques.

7.2.10 Any equipment damaged or lost during the course and cause/circumstances.

7.2.11 Type/amount of equipment required to be replaced during or after completion of the course due to normal wear, age or abuse and pertinent data (i.e., end of service life, airworthiness, number of jumps, and/or date of manufacturer).

7.2.12 MMPC improvement, recommendation, and justification.

7.3 Delivery Schedule: Course dates and the number of courses per year may vary to best facilitate FY throughput as the USMC training requirements may change. The contractor shall be notified by the KO and COR of the intended annual throughput, and the intended CLINs to be executed within sixty (60) days prior to the period of performance. At contract award, the appropriate base period CLINs will be selected and executed in accordance with the requirement’s need for training.

Delivery Schedule: MMPC Base Period and Option Periods One through Four

Base Period (1 Oct 2026 - 30 Sept 2027)

Course # MMPC Calendar Year Course Dates Number of Students Start End

(CLIN 0001AA) 12-Oct-26 6-Nov-26 30

(CLIN 0002AB) 30-Nov-26 25-Dec-26 30

(CLIN 0003AC) 11-Jan-27 5-Feb-27 30

(CLIN 0004AD) 15-Feb-27 12-Mar-27 30

(CLIN 0005AE) 22-Mar-27 16-Apr-27 30

(CLIN 0006AF) 26-Apr-27 21-May-27 30

(CLIN 0007AG) 7-Jun-27 2-Jul-27 30

(CLIN 0008AH) 12-Jul-27 6-Aug-27 30

(CLIN 0009AJ) 30-Aug-27 24-Sep-27 30

Total Students 270

Option Period-1 (1 Oct 2027 - 30 Sept 2028)

Start End

(CLIN 1001AA) 11-Oct-27 5-Nov-27 30

(CLIN 1002AB) 29-Nov-27 24-Dec-27 30

(CLIN 1003AC) 10-Jan-28 4-Feb-28 30

(CLIN 1004AD) 14-Feb-28 10-Mar-28 30

(CLIN 1005AE) 20-Mar-28 14-Apr-28 30

(CLIN 1006AF) 24-Apr-28 19-May-28 30

(CLIN 1007AG) 5-Jun-28 30-Jun-28 30

(CLIN 1008AH) 10-Jul-28 4-Aug-28 30

(CLIN 1009AJ) 4-Sept-28 29-Sep-28 30

Option Period-2 (1 Oct 2028 - 30 Sept 2029)

Start End

(CLIN 2001AA) 16-Oct-28 10-Nov-28 30

(CLIN 2002AB) 27-Nov-28 22-Dec-28 30

(CLIN 2003AC) 8-Jan-29 2-Feb-29 30

(CLIN 2004AD) 12-Feb-29 9-Mar-29 30

(CLIN 2005AE) 19-Mar-29 13-Apr-29 30

(CLIN 2006AF) 23-Apr-29 18-May-29 30

(CLIN 2007AG) 4-Jun-29 29-Jun-29 30

(CLIN 2008AH) 9-Jul-29 3-Aug-29 30

(CLIN 2009AJ) 3-Sep-29 28-Sep-29 30

Option Period-3 (1 Oct 2029 - 30 Sept 2030)

Start End

(CLIN 3001AA) 15-Oct-29 9-Nov-29 30

(CLIN 3002AB) 26-Nov-29 21-Dec-29 30

(CLIN 3003AC) 7-Jan-30 1-Feb-30 30

(CLIN 3004AD) 11-Feb-30 8-Mar-30 30

(CLIN 3005AE) 18-Mar-30 12-Apr-30 30

(CLIN 3006AF) 22-Apr-30 17-May-30 30

(CLIN 3007AG) 3-Jun-30 28-Jun-30 30

(CLIN 3008AH) 8-Jul-30 2-Aug-30 30

(CLIN 3009AJ) 2-Sep-30 27-Sep-30 30

Option Period-4 (1 Oct 2030 - 30 Sept 2031)

Start End

(CLIN 4001AA) 14-Oct-30 8-Nov-30 30

(CLIN 4002AB) 2-Dec-30 27-Dec-30 30

(CLIN 4003AC) 6-Jan-31 31-Jan-31 30

(CLIN 4004AD) 10-Feb-31 7-Mar-31 30

(CLIN 4005AE) 17-Mar-31 11-Apr-31 30

(CLIN 4006AF) 21-Apr-31 16-May-31 30

(CLIN 4007AG) 2-Jun-31 27-Jun-31 30

(CLIN 4008AH) 7-Jul-31 1-Aug-31 30

(CLIN 4009AJ) 1-Sept-31 26-Sep-31 30

NOTE: The delivery schedules above include estimated dates for each course during each period of performance. These dates are the government’s current best estimation; however, are subject to change.

If the planned dates require shifting, the COR will work with the contractor to revise the dates accordingly.

8.0 TRANSITION

8.1. Transition Support: During the transition-in period, the contractor shall be prepared to receive transitional support from the predecessor contractor. This support may include the ability to shadow the predecessor contractor.

8.2 Transition-In: The contractor shall ensure there will be minimum disruption and degradation to the MMPC during and after transition. Upon contract award, the contractor shall provide and brief a Transition-in-Plan (TIP) at the Post Award Conference (PAC) IAW para. 5.6. The TIP shall be subject to changes pending Government review and recommendations. Any changes to the TIP shall be reviewed and approved by the KO/COR within five (5) business days of submission. The TIP shall include but not be limited to:

• Organizational Overview

• Overview of current Facilities and plan to build up to full operational capability

• List of current Equipment and plan to build up to full operational capability

• By name list and qualifications of current Instructors and plan to build up to full operational capability

• Plan to conduct PILOT Courses (if required)

• Plan to conduct JSAT Certification Course (if required)

The TIP shall be broken down into weekly increments covering the entire transition period to best provide transparent visibility of all activities and milestones needing to be accomplished. The contractor shall provide emphasis on its ability to obtain SOFBIS Certification during JSAT Certification Course (if required) and the attainment of all facilities and equipment required to meet the requirements of the

POI.

8.3 Transition Out: During the transition out period, the contractor shall maintain staffing levels to impart knowledge and understanding of task requirements to the new contractor and to fulfill its contractual requirements to conduct any scheduled MMPCs on the existing contract / option period.

The contractor shall provide a Transition-Out Plan NLT 180 calendar days prior to expiration of this contract.

In the event the contractor is re-selected for the follow-on contract award, they shall be required to provide a TIP IAW para. 8.2 and shall be provided adequate time (approximately ~ two (2) classes) to transition. The incumbents TIP shall include their plan to obtain or maintain SOFBIS Certification before its expiration date.

Throughout this transition period, the contractor shall establish and maintain effective communication with the KO/COR and provide weekly status updates / meetings IAW their guidance.

9.0 Performance Requirement Summary (PRS)

9.1 The Performance Requirement Summary identifies the Performance Objectives that are considered critical in determining successful Contractor performance for the multi-mission parachute course. It identifies both the Performance Objectives and the Performance Standard required for each Performance Objective from the PWS.

9.2 Performance Evaluation. Performance of a service will be evaluated to determine whether or not it meets the performance standard. Inspections may be performed by the COR or any tenant of the facilities designated by the COR. Re-performance/correction of action is the preferred method of correcting any unacceptable services. If an unacceptable service is annotated on a Contract Discrepancy Report (DA Form 5479-R) the Contractor shall provide the Government written response stating why the performance standard was not met, how the performance will be returned to acceptable levels, and how recurrence of the cause will be prevented in the future.

Performance Objective

PWS

Paragraph

Performance Standard

Acceptable Quality Level

(AQL)

Surveillance Method

Safely conduct

MMPC

4.0 Contractor

executes without any mishaps

100% Direct Observation by the COR

Maintain MMPC POI Certification

5.1, 5.2 Maintain POI certification

100% Verification by the COR

Provide MMPS qualified MFF parachutists

5.1, 7.1 Students capable of MFF in all configurations

100% Direct Observation by the COR

Provide and maintain qualified staff

5.3 Contractor

provides and maintains qualified key personnel

98% Periodic Inspections and verification by the COR

Maintain facilities and support equipment

5.4 No course delays

due to equipment, facilities or lack of airlift (aircraft)

98% Direct Inspections and Periodic Inspections by the COR

Submit After Action Reports

7.2 Clear, concise, timely, and accurate

95% Review and Analyze by the

COR

File details come from the government source that posted it. Updated .