This document appears to be a set of mechanical drawings for a federal construction contract opportunity. The drawings provide details on the HVAC equipment, piping, and ductwork for the new Primary Care Services Building 642 project. The drawings include floor plans, equipment schedules, notes, and symbols. Key details include the mechanical equipment such as air handling units, pumps, fans, and terminal units. The piping system details the chilled water, heating hot water, and condensate drain piping routing and sizes. The ductwork layout shows the supply, return, and exhaust air distribution. The drawings indicate this is the final bid set with revisions dated up to May 4, 2018. No specific pricing, award, or response date information is provided in these drawings.

View the file

Other files

File Type Posted
Draft - B642 Device List.pdf PDF
36C26124Q1073.docx DOCX document
Draft -SOW642BACnet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draf t

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of Facilities

Management

KEY PLAN STAMP

ATTENTION:

ONLY WET SIGNED DOCUMENTS CONSTITUTE ADVANCE DESIGN CONSULTANTS, INC.

PROFESSIONAL WORK AND BECAUSE OTHER REPRODUCIBLE DOCUMENTS MAY BE EASILY

ALTERED WITHOUT THE CONSENT OF ADVANCE DESIGN CONSULTANTS, INC., THE WET

SIGNED DOCUMENTS MUST BE REFERRED TO FOR THE ORIGINAL AND CORRECT

INFORMATION. IF THERE ANY DIFFERENCES BETWEEN THE WET SIGNED DOCUMENTS AND

ANY O T H E R D O C U M E N T S , T H E W E T S I G N E D D O C U M E N T S S H A L L G O V E R N .

ADVANCE DESIGN CONSULTANTS, INC. IS NOT RESPONSIBLE FOR ANY MODIFICATIONS MADE

TO OUR DOCUMENTS BY ANYONE OTHER THAN AUTHORIZED REPRESENTATIVES OF

A D V A N C E D E S I G N C O N S U L T A N T S , I N C .

PRJ# 14-308-38

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

95%%% CONSTRUCTION DOCUMENTS (14-272)

AutoCAD SHX Text 11/7/17

AutoCAD SHX Text 612-400

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCT PRIMARY CARE SERVICES BLDG.

AutoCAD SHX Text

10535 HOSPITAL WAY, MATHER, CA.

AutoCAD SHX Text

FINAL ISSUE FOR BID

AutoCAD SHX Text

FINAL BID DOCUMENTS (14-273)

AutoCAD SHX Text 3/9/18

AutoCAD SHX Text 5/4/18

AutoCAD SHX Text

FINAL ISSUE FOR BID (14-276)

AutoCAD SHX Text 5/4/18

AutoCAD SHX Text

AND SYMBOLS

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

GENERAL NOTES, ABBREVIATIONS

AutoCAD SHX Text

G. YOUSSEFI

AutoCAD SHX Text

J. ROTHWEIN

AutoCAD SHX Text M-001

AutoCAD SHX Text

SYMB.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

PIPING SYMBOLS

AutoCAD SHX Text

PIPE SLOPE DIRECTION

AutoCAD SHX Text

ELBOW TURN DOWN

AutoCAD SHX Text

RISE OR DOWN

AutoCAD SHX Text

SERVICE PIPING IDENTIFICATIONS

AutoCAD SHX Text

PIPE CAPPED OR PLUGGED

AutoCAD SHX Text

BRANCH BOTTOM CONNECTION

AutoCAD SHX Text

BRANCH TOP CONNECTION

AutoCAD SHX Text

ELBOW TURN UP & DOWN

AutoCAD SHX Text

SYSTEM

AutoCAD SHX Text

PIPE GUIDE

AutoCAD SHX Text

ECCENTRIC REDUCER

AutoCAD SHX Text

CONCENTRIC REDUCER

AutoCAD SHX Text

FLOW DIRECTION

AutoCAD SHX Text

UNION

AutoCAD SHX Text

EXPANSION CONNECTOR

AutoCAD SHX Text

FLANGE

AutoCAD SHX Text

FLOW SWITCH

AutoCAD SHX Text

FLEXIBLE CONNECTOR OR

AutoCAD SHX Text

PIPE ANCHOR OR SUPPORT

AutoCAD SHX Text

THERMOWELL

AutoCAD SHX Text

PRESSURE GAUGE W/GA.

AutoCAD SHX Text

AUTOMATIC VENT W/GA. COCK

AutoCAD SHX Text

PRESSURE RELIEF VALVE

AutoCAD SHX Text

BALL VALVE

AutoCAD SHX Text

FS

AutoCAD SHX Text

PI

AutoCAD SHX Text

COCK & SNUBBER

AutoCAD SHX Text

FC

AutoCAD SHX Text 10x8

AutoCAD SHX Text

FLEXIBLE CONNECTION, EQUIPMENT,

AutoCAD SHX Text

VANED ELBOW (PROVIDE ALL SQUARE OR

AutoCAD SHX Text

RECTANGULAR ELBOWS WITH VANES EVEN IF

AutoCAD SHX Text

SYMBOL IS MISSING)

AutoCAD SHX Text

VANED ELBOW (SHORT RADIUS)

AutoCAD SHX Text

STANDARD RADIUS ELBOW (LONG RADIUS)

AutoCAD SHX Text

NEW DUCT

AutoCAD SHX Text

EXISTING DUCT TO REMAIN

AutoCAD SHX Text

VIBRATION, OR SEISMIC

AutoCAD SHX Text

LIMIT OF DEMOLITION

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

SUPPLY DUCT (UP & DOWN)

AutoCAD SHX Text

EXHAUST DUCT (UP & DOWN)

AutoCAD SHX Text

ROUND AND SQUARE

AutoCAD SHX Text

VANED ELBOW & AIR SPLIT

AutoCAD SHX Text

CONNECT NEW DUCT TO EXISTING DUCT

AutoCAD SHX Text D

AutoCAD SHX Text

INCLINED RISE, IN DIRECTION OF AIR FLOW

AutoCAD SHX Text

INCLINED DROP, IN DIRECTION OF AIR FLOW

AutoCAD SHX Text R

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

RETURN DUCT (UP & DOWN)

AutoCAD SHX Text

SQUARE 3-WAY CEILING DIFFUSERS

AutoCAD SHX Text

SQUARE 2-WAY CEILING DIFFUSERS

AutoCAD SHX Text

4-WAY CEILING DIFFUSERS

AutoCAD SHX Text

TYPE DUCT TAKE-OFF

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text

ABBREVIATION

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

FT

AutoCAD SHX Text

FEET

AutoCAD SHX Text

FSD

AutoCAD SHX Text

COMBINATION FIRE/SMOKE DAMPER

AutoCAD SHX Text

FD

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FDPR

AutoCAD SHX Text

FIRE DAMPER

AutoCAD SHX Text

FPM

AutoCAD SHX Text

FEET PER MINUTE

AutoCAD SHX Text

FH

AutoCAD SHX Text

FUME HOOD

AutoCAD SHX Text

GEA

AutoCAD SHX Text

GENERAL EXHAUST AIR

AutoCAD SHX Text

GPM

AutoCAD SHX Text

GALLONS PER MINUTE

AutoCAD SHX Text

HX

AutoCAD SHX Text

HEAT EXCHANGER

AutoCAD SHX Text

HWS

AutoCAD SHX Text

HEATING HOT WATER SUPPLY

AutoCAD SHX Text

HWR

AutoCAD SHX Text

HEATING HOT WATER RETUN

AutoCAD SHX Text

HP

AutoCAD SHX Text

HORSEPOWER

AutoCAD SHX Text

LAT

AutoCAD SHX Text

LEAVING AIR TEMPERATURE

AutoCAD SHX Text

LWT

AutoCAD SHX Text

LEAVING WATER TEMPERATURE

AutoCAD SHX Text

LBS

AutoCAD SHX Text

POUNDS

AutoCAD SHX Text

MBH

AutoCAD SHX Text

1000 BTU PER HOUR

AutoCAD SHX Text

MAX/MIN

AutoCAD SHX Text

MAXIMUM/MINIMUM

AutoCAD SHX Text

LBS/HR

AutoCAD SHX Text

POUNDS PER HOUR

AutoCAD SHX Text

MUA

AutoCAD SHX Text

MAKE UP AIR

AutoCAD SHX Text

MPS

AutoCAD SHX Text

MEDIUM PRESSURE STEAM

AutoCAD SHX Text (N)

AutoCAD SHX Text

NEW

AutoCAD SHX Text N.C.

AutoCAD SHX Text

NORMALLY CLOSED

AutoCAD SHX Text N.O.

AutoCAD SHX Text

NORMALLY OPEN

AutoCAD SHX Text

PSI

AutoCAD SHX Text

POUNDS PER SQUARE INCH

AutoCAD SHX Text

OA

AutoCAD SHX Text

OUTSIDE AIR

AutoCAD SHX Text P

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

PD

AutoCAD SHX Text

PRESSURE DROP

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text

ABBREVIATION

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

RA

AutoCAD SHX Text

RETURN AIR

AutoCAD SHX Text

RPM

AutoCAD SHX Text

REVOLUTIONS PER MINUTE

AutoCAD SHX Text

RF

AutoCAD SHX Text

RETURN FAN

AutoCAD SHX Text

RH

AutoCAD SHX Text

RELATIVE HUMIDITY

AutoCAD SHX Text

RL

AutoCAD SHX Text

REFRIGERANT LIQUID

AutoCAD SHX Text

RS

AutoCAD SHX Text

REFRIGERANT SUCTION

AutoCAD SHX Text

SA

AutoCAD SHX Text

SUPPLY AIR

AutoCAD SHX Text

SF

AutoCAD SHX Text

SUPPLY FAN

AutoCAD SHX Text

SD

AutoCAD SHX Text

SMOKE DAMPER

AutoCAD SHX Text

SP GR

AutoCAD SHX Text

SPECIFIC GRAVITY

AutoCAD SHX Text

SS

AutoCAD SHX Text

STAINLESS STEEL

AutoCAD SHX Text

STL

AutoCAD SHX Text

STEEL

AutoCAD SHX Text

TOD

AutoCAD SHX Text

TOP OF DUCT

AutoCAD SHX Text

VFD

AutoCAD SHX Text

VARIABLE FREQUENCY DRIVE

AutoCAD SHX Text

VAV

AutoCAD SHX Text

VARIABLE AIR VOLUME

AutoCAD SHX Text

VD

AutoCAD SHX Text

MANUAL VOLUME DAMPER

AutoCAD SHX Text

WB

AutoCAD SHX Text

WET BULB TEMPERATURE °F

AutoCAD SHX Text

KW

AutoCAD SHX Text

KILOWATT

AutoCAD SHX Text

SH

AutoCAD SHX Text

STEAM HUMIDIFIER

AutoCAD SHX Text

BDD

AutoCAD SHX Text

BACKDRAFT DAMPER

AutoCAD SHX Text D

AutoCAD SHX Text

DRAIN

AutoCAD SHX Text

SDS

AutoCAD SHX Text

SMOKE DETECTOR SUPPLY

AutoCAD SHX Text

SDR

AutoCAD SHX Text

SMOKE DETECTOR REPLY

AutoCAD SHX Text

SPS

AutoCAD SHX Text

STATIC PRESSURE SENSOR

AutoCAD SHX Text

WG

AutoCAD SHX Text

WATER GAGE

AutoCAD SHX Text

WPD

AutoCAD SHX Text

WATER PRESSURE DROP

AutoCAD SHX Text

TU

AutoCAD SHX Text

TERMINAL UNIT

AutoCAD SHX Text

LOUVER

AutoCAD SHX Text (INSIDE DIMENSIONS: WIDTH x DEPTH)

AutoCAD SHX Text

DUCTWORK SYMBOLS

AutoCAD SHX Text

SYMB.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

PIPING SYMBOLS

AutoCAD SHX Text

TEMPERATURE SENSOR

AutoCAD SHX Text T

AutoCAD SHX Text

DRAIN

AutoCAD SHX Text

CONDENSATE DRAIN

AutoCAD SHX Text

CHILLED WATER RETURN

AutoCAD SHX Text

CHILLED WATER SUPPLY

AutoCAD SHX Text

SOLENOID VALVE

AutoCAD SHX Text

CD

AutoCAD SHX Text

CHS

AutoCAD SHX Text

CHR

AutoCAD SHX Text

DRAIN

AutoCAD SHX Text

PRESSURE REDUCING VALVE

AutoCAD SHX Text

BUTTERFLY VALVE

AutoCAD SHX Text

2-WAY MODULATING

AutoCAD SHX Text

CIRCUIT SETTER

AutoCAD SHX Text

3-WAY MODULATING

AutoCAD SHX Text

BALANCING VALVE

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

THERMOMETER

AutoCAD SHX Text

FLOW METER

AutoCAD SHX Text

HEATING HOT WATER SUPPLY

AutoCAD SHX Text

HEATING HOT WATER RETURN

AutoCAD SHX Text

HWR

AutoCAD SHX Text

HWS

AutoCAD SHX Text

FM

AutoCAD SHX Text

PETE'S PLUG

AutoCAD SHX Text

MOTORIZED VALVE

AutoCAD SHX Text M

AutoCAD SHX Text

MPS/CONDENSATE

AutoCAD SHX Text T

AutoCAD SHX Text

THERMOSTAT

AutoCAD SHX Text

HUMIDISTAT

AutoCAD SHX Text

ABBREVIATIONS

AutoCAD SHX Text

ABBREVIATION

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AC

AutoCAD SHX Text

AIR CONDITIONING UNIT.

AutoCAD SHX Text

AD

AutoCAD SHX Text

ACCESS DOOR

AutoCAD SHX Text

AFM

AutoCAD SHX Text

AIR FLOW MEASURING

AutoCAD SHX Text

ARCH

AutoCAD SHX Text

ARCHITECTURAL ABOVE FINISH FLOOR

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AIR HANDLING UNIT

AutoCAD SHX Text

AP

AutoCAD SHX Text

ACCESS PANEL

AutoCAD SHX Text

BHP

AutoCAD SHX Text

BRAKE HORSE POWER

AutoCAD SHX Text

BTU

AutoCAD SHX Text

BRITISH THERMAL UNIT

AutoCAD SHX Text

BOD

AutoCAD SHX Text

BOTTOM OF DUCT

AutoCAD SHX Text

BOP

AutoCAD SHX Text

BOTTOM OF PIPE

AutoCAD SHX Text

CD

AutoCAD SHX Text

CONDENSATE DRAIN

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CUBIC FEET PER MINUTE

AutoCAD SHX Text

CHS

AutoCAD SHX Text

CHILLED WATER SUPPLY

AutoCAD SHX Text

CHR

AutoCAD SHX Text

CHILLED WATER RETURN

AutoCAD SHX Text

CLG

AutoCAD SHX Text

CEILING

AutoCAD SHX Text

CV

AutoCAD SHX Text

CONTROL VALVE

AutoCAD SHX Text

CONT

AutoCAD SHX Text

CONTINUATION

AutoCAD SHX Text

DB

AutoCAD SHX Text

DRY BULB TEMPERATURE

AutoCAD SHX Text

DEG. F.

AutoCAD SHX Text

DEGREE FAHRENHEIT

AutoCAD SHX Text

DET.

AutoCAD SHX Text

DETAIL

AutoCAD SHX Text

DN

AutoCAD SHX Text

DOWN

AutoCAD SHX Text

DSD

AutoCAD SHX Text

DUCT SMOKE DETECTOR

AutoCAD SHX Text

EF

AutoCAD SHX Text

EXHAUST FAN

AutoCAD SHX Text

EA

AutoCAD SHX Text

EXHAUST AIR

AutoCAD SHX Text

EAT

AutoCAD SHX Text

ENTERING AIR TEMPERATURE

AutoCAD SHX Text

EWT

AutoCAD SHX Text

ENTERING WATER TEMPERATURE

AutoCAD SHX Text

EFF

AutoCAD SHX Text

EFFICIENCY

AutoCAD SHX Text (E)

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

DUCT MOUNTED REHEAT COIL

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

RETURN

AutoCAD SHX Text 45%%d

AutoCAD SHX Text RETURN, NO SPLITTER (45%%d TAP)

AutoCAD SHX Text

STANDARD BRANCH SUPPLY OR

AutoCAD SHX Text

MANUAL SPLITTER DAMPER

AutoCAD SHX Text 45%%d

AutoCAD SHX Text

STAINLESS STEEL DUCT

AutoCAD SHX Text

BACKDRAFT DAMPER

AutoCAD SHX Text

BDD

AutoCAD SHX Text

EXISTING DUCT TO BE REMOVED

AutoCAD SHX Text

(HOT WATER OR STEAM COIL)

AutoCAD SHX Text

SS

AutoCAD SHX Text

VAV UNIT W/O REHEAT

AutoCAD SHX Text

VAV UNIT W/ REHEAT

AutoCAD SHX Text

STAINLESS STEEL DUCT

AutoCAD SHX Text

COMBINATION FIRE/STOP DAMPER

AutoCAD SHX Text

DUCTWORK SYMBOLS

AutoCAD SHX Text

MANUAL VOLUME DAMPER

AutoCAD SHX Text

VD

AutoCAD SHX Text

SHEET NOTE

AutoCAD SHX Text

EQUIPMENT NO.

AutoCAD SHX Text

EQUIPMENT TYPE

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL SYMBOLS

AutoCAD SHX Text

NEW

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

SHEET NUMBER WHERE SECTION OR

AutoCAD SHX Text

SECTION LETTER OR DETAIL NUMBER

AutoCAD SHX Text

DETAIL IS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION NOTE

AutoCAD SHX Text

TYPE/NECK SIZE

AutoCAD SHX Text

1. INSTALL HVAC EQUIPMENT PER SPECIFICATIONS. INSTALL HVAC EQUIPMENT PER SPECIFICATIONS. 2. ALL DIMENSIONS ARE IN INCHES, UNLESS SHOWN OTHERWISE. ALL DIMENSIONS ARE IN INCHES, UNLESS SHOWN OTHERWISE. 3. PROVIDE AUTOMATIC AIR VENTS IN ALL PIPING AT HIGH POINTS AND PROVIDE PROVIDE AUTOMATIC AIR VENTS IN ALL PIPING AT HIGH POINTS AND PROVIDE VALVED DRAIN CONNECTIONS AT LOW POINTS. RUN VENTS AND DRAINS TO ACCESSIBLE LOCATIONS. 4. BRACE ALL PIPING AND MECHANICAL EQUIPMENT AND SUPPORT IN BRACE ALL PIPING AND MECHANICAL EQUIPMENT AND SUPPORT IN ACCORDANCE WITH DRAWINGS, THE LATEST SMACNA GUIDELINES AND THE LATEST VA HVAC DESIGN MANUAL FOR NEW, REPLACEMENT, ADDITION AND RENOVATION OF EXISTING VA FACILITIES. 5. MAKE CONNECTIONS BETWEEN COPPER AND IRON OR STEEL PIPES WITH MAKE CONNECTIONS BETWEEN COPPER AND IRON OR STEEL PIPES WITH DIELECTRIC CONNECTORS. 6. SEAL AROUND ALL PIPES AND DUCTS PENETRATING FIRE RATED WALLS WITH SEAL AROUND ALL PIPES AND DUCTS PENETRATING FIRE RATED WALLS WITH A U.L. LISTED FIRE-STOPPING SYSTEM. SEAL SMOKE TIGHT ALL PIPE PENETRATIONS. 7. INSTALL VALVE WITH STEM POINTING UPWARD OR ABOVE HORIZONTAL PLANE, INSTALL VALVE WITH STEM POINTING UPWARD OR ABOVE HORIZONTAL PLANE, UNLESS OTHERWISE INDICATED. 8. INSTALL ALL PIPING AND VALVES, ETC., TO SUIT BEST FIELD CONDITIONS INSTALL ALL PIPING AND VALVES, ETC., TO SUIT BEST FIELD CONDITIONS AND TO COORDINATE WITH OTHER TRADES. 9. MECHANICAL CONTRACTOR SHALL COORDINATE INSTALLATION OF VARIABLE MECHANICAL CONTRACTOR SHALL COORDINATE INSTALLATION OF VARIABLE FREQUENCY DRIVES WITH ELECTRICAL CONTRACTOR AND CONTROLS CONTRACTOR. 10. DUCT SMOKE DETECTORS SHALL BE PROVIDED AND INSTALL BY MECHANICAL DUCT SMOKE DETECTORS SHALL BE PROVIDED AND INSTALL BY MECHANICAL CONTRACTOR AND WIRED BY ELECTRICAL CONTRACTOR AND CONNECTED TO FIRE ALARM SYSTEM BY CONTROLS CONTRACTOR. 11. BALANCE WATER MOVING EQUIPMENT TO CAPACITIES INDICATED IN THE BALANCE WATER MOVING EQUIPMENT TO CAPACITIES INDICATED IN THE SCHEDULES. 12. AS A PART OF THIS CONTRACT, MECHANICAL CONTRACTOR SHALL PROVIDE AS A PART OF THIS CONTRACT, MECHANICAL CONTRACTOR SHALL PROVIDE ACCURATE SHOP DRAWINGS OF THE PIPING, DUCTWORK AND CONTROLS. PROVIDE AND INSTALL ALL SUPPLEMENTARY OR MISCELLANEOUS ITEMS, APPURTENANCES AND DEVICES INCIDENTAL TO OR NECESSARY FOR A SOUND, SECURE AND COMPLETE INSTALLATION. 13. CONTRACTOR SHALL PROVIDE A CONTROL SYSTEM COMPATIBLE WITH THE CONTRACTOR SHALL PROVIDE A CONTROL SYSTEM COMPATIBLE WITH THE EQUIPMENT MOUNTED CONTROL AND WITH THE BUILDING FMCS. THE CONTROL DIAGRAMS ARE GENERIC IN NATURE AND REPRESENT LOCAL CONTROL POINTS AND THE POINTS TO THE CENTRAL ENERGY MANAGEMENT AND CONTROL SYSTEMS. 14. INSTALL SEISMIC BRACING FOR DUCTWORK, PIPES, EQUIPMENT IN INSTALL SEISMIC BRACING FOR DUCTWORK, PIPES, EQUIPMENT IN ACCORDANCE WITH LATERAL ANCHORAGE PROVISIONS SPECIFIED. 15. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL FITTINGS, FLEXIBLE CONNECTION, VIBRATION ISOLATOR, TRANSITIONS, VALVE AND OTHER DEVICES REQUIRED. 16. THE CONTRACTOR SHALL PROVIDE ALL WIRING AND CONDUIT FROM JUNCTION THE CONTRACTOR SHALL PROVIDE ALL WIRING AND CONDUIT FROM JUNCTION BOXES TO ALL CONTROL PANELS AND DEVICES PART OF THE CONTROL SYSTEM. 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUPPORT OF ALL THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUPPORT OF ALL CONTROL DEVICES, CONDUIT AND PANEL ASSEMBLIES AS NOTED HEREIN, AND IN THE SPECIFICATION AS REQUIRED TO PROVIDE ADEQUATE MAINTENANCE AND CLEARANCE PER CODE AND MANUFACTURER'S PER CODE AND MANUFACTURER'S RECOMMENDATIONS. 18. DRAWING ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF DRAWING ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEM AND EQUIPMENT. FIELD MEASUREMENTS TAKE PRECEDENCE OVER DIMENSIONED DRAWINGS. 19. PROVIDE MANUAL VOLUME DAMPER TO ALL SUPPLY, RETURN AND EXHAUST PROVIDE MANUAL VOLUME DAMPER TO ALL SUPPLY, RETURN AND EXHAUST DUCTS TO DIFFUSERS, REGISTERS OR GRILLES WHERE REQUIRED FOR PROPER AIR BALANCE EVEN IF NOT SHOWN IN THE DRAWINGS. 20. ALL DUCTWORK SHALL BE CONSTRUCTED, ERECTED, AND TESTED IN ALL DUCTWORK SHALL BE CONSTRUCTED, ERECTED, AND TESTED IN ACCORDANCE WITH THE MOST RESTRICTIVE OF LOCAL REGULATIONS, PROCEDURES DETAILED IN THE ASHRAE HANDBOOK OF FUNDAMENTALS, OR THE APPLICABLE STANDARDS ADOPTED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION. 21. ALL EQUIPMENT, DUCTS, PIPING, AND OTHER DEVICES AND MATERIALS ALL EQUIPMENT, DUCTS, PIPING, AND OTHER DEVICES AND MATERIALS INSTALLED OUTSIDE OF THE BUILDING OR OTHERWISE EXPOSED TO THE WEATHER SHALL BE INSULATED AND COMPLETELY WEATHERPROOFED. 22. MECHANICAL CONTRACTOR SHALL PROVIDE ACCESS FOR ALL FIRE & SMOKE MECHANICAL CONTRACTOR SHALL PROVIDE ACCESS FOR ALL FIRE & SMOKE DAMPERS. 23. MECHANICAL EQUIPMENT, DUCTING, AND ASSOCIATED COMPONENTS, CONTAIN MECHANICAL EQUIPMENT, DUCTING, AND ASSOCIATED COMPONENTS, CONTAIN SETTLED METAL DUST CONTAMINATION AND SHALL ONLY BE HANDLED BY LEAD-METAL TRAINED WORKERS PER V.A. SPECIFICATIONS. 24. DAMPER ACTUATORS AND CONTROL VALVES WITH ACTUATORS SHALL BE DAMPER ACTUATORS AND CONTROL VALVES WITH ACTUATORS SHALL BE PROVIDED BY CONTROL TRADE CONTRACTOR. 25. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND SEQUENCE OF CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND SEQUENCE OF OPERATION BEFORE COMMENCING WORK. 26. THE DUCT SYSTEM SHALL BE CONSTRUCTED PER IMC 603.4 AND SHALL THE DUCT SYSTEM SHALL BE CONSTRUCTED PER IMC 603.4 AND SHALL MEET ALL REQUIREMENTS OF IMC 603.10. FLEXIBLE FACTORY-MADE AIR DUCTS SHALL BE CLASS 0 OR CLASS 1 AND MEET ALL REQUIREMENTS OF IMC 603.5. 27. MATERIAL EXPOSED WITHIN DUCTS OR PLENUM SHALL HAVE A MATERIAL EXPOSED WITHIN DUCTS OR PLENUM SHALL HAVE A FLAME-SPREAD INDEX OF NOT MORE THAN 25 AND SMOKE DEVELOPED RATING OF NO MORE THAN 50 FOR MATERIAL EXPOSED WITHIN THE DUCT/PLENUM AND/OR INSULATION MATERIALS APPLIED TO THE EXTERIOR OF DUCTS LOCATED IN THE BUILDING. IMC 602.2.1 AND/OR 607. 28. DEBRIS SHALL BE REMOVED FROM THE PREMISES ON A DAILY BASIS. DO DEBRIS SHALL BE REMOVED FROM THE PREMISES ON A DAILY BASIS. DO NOT ALLOW DEBRIS TO ACCUMULATE. PROTECT ADJACENT AREAS FROM DUST AND DEBRIS. 29. ALL SERVERS MUST BE PROTECTED FROM DAMAGE, DEBRIS AND DUST ALL SERVERS MUST BE PROTECTED FROM DAMAGE, DEBRIS AND DUST DURING CONSTRUCTION. CONTRACTOR TO SUBMIT PROTECTION PLAN TO THE VA C.O.R. FOR APPROVAL PRIOR TO CONSTRUCTION. 30. SMOKE DAMPERS SHALL BE PROVIDED AND INSTALLED BY MECHANICAL SMOKE DAMPERS SHALL BE PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR. HARD WIRED BY ELECTRICAL CONTRACTOR AND WIRED BY CONTROL CONTRACTOR TO FIRE ALARM CONTROL PANEL. 31. DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR OPENING INSIDE DIMENSIONS. DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR OPENING INSIDE DIMENSIONS. 32. FLEXIBLE DUCT LENGTH SHALL NOT EXCEED FIVE (5) FEET. FLEXIBLE DUCT LENGTH SHALL NOT EXCEED FIVE (5) FEET.

AutoCAD SHX Text

GENERAL AND SPECIAL REQUIREMENT:

AutoCAD SHX Text

"AS-BUILT" DRAWINGS:

AutoCAD SHX Text

FUNCTIONAL TEST AND ACCEPTANCE:

AutoCAD SHX Text

CONTRACTOR'S RESPONSIBILITY:

AutoCAD SHX Text

%%UMECHANICAL REQUIREMENTS:

AutoCAD SHX Text A.

AutoCAD SHX Text F.

AutoCAD SHX Text C.

AutoCAD SHX Text E.

AutoCAD SHX Text

%%UGENERAL NOTES

AutoCAD SHX Text

CODE COMPLIANCE:

AutoCAD SHX Text B.

AutoCAD SHX Text CONTRACTOR SHALL VERIFY THE FIELD CONDITIONS AND MAKE ADJUSTMENT TO THE CONSTRUCTION DRAWINGS AS REQUIRED. ANY CORRECTIVE MEASURE ARISING FROM AS LACK OF COORDINATION WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES.

AutoCAD SHX Text THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES ISSUED BY THE AUTHORITIES HAVING JURISDICTION. THE COMPLETE MECHANICAL INSTALLATION SHALL BE IN ACCORDANCE WITH THE ADOPTED EDITION OF IMC, IPC, IFC, IBC, OSHA, NFPA, V.A. DESIGN MANUAL REQUIREMENTS, THE LATEST RULES AND REGULATIONS OF THE SAFETY ORDERS ISSUED BY THE DIVISION OF INDUSTRIAL SAFETY, STATE OF CALIFORNIA. THE CONTRACTOR SHALL COMPLY WITH DIVISION OF INDUSTRIAL SAFETY, STATE OF CALIFORNIA.

AutoCAD SHX Text CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF GENERAL REQUIREMENTS (010000) AND LATERAL FORCE ANCHORAGE PROVISIONS (130541). CONTRACTOR SHALL RETAIN THE SERVICES OF A LICENSED STRUCTURAL ENGINEER (S.E.) IN THE STATE OF CALIFORNIA TO PREPARE DETAIL EQUIPMENT SUPPORT DRAWINGS AND CALCULATIONS.

AutoCAD SHX Text THE CONTRACTOR SHALL MAINTAIN AT THE JOB SITE AN UP-TO-DATE "AS-BUILT" DRAWING SET. THE "AS-BUILT" DRAWING SET SHALL REFLECT ALL APPROVED CHANGES TO THE DESIGN DRAWINGS AND FIELD CONDITION. THE "AS-BUILT" DRAWING SET SHALL BE KEPT CLEAN AND IN GOOD CONDITION AND SHALL BE TURNED OVER TO V.A. CONTRACTING OFFICER REPRESENTATIVE (C.O.R.) TWO (2) WEEKS AFTER COMPLETION OF THE PROJECT.

AutoCAD SHX Text UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL SCHEDULE AND PERFORM A COMPLETE FUNCTIONAL TEST TO DEMONSTRATE TO THE V.A. FACILITIES OPERATIONS AND MAINTENANCE PERSONNEL PROJECT MANAGER THAT THE MECHANICAL SYSTEMS ARE OPERATING AS INTENDED. ANY DEFECTS OR DISCREPANCIES IN THE MATERIAL OR WORK SHALL BE CORRECTED IMMEDIATELY TO THE SATISFACTION OF V.A. CONTRACTING OFFICER REPRESENTATIVE (C.O.R.) AT NO ADDITIONAL COST. NOISY OPERATION AND/OR VIBRATION TRANSMISSION TO THE BLDG. STRUCTURE WILL NOT BE ACCEPTED.

AutoCAD SHX Text

SV

AutoCAD SHX Text

FIRE DAMPER

AutoCAD SHX Text

NEW DUCT

AutoCAD SHX Text

SMOKE DETECTOR (SUPPLY OR RETURN)

AutoCAD SHX Text

SD_

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VALVE AND QUICK-COUPLING

AutoCAD SHX Text

WYE STRAINER WITH DRAIN

AutoCAD SHX Text

HOSE CONNECTOR

AutoCAD SHX Text H

AutoCAD SHX Text

XXX

AutoCAD SHX Text X

AutoCAD SHX Text

CFM

AutoCAD SHX Text

CONTROL VALVE

AutoCAD SHX Text

CONTROL VALVE

AutoCAD SHX Text

TRIPLE DUTY VALVE

AutoCAD SHX Text O

AutoCAD SHX Text

EXP. 06/30/2017

AutoCAD SHX Text

NO. M 21000

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text Z

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text

COORDINATION:

AutoCAD SHX Text D.

AutoCAD SHX Text THE MECHANICAL INSTALLATION REQUIRES CLOSE COORDINATION WITH OTHER TRADES INCLUDING CONCRETE, STRUCTURAL STEEL, PLUMBING, FIRE SPRINKLERS, FIRE ALARM, ELECTRICAL AND CONTROLS. GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE NEW INFORMATION DEVELOPED BY SUBMITTALS AND SHOP DRAWINGS OF THE TRADES LISTED ABOVE.

t FD

PF

FDPR

T

T

T

TT

T

T

T

T

T

T

T

T

T

T

T

FD

PR

FD

PR

T

T

PF

1 2 3 4 5 6 7 8 8.4 9

A

B

C

D

E

F

G

642-FC-01

642-TU-1-01

642-TU-1-02

642-TU-1-03

642-TU-1-04

642-TU-1-06

642-TU-1-07

642-TU-1-08

642-TU-1-15

642-TU-1-10 642-TU-1-05

642-TU-1-11

642-TU-1-13

GENERAL NOTES:

FOR DUCTWORK AND AIR DISTRIBUTION SEE SHEET M-101.

642-FC-02

VESTIBULE

COMMONS/LOBBY

ELEVATOR

MACHINE ROOM

HALLWAY

RECEPTION

CONSULT

EXAM ROOM

TEAM WORK

AREA

PATIENT

HALLWAY

PATIENT

HALLWAY

HSKG

TOILET, PUBLIC

EXAM ROOM

EXAM ROOM

EXAM ROOM

SCI/D WOMEN'S

HEALTH

TOILET, PATIENT

124B

EXAM ROOM

SCI/D PATIENT

117A

TOILET SCI/D

PATIENT

117B

IT/TELECOM

EXAM ROOM

EXAM ROOM

STAIR 1

S 1

642-FDPR-03

642-FDPR-02

642-FDPR-01

ELEVATOR

642-FDPR-04

642-FC-03

O

EXP. 06/30/2017

NO. M 21000

F A

C

ET

AT

S

NHC A CI

OF AC IL

EM

NZ

D

ET

RE

G

SI

LO

ER

RE O

R

FRO

A P

ESSI

OI S

RNO

AL I

STA

NGE

NO

LL

I

R

NEE

E

NAL

ONLY WET SIGNED DOCUMENTS CONSTITUTE ADVANCE DESIGN CONSULTANTS, INC.

PROFESSIONAL WORK AND BECAUSE OTHER REPRODUCIBLE DOCUMENTS MAY BE

EASILY ALTERED WITHOUT THE CONSENT OF ADVANCE DESIGN CONSULTANTS, INC.,

THE WET SIGNED DOCUMENTS MUST BE REFERRED TO FOR THE ORIGINAL AND

CORRECT INFORMATION. IF THERE ARE ANY DIFFERENCES BETWEEN THE WET

SIGNED DOCUMENTS AND ANY OTHER DOCUMENTS, THE WET SIGNED DOCUMENTS

SHALL GOVERN.

ADVANCE DESIGN CONSULTANTS, INC. IS NOT RESPONSIBLE FOR ANY

MODIFICATIONS MADE TO OUR DOCUMENTS BY ANYONE OTHER THAN AUTHORIZED

REPRESENTATIVES OF ADVANCE DESIGN CONSULTANTS, INC.

PO# 13-308-38

ATTENTION:

o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FINAL ISSUE FOR BID

5/4/18 M-101.1

MECHANICAL FIRST FLOOR HVAC

EQUIPMENT PLAN

CONSTRUCT PRIMARY CARE

SERVICES BLDG.

612-400

10535 HOSPITAL WAY MATHER,CA.

G. YOUSSEFI R. SOTELO

N SCALE: 3/16" = 1'-0"

MECHANICAL FIRST FLOOR HVAC EQUIPMENT PLAN

95% CONSTRUCTION DOCUMENTS (14-272) 11/7/17

FINAL BID DOCUMENTS (14-273) 3/9/18

FINAL ISSUE FOR BID (14-276) 5/4/18

1111642-11116426421666664444442424222222--TU--TTTUUU-1-01111--001

6426664422-TUTUTU22 TTTTUUUU-1-0U-1-0U-1-0

11111

UU 1 000

0005EPTPTTTTE0505

10444441110444104104642642111

00040 P 004224 P T

TU

TIOO

4444444444 T

T

T

U

O

U

OO

1 01

ON

ON

N6426664422 TRRRRRRRRRRRRRTUTU22 TTTRRRTTRRRRURRUURRRUECECCEECEEECCCCECECECECECEECEU 1 0U 1 0UUEEEEEEE1EEEEECCCCCC00CCCC00CCC00EEEPEEPTEEEEEPTTTTPTPTEEPPPTPTPTPTEPE050500EE5EEE55EEEEEPPPPTTTTTTTIOTTIOOTIOOTIOT OTIOOOOOOOTTTTTTIIOOOOOOOOOOOOOOONNNNONNOONNNNNNNN

TTTTTTT

C

RECEPTION

642-TU-1-01

642-TU-1-05

1"ø HWR 1"ø HWS

This T-stat controls TU-1-05, which supplies air to the corridor behind the reception desk. It does not appear as if this is the best location for the T-Stat. In addition, per the original contract it also feeds the consult room, but per the pending modification, the consult room is being moved and this room will be the IT room that is serviced by a separate Fan Coil unit. Please confirm that this is the correct location.

Please confirm that the VA is ok with having TU-1-05 and TU-1-02 above the wood ceiling, which has a interlocking revel system that make removing tiles difficult

Please confirm that the VA wants to have the controls for this Fan Coil unit located above the wood ceiling that has a revel system that makes removing tiles without damaging them very difficult

With the pending change to change this room to a telecommunication room, is the VA ok with having duct work not associated with the telecommunication room passing through the IT room

642-FC-02

M

Based upon the assumption that the pending modification to move the IT Room to this location and the IT room will be cooled by the fan coil unit. Will the Fan coil unit be ok being installed above the ceiling in the IT Room and will it need secondary containment?

Wood ceiling

Wood ceiling

Wood ceiling

T

Relocate T-stat for TU-1-02 to this location

T

PATIENTPATIENT

CI/DDDD

T IT/TELECOMOOOMOMITT//T C

T

CCCCCCCCCOOOOOCOOONNONNONNNNNNNNNNOONNONNOO

NSSNSNSSSSSSSS

SUUUUSSUSUU

555555555

ULLLLLLLLU

T

TTTTT

T 6 36442-TUU-11-003

1"ø HWS

642-FC-02

MMMMMMMMMMMMMMMM

33333

Exam Room IT Room amartinez Rectangle amartinez Dimension 2' amartinez Cloud

VHAMACGuptaS1 Text Box VA Comment: As mentioned in RFI 26, add #5 Wood Plank ceiling to be deleted from scope in this conflicting location with the extension of the IT closet. Provide a regular drop ceiling per specs and drawing.

Secondary fan coil unit tray to be installed.

VHAMACGuptaS1 Line

PF

1 2 3 4 5 6 7 8 8.4 9

A

B

C

D

E

F

G

VESTIBULE

COMMONS/LOBBY

ELEVATOR

MACHINE ROOM

HALLWAY

RECEPTION

CONSULT

EXAM ROOM

TEAM WORK

AREA

PATIENT

HALLWAY

PATIENT

HALLWAY

HSKG

TOILET, PUBLIC

EXAM ROOM

EXAM ROOM

EXAM ROOM

SCI/D WOMEN'S

HEALTH

TOILET, PATIENT

124B

EXAM ROOM

SCI/D PATIENT

117A

TOILET SCI/D

PATIENT

117B

IT/TELECOM

EXAM ROOM

EXAM ROOM

3/4"ø HWR 3/4"ø HWS 1"ø HWS

1"ø HWR

1"ø HWR 1"ø HWS

3/4"ø CHR

1 1/4"ø CHR

1 1/2"ø CHS

"ø

C H

S

"ø C

H R

/2 "ø

H W

R

/4

"ø H

W R

/4

"ø H

W S

SHEET NOTES:

4" CHS/R PIPES UP TO 2ND FLR.

3" HWS AND 2-1/2" HWR PIPES UP TO 2ND FLR.

1-1/2" HWS FROM 2ND FLR.

1-1/2" CHS PIPE FROM 2ND FLR.

PROVIDE SEISMIC EXPANSION JOINT AT CH & HW

PIPING BETWEEN (E) B650 & (N) B642. METRAFLEX

METRALOOP VLF80300 (3") & VLF80400 (4"), ±4"

MOVEMENT.

FOR CONTINUATION

SEE SHEET M-104

STAIR 1

S 1

642-FC-01

642-TU-1-01

642-TU-1-02

642-TU-1-03

642-TU-1-04

642-TU-1-06

642-TU-1-07

642-TU-1-08

642-TU-1-15

642-TU-1-10

642-TU-1-05

642-TU-1-11642-TU-1-13

642-FC-02

3/4"ø CHS

1 1/4"ø CHS

1"ø HWS

B M-102

3/4"ø CHS

3/4"ø CHR

642-MV-02

642-DPC-02

642-MV-01

642-DPC-01

642-FC-03

ELEVATOR

GENERAL NOTES:

COORDINATE PLUMBING WORK WITH ALL OTHER TRADES

IN ORDER TO AVOID CONFLICTS.

SEE TERMINAL UNIT SCHEDULE FOR 2-WAY AND 3-WAY

CONTROL VALVES.

UNLESS OTHERWISE NOTED ON PLANS, ALL HW PIPING

CONNECTED TO TERMINAL UNITS REHEAT COIL SHALL BE

3/4"ø.

1"ø HWR 1"ø HWS

3/4"ø HWR 3/4"ø HWS

3/4"ø HWR 3/4"ø HWS

PIPE ANCHOR (TYP)

PIPE ALIGNMENT GUIDE (TYP)

C M-105

1 1/4"ø CHR 1 1/4"ø CHS

642-TU-1-14

642-TU-1-09

642-TU-1-12

3/4"ø HWS

3/4"ø HWR

TOILET STAFF

ELECTRICAL

CLEAN HOLDING

SOILED HOLDING

STAFF HALLWAY

1"ø HWR

1 1/4"ø HWR

1 1/2"ø HWS

/2 "ø

H W

S

2 1/2"ø HWS 2 1/2"ø HWR

3"ø CHR 3"ø CHS

LEVEL 1

0' - 0"

LEVEL 2

14' - 0"

ROOF

28' - 0"

A

5CH & HW PIPING ON ROOF.

FOR CONTINUATION

SEE SHEET M-100

(E) B650

(N) B642

(E) ROOF

O

EXP. 06/30/2017

NO. M 21000

F A

C

ET

AT

S

NHC A CI

OF AC IL

EM

NZ

D

ET

RE

G

SI

LO

ER

RE O

R

FRO

A P

ESSI

OI S

RNO

AL I

STA

NGE

NO

LL

I

R

NEE

E

NAL

Date

Approved: Project Director

Drawing Title: Project Title:

Location

Project Number:

Building Number:

Drawing Number:

Checked Drawn

ARCHITECT/ENGINEERS

STAMPKEY PLANCONSULTANTS:

Office of Facilities

Management

Dwg. of

ONLY WET SIGNED DOCUMENTS CONSTITUTE ADVANCE DESIGN CONSULTANTS, INC.

PROFESSIONAL WORK AND BECAUSE OTHER REPRODUCIBLE DOCUMENTS MAY BE

EASILY ALTERED WITHOUT THE CONSENT OF ADVANCE DESIGN CONSULTANTS, INC.,

THE WET SIGNED DOCUMENTS MUST BE REFERRED TO FOR THE ORIGINAL AND

CORRECT INFORMATION. IF THERE ARE ANY DIFFERENCES BETWEEN THE WET

SIGNED DOCUMENTS AND ANY OTHER DOCUMENTS, THE WET SIGNED DOCUMENTS

SHALL GOVERN.

ADVANCE DESIGN CONSULTANTS, INC. IS NOT RESPONSIBLE FOR ANY

MODIFICATIONS MADE TO OUR DOCUMENTS BY ANYONE OTHER THAN AUTHORIZED

REPRESENTATIVES OF ADVANCE DESIGN CONSULTANTS, INC.

PO# 13-308-38

ATTENTION:

o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FINAL ISSUE FOR BID

5/4/18 M-102

MECHANICAL FIRST FLOOR PIPING

PLAN AND SECTIONS

CONSTRUCT PRIMARY CARE

SERVICES BLDG.

612-400

10535 HOSPITAL WAY MATHER,CA.

G. YOUSSEFI R. SOTELO

N SCALE: 3/16" = 1'-0"

MECHANICAL FIRST FLOOR PIPING PLAN

SCALE: 3/16" = 1'-0"B MECHANICAL PIPING SECTION VIEW

Revisions: Date

95% CONSTRUCTION DOCUMENTS (14-272) 11/7/17

FINAL BID DOCUMENTS (14-273) 3/9/18

FINAL ISSUE FOR BID (14-276) 5/4/18

Highlight

Highlight t R

EF

PF

FD

PR

T

T

T

T

TT

T

T

T

T

T

T

T

T

T

PF

1 2 3 4 5 6 7 8 8.4 9

A

B

C

D

E

F

G

642-TU-2-02

642-TU-2-01

642-TU-2-03

642-TU-2-04

642-TU-2-05

642-TU-2-06

642-TU-2-07

642-TU-2-08

642-TU-2-15

642-TU-2-09

642-TU-2-10

642-TU-2-11

642-TU-2-12

642-TU-2-13

642-TU-2-14

GENERAL NOTES:

FOR DUCTWORK AND AIR DISTRIBUTION SEE SHEETS M-

103 & M-103A.

THIS DRAWING IS FOR EQUIPMENT TAGS PURPOSE ONLY.

SEE SHEETS M-103 & M-103A FOR BASE AND ADD #14

DESIGNATION.

642-EF-02

642-FDPR-05 642-SA-01

O

EXP. 06/30/2017

NO. M 21000

F A

C

ET

AT

S

NHC A CI

OF AC IL

EM

NZ

D

ET

RE

G

SI

LO

ER

RE O

R

FRO

A P

ESSI

OI S

RNO

AL I

STA

NGE

NO

LL

I

R

NEE

E

NAL

Date

Approved: Project Director

Drawing Title: Project Title:

Location

Project Number:

Building Number:

Drawing Number:

Checked Drawn

ARCHITECT/ENGINEERS

STAMPKEY PLANCONSULTANTS:

Office of Facilities

Management

Dwg. of

ONLY WET SIGNED DOCUMENTS CONSTITUTE ADVANCE DESIGN CONSULTANTS, INC.

PROFESSIONAL WORK AND BECAUSE OTHER REPRODUCIBLE DOCUMENTS MAY BE

EASILY ALTERED WITHOUT THE CONSENT OF ADVANCE DESIGN CONSULTANTS, INC.,

THE WET SIGNED DOCUMENTS MUST BE REFERRED TO FOR THE ORIGINAL AND

CORRECT INFORMATION. IF THERE ARE ANY DIFFERENCES BETWEEN THE WET

SIGNED DOCUMENTS AND ANY OTHER DOCUMENTS, THE WET SIGNED DOCUMENTS

SHALL GOVERN.

ADVANCE DESIGN CONSULTANTS, INC. IS NOT RESPONSIBLE FOR ANY

MODIFICATIONS MADE TO OUR DOCUMENTS BY ANYONE OTHER THAN AUTHORIZED

REPRESENTATIVES OF ADVANCE DESIGN CONSULTANTS, INC.

PO# 13-308-38

ATTENTION:

o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FINAL ISSUE FOR BID

5/4/18 M-103.1

MECHANICAL SECOND FLOOR

HVAC EQUIPMENT PLAN

CONSTRUCT PRIMARY CARE

SERVICES BLDG.

612-400

10535 HOSPITAL WAY MATHER,CA.

G. YOUSSEFI R. SOTELO

N SCALE: 3/16" = 1'-0"

MECHANICAL SECOND FLOOR HVAC EQUIPMENT PLAN

Revisions: Date

95% CONSTRUCTION DOCUMENTS (14-272) 11/7/17

FINAL BID DOCUMENTS (14-273) 3/9/18

FINAL ISSUE FOR BID (14-276) 5/4/18

t R

EF

PF

1 2 3 4 5 6 7 8 8.4 9

A

B

C

D

E

F

G

1"ø HWR 1"ø HWS

1 1/4"ø HWR 1 1/4"ø HWS

3/4"ø HWR 3/4"ø HWS

1 1/2"ø HWS

1 1/2"ø HWR

SHEET NOTES:

4" CHS PIPE UP TO ROOF AND DN TO 1ST FLR.

3" CHR PIPE UP TO ROOF AND 4" CHR DN TO 1ST FLR.

3" HWS PIPE UP TO ROOF AND DN TO 1ST FLR.

2" HWR PIPE UP TO ROOF AND 2-1/2" HWR DN TO 1ST

FLR.

2" HWS PIPE UP TO ROOF AND 1-1/2" DN TO 1ST FLR.

1-1/2" CHS UP TO ROOF AND DN TO 1ST FLR.

PROVIDE SEISMIC EXPANSION JOINT AT CH & HW PIPING

BETWEEN (E) B650 & (N) B642. METRAFLEX METRALOOP

VLF80300 (3") & VLF80400 (4"), ±4" MOVEMENT.

FOR CONTINUATION

SEE SHEET M-102

TO/FROM (E) BLDG 702 (ENERGY CENTER)

"ø

C H

R

/2

"ø H

W R

SEE SHEET M-100

642-TU-2-02

642-TU-2-01

642-TU-2-03

642-TU-2-04

642-TU-2-05642-TU-2-06642-TU-2-07

642-TU-2-08642-TU-2-15

642-TU-2-09

642-TU-2-10

642-TU-2-11

642-TU-2-12

642-TU-2-13

642-TU-2-14

/2 "ø

H W

S

642-MV-04

642-DPC-04

1"ø HWS 1"ø HWR

3/4"ø HWR 3/4"ø HWS

3/4"ø HWR 3/4"ø HWS(TYP TU CONNECTION)

1"ø HWR

1"ø HWS

642-DPC-03

642-MV-03 3/4"ø HWS 3/4"ø HWR

3/4"ø HWR 3/4"ø HWS

3/4"ø HWR 3/4"ø HWS

3/4"ø HWR 3/4"ø HWS

3/4"ø HWR 3/4"ø HWS

(TYP TU CONNECTION)

GENERAL NOTES:

COORDINATE MECHANICAL WORK WITH ALL OTHER

TRADES IN ORDER TO AVOID CONFLICTS.

SEE TERMINAL UNIT SCHEDULE FOR 2-WAY AND 3-WAY

CONTROL VALVES.

UNLESS OTHERWISE NOTED ON PLANS, ALL HW PIPING

CONNECTED TO TERMINAL UNITS REHEAT COIL SHALL BE

3/4"ø.

"ø

C H

S

ADD_ALT #2

O

EXP. 06/30/2017

NO. M 21000

F A

C

ET

AT

S

NHC A CI

OF AC IL

EM

NZ

D

ET

RE

G

SI

LO

ER

RE O

R

FRO

A P

ESSI

OI S

RNO

AL I

STA

NGE

NO

LL

I

R

NEE

E

NAL

Date

Approved: Project Director

Drawing Title: Project Title:

Location

Project Number:

Building Number:

Drawing Number:

Checked Drawn

ARCHITECT/ENGINEERS

STAMPKEY PLANCONSULTANTS:

Office of Facilities

Management

Dwg. of

ONLY WET SIGNED DOCUMENTS CONSTITUTE ADVANCE DESIGN CONSULTANTS, INC.

PROFESSIONAL WORK AND BECAUSE OTHER REPRODUCIBLE DOCUMENTS MAY BE

EASILY ALTERED WITHOUT THE CONSENT OF ADVANCE DESIGN CONSULTANTS, INC.,

THE WET SIGNED DOCUMENTS MUST BE REFERRED TO FOR THE ORIGINAL AND

CORRECT INFORMATION. IF THERE ARE ANY DIFFERENCES BETWEEN THE WET

SIGNED DOCUMENTS AND ANY OTHER DOCUMENTS, THE WET SIGNED DOCUMENTS

SHALL GOVERN.

ADVANCE DESIGN CONSULTANTS, INC. IS NOT RESPONSIBLE FOR ANY

MODIFICATIONS MADE TO OUR DOCUMENTS BY ANYONE OTHER THAN AUTHORIZED

REPRESENTATIVES OF ADVANCE DESIGN CONSULTANTS, INC.

PO# 13-308-38

ATTENTION:

o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FINAL ISSUE FOR BID

5/4/18 M-104.A

MECHANICAL SECOND FLOOR

PIPING PLAN - ADD #14

CONSTRUCT PRIMARY CARE

SERVICES BLDG.

612-400

10535 HOSPITAL WAY MATHER,CA.

G. YOUSSEFI R. SOTELO

N SCALE: 3/16" = 1'-0"

MECHANICAL SECOND FLOOR PIPING PLAN - ADD #14

Revisions: Date

95% CONSTRUCTION DOCUMENTS (14-272) 11/7/17

FINAL BID DOCUMENTS (14-273) 3/9/18

t AFM

AF

M

AF

M

1 2 3 4 5 6 7 8 8.4 9

A

B

C

D

E

F

G

A M-105

B M-105

642-AHU-02 642-AHU-01

642-CHWP-01 642-CHWP-02 642-HWP-01 642-HWP-02

642-EF-01

642-DWH-01 642-DWH-02

22"x24"

24"x30"

32"x24"

24"x24"

48"x24"

48"x24"

SHEET NOTES:

FLEXIBLE CONNECTION.

ELEVATOR SHAFT VENT GRAVITY VENTILATOR,

GREENHECK, MODEL WRH WITH 24"x18" THROAT SIZE.

16"x18"

642-SA-03

SOUND ATTENUATOR ON DUCT RISER

SEE SHEET M-103.1

642-SA-02642-SA-04

GENERAL NOTES:

COORDINATE MECHANICAL WORK WITH ALL OTHER

TRADES IN ORDER TO AVOID CONFLICTS.

AFM ON RISER

BELOW ROOF

642-AFM-03

642-AFM-01

642-AFM-02

SDS

SD

S

O

EXP. 06/30/2017

NO. M 21000

F A

C

ET

AT

S

NHC A CI

OF AC IL

EM

NZ

D

ET

RE

G

SI

LO

ER

RE O

R

FRO

A P

ESSI

OI S

RNO

AL I

STA

NGE

NO

LL

I

R

NEE

E

NAL

Date

Approved: Project Director

Drawing Title: Project Title:

Location

Project Number:

Building Number:

Drawing Number:

Checked Drawn

ARCHITECT/ENGINEERS

STAMPKEY PLANCONSULTANTS:

Office of Facilities

Management

Dwg. of

ONLY WET SIGNED DOCUMENTS CONSTITUTE ADVANCE DESIGN CONSULTANTS, INC.

PROFESSIONAL WORK AND BECAUSE OTHER REPRODUCIBLE DOCUMENTS MAY BE

EASILY ALTERED WITHOUT THE CONSENT OF ADVANCE DESIGN CONSULTANTS, INC.,

THE WET SIGNED DOCUMENTS MUST BE REFERRED TO FOR THE ORIGINAL AND

CORRECT INFORMATION. IF THERE ARE ANY DIFFERENCES BETWEEN THE WET

SIGNED DOCUMENTS AND ANY OTHER DOCUMENTS, THE WET SIGNED DOCUMENTS

SHALL GOVERN.

ADVANCE DESIGN CONSULTANTS, INC. IS NOT RESPONSIBLE FOR ANY

MODIFICATIONS MADE TO OUR DOCUMENTS BY ANYONE OTHER THAN AUTHORIZED

REPRESENTATIVES OF ADVANCE DESIGN CONSULTANTS, INC.

PO# 13-308-38

ATTENTION:

o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FINAL ISSUE FOR BID

5/4/18 M-105.A

MECHANICAL ROOF HVAC PLAN -

ADD #14

CONSTRUCT PRIMARY CARE

SERVICES BLDG.

612-400

10535 HOSPITAL WAY MATHER,CA.

G. YOUSSEFI R. SOTELORevisions: Date

95% CONSTRUCTION DOCUMENTS (14-272) 11/7/17

FINAL BID DOCUMENTS (14-273) 3/9/18

FINAL ISSUE FOR BID (14-276) 5/4/18

SCALE: 3/16" = 1'-0"1 MECHANICAL ROOF HVAC PLAN - ADD #14

1 2 3 4 5 6 7 8 8.4 9

A

B

C

D

E

F

G

C M-106

642-AHU-02 642-AHU-01

642-CHWP-01 642-CHWP-02

642-HWP-01 642-HWP-02

642-EF-01

642-DWH-01 642-DWH-02

2 1/2"ø CHS 2 1/2"ø CHR

1"ø HWS 1"ø HWR

/2 "ø

H W

R

"ø

C H

R

"ø C

H S

/2 "ø

H W

S

2"ø HWS 2 1/2"ø HWS

3"ø CHS 3"ø CHR

2 1/2"ø HWS

DN TO 2ND FLR

SEE SHEET M-104

2"ø HWR

1"ø HWR 1"ø HWS

2 1/2"ø CHS 2 1/2"ø CHR

"ø

H W

S

"ø

H W

S

2"ø HWR

2"ø HWS

1 1/2"ø CHS

VERTICALLY STACKED CHS & HWS PIPES.

SEE SECTION ON THIS SHEET

"ø

C H

S

2 1/2"ø HWS

642-FM-02

642-AS-02

642-AS-01

642-FM-01

1 1/2"ø CHS

SHEET NOTES:

SEE PLUMBING DRAWINGS FOR CONDENSATE DRAIN

PIPE SIZE AND ROUTING.

PROVIDE CROSSOVER LADDER AT POINTS INDICATED

ON PLAN. COORDINATE EXACT LOCATION IN FIELD.

CROSSOVER LADDER (TYP)

(SEE STRUCT DWGS FOR ANCHORING)

2 1/2"ø HWS 3"ø CHS

642-DPC-05

642-MV-05

642-MV-06

642-DPC-06

GRAVITY VENTILATOR

SEE SHEET M-105

GENERAL NOTES:

COORDINATE MECHANICAL WORK WITH ALL OTHER

TRADES IN ORDER TO AVOID CONFLICTS.

O

EXP. 06/30/2017

NO. M 21000

F A

C

ET

AT

S

NHC A CI

OF AC IL

EM

NZ

D

ET

RE

G

SI

LO

ER

RE O

R

FRO

A P

ESSI

OI S

RNO

AL I

STA

NGE

NO

LL

I

R

NEE

E

NAL

Date

Approved: Project Director

Drawing Title: Project Title:

Location

Project Number:

Building Number:

Drawing Number:

Checked Drawn

ARCHITECT/ENGINEERS

STAMPKEY PLANCONSULTANTS:

Office of Facilities

Management

Dwg. of

ONLY WET SIGNED DOCUMENTS CONSTITUTE ADVANCE DESIGN CONSULTANTS, INC.

PROFESSIONAL WORK AND BECAUSE OTHER REPRODUCIBLE DOCUMENTS MAY BE

EASILY ALTERED WITHOUT THE CONSENT OF ADVANCE DESIGN CONSULTANTS, INC.,

THE WET SIGNED DOCUMENTS MUST BE REFERRED TO FOR THE ORIGINAL AND

CORRECT INFORMATION. IF THERE ARE ANY DIFFERENCES BETWEEN THE WET

SIGNED DOCUMENTS AND ANY OTHER DOCUMENTS, THE WET SIGNED DOCUMENTS

SHALL GOVERN.

ADVANCE DESIGN CONSULTANTS, INC. IS NOT RESPONSIBLE FOR ANY

MODIFICATIONS MADE TO OUR DOCUMENTS BY ANYONE OTHER THAN AUTHORIZED

REPRESENTATIVES OF ADVANCE DESIGN CONSULTANTS, INC.

PO# 13-308-38

ATTENTION:

o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FINAL ISSUE FOR BID

5/4/18 M-106.A

MECHANICAL ROOF PIPING PLAN -

ADD #14

CONSTRUCT PRIMARY CARE

SERVICES BLDG.

612-400

10535 HOSPITAL WAY MATHER,CA.

G. YOUSSEFI R. SOTELORevisions: Date

95% CONSTRUCTION DOCUMENTS (14-272) 11/7/17

FINAL BID DOCUMENTS (14-273) 3/9/18

SCALE: 3/16" = 1'-0"1 MECHANICAL ROOF PIPING PLAN - ADD #14

AFM

AF

M

AF

M

J

GFCI

G

FC

I G

FC

I

GFCI

G

FC

I G

FC

I

J

D S

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

G

VFD

VFD

VFD

VFD

642-HWP-02642-HWP-01642-CHWP-02642-CHWP-01

642-EF-01

TO PNL "QHP-1"- 14,16,18

TO PNL "QHP-1"- 13,15,17

TO PNL "QHP-1"- 19,21,23TO PNL "NLP-2"- 33

TO PNL "QHP-1"- 8,10,12

TO PNL "QHP-1"- 7,9,11

TO PNL "QHP-1"- 2,4,6

TO PNL "QHP-1"- 1,3,5

642-BP-03

642-BP-02

642-BP-01

3 #6AWG, 1 #8(G)

IN 1"C.

TO PNL "NLP-2"- 30

2 #12AWG, 1 #12(G)

IN 3/4"C.

2 #12 AWG, 1 #12(G)

IN 3/4C.

3 #12AWG, 1 #12(G) IN 3/4"C.

3 #12AWG, 1 #12(G) IN 3/4"C.

3 #12AWG, 1 #12(G)

IN 3/4"C.

3 #12AWG, 1 #12(G) IN

3/4"C.

3 #12AWG, 1 #12(G) IN 3/4"C.

3 #12AWG, 1 #12(G) IN 3/4"C.

3 #6AWG, 1 #8(G)

IN 1"C.

TO PNL "QHP-1"- 26,28,30

3 #12AWG, 1 #12(G)

IN 3/4"C.

TO PNL "ELP1"- 8

2 #12AWG, 1 #12(G) IN 3/4"C.

TO POWER SMOKE DAMPER

TO PNL "QHP-1"- 20,22,24

TO PNL "QHP-1"- 25,27,29

8.4

642-AHU-02

642-DWH-01

642-DWH-02

4 #12, 1 #12(G) IN

3/4" C.

642-AHU-01

3 #6AWG, 1 #8(G)

IN 1"C.

642-GV-01

642-CWCP-01

642-CWCP-02

642-DHCP-01

642-DHCP-02

J

TO PNL "NLP-2" - 29, 31

Date

Approved: Project Director

Drawing Title: Project Title:

Location

Project Number:

Building Number:

Drawing Number:

Checked Drawn

ARCHITECT/ENGINEERS:STAMPKEY PLANCONSULTANTS:

Office of Facilities

Management

Dwg. of

ONLY WET SIGNED DOCUMENTS CONSTITUTE ADVANCE DESIGN CONSULTANTS, INC.

PROFESSIONAL WORK AND BECAUSE OTHER REPRODUCIBLE DOCUMENTS MAY BE

EASILY ALTERED WITHOUT THE CONSENT OF ADVANCE DESIGN CONSULTANTS, INC.,

THE WET SIGNED DOCUMENTS MUST BE REFERRED TO FOR THE ORIGINAL AND

CORRECT INFORMATION. IF THERE ARE ANY DIFFERENCES BETWEEN THE WET

SIGNED DOCUMENTS AND ANY OTHER DOCUMENTS, THE WET SIGNED DOCUMENTS

SHALL GOVERN.

ADVANCE DESIGN CONSULTANTS, INC. IS NOT RESPONSIBLE FOR ANY

MODIFICATIONS MADE TO OUR DOCUMENTS BY ANYONE OTHER THAN AUTHORIZED

REPRESENTATIVES OF ADVANCE DESIGN CONSULTANTS, INC.

PO# 13-308-38

ATTENTION:

o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

FINAL BID DOCUMENTS

LA

G

NI

N

T LE

E

S

RN EO EL

C.A OIR S

OZ

EXP. 09/30/2018

A

NO. E 10342

RN I

O

C RTEL I

FO LCA IE C

F

ALE A

TSI

ER

ER

G

TS

E

EN

D

L

A

O

T

R

OSSEORP F I N

Revisions: Date

95% CONSTRUCTION DOCUMENTS (14-272) 11/7/17

FINAL BID DOCUMENTS (14-273) 3/9/18

FINAL ISSUE FOR BID (14-276) 5/4/18

5/4/18

EP103

ROOF POWER PLAN CONSTRUCT PRIMARY CARE

SERVICES BLDG.

612-400

10535 HOSPITAL WAY, MATHER, CA.

Checker Author

SCALE: 3/16" = 1'-0"

ROOF POWER PLAN

SHEET NOTES:

CONTRACTOR SHALL PROVIDE AND INSTALL NEW VFD IN

NEMA 3R ENCLOSURE, THE VFD SHALL INCLUDE DOOR

INTERLOCK CIRCUIT BREAKER , MANUAL BYPASS CIRCUIT, A

CONTACTOR TO OPERATE MOTOR WHILE IN BYPASS, MOTOR

OVERLOAD RELAYS.

CONTRACTOR SHALL PROVIDE AND INSTALL NEW 30A, 480V, 3

POLE NON-FUSED SINGLE THROW DISCONNECT SWITCH IN

NEMA 3R ENCLOSURE.

CONTRACTOR SHALL PROVIDE AND INSTALL GFI DUPLEX

RECEPTACLES, NEW RECEPTACLES SHALL BE NEMA 5-20R,

20A, 125V HUBBELL GFR5362SGI OR APPROVED EQUAL. NEW

RECEPTACLE SHALL BE INSTALLED WITH IN-USE METALLIC

WEATHERPROOF COVERS "TAYMAC 6200 SERIES" OR EQUAL.

CONTRACTOR SHALL PROVIDE AND INSTALL 2 POLE

FRACTIONAL HORSE POWER MANUAL STARTER WITH

MELTING ALLOY TYPE OVERLOAD RELAY. NEMA TYPE 3

ENCLOSURE IN SQUARE "D" CLASS 2510 CAT. #KR1 OR

APPROVED EQUAL.

TYP. OF 4

4 TYP. OF 4

TYP. OF 3