Draft - Joint Venture SOW Sep24.pdf

PDF 236 KB Posted

Attached to
RFI*** 57 WG Project Management Support
Solicitation number
FY2557WGPM
Issued by

About this file

This document is a draft Statement of Work (SOW) for the Warfighter Program Support (WPS) contract. The SOW provides an overview of the scope, objectives, and requirements for the contract, which include:

The contractor will provide expert-level support for Live, Virtual, and Constructive (LVC) tactics, test, and training mission execution, as well as high-level program/project management and security support up to the Top Secret/SCI and Special Access Program (SAP) level. Key objectives include providing M&S scenario development, mission planning and execution, information/network security, contractor aircrew training, and facilities engineering and maintenance. The period of performance is an initial base year with four option years. Deliverables include monthly status reports, travel approvals, and technical documentation. The work will primarily be performed at Nellis AFB and other locations in Nevada, requiring personnel with active Top Secret/SCI and SAP clearances.

The related federal contract opportunity is a Request for Information (RFI) for a Project Manager to support the 57th Wing at Nellis AFB. The RFI requests information from interested vendors on their qualifications, ability to fulfill a single FTE requirement, timeline for responding to an RFP, and transition timeframe. Responses are due by November 13, 2024.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WARFIGHTER PROGRAM SUPPORT (WPS)

STATEMENT OF WORK (SOW)

1.0 BACKGROUND

Headquarters Air Force, Air Combat Command, the United States Air Warfare Center and its associated units (53rd, 57th, 99 AB Wings and USAF Weapons School) train tactical experts and produce leaders to control and exploit air, space, and cyber domains on behalf of the joint force.

The HQ AF Flight Plan establishes lines-of-effort required to create relevant and realistic training infrastructure, systems, and networks. Each line-of-effort contains a broad outline of objectives and required tasks, but each will require refinement during execution. Lines-of-effort will require periodic support to refine many strategy documents and/or reports and coordination of technical system integration. The USAFWC is the AF’s center of excellence for Live, Virtual, and Constructive (LVC/M&S) high-end advanced Training, tactics, and test (HEAT3) and real-world mission execution IAW the AF Flight Plan.

With the continued evolution and implementation highly integrated Multi-Domain Air/Space/Cyber C5ISR mission execution solution sets, the Large Force Execution (LFE) construct has significantly evolved in recent years, requiring advanced-level, highly Classified, mission and test operations planning and execution, systems and network engineering and security, program security support, continuous process improvement, 5th and Next Generation facility engineering and construction, aircraft/mission systems maintenance, for advanced integration of service and joint warfighting TTP.

2.0 SCOPE

The Warfighter Program Support (WPS) SOW is a broadly scoped and adaptable effort in order to provide responsive, expert-level warfighter execution and support to enable advanced integration of current and next generation capabilities and execution of joint/combined warfighting, tactics, testing, training, and operational support for USAF and DoD components.

Examples of unit and program-level support are not limited to:

• Advanced Air/Space/Cyber Live, Virtual (M&S), and Constructive (LVC) mission planning, execution, support, analysis, and tactics, techniques, and procedures (TTP) development

• Advanced C5ISR systems integration, including M&S systems integration, and engineering and software design, development and/or procurement

• Current Operations planning, execution, debriefing, and reporting

• Civil Engineering Project Design, Review, Management and Sustainment and Special project requirements review and execution

• Contractor LVC aircrew training (CAT) and courseware development (CWD)

• 4th, 5th and Next generation facilities civil engineering, program management, architectural design, construction, security (including site security), and follow-on facility maintenance and support

• Information, Network and Program security at the Collateral through TS/SCI and Special Access programs (SAP/SAR)

• HQ staff-level SME program-level oversight and coordination support for current and future mission requirements

• Aircraft, aircrew, and other mission equipment, systems maintenance support

• M&S systems design and engineering and exercise test planning and execution

• Operations and maintenance planning and scheduling

• LVC exercise mission planning, execution, analysis, reporting and TTP development

• Streamlined/responsive ODC process

3.0 OBJECTIVES

PROVIDE EXPERT WARFIGHTER LVC TACTICS, TEST AND TRAINING MISSION

EXECUTION AND SUPPORT AND HIGH-LEVEL PROGRAM/ PROJECT

MANAGEMENT AND SUPPORT UP TO THE TS-SCI AND SAP/SAR LEVEL

The contractor shall conduct advanced, Weapons Instructor-level Live/Virtual/ Constructive (LVC) Air/Space/Cyber mission execution and support, including 4th/5th Gen Simulator Pilot and Aircrew-led flight and mission execution, threat replication, analysis, and Modeling and simulation to enhance tactical, operational, and strategic survivability and lethality decisions via quantitative and qualitative Tactics, Techniques, and Procedures (TTP).

The contractor shall provide Program//Project Management, Network (IT) and Program- Level Security, advanced facility engineering, quality control, and other support as directed.

OBJECTIVE 1 – PROVIDE TACTICS, TEST AND TRAINING SIMULATION (M&S)

SCENARIO DEVELOPMENT, MISSION PLANNING, EXECUTION, AND

ASSESSMENT

• Conduct expert, Weapons Instructor-level Virtual/Constructive Tactics, Test, and Training simulation support during test, USAF Weapons School syllabus mission, and FLAG exercise planning, execution, debriefing, and mission analysis up to and including simulated LFE and large-scale 4th/5th Generation Air/Space/Cyber weapons system integration (WSINT) and LFE employment phases. Execution and support will be conducted up to the TS-SCI and SAP/SAR level:

• Provide 5th Gen Fighter (F-22/F-35) and Next Generation assets Weapons Instructor-level Instructor mission crew simulator flight mission planning, execution, and debriefing analysis

• Provide 4th Gen Fighter (including F-15C, F-15E, and F-16) Weapons

Instructor-level Instructor Pilot simulator flight mission planning, execution, and debriefing analysis

• Provide C4ISR (e.g. E-3, E-7, EC-37, RC-135), RPA (MQ-9 and other emerging weapons systems) Intelligence, Space, and Cyber Weapons Instructor-level mission crew member simulator planning, execution, and debriefing analysis

• Provide advanced C5ISR systems integration, including M&S systems integration, and engineering and software design, development and/or procurement

• Develop/execute test and training scenarios, mission simulator procedures, and provide simulation flight scheduling and evaluation processes in support of mission execution/analysis

• Provide simulation mission trend analysis reporting, and operational courses of action (COAs) to support Engineering Directorate acquisition initiatives

OBJECTIVE 2 PROVIDE INFORMATION, NETWORK AND PROGRAM SECURITY

• Plan, organize and direct activities of the collateral security program and Special Access

Program (SAP) ensuring the administration, deployment and enforcement of a comprehensive special access security program.

• Review, analyze and resolve problems related to secure systems, policies and procedures

• Establish policies and procedures for special access functions

• Evaluate compliance of SAP activities with security requirements, identify deficiencies and analyze major problems and SAP mission vulnerabilities

• Provide expertise in information and computer system security to plan, manage, and execute facility/system

• Ensure systems/networks are in compliance and track accreditation/cybersecurity status for all persistent system connections (external and internal)

• Generate and maintain System Security Plans, support Continuous Monitoring (CM), and create Plans of Action and Milestones (POA&M) for non-compliant and non-applicable controls

• Schedule and conduct ACAS scans, perform and document initial training for all personnel requiring access to classified systems

OBJECTIVE 3 PROVIDE CONTRACTOR AIRCREW TRAINING (CAT) AND COURSEWARE

DEVELOPMENT (CWD) EXECUTION AND SUPPORT

• Provide qualified operational SMEs to execute and/or support LVC operational, test, and training missions across a wide range of advanced fighter and other weapons training systems including Distributed Mission Operations (DMO) and Joint Synthetic Environment (JSE) and other Classified systems

• Provide live flight and mission simulator support duties

• Design, develop, and deliver training program CWD

OBJECTIVE 4 PROVIDE PROGRAM/PROJECT MANAGEMENT, AND SECURITY

SUPPORT

The Contractor shall provide Program/Project Management and Security support to develop program objectives/actions/milestones, development of schedules and deadlines, contractor team management, cybersecurity program implementation, faculty engineering, quality Assurance, planning/executing Risk Management Framework (RMF) processes and Authorization to Operate/Connect package production, special program security execution, and technical subject matter expert advice. The Contractor shall provide personnel with a current TS clearance, and up to SAP/SAR eligibility, and SCI eligibility as required.

OBJECTIVE 5 PROVIDE FACILITY CIVIL ENGINEERING AND PROJECT/PROGRAM

MANAGEMENT

• Provide advanced generation facilities civil engineering, program management, architectural design, construction, security (including site security), and follow-on facility maintenance and support

• Provide program level advisory oversight tasking/HHQ staff response, baseline budgeting, program/project planning and scheduling, milestone tracking

• Advise on program requirement definition and implementation. Coordinate funding prioritization

• Coordinate with host agencies to monitor program milestones and deadlines and provide program status slides and brief to leadership.

• Coordinate staff packages for HHQ approval

OBJECTIVE 6 PROVIDE AIRCRAFT AND/OR SYSTEMS MAINTENANCE SUPPORT

• Provide a broad range of flightline and back shop maintenance to support aircraft sortie generation

• Perform maintenance on other mission systems and simulators

OBJECTIVE 7PROVIDE HQ STAFF SME PROGRAM MANAGEMENT AND

REQUIREMENTS OVERSIGHT

• Provide HQ staff functional SME and Program Management support required to ensure tactics, test and training operations and requirements are prioritized, planned, budgeted for, and executed across the FYDP

• Provide staff interface between operational units and HQ Staff Directorates and Commanders

4.1 General

The Contractor and Team will function as a seamless team, without division between companies, outside of the mandatory contractual management requirements. Prime and subcontractor personnel assigned to the project will take technical direction from assigned objective leads, regardless of the company affiliation.

Position-specific contractor duties, tasks, and responsibilities are outlined in Performance Requirement Documents (PRD) and other documents as required.

4.2 Project Manager

Prime will provide an experienced project manager that will be responsible for all actions and direction of the project in support of the Warfighter Support project.

4.3 Subcontractor Lead

The subcontractor will provide a technical lead that will be responsible for all tasking and actions in support of this statement of work under the direction of the Prime Project Manager

5.0 SCHEDULE

Project start is assumed xxx and will end on xxx (Option Year 1) and will continue through Option Year 4 as follows:

Option 1:

Option 2:

Option 3:

Option 4:

6.0 DELIVERABLES

6.1 General

• Spend Plan (Due NLT 10 Days After LSC and Task Order Award). The expenditures will be laid out in a monthly format and will include planned expenditures against funding amounts broken out by applicable CLIN (Labor, Travel, M&E, and/or ODC). The Spend Plan shall be evaluated monthly and updated with ITD actuals as part of the MSR. Forecasted expenditures shall be updated based on the ITD actuals not to exceed the CLIN funding amount.

• Estimated Monthly Billing Value (NLT the 22nd Calendar Day of the Month). This deliverable should state the current period estimated expenditures by CLIN (Labor, Travel, M&E, and/or ODC) and should represent what will be invoiced to Prime for the current period. The current period and due date for this deliverable will be defined in a monthly email request sent by an Prime POC. An email response to the Prime request is acceptable for this deliverable.

• Monthly Status Report (MSR) to include financial reporting and forecast. The MSR will be in the format as directed by the WPSPMO, based upon the [GOV] contract requirements. The MSR will contain, at a minimum the following information o Technical Status. Technical status shall include on-going activities, new activities, and activities completed with progress to date on all above mentioned activities. Each section shall start with a brief description of the task.

o Updated Spend Plan as per above o New Activities o Activities Completed o Problems and Corrective actions taken. Each problem and corrective actions shall include issues/concerns and proposed resolutions to address them.

o Personnel gains, losses, and status (security, etc.)

o Risks o Government Action Required o Schedule. Schedule shall include major tasks, milestones, and deliverables; planned and actual start and completion dates for each.

o Deliverable. Includes Due Date Completed o Travel. Travel summary shall include trips taken, conferences attended, etc.

Trip Reports shall be attached to the MSR for reporting period.

o Upcoming Travel o Plans for Next Reporting Period

• Monthly manpower report. This report is required for all subcontracts, without exception. The report will include the following information and should be based on subcontractor invoice periods o Employee name (current and past employees) o Employee company o Employee OASIS labor category o Service Occupational Classifications (SOC) number o Exempt or non-exempt designation o Current monthly and total cumulative hours worked o Direct Labor Rate o Effective hourly rate (e.g., costs/hours) o Current approved billing rates in support of costs billed

6.2 Technical

• Kick Off Meeting, within 10 workdays of TOA

• Kick Off Meeting Report within 5 workdays of Kickoff Meeting

• Technical Status Meeting, as required/monthly

• Technical Meeting Minutes Report within 5 workdays of Technical Meeting

6.3 Deliverable Media

The subcontractor shall deliver all electronic versions by electronic mail (email) and removable electronic media to Prime. The following are the required electronic formats, whose versions must be compatible with the latest, commonly available version on the market.

a. Text Microsoft (MS) Word, PDF

b. Spreadsheets MS Excel

c. Briefings MS PowerPoint

d. Drawings MS Visio

e. Schedules MS Project

7.0 LEVEL OF EFFORT

7.1 General

No person will be added or removed from any task unless approved by the Prime project manager. Resumes of initial cadre and any proposed replacement personnel will be provided to Prime to use in consultation with appropriate government personnel for approval or rejection.

7.2 Direct

The subcontractor will bid the optimum number of FTE. One FTE is considered to be no more than 1920 hours in a work year of twelve months.

7.3 Labor Categories

The subcontractor will propose the appropriate labor categories as provided in the RFP.

7.3 Subcontractor Management

A moderate amount of management charge may be proposed, separately identified, and reported in the MSR. Resumes are not required for management personnel and support staff.

8.0 TRAVEL

8.1 General

All travel cost will be reimbursed strictly in accordance with JFTR and FAR Cost Principle 31.205-46, Travel Cost. Travel requirement is required during the execution of this subcontract and must be approved in advance by the [GOV] COR through the Prime

PM.

8.2 Subcontractor Travel Requirement

The subcontractor is required to travel to accomplish this requirement. The subcontractor should estimate expected travel and provide specific rationale for each trip. Travel funding appears to be a limiting factor for contract base year and all attempts must be made to limit travel to the minimum required.

8.3 Travel Approval Requests (TAR)

Actual travel MUST be submitted and approved by both the Mission Partner POC and [GOV] COR in advance of any travel or may not be compensated so it is critical sufficient time is given to ensure approvals. The normal submission time to Prime is at least two weeks prior to travel. The earlier travel is submitted, better chance approvals are obtained. In high priority short notice travel requirements, Prime will fast track the requests but cannot guarantee [GOV] will approve.

Prime will provide a spreadsheet form that must be used for individual travels, even if there is group travel. Travel estimates must be broken out as indicated on the form.

Actual travel costs must be within 10% of the travel estimate or [GOV] will require justification and may not reimburse. NOTE: Prime is in the process of automating the travel approval process and will require the subcontract to use the automated process once completed and approved by RSC/[GOV].

8.4 Travel Approval Process

The subcontractor will consolidate subcontractor travel and provide travel spreadsheets to the Prime Project Lead for submission to the mission partner POC for approval. After Mission Partner approval, the Project Manager will submit to the Contractor WPS PMO for all projects consolidation and provision to [GOV] for approval. Upon [GOV] approval the PMO will provide approval to the Prime Project Manager for transmission to the subcontractor.

Any changes to travel estimate such as date changes, extension or curtailment of travel days, airline ticket cost increases, etc., will require re-approval prior to travel. Changes to travel costs while on travel must be reported to Prime with rationale to submit to [GOV] to ensure travel is reimbursed.

The subcontractor shall use only the minimum number of travelers and rental cars needed to accomplish the task(s). Travel shall be scheduled during normal duty hours whenever possible.

Unauthorized travel, or travel not coordinated through Prime with the [GOV] COR or RSC-NCR TPOC, shall not be reimbursed

8.5 Travel Expense and Trip Reports

After each travel, within seven days a travel expense report must be provided for each individual that traveled, using the form that will be provided by Prime. This travel expense report must include all receipts that are $75 or more. This expense report must be within 10% of the travel estimate and must match the travel invoice that will correspond to the travel. Prime will consolidate and provide to [GOV].

A trip report must accompany the travel expense report, using format provided by Prime. This trip report is required for each individual that traveled even if it is group travel and all information is the same.

9.0 GOVERNMENT FURNISHED EQUIPMENT/FACILITIES/DATA

9.1 Location

The work will be performed at the following locations: Nellis/Creech/HQ AF/HQ ACC

USAF Warfare Center 4370 N. Washington Blvd Nellis AFB, NV 89191

JTTC Operations Center 4001 Kinley Ave Nellis AFB, NV 89191

F-22 Flight Simulation Facility 3715 Freedom Circle Nellis AFB, NV 89191

F-35 80 Kinley Dr Nellis AFB, NV 89191

F-16 3760 Kinley Dr Nellis AFB, NV 89191

The subcontractor shall work occasionally in the subcontractor’s facilities, at TDY locations, and at other locations as requested by Prime, in coordination with the mission partner POC.

9.2 Equipment (GFE)

If available, the Government will provide the subcontractor limited work area for work accomplished on-site. This work area may include one work space for the team, utilities, electric power hook-up, computers, and access to copiers, access to a facsimile machine, and telephone services, to include local calls through standard Government assets. All GFE must be utilized in strict performance of contract-related duties, and the subcontractor shall maintain policies that prohibit fraud and abuse.

9.3 Government Furnished Information (GFI)

The Government will provide access to all necessary information and documentation required for this effort.

9.4 Subcontractor Furnished Items

Except for those items or services stated as Government furnished, the subcontractor must furnish everything needed to perform this task order according to all its terms. The subcontractor shall provide training that is necessary for subcontractor personnel at their own expense.

10.0 SECURITY

10.1 General

The work on this task will be a mix of security levels up to Top Secret/SCI and including SAP/SAR at all work locations. The government facility may require personnel to have up to Top Secret/SCI clearance to work in those spaces. For work on this task that is SECRET or TOP SECRET the work and the resulting reports will be classified in accordance with provided DD254.

10.2 Places of Work, and Security Clearance/Access Required

Current work locations requiring clearances/access up to TS/SCI and SAP/SAR

a. Nellis AFB, NV: 53rd/57 WG; USAFWS (6th/8th/32 WPS), 53rd TEG, Virtual Test and Training Simulation Center (VTTC)

b. Hill AFB, UT: 388th FW/388th OG

10.3 Coordination

DD254 information and SCI nomination letters with be coordinated with the designated Prime FSO, who will coordinate all actions with government security personnel. If government space is provided to the subcontractor by the government, a Visitor Group Security Agreement will be submitted through Prime for delivery to the government.

WARFIGHTER PROGRAM SUPPORT (WPS)
STATEMENT OF WORK (SOW)
1.0 BACKGROUND
2.0 SCOPE
PROVIDE EXPERT WARFIGHTER LVC TACTICS, TEST AND TRAINING MISSION EXECUTION AND SUPPORT AND HIGH-LEVEL PROGRAM/ PROJECT MANAGEMENT AND SUPPORT UP TO THE TS-SCI AND SAP/SAR LEVEL
OBJECTIVE 1 – PROVIDE TACTICS, TEST AND TRAINING SIMULATION (M&S) SCENARIO DEVELOPMENT, MISSION PLANNING, EXECUTION, AND ASSESSMENT
Provide HQ staff functional SME and Program Management support required to ensure tactics, test and training operations and requirements are prioritized, planned, budgeted for, and executed across the FYDP
Provide staff interface between operational units and HQ Staff Directorates and Commanders
4.1 General
4.2 Project Manager
4.3 Subcontractor Lead
5.0 SCHEDULE
6.0 DELIVERABLES
6.1 General
6.2 Technical
6.3 Deliverable Media
7.0 LEVEL OF EFFORT
7.1 General
7.2 Direct
7.3 Labor Categories
7.3 Subcontractor Management
8.0 TRAVEL
8.1 General
8.2 Subcontractor Travel Requirement
8.3 Travel Approval Requests (TAR)
8.4 Travel Approval Process
8.5 Travel Expense and Trip Reports
9.0 GOVERNMENT FURNISHED EQUIPMENT/FACILITIES/DATA
9.1 Location
9.2 Equipment (GFE)
9.3 Government Furnished Information (GFI)
9.4 Subcontractor Furnished Items
10.0 SECURITY
10.1 General
10.2 Places of Work, and Security Clearance/Access Required
10.3 Coordination