Draft Full Set Final Sponsor Review C-23-24 STA 2021-02-25 part 1 of 3.pdf
PDF 60 MB Posted
- Attached to
- Comprehensive Everglades Restoration Plan, Indian River Lagoon - South C-23/24 Stormwater Treatment Area
- Solicitation number
- W912EP21Z0015
About this file
This notice provides draft documentation for a future procurement for construction services pertaining to the Comprehensive Everglades Restoration Plan, Indian River Lagoon - South, C-23/24 Stormwater Treatment Area project. The work includes construction of five contiguous stormwater treatment cells totaling approximately 1,970 acres west and east of County Road 613, with associated culverts, box culverts, drop structures, and modifications to roadway drainage along CR 613 and CR 609. Construction is divided into three phases, with an optional fourth phase involving installation of a temporary pump station. The first phase includes construction of a sag culvert and project initiation activities, the second phase includes construction of a connection canal, and the third phase includes construction of all five cells and associated water control structures. The documents are provided for informational purposes only and do not constitute a solicitation; an actual solicitation will be issued for bids on the construction work at a future date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .