Draft-C-23-24_STA_Specs-GDR.pdf

PDF 79 MB Posted

Attached to
Comprehensive Everglades Restoration Plan, Indian River Lagoon - South C-23/24 Stormwater Treatment Area
Solicitation number
W912EP21Z0015
Issued by

About this file

This notice provides draft documentation for plans and specifications for a future procurement for the Comprehensive Everglades Restoration Plan, Indian River Lagoon - South, C-23/24 Stormwater Treatment Area project. The work includes construction of five contiguous stormwater treatment cells totaling approximately 1,970 acres west and east of County Road 613, with associated structures such as culverts, box culverts, weirs, and levees. The project is divided into three phases, with Phase 1 involving construction of a sag culvert and initial site work, Phase 2 constructing a connection canal, and Phase 3 building the five treatment cells along with modifying nearby roadway drainage. An option is also specified for installing a temporary pump station. The draft documentation is non-binding and provided for informational purposes only, as the Army Corps of Engineers District Jacksonville intends to issue an actual solicitation for bids or proposals for this procurement in the future.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .