DRAFT FA810223R2000 2Nov22.pdf

PDF 968 KB Posted

Attached to
AN/TRN-41 MP TACAN Replacement Federal contract opportunity
Solicitation number
FA8102-23-R-2000
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)

PREVIOUS EDITION NOT USABLE Prescribed by GSA – FAR (48 CFR) 53/214(c)

SOLICITATION, OFFER AND AWARD J

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15CFR 7900)

RATING

DO: A7

Page of Page

2. CONTRACT NO. 3. SOLICITATION NO.

FA8102-23-R-2000

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

7. ISSUED BY

DEPARTMENT OF THE AIR FORCE, AFLCMC HBSK

3001 STAFF DR STE 2AH 86A

TINKER AFB OK 73145-3303

BUYER: Amanda Jones/AFLCMC/HBK amanda.jones.39@us.af.mil Phone:

FA8102 8. ADDRESS OFFER TO (If other than Item 7)

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTON PAGE(S) (X) Sec. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM

X B SUPPLIES OR SERVICES AND

X C DESCRIPTION/SPECS/WORK STATEMENT

X D PACKAGING AND MARKING

X E INPECTION AND ACCEPTANCE

X F DELIVERIES OR PERFORMANCE

X G CONTRACT ADMINISTRATION DATA

X H SPECIAL CONTRACT REQUIREMENTS

X I CONTRACT CLAUSES

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER

X J LIST OF ATTACHMENTS

X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

X L INSTRS., CONDS., AND NOTICES TO OFFERORS

X M EVALUATION AND FACTORS FOR AWARD

OFFER (Must be fully completed by offeror)

24. ADMINISTERED BY (If other than Item 7) SCD:C 25. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

X

5. DATE ISSUED 6.REQUISITION/PURCHASE NO

TBD

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in until 3:00 (Hour) local time 29-DEC-2022 (Date).

CAUTION- LATE Submissions, Modifications, and Withdrawals: Section L, Provision No 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this section.

10. FOR INFORMATION

CALL:

A. NAME

Amanda Jones

B. TELEPHONE (NO COLLECT

CALLS)(714) 343-7808

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period. AN/TRN-41 Replacement12. In compliance with the above, the undersigned agrees, if this offer is accepted within 220 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT(See Section I, Clause No 52.232-8)

10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS

14. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated:

AMENDMENT NO. DATE AMENDMENT NO. DATE

15A. NAME AND

ADDRESS OF

OFFEROR

CODE FACILITY 16. NAME AND TITLE OF PERSON

AUTHORIZED TO SIGN OFFER (Type or print)

15B. TELEPHONE NO.

(Include Area Code)

15C.CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE-ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS 20. AMOUNT

$ 198,360,000.00

21. ACCOUNTING AND APPROPRIATION

SEE SCHEDULE

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN

COMPETITION

10 U.S.C. 2304 (c) ( ) 41 U.S.C. 253 (c)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

SOLICITATION

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

C. E-MAIL ADDRESS

amanda.jones.39@us.af.mil

FA8102-23-R-2000

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

MP TACAN Antenna Kit

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price From Quantity

U/I To Quantity Unit Price

EA

Quantity Range 1-4

1 EA 4 EA

Quantity Range 5-8

5 EA 8 EA

Quantity Range 9-16

9 EA 16 EA

Quantity Range 17-32

17 EA 32 EA

Quantity Range 33+

33 EA

NSN: 5825

Antenna Kit (Antenna, Case, Cables, and Auxillary Equipment) SOW Paragraph 4, 5, 6.1, 6.2, 6.3, 6.4.1, 6.4.2, 6.4.3, 6.4.5, 7, 8, 9.1, 11, 12, 15, 16, 17, 18, 19, 20, 21, 22, 23, 29, 30, 31, 32, 33

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

AS9100 9100

NATO AQAP AQAP 2070

Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

FA8102-23-R-2000

MP TACAN Beacon Transponder Kit

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price From Quantity

U/I To Quantity Unit Price

EA

Quantity Range 1-4

1 EA 4 EA

Quantity Range 5-8

5 EA 8 EA

Quantity Range 9-16

9 EA 16 EA

Quantity Range 17-32

17 EA 32 EA

Quantity Range 33+

33 EA

NSN: 5825

Beacon Transponder, Case, Cables and Auxillary Equipment SOW Paragraph 4, 5, 6.1, 6.2, 6.3, 6.4.1, 6.4.2, 6.4.3, 6.4.5, 7, 8, 9.1, 11, 12, 15, 16, 17, 18, 19, 20, 21, 22, 23, 29, 30, 31, 32, 33

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN - Remote Control Status Unit (RCSU) Kit

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price From Quantity

U/I To Quantity Unit Price

EA

Quantity Range 1-4

FA8102-23-R-2000

MP TACAN - Remote Control Status Unit (RCSU) Kit

TBD 2023 - TBD 2028

1 EA 4 EA

Quantity Range 5-8

5 EA 8 EA

Quantity Range 9-16

9 EA 16 EA

Quantity Range 17-32

17 EA 32 EA

Quantity Range 33+

33 EA

NSN: 5825

RSCU Case, Cables, and Auxillary Equipment SOW Paragraph 4, 5, 6.1, 6.2, 6.3, 6.4.1, 6.4.2, 6.4.3, 6.4.5, 7, 8, 9.1, 11, 12, 15, 16, 17, 18, 19, 20, 21, 22, 23, 29, 30, 31, 32, 33

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Assembly System (excludes Antenna, Transponder and RCSU)

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price From Quantity

U/I To Quantity Unit Price

EA

Quantity Range 1-4

1 EA 4 EA

Quantity Range 5-8

5 EA 8 EA

Quantity Range 9-16

9 EA 16 EA

Quantity Range 17-32

FA8102-23-R-2000

MP TACAN Assembly System (excludes Antenna, Transponder and RCSU)

TBD 2023 - TBD 2028

17 EA 32 EA

Quantity Range 33+

33 EA

NSN: 5825

Assembly System Kit(excludes Antenna, Transponder, and RSCU Kits) SOW Paragraph 4, 5, 6.1, 6.2, 6.3, 6.4.1, 6.4.2, 6.4.3, 6.4.5, 7, 8, 9.1, 11, 12, 15, 16, 17, 18, 19, 20, 21, 22, 23, 29, 30, 31, 32, 33

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

Support Equipment and Tool Kits

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price From Quantity

U/I To Quantity Unit Price

EA

NSN: 5825

Support Equipment and Tools SOW Paragraph 4, 5, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 11, 12, 14, 16, 17, 21, 22, 27, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

Support Equipment and Tool Kits

TBD 2023 - TBD 2028

IAW MIL-STD-130

Serial Number Required

MP TACAN Spares

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

MP TACAN Spares SOW Paragraph 4, 5, 6.3, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.1.1, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Training (Per Event)

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Training Per Event SOW Paragraph 4, 5, 6.4, 13, 22, 27, 29, 28, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Quality Assurance: Certificate of Conformance Buy American Act/Balance of Payments Program

MP TACAN Training Vendor Location

TBD 2023 - TBD 2028

Item No.

0007AA

FA8102-23-R-2000

MP TACAN Training Vendor Location

TBD 2023 - TBD 2028

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Training Vendor Location SOW Paragraph 4, 5, 6.4, 13, 22, 27, 29, 28, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Quality Assurance: Certificate of Conformance Buy American Act/Balance of Payments Program

MP TACAN Training CONUS Location

TBD 2023- TBD 2028

Item No.

0007AB

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Training CONUS Location SOW Paragraph 4, 5, 6.4, 13, 22, 27, 29, 28, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Quality Assurance: Certificate of Conformance Buy American Act/Balance of Payments Program

MP TACAN Training OCONUS Location

TBD 2023 - TBD 2028

Item No.

0007AC

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Training OCONUS Location SOW Paragraph 4, 5, 6.4, 13, 22, 27, 29, 28, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Quality Assurance: Certificate of Conformance Buy American Act/Balance of Payments Program

MP TACAN Travel

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

FA8102-23-R-2000

MP TACAN Travel

TBD 2023 - TBD 2028

EA

NSN: 5825

Travel IAW H04 SOW Paragraph 4, 5, 9.1.6.2, 9.1.9, 25, 26, 27, 28, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Quality Assurance: Certificate of Conformance Buy American Act/Balance of Payments Program

MP TACAN Interim Contractor Support (ICS) - Maintenance/Software Support

TBD 2023 - TBD 2024

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Contractor Support (ICS) - Maintenance/Software Support 9.1.9, 9.1.9.1, 9.1.9.4, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

MP TACAN Interim Supply Support (ISS) - Hardware

TBD 2023 - TBD 2024

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Supply Support (ISS) - Replaceable Parts SOW Paragraph 9.1.9, 9.1.9.2, 9.1.9.3, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

FA8102-23-R-2000

MP TACAN Interim Supply Support (ISS) - Hardware

TBD 2023 - TBD 2024

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Engineering Change Proposal (ECP) per Event

TBD 2023 - TBD 2024

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Engineering Change Proposal (ECP) per Event IAW H02 SOW Paragraph 4, 5, 6.3, 7.1, 7.2, 8, 9, 12, 15, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Per Event

TBD 2023 - TBD 2024

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Per Event IAW H03 SOW Paragraph 4, 5, 16, 17, 21, 22, 24, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

FA8102-23-R-2000

MP TACAN Per Event

TBD 2023 - TBD 2024

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Depot Stand Up Support (Organic)

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Depot Stand Up Support (Organic) SOW Paragraph 4, 5, 6.3, 7.1, 7.2, 8, 9.1.1, 9.1.1.1, 9.1.2, 9.1.3, 27, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

MP TACAN Technical Data Package Exhibit A

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Technical Data Package - Exhibit A SOW Paragraph 11, 27, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

FA8102-23-R-2000

MP TACAN Technical Data Package Exhibit A

TBD 2023 - TBD 2028

MP TACAN Technical Orders- CDRL A028- Exhibit B

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Technical Orders- CDRL A028- Exhibit B SOW Paragraph 27, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

MP TACAN Technical Orders- CDRL A047- Exhibit C

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Technical Orders- CDRL A047- Exhibit C SOW Paragraph 27, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

FA8102-23-R-2000

MP TACAN CDRL 1423 Deliverables (Other DATA)- Exhibit D

TBD 2023 - TBD 2028

Item No.

Not Separately Priced Quantity U/I Unit Price

1 EA NSP

NSN: 5825

CDRL 1423 Deliverables (Other DATA)- Exhibit D SOW Paragraph 23.1

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

MP TACAN Increased Data Rights- IAW CLIN 0014

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Increased Data Rights- IAW Appendix 2 CDRL Assertion Matrix

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

MP TACAN Increased Data Rights- IAW CLIN 0015

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Increased Data Rights- IAW Appendix 2 CDRL Assertion Matrix

FA8102-23-R-2000

MP TACAN Increased Data Rights- IAW CLIN 0015

TBD 2023 - TBD 2028

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

MP TACAN Increased Data Rights- IAW CLIN 0016

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Increased Data Rights- IAW Appendix 2 CDRL Assertion Matrix

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

MP TACAN Increased Data Rights - IAW CLIN 0017

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Increased Data Rights - Appendix 2 CDRL Assertion Matrix

IAW CLIN 0017

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

FA8102-23-R-2000

MP TACAN Increased Data Rights - IAW CLIN 0017

TBD 2023 - TBD 2028

MP TACAN Delivery Incentive/Disincentive Terms

TBD 2023 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

IAW H05 Delivery Incentive/Disincentive Terms Maximum Quantity 3

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program

MP TACAN Support Equipment and Tool Kits

TBD 2024 - TBD 2025

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Support Equipment and Tools SOW Paragraph 4, 5, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 11, 12, 14, 16, 17, 21, 22, 27, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

MP TACAN Spares

TBD 2024 - TBD 2025

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

MP TACAN Spares SOW Paragraph 4, 5, 6.3, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.1.1, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Interim Contractor Support (ICS) - Maintenance/Software Support

TBD 2024 - TBD 2025

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Contractor Support (ICS) - Maintenance/Software Support 9.1.9, 9.1.9.1, 9.1.9.4, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

FA8102-23-R-2000

MP TACAN Interim Supply Support (ISS) - Replaceable Parts

TBD 2024 - TBD 2025

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Supply Support (ISS) - Replaceable Parts SOW Paragraph 9.1.9, 9.1.9.2, 9.1.9.3, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Engineering Change Proposal (ECP) per Event

TBD 2024 - TBD 2025

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Engineering Change Proposal (ECP) per Event IAW H02 SOW Paragraph 4, 5, 6.3, 7.1, 7.2, 8, 9, 12, 15, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

MP TACAN Per Event

TBD 2024 - TBD 2025

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Per Event IAW H03

SOW Paragraph 4, 5, 16, 17, 21, 22, 24, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Support Equipment and Tool Kits

TBD 2025 - TBD 2026

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Support Equipment and Tools SOW Paragraph 4, 5, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 11, 12, 14, 16, 17, 21, 22, 27, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

MP TACAN Spares

TBD 2025 - TBD 2026

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

MP TACAN Spares SOW Paragraph 4, 5, 6.3, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.1.1, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Interim Contractor Support (ICS) - Maintenance/Software Support

TBD 2025 - TBD 2026

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Contractor Support (ICS) - Maintenance/Software Support 9.1.9, 9.1.9.1, 9.1.9.4, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

FA8102-23-R-2000

MP TACAN Interim Supply Support (ISS) - Replaceable Parts

TBD 2025 - TBD 2026

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Supply Support (ISS) - Replaceable Parts SOW Paragraph 9.1.9, 9.1.9.2, 9.1.9.3, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Engineering Change Proposal (ECP) per Event

TBD 2025 - TBD 2026

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Engineering Change Proposal (ECP) per Event IAW H02 SOW Paragraph 4, 5, 6.3, 7.1, 7.2, 8, 9, 12, 15, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

MP TACAN Per Event

TBD 2025 - TBD 2026

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Per Event IAW H03 SOW Paragraph 4, 5, 16, 17, 21, 22, 24, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Support Equipment and Tools

TBD 2026 - TBD 2027

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Support Equipment and Tools SOW Paragraph 4, 5, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 11, 12, 14, 16, 17, 21, 22, 27, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

MP TACAN Spares

TBD 2026 - TBD 2027

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

MP TACAN Spares SOW Paragraph 4, 5, 6.3, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.1.1, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Interim Contractor Support (ICS) - Maintenance/Software Support

TBD 2026 - TBD 2027

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Contractor Support (ICS) - Maintenance/Software Support 9.1.9, 9.1.9.1, 9.1.9.4, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

FA8102-23-R-2000

MP TACAN Interim Supply Support (ISS) - Replaceable Parts

TBD 2026 - TBD 2027

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Supply Support (ISS) - Replaceable Parts SOW Paragraph 9.1.9, 9.1.9.2, 9.1.9.3, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Engineering Change Proposal (ECP) per Event

TBD 2026 - TBD 2027

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Engineering Change Proposal (ECP) per Event IAW H02 SOW Paragraph 4, 5, 6.3, 7.1, 7.2, 8, 9, 12, 15, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

MP TACAN Per Event

TBD 2026 - TBD 2027

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Per Event IAW H03 SOW Paragraph 4, 5, 16, 17, 21, 22, 24, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Support Equipment and Tool Kits

TBD 2027 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Support Equipment and Tools SOW Paragraph 4, 5, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 11, 12, 14, 16, 17, 21, 22, 27, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

MP TACAN Spares

TBD 2027 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

MP TACAN Spares SOW Paragraph 4, 5, 6.3, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.1.1, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Interim Contractor Support (ICS) - Maintenance/Software Support

TBD 2027 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Contractor Support (ICS) - Maintenance/Software Support 9.1.9, 9.1.9.1, 9.1.9.4, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

FA8102-23-R-2000

MP TACAN Interim Supply Support (ISS) - Replaceable Parts

TBD 2027 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Supply Support (ISS) - Replaceable Parts SOW Paragraph 9.1.9, 9.1.9.2, 9.1.9.3, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

MP TACAN Engineering Change Proposal (ECP) per Event

TBD 2027 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Engineering Change Proposal (ECP) per Event IAW H02 SOW Paragraph 4, 5, 6.3, 7.1, 7.2, 8, 9, 12, 15, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

MP TACAN Per Event

TBD 2027 - TBD 2028

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Per Event IAW H03 SOW Paragraph 4, 5, 16, 17, 21, 22, 24, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

OPTION 1 MP TACAN Antenna Kit

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price From Quantity

U/I To Quantity Unit Price

EA

Quantity Range 1-4

1 EA 4 EA

Quantity Range 5-8

5 EA 8 EA

Quantity Range 9-16

9 EA 16 EA

Quantity Range 17-32

17 EA 32 EA

Quantity Range 33+

33 EA

NSN: 5825

Antenna Kit (Antenna, Case, Cables, and Auxillary Equipment) SOW Paragraph 4, 5, 6.1, 6.2, 6.3, 6.4.1, 6.4.2, 6.4.3, 6.4.5, 7, 8, 9.1, 11, 12, 15, 16, 17, 18, 19, 20, 21, 22, 23, 29, 30, 31, 32, 33

Limitations of Liability: High Value Item

FA8102-23-R-2000

OPTION 1 MP TACAN Antenna Kit

TBD 2028 - TBD 2030

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

OPTION 1 Beacon Transponder Kit

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price From Quantity

U/I To Quantity Unit Price

EA

Quantity Range 1-4

1 EA 4 EA

Quantity Range 5-8

5 EA 8 EA

Quantity Range 9-16

9 EA 16 EA

Quantity Range 17-32

17 EA 32 EA

Quantity Range 33+

33 EA

NSN: 5825

Beacon Transponder, Case, Cables and Auxillary Equipment SOW Paragraph 4, 5, 6.1, 6.2, 6.3, 6.4.1, 6.4.2, 6.4.3, 6.4.5, 7, 8, 9.1, 11, 12, 15, 16, 17, 18, 19, 20, 21, 22, 23, 29, 30, 31, 32, 33

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

FA8102-23-R-2000

OPTION 1 Beacon Transponder Kit

TBD 2028 - TBD 2030

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

OPTION 1 MP TACAN - Remote Control Status Unit (RCSU) Kit

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price From Quantity

U/I To Quantity Unit Price

EA

Quantity Range 1-4

1 EA 4 EA

Quantity Range 5-8

5 EA 8 EA

Quantity Range 9-16

9 EA 16 EA

Quantity Range 17-32

17 EA 32 EA

Quantity Range 33+

33 EA

NSN: 5825

RSCU Case, Cables, and Auxillary Equipment SOW Paragraph 4, 5, 6.1, 6.2, 6.3, 6.4.1, 6.4.2, 6.4.3, 6.4.5, 7, 8, 9.1, 11, 12, 15, 16, 17, 18, 19, 20, 21, 22, 23, 29, 30, 31, 32, 33

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

OPTION 1 MP TACAN Assembly System (excludes Antenna, Transponder and RCSU)

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price From Quantity

U/I To Quantity Unit Price

EA

Quantity Range 1-4

1 EA 4 EA

Quantity Range 5-8

5 EA 8 EA

Quantity Range 9-16

9 EA 16 EA

Quantity Range 17-32

17 EA 32 EA

Quantity Range 33+

33 EA

NSN: 5825

Assembly System Kit(excludes Antenna, Transponder, and RSCU Kits) SOW Paragraph 4, 5, 6.1, 6.2, 6.3, 6.4.1, 6.4.2, 6.4.3, 6.4.5, 7, 8, 9.1, 11, 12, 15, 16, 17, 18, 19, 20, 21, 22, 23, 29, 30, 31, 32, 33

Limitations of Liability: High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

OPTION 1 MP TACAN Support Equipment and Tool Kits

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

Support Equipment and Tools

FA8102-23-R-2000

OPTION 1 MP TACAN Support Equipment and Tool Kits

TBD 2028 - TBD 2030

SOW Paragraph 4, 5, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 11, 12, 14, 16, 17, 21, 22, 27, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

OPTION 1 MP TACAN Spares

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

MP TACAN Spares SOW Paragraph 4, 5, 6.3, 6.4.4, 6.4.5, 7.1, 7.2, 9.1.1.1, 9.1.5, 9.1.6, 9.1.7, 9.1.8, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

Special Marking Instructions Below Serial Number Required

OPTION 1 MP TACAN Training (Per Event)

TBD 2028 - TBD 2030

Item No.

FA8102-23-R-2000

OPTION 1 MP TACAN Training (Per Event)

TBD 2028 - TBD 2030

Quantity U/I Unit Price Amount

EA

NSN: 5825

Training (per event) SOW Paragraph 4, 5, 6.4, 13, 22, 27, 29, 28, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Quality Assurance: Certificate of Conformance Buy American Act/Balance of Payments Program

OPTION 1 MP TACAN Training Vendor Location

TBD 2028 - TBD 2030

Item No.

5007AA

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Training Vendor Location SOW Paragraph 4, 5, 6.4, 13, 22, 27, 29, 28, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Quality Assurance: Certificate of Conformance Buy American Act/Balance of Payments Program

OPTION 1 MP TACAN Training CONUS Location

TBD 2028 - TBD 2030

Item No.

5007AB

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Training CONUS Location SOW Paragraph 4, 5, 6.4, 13, 22, 27, 29, 28, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Quality Assurance: Certificate of Conformance Buy American Act/Balance of Payments Program

OPTION 1 MP TACAN Training OCONUS Location

TBD 2028 - TBD 2030

Item No.

5007AC

Firm Fixed Price

EA

FA8102-23-R-2000

OPTION 1 MP TACAN Training OCONUS Location

TBD 2028 - TBD 2030

NSN: 5825

Training OCONUS Location SOW Paragraph 4, 5, 6.4, 13, 22, 27, 29, 28, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Quality Assurance: Certificate of Conformance Buy American Act/Balance of Payments Program

OPTION 1 MP TACAN Travel

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Travel IAW H04 SOW Paragraph 4, 5, 9.1.6.2, 9.1.9, 25, 26, 27, 28, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Quality Assurance: Certificate of Conformance Buy American Act/Balance of Payments Program

OPTION 1 MP TACAN Interim Contractor Support (ICS) -Maintenance/Software Support

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Contractor Support (ICS) - Maintenance/Software Support

SOW 9.1.9, 9.1.9.1, 9.1.9.4, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

OPTION 1 MP TACAN Interim Supply Support (ISS) - Replaceable Parts

TBD 2028 - TBD 2030

Item No.

FA8102-23-R-2000

OPTION 1 MP TACAN Interim Supply Support (ISS) - Replaceable Parts

TBD 2028 - TBD 2030

Quantity U/I Unit Price Amount

MO

NSN: 5825

Interim Supply Support (ISS) - Replaceable Parts SOW Paragraph 9.1.9, 9.1.9.2, 9.1.9.3, 9.1.9.5, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

OPTION 1 MP TACAN Engineering Change Proposal (ECP) Per Event

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Engineering Change Proposal (ECP) per Event IAW H02 SOW Paragraph 4, 5, 6.3, 7.1, 7.2, 8, 9, 12, 15, 16, 17, 19, 21, 22, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

FA8102-23-R-2000

OPTION 1 MP TACAN Per Event

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Per Event IAW H03 SOW Paragraph 4, 5, 16, 17, 21, 22, 24, 27, 28, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Serial Number Required

OPTION 1 MP TACAN Depot Stand Up Support (Organic)

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Depot Stand Up Support (Organic) SOW Paragraph 4, 5, 6.3, 7.1, 7.2, 8, 9.1.1, 9.1.1.1, 9.1.2, 9.1.3, 27, 29, 30, 31, 32, 33

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

OPTION 1 MP TACAN Technical Data Package - Exhibit E

TBD 2028 - TBD 2030

Item No.

FA8102-23-R-2000

OPTION 1 MP TACAN Technical Data Package - Exhibit E

TBD 2028 - TBD 2030

Quantity U/I Unit Price Amount

EA

NSN: 5825

Technical Data Package CDRL B026- Exhibit E SOW Paragraph 11, 27, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

OPTION 1 MP TACAN Technical Orders- CDRL B028- Exhibit F

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Technical Orders- CDRL B028- Exhibit F SOW Paragraph 27, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

OPTION 1 MP TACAN Technical Orders- CDRL B047- Exhibit G

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

Technical Orders- CDRL B047- Exhibit G

FA8102-23-R-2000

OPTION 1 MP TACAN Technical Orders- CDRL B047- Exhibit G

TBD 2028 - TBD 2030

SOW Paragraph 27, 29, 30, 31, 32, 33

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

OPTION 1 MP TACAN CDRL 1423 Deliverables (Other DATA)- Exhibit H

TBD 2028 - TBD 2030

Item No.

Not Separately Priced Quantity U/I Unit Price

1 EA NSP

NSN: 5825

CDRL 1423 Deliverables (Other DATA)- Exhibit H SOW Paragraph 23.1

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Warranty Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

OPTION 1 MP TACAN Increased Data Rights- IAW CLIN 5014

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Increased Data Rights- Appendix 2 CDRL Assertion Matrix IAW 5014

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

FA8102-23-R-2000

OPTION 1 MP TACAN Increased Data Rights- IAW CLIN 5014

TBD 2028 - TBD 2030

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

OPTION 1 MP TACAN Increased Data Rights- IAW CLIN 5015

TBD 2028 - 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Increased Data Rights- Appendix 2 CDRL Assertion Matrix IAW 5015

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

OPTION 1 MP TACAN Increased Data Rights- IAW CLIN 5016

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Increased Data Rights- Appendix 2 CDRL Assertion Matrix IAW 5016

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

FA8102-23-R-2000

OPTION 1 MP TACAN Increased Data Rights- IAW CLIN 5017

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

NSN: 5825

Increased Data Rights- Appendix 2 CDRL Assertion Matrix IAW 5017

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001:2015

MP TACAN OPTION 1 Delivery Incentive/Disincentive Terms

TBD 2028 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

IAW H05. Delivery Incentive/Disincentive Terms Maximum quantity 3

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program

MP TACAN OPTION 1 Support Equipment and Tools

TBD 2029 - TBD 2030

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

EA

NSN: 5825

Support Equipment and Tools SOW Paragraph 4, 5, 6.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .