This is a Draft Exploration Plan Checklist Reference Document prepared by Jackson County, Oregon for the 2025 Emergency Response (ER) Landslides project along Highway 227. The project encompasses three geotechnical drilling and sampling locations at milepost markers 43.1, 44.1, and 44.7, with each location requiring three drill holes to depths of approximately 60 feet each, totaling 180 feet per location and 20 feet of coring per hole. The work involves HQ3 coring, hollow stem auger (HSA) drilling using tracked or truck-mounted equipment, and Standard Penetration Testing (SPT) at 2.5-foot intervals. Anticipated subsurface conditions consist of asphalt and dirt layers. Each drill hole location will require installation of slope inclinometers and vibrating wire transducers (VWT) for instrumentation purposes. The anticipated drilling duration is 4 to 5 days per location, with a total estimated completion timeframe determined by mobilization efficiency. The anticipated start date is to be determined (TBD), and erosion control requirements, utility locate tickets, environmental clearance status, site access arrangements, right-of-way documentation, staging areas, and traffic control plans are noted as pending or under review by Jessica Bochart.

The exploration plan document includes GPS coordinates for each drill site, scaled maps at varying magnifications (1:4,800, 1:960, and 1:200 scales), and access road designations. The project is identified under Environmental Assessment Number ERADMF25000 and filed under County Jackson\OR227 Tiller-Trail directory. Special sampling methods such as Shelby Tubes are not anticipated for this work. Environmental clearance requests have been submitted to the responsible environmental clearance (REC) authority, with final clearance status and any environmental restrictions remaining to be confirmed. Additional details regarding utility location coordination, erosion control specifications, right-of-way agreements, and comprehensive traffic control protocols are to be finalized prior to drilling operations commencement.

View the file

Other files

File Type Posted
SupplierBidResponse~3.pdf PDF
ATT C Bid Pricing Form~21.xlsx XLSX spreadsheet
Preliminary Results~96.xlsx XLSX spreadsheet
Sample Contract~56.docx DOCX document
00016581 Request for Competitive Quotes.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GPS

42.753564, -122.870386

1000 ft

N

N © 2026 Google

© 2026 Google

© 2026 Google

Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

DH-01 DH-02

DH-03

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Text Box HWY 227 MP43.1 Tiller Trail Highway Exploration Plan 2/9/2026

Hwy 227 MP 43.1

February 9, 2026

² 0 0.08 0.160.04 mi

0 0.1 0.20.05 km

1:4,800

IMPORTANT NOTICE:

This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.

DH-01 DH-02

DH-03

Access Road

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Underline

HWYE33L

Polygonal Line

HWYE33L

Line

Project Location: HWY 227 MP 43.1

County: Jackson

Key No.: N/A

EA No.: ERADMF25000

Project File Location: County Jackson\OR227 Tiller-Trail 2025 ER Landslides

Project Description: Emergency Response Landslide

Number of Drillholes and Depths: 3

Estimated Footage: 60 ft ea., total 180 feet, 20 feet of coring

Anticipated Subsurface Conditions: Asphalt and Dirt

Anticipated Drill Methods: HQ3 coring, HSA, tracked or Truck, SPT 2.5’ intervals

Special Sampling (Shelby Tubes, etc.): Not expected

Instrumentation/Installation: 3 slope inclinometers and 1 VWT per Drill Hole

Anticipated Start Date: TBD

Anticipated # of Days to Drill: 4-5 days

Erosion Control Required: TBD

Utility Locate Ticket Numbers, submitted by?:

Environmental Clearance Requests Submitted to REC?:

Jessica Bochart

Environmental Clearance Obtained?:

Environmental Restrictions?:

Site Access, R/W, Staging Area:

Traffic Control Plan:

GPS Location

42.747164 , -122.865716

1000 ft

N

N © 2026 Google

© 2026 Google

© 2026 Google

Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

DH-02DH-01

DH-03

HWYE33L

Text Box HWY 227 MP44.1 Tiller Trail Highway Exploration Plan 2/9/2026

HWYE33L

Oval

HWYE33L

Oval

Oval

HWY 227 MP 44.1 Tiller Trail Highway Exploration Plan

February 6, 2026

² 0 0.015 0.030.0075 mi

0 0.025 0.050.0125 km

1:960

IMPORTANT NOTICE:

This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.

DH-02DH-01

DH-03

Access Road

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Polygonal Line

Project Location: HWY 227 MP 44.1

Key No.: N/A

EA No.: ERADMF25000

Project File Location: County Jackson\OR227 Tiller-Trail 2025 ER Landslides

Project Description: Emergency Response Landslide

Number of Drillholes and Depths: 3

Estimated Footage: 60 ft each, total 180 feet, 20 feet each of coring

Anticipated Subsurface Conditions: Asphalt and Dirt

Anticipated Drill Methods: HQ3 coring, HSA, tracked or Truck, SPT 2.5’ intervals

Special Sampling (Shelby Tubes, etc.): Not expected

Instrumentation/Installation: 2 slope inclinometers and 1 VWT in each SI

Anticipated Start Date: TBD

Anticipated # of Days to Drill: 4-5 days

Erosion Control Required: TBD

Utility Locate Ticket Numbers, submitted by?:

Environmental Clearance Requests Submitted to REC?:

Jessica Bochart

Environmental Clearance Obtained?:

Environmental Restrictions?:

GPS

42.739403, -122.863553

1000 ft

N

N Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

DH-01

DH-02

DH-03

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Text Box HWY 227 MP 44.7 Tiller Trail Highway Exploration Plan 2/9/2026

HWY 227 MP 44.7

February 9, 2026

² 0 0.02 0.040.01 mi

0 0.03 0.060.015 km

1:1,200

IMPORTANT NOTICE:

This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.

DH-01 DH-02

DH-03

Access Roads

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Polygonal Line

HWYE33L

Line

HWYE33L

Line

Project Location: HWY 227 MP 44.7

Key No.: N/A

EA No.: ERADMF25000

Project File Location: County Jackson\OR227 Tiller-Trail 2025 ER Landslides

Project Description: Emergency Response Landslide

Number of Drillholes and Depths: 3

Estimated Footage: 60 ft each, total 180 feet, 20 feet each of coring

Anticipated Subsurface Conditions: Asphalt and Dirt

Anticipated Drill Methods: HQ3 coring, HSA, tracked or Truck, SPT 2.5’ intervals

Special Sampling (Shelby Tubes, etc.): Not expected

Instrumentation/Installation: 3 slope inclinometers and 1 VWT per Drill Hole

Anticipated Start Date: TBD

Anticipated # of Days to Drill: 4-5 days

Erosion Control Required: TBD

Utility Locate Ticket Numbers, submitted by?:

Environmental Clearance Requests Submitted to REC?:

Jessica Bochart

Environmental Clearance Obtained?:

Environmental Restrictions?: