Draft Exploration Plan - Checklist Reference Document~1.pdf

PDF 2 MB Posted

Attached to
ER Geotechnical Drilling and Sampling Rebid
Solicitation number
S-73000-00016581
Issued by
Jackson County, Oregon

About this file

This is a Draft Exploration Plan Checklist Reference Document for the State of Oregon's Emergency Response Geotechnical Drilling and Sampling project located in Jackson County on Highway 227. The project addresses three landslide locations at mile posts 43.1, 44.1, and 44.7, with work expected to be completed under a single mobilization. Each location requires three drill holes with estimated depths of 60 feet each, totaling 180 feet per site with approximately 20 feet of coring per hole. The anticipated drilling methods include HQ3 coring, hollow stem augers, and standard penetration testing at 2.5-foot intervals. Each drill hole will be instrumented with slope inclinometers and vibrating wire transducers for monitoring. Drilling is anticipated to take 4–5 days per location, with subsurface conditions expected to consist of asphalt and dirt. The project is designated with Environmental Assessment Number ERADMF25000 and is filed under Jackson County OR227 Tiller-Trail 2025 Emergency Response Landslides.

Environmental clearance requests have been submitted to the responsible environmental contact, Jessica Bochart. Utility locate tickets, erosion control measures, site access and right-of-way arrangements, and traffic control plans are noted as requirements with details to be determined. The document includes detailed geographic coordinates and scaled maps for each drill hole location, along with satellite imagery from 2026 sources. Special sampling such as Shelby tubes is not anticipated. The anticipated start date for drilling operations remains to be determined, pending completion of environmental clearance and pre-mobilization planning activities.

View the file

Other files

File Type Posted
00016581 Request for Competitive Quotes.docx DOCX document
ATT C Bid Pricing Form~21.xlsx XLSX spreadsheet
Sample Contract~56.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GPS

42.753564, -122.870386

1000 ft

N

N © 2026 Google

© 2026 Google

© 2026 Google

Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

DH-01 DH-02

DH-03

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Text Box HWY 227 MP43.1 Tiller Trail Highway Exploration Plan 2/9/2026

Hwy 227 MP 43.1

February 9, 2026

² 0 0.08 0.160.04 mi

0 0.1 0.20.05 km

1:4,800

IMPORTANT NOTICE:

This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.

DH-01 DH-02

DH-03

Access Road

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Underline

HWYE33L

Polygonal Line

HWYE33L

Line

Project Location: HWY 227 MP 43.1

County: Jackson

Key No.: N/A

EA No.: ERADMF25000

Project File Location: County Jackson\OR227 Tiller-Trail 2025 ER Landslides

Project Description: Emergency Response Landslide

Number of Drillholes and Depths: 3

Estimated Footage: 60 ft ea., total 180 feet, 20 feet of coring

Anticipated Subsurface Conditions: Asphalt and Dirt

Anticipated Drill Methods: HQ3 coring, HSA, tracked or Truck, SPT 2.5’ intervals

Special Sampling (Shelby Tubes, etc.): Not expected

Instrumentation/Installation: 3 slope inclinometers and 1 VWT per Drill Hole

Anticipated Start Date: TBD

Anticipated # of Days to Drill: 4-5 days

Erosion Control Required: TBD

Utility Locate Ticket Numbers, submitted by?:

Environmental Clearance Requests Submitted to REC?:

Jessica Bochart

Environmental Clearance Obtained?:

Environmental Restrictions?:

Site Access, R/W, Staging Area:

Traffic Control Plan:

GPS Location

42.747164 , -122.865716

1000 ft

N

N © 2026 Google

© 2026 Google

© 2026 Google

Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

DH-02DH-01

DH-03

HWYE33L

Text Box HWY 227 MP44.1 Tiller Trail Highway Exploration Plan 2/9/2026

HWYE33L

Oval

HWYE33L

Oval

Oval

HWY 227 MP 44.1 Tiller Trail Highway Exploration Plan

February 6, 2026

² 0 0.015 0.030.0075 mi

0 0.025 0.050.0125 km

1:960

IMPORTANT NOTICE:

This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.

DH-02DH-01

DH-03

Access Road

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Polygonal Line

Project Location: HWY 227 MP 44.1

Key No.: N/A

EA No.: ERADMF25000

Project File Location: County Jackson\OR227 Tiller-Trail 2025 ER Landslides

Project Description: Emergency Response Landslide

Number of Drillholes and Depths: 3

Estimated Footage: 60 ft each, total 180 feet, 20 feet each of coring

Anticipated Subsurface Conditions: Asphalt and Dirt

Anticipated Drill Methods: HQ3 coring, HSA, tracked or Truck, SPT 2.5’ intervals

Special Sampling (Shelby Tubes, etc.): Not expected

Instrumentation/Installation: 2 slope inclinometers and 1 VWT in each SI

Anticipated Start Date: TBD

Anticipated # of Days to Drill: 4-5 days

Erosion Control Required: TBD

Utility Locate Ticket Numbers, submitted by?:

Environmental Clearance Requests Submitted to REC?:

Jessica Bochart

Environmental Clearance Obtained?:

Environmental Restrictions?:

GPS

42.739403, -122.863553

1000 ft

N

N Image © 2026 Airbus

Image © 2026 Airbus

Image © 2026 Airbus

DH-01

DH-02

DH-03

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Text Box HWY 227 MP 44.7 Tiller Trail Highway Exploration Plan 2/9/2026

HWY 227 MP 44.7

February 9, 2026

² 0 0.02 0.040.01 mi

0 0.03 0.060.015 km

1:1,200

IMPORTANT NOTICE:

This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information.

DH-01 DH-02

DH-03

Access Roads

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Oval

HWYE33L

Polygonal Line

HWYE33L

Line

HWYE33L

Line

Project Location: HWY 227 MP 44.7

Key No.: N/A

EA No.: ERADMF25000

Project File Location: County Jackson\OR227 Tiller-Trail 2025 ER Landslides

Project Description: Emergency Response Landslide

Number of Drillholes and Depths: 3

Estimated Footage: 60 ft each, total 180 feet, 20 feet each of coring

Anticipated Subsurface Conditions: Asphalt and Dirt

Anticipated Drill Methods: HQ3 coring, HSA, tracked or Truck, SPT 2.5’ intervals

Special Sampling (Shelby Tubes, etc.): Not expected

Instrumentation/Installation: 3 slope inclinometers and 1 VWT per Drill Hole

Anticipated Start Date: TBD

Anticipated # of Days to Drill: 4-5 days

Erosion Control Required: TBD

Utility Locate Ticket Numbers, submitted by?:

Environmental Clearance Requests Submitted to REC?:

Jessica Bochart

Environmental Clearance Obtained?:

Environmental Restrictions?:

File details come from the government source that posted it. Updated .