Draft-Drawings-13pgs.pdf
PDF 8 MB Posted
- Attached to
- Demolition Services for LaGuardia Airport Runway #22 Localizer Shelter, Flushing, New York
- Solicitation number
- FAA-AAQ560-00847
About this file
This document is a set of design and demolition plans for the Runway 22 Localizer Shelter at LaGuardia Airport in Flushing, New York, prepared by the Federal Aviation Administration (FAA) Eastern Service Area – New York Technical Support Center.
The project involves the complete demolition of a 20' x 36' shelter structure containing navigational equipment, with work conducted in three phases. Phase 1 (completion by March 19, 2027) requires the contractor to perform TCLP testing on the existing shelter, prepare asbestos abatement and demolition/recycling plans, and submit all required notifications. Phase 2 (March 20 to April 12, 2027) is conducted by the FAA with no contractor on-site work, during which the FAA removes equipment, recovers freon from HVAC units, installs a temporary shelter, and disconnects power. Phase 3A (April 12 to April 24, 2027) involves contractor demolition work including removal and disposal of interior items, asbestos-containing exterior skirt abatement, recycling of lead-based paint-coated steel, and demolition of the shelter structure, concrete floor, and steel beams. Testing results indicate the exterior skirt contains 26.7% chrysotile asbestos and the floor tile mastic contains less than 1% chrysotile. The shelter contains lead-based paint on wall panels, metal Z-flashing, and steel hoods. All demolition of the roof and walls must occur during Runway 4-22 closures (midnight to 0500 local). The contractor must prepare a comprehensive demolition and disposal/recycling plan addressing TCLP results, dust control, paint chip collection, material separation, worker protection, and facility information for hazardous waste and debris disposal. Work shall comply with the 2024 International Building Code, OSHA standards, and New York State Department of Labor Industrial Code Rule 56 for asbestos abatement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft-SOW-Specs-45pgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LA GUARDIA AIRPORT
FLUSHING, NEW YORK
DEMOLITION OF THE RUNWAY 22
LOCALIZER SHELTER
VICINITY MAP
SUBMITTED BY:
APPROVED BY:
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER
LOC
DEMOLITION OF THE R/W 22 LOCALIZER SHELTER
COVER
FLUSHING LA GUARDIA AIRPORT NY
DWG NO REV
URD LOC - DEMO
SHEET G001DATE
01/08/2026
LOCALIZER SITE
LOCATION MAP
ACCESS GATE
JOSEPH C HENN Digitally signed by JOSEPH C HENN Date: 2026.03.10 14:38:04 -04'00'
DRAFT
SUBMITTED BY:
APPROVED BY:
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER
LOC
DEMOLITION OF THE RUNWAY 22 LOCALIZER SHELTER
INDEX/WORK PLAN
FLUSHING LA GUARDIA AIRPORT NY
DWG NO REV
URD LOC - DEMO
SHEET G002DATE
01/08/2026
DRAWING LIST
ABBREVIATIONS
PROJECT SCHEDULE
GENERAL
G001 TITLE
G002 INDEX/WORK PLAN
G003 PHOTOS
CIVIL
C001 VICINITY SKETCH
C002 SITE PLAN WITH TEMPORARY SHELTER
C003 DEMOLITION PLAN
REFERENCE
D-5242-2 20' X 36' BUILDING FOUNDATION PLAN
D-5242-3 20' X 36' BUILDING CONCRETE FLOOR FILL
D-5242-4 20' X 36' BUILDING ROOF PLAN AND BUILDING SKETCH
D-5242-11 20' X 36' BUILDING STEEL FLOOR FRAMING
D-5150-2 WALL PANEL 4SD
D-5150-4 WALL PANEL 8LSD
D-5158-2 ERECTION DETAIL (SD PANELS)
FAA FEDERAL AVIATION ADMINISTRATION
EES EARTH ELECTRODE SYSTEM
FOTS FIBER OPTIC SYSTEM
JB JUNCTION BOX
LOC LOCALIZER
OB OBSTRUCTION LIGHT
RE RESIDENT ENGINEER
RF RADIO FREQUENCY
RGSC RIGID GALVANIZED STEEL CONDUIT
SS STAINLESS STEEL
PHASE 1: SHELTER TESTING AND ASBESTOS/LEAD ABATEMENT PLANNING AND DESIGN: COMPLETE BY MARCH 19, 2027
CONTRACTOR TO PERFORM TCLP TEST ON EXISTING SHELTER
CONTRACTOR TO PREPARE AND SUBMIT SHELTER DEMOLITION AND RECYCLING/DISPOSAL PLAN
CONTRACTOR TO PREPARE AND SUBMIT ASBESTOS ABATEMENT WORK PLAN AND DESIGN
CONTRACTOR TO SUBMIT ALL NOTIFICATIONS
PHASE 2: FAA TEMPORARY SHELTER SET (NO CONTRACTOR ON-SITE WORK): MARCH 20 TO APRIL 12
FAA TO REMOVE ALL EQUIPMENT FROM EXISTING SHELTER
FAA TO RECOVER ALL FREON FROM EXISTING SPLIT HVAC UNITS
FAA TO INSTALL/SET UP TEMPORARY FOTS NODE 2/LOCALIZER SHELTER
FAA TO DISCONNECT AND REMOVE POWER FROM THE EXISTING SHELTER
PHASE 3A: ABATEMENT/DEMOLITION: APRIL 12 TO APRIL 24, 2027 – CONTRACTOR WORKFORCE
REMOVE AND DISPOSE OF ALL ITEMS REMAINING INSIDE THE LOCALIZER SHELTER
REMOVE AND DISPOSE OF ASBESTOS EXTERIOR SKIRT
REMOVE AND RECYCLE STEEL COATED WITH LEAD-BASED PAINT
DEMOLISH AND PROPERLY DISPOSE OF SHELTER, CONCRETE FLOOR AND STEEL BEAMS
NATIONAL STANDARDS:
2024 INTERNATIONAL BUILDING CODE (IBC)
OSHA
CONTROLLED INSPECTIONS:
NONE
DEMOLITION OF SHELTER ROOF AND WALLS SHALL OCCUR WHEN RUNWAY 4-22 IS CLOSED (MIDNIGHT TO 0500 LOCAL)
ASBESTOS ABATEMENT
THIS WORK SHALL COMPLY WITH THE U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) 29 CFR 1926.1101, ASBESTOS STANDARD FOR THE CONSTRUCTION INDUSTRY AND NEW YORK STATE DEPARTMENT OF LABOR INDUSTRIAL CODE RULE 56 (12 NYCRR PART 56). ASBESTOS ABATEMENT TO INCLUDE ALL APPLICABLE NOTIFICATIONS TO FEDERAL, STATE, AND LOCAL GOVERNMENTAL AUTHORITIES.
PHASE I:
1. PHASE IA, SUBMIT ABATEMENT DESIGN AND WORKPLAN IN ACCORDANCE WITH NEW YORK STATE (NYS) CODE RULE 56, ASBESTOS AND SPECIFICATIONS TO
FAA
2. PHASE IB, PERFORM BACKGROUND AIR SAMPLING IN ACCORDANCE WITH NYS CODE RULE 56, ASBESTOS AND SUBMIT ALL REQUIRED NOTIFICATIONS.
PHASE II SHALL NOT START UNTIL PHASE I IS COMPLETED AND APPROVAL IS GIVEN BY THE FAA.
NOTE: AIR SAMPLING PROCEDURES SHALL NOT BE PERFORMED BY ANY ASBESTOS CONTRACTOR INVOLVED WITH THE ASBESTOS PROJECT, EXCEPT AS FOLLOWS: THE NON-ABATEMENT ASBESTOS CONTRACTOR FIRM THAT PERFORMED THE BUILDING/STRUCTURE ASBESTOS SURVEY, OR IS ACTING AS THE PROJECT MONITOR OR PROJECT DESIGNER ON THE ASBESTOS PROJECT, MAY PERFORM PROJECT AIR SAMPLING AND ANALYSIS, PROVIDED THAT THE INDIVIDUAL OR FIRM PERFORMING THE BUILDING/STRUCTURE ASBESTOS SURVEY OR ACTING AS PROJECT MONITOR OR PROJECT DESIGNER, WILL NOT PERFORM ANY ASBESTOS ABATEMENT WORK ON THE PROJECT AND HAS NOT RETAINED OR BEEN RETAINED BY THE ASBESTOS
ABATEMENT CONTRACTOR FOR WORK ON THE ASBESTOS PROJECT.
PHASE II:
1. PHASE IIA, PERFORM WORK AREA PREPARATION FOR THE REMOVAL OF THE ASBESTOS CONTAINING MATERIAL IN ACCORDANCE WITH NYS CODE RULE 56.
2. PHASE IIB, PERFORM ASBESTOS ABATEMENT FOR THE REMOVAL OF THE ASBESTOS CONTAINING MATERIAL IN ACCORDANCE WITH NYS CODE RULE 56.
3. PHASE IIC, PERFORM FINAL CLEANING AND CLEARANCE PROCEDURES IN ACCORDANCE WITH NYS CODE RULE 56. NOTE: RESULTS SHALL BE IMMEDIATELY
FORWARDED TO THE FAA
4. PHASE IID, PERFORM FINAL WASTE REMOVAL AND DISPOSAL FROM THE SITE IN ACCORDANCE WITH NYS CODE RULE 56, US EPA AND NYS DEPARTMENT OF ENVIRONMENTAL CONSERVATION REGULATIONS. CONTRACTOR SHALL PROVIDE ORIGINAL COPY OF DISPOSAL MANIFEST TO THE FAA WITHIN THIRTY (30) DAYS OF THE ASBESTOS CONTAINING MATERIAL REMOVAL. MANIFEST SHALL HAVE SIGNATURE AND PRINTED NAME OF THE INDIVIDUAL RECEIVING THE MATERIAL AT
THE DISPOSAL FACILITY.
TESTING RESULTS
LEAD PAINT
THE SHELTER WAS TESTED FOR LEAD PAINT BY FAA, REFER TO LEAD PAINT
SAMPLING REPORT AND EMSL TESTING RESULTS FOR LOCATIONS OF LEAD
CONTAINING AND LEAD BASED PAINTS.
ASBESTOS
THE SHELTER WAS TESTED FOR ASBESTOS AND THE
FOLLOWING IS THE RESULTS:
EXTERIOR SKIRT – 26.7% CHRYSOTILE
FLOOR TILE MASTIC - < 1% CHRYSOTILE
REFER TO ASBESTOS SAMPLING REPORT, DATED APRIL 01, 2024
AND EMSL TESTING RESULTS DATED 03/24/2016.
DEMOLITON
DEMOLITION OF THE SHELTER MUST NOT BEGIN UNTIL AFTER ALL ASBESTOS CONTAINING MATERIAL HAS BEEN REMOVED AND CLEARANCE
HAS BEEN GIVEN IN ACCORDANCE WITH NYS CODE RULE 56.
ALL ABANDONED CONDUITS SHALL BE REMOVED TO A DEPTH OF 1 FOOT BELOW GRADE.
CUTTING WITH AN OPEN FLAME IS NOT PERMITTED ON-SITE.
ALL CONSTRUCTION DEBRIS SHALL BE IMMEDIATELY PLACED INTO THE APPROPRIATE COVERED CONTAINER. ALL CONTAINERS SHALL BE REMOVED FROM THE SITE IMMEDIATELY AFTER COMPLETION OF THE SHELTER DEMOLITION. ALL DEBRIS SHALL BE DISPOSED OF/RECYCLED
IN ACCORDANCE WITH THE APPROVED DEMOLITION AND DISPOSAL/RECYCLING PLAN
SHELTER DEMOLITION AND DISPOSAL/RECYCLING PLAN
THE CONTRACTOR SHALL PREPARE A DEMOLITION AND DISPOSAL/RECYCLING PLAN. THE PLAN SHALL BE SUBMITTED TO THE FAA FOR APPROVAL PRIOR TO THE START OF WORK. AT A MINIMUM, THE PLAN MUST CONTAIN THE FOLLOWING:
1. TCLP TESTING RESULTS
2. DEMOLITION SEQUENCE OF WORK
3. DUST CONTROL MEASURES
4. PAINT CHIP COLLECTIONAND DISPOSAL METHOD (D008 HAZARDOUS WASTE)
5. PROCESS FOR SEPARATING MATERIALS TO BE RECYCLED (PAINTED STEEL, NON-PAINTED STEEL), GENERAL CONSTRUCTION DEBRIS
(C&D WASTE), GENERAL WASTE AND HAZARDOUS WASTE.
6. PAINTED STEEL RECYCLING NOTIFICATION (NYSDEC FORM 7).
7. CONTRACTOR EPA LEAD CERTIFICATION/LICENSE, WORKER EPA/OSHA LEAD TRAINING CERTIFICATIONS, REQUIRED WORKER
PROTECTION (PPE), LEAD BASED PAINT COLLECTION PROCEDURES AND HAZARDOUS DISPOSAL PROCEDURES.
8. WORKER PROTECTION FOR DEMOLITION OF CONCRETE FLOOR COATED WITH MASTIC CONTAINING LESS THAN 1% ASBESTOS PER
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) 29 CFR 1926.1101, ASBESTOS STANDARD FOR THE CONSTRUCTION
INDUSTRY
9. METHOD FOR DEMOLITION OF CONCRETE FLOOR COATED WITH MASTIC CONTAINING LESS THAN 1% ASBESTOS
10. NAME, PHONE NUMBER ADDRESS AND LICENSE/PERMIT FOR THE FACILITY ACCEPTING HAZARDOUS MATERIAL (LEAD PAINT CHIPS) 11.NAME, PHONE NUMBER, ADDRESS AND LICENSE/PERMIT FOR THE RECYCLING FACILITY ACCEPTING LEAD PAINTED SCRAP STEEL
12. NAME, PHONE NUMBER, ADDRESS AND PERMITS FOR FACILITY ACCEPTING GENERAL CONSTRUCTION DEBRIS (C&D WASTE)
13. NAME, PHONE NUMBER, ADDRESS AND LICENSE/PERMIT FOR ALL TRANSPORTERS
CONTRACTOR SHALL PROVIDE A COPY OF ALL DISPOSAL MANIFESTS TO THE FAA RESIDENT ENGINEER IMMEDIATELY AFTER DISPOSAL.
JOSEPH C HENN
Digitally signed by JOSEPH C
HENN
Date: 2026.03.10 14:38:35 -04'00'
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER
LOC
DEMOLITION OF THE RUNWAY 22 LOCALIZER SHELTER
SITE PHOTOS
FLUSHING LA GUARDIA AIRPORT NY
DWG NO REV
URD LOC - DEMO
SHEET G003DATE
01/08/2026
EXTERIOR PAINTED (LEAD) WALL PANEL BENEATH EXISTING HARDIE BOARD
EXISTING SHETLER FOUNDATIN PIER AND STEEL BEAM
REAR VIEW OF SHELTER
STEEL ROOF DECK
FRONT VIEW OF SHELTER
SIDE AND FRONT VIEW OF SHELTER FOUNDATION SKIRT (ACM) AND METAL Z-FLASHING (LEAD PAINT)
INTERIOR WALL
(EQUIPMENT TO BE REMOVED BY FAA)
INTERIOR WALL
FLOOR TILE AND MASTIC
FURRING STRIPS AND INSULATION OVER WALL PANEL AND BENEATH HARDIE BOARD
METAL Z FLASHING
( LEAD BASED PAINT)
EXTERIOR WALL PANEL
(LEAD BASED PAINT)
FOAM INSULATION BOARD
WOOD FURRING STRIP
HARDIE SIDING
JOSEPH C HENN
Digitally signed by JOSEPH C
Date: 2026.03.10 14:39:03 -04'00'
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER
LOC
DEMOLITION OF THE RUNWAY 22 LOCALIZER SHELTER
VICINITY SKETCH
FLUSHING LA GUARDIA AIRPORT NY
DWG NO REV
URD LOC - DEMO
SHEET C001DATE
01/08/2026
GUARD POST
(AOA ENTRY)
0ft. 0in. 48ft. 0in. 80ft. 0in. 160ft. 0in.
SCALE
RUNWAY SAFETY AREA
(DO NOT ENTER)
STAGING AND PARKING AREA10'-0"
ACCESS/EGRESS ROUTE
NOTES:
1. CONTRACTOR TO BE ESCORTED TO/FROM THE SITE BY THE FAA. CONTRACTOR TO MEET THE FAA ESCORTS AT PANYNJ BUILDING 7A PARKING LOT LOCATED ON FIORELLO LANE (300' EAST OF GUARD POST)
2. CONTRACTOR TO REMAIN CLEAR OF THE RUNWAY SAFETY AREA (RSA) AT ALL TIMES, UNLESS RUNWAY IS CLOSED AND ESCORTED INTO THE RSA BY THE FAA CONTRACTING OFFICER REPRESENTATIVE (COR).
3. CONTRACTOR TO COORDINATE THE USE OF ANY EQUIPMENT THAT WILL EXTEND ABOVE THE EXISTING
LOCALIZER SHELTER ROOF WHEN THE RUNWAY IS OPEN A MINIMUM OF 48 HOURS IN ADVANCE.
4. CRANE OPERATIONS SHALL OCCUR WHEN RUNWAY 4-22 (0000 TO 0500 LOCAL). THE CONTRACTOR SHALL COORDINATE THE DATE(S)/TIME(S) WITH THE FAA COR A MINIMUM OF 7 DAYS IN ADVANCE.
5. THE DEMOLITION OF THE RUNWAY 4 LOCALIZER BUILDING ROOF AND WALLS SHALL OCCUR WHEN RUNWAY 4-22 IS CLOSED (0000 TO 0500 LOCAL). THE CONTRACTOR SHALL COORDINATE THE DELIVERY OF ON-SITE DUMPSTER(S) WITH THE FAA COR A MINIMUM OF 48 HOURS IN ADVANCE. ALL DUMPSTERS
SHALL BE COVERED WITH A SECURED TARP WHEN NOT ACTIVELY LOADING THE DUMPSTER.
6. CONTRACTOR SHALL BE AWARE OF THE LOCATION OF THE TEMPORARY ABOVEGROUND LOCALIZER AND FIBER OPTIC/CONTROL CONDUITS AND USE EXTREME CAUTION WHEN WORKING IN THE VICINITY OF THE TEMPORARY SHELTER, TEMPORARY CONDUITS, ENGINE GENERATOR SHELTER AND ELECTRICAL GEAR.
7. PARKED VEHICLES AND STAGED EQUIPMENT/MATERIAL SHALL REMAIN A MINIMUM OF 10' CLEAR OF
THE AOA PERIMETER FENCE.
8. ALL CONTRACTOR VEHICLES/EQUIPMENT/CRANES OPERATING WITHIN THE AOA SHALL HAVE AN ORANGE/WHITE CHECKERED FLAG MOUNTED TO THE HIGHEST POINT DURING DAYLIGHT HOURS AND AN
AMBER ROTATING/FLASHING BEACON MOUNTED TO HIGHEST POINT FROM DUSK TO DAWN.
EXISTING RUNWAY 22 LOCALIZER
SHELTER TO BE DEMOLISHED
EXISTING ENGINE GENERATOR
BUILDING AND FUEL TANK
(TO REMAIN)
EXISTING LOCALIZER MEDIUM
VOLTAGE SWITCHES
(TO REMAIN)
EXISTING LOCALIZER
TRANSFORMER
(TO REMAIN)
DECOMISSIONED LDA ANTENNA
(TO BE REMOVED BY OTHERS)
RUNWAY 22 (URD) LOCALIZER ANTENNA ARRAY
(TO REMAIN)
MARINE TERMINAL ROAD
R
UN
W A
Y D
R
IV
E
TEMPORARY LOCALIZER/FOTS BUILDING LOCATION
VICINITY SKETCH
DUMPSTER STAGING AREA
JOSEPH C HENN
Digitally signed by JOSEPH C
HENN
Date: 2026.03.10 14:39:30 -04'00'
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER
LOC
DEMOLITION OF THE RUNWAY 22 LOCALIZER SHELTER
SITE PLAN WITH TEMPORARY LOCALIZER SHELTER
FLUSHING LA GUARDIA AIRPORT NY
DWG NO REV
URD LOC - DEMO
SHEET C002DATE
01/08/2026
0ft. 0in. 9ft. 0in. 15ft. 0in. 30ft. 0in.
SCALE
NOTES:
1. MARK RUNWAY SAFETY AREA BOUNDARY LINE WITH CONES. CONTRACTOR SHALL REMAIN CLEAR OF THE
RUNWAY SAFETY AREA AT ALL TIMES.
2. CONTRACTOR SHALL WORK WITH CAUTION AROUND ALL SHELTERS, ELECTRICAL GEAR AND ABOVEGROUND
CONDUITS.
3. CONTRACTOR SHALL DEMOLISH THE 22 LOCALIZER SHELTER ROOF AND EXTERIOR WALLS WHEN RUNWAY 4-
22 IS CLOSED (MIDNIGHT SHIFT).
4. CONTRACTOR SHALL CUT ALL CONDUITS TO 1' BELOW GRADE, EXCEPT WHERE NOTED.
UNDERGROUND CONDUIT TO LOCALIZER ANTENNA
EXISTING FIBER OPTIC CABLE AND CONTROL CABLE HANDHOLE
EXISTING PRIMARY SERVICE 3-PHASE,
2400/4160v
TEMPORARY ABOVEGROUND CONDUIT AND CABLES
TO LOCALIZER ANTENNA
EXTERIOR PVC JUNCTION BOX WITH TERMINAL BLOCKS MOUNTED TO A 4" X 4" X 4'
WOODEN POST WITH LIQUID-TITE CONDUIT.
EG SHELTER
EXISTING POWER
HANDHOLE TO REMAIN
EXISTING SERVICE
120/240V IN RGSC
CUT ABANDONED CONDUITS AND CABLES TO
DECOMISSIONED LDA ANTENNA
2 - JUNCTION ABOVEGROUND
PAVED PARKING AREA
DEMOLISH
22 LOCALIZER
SHELTER
ABOVEGROUND 2" FLEXIBLE LIQUIDTITE METAL CONDUIT
(CONDUITS MARKED WITH CONES AND ELEVATED
CAUTION TAPE)
HANDHOLE
RF/CONTROL/COMM CABLES
LOW VOLTAGE POWER CABLES
MEDIUM VOLTAGE POWER CABLES
FOTS CABLES
AIRPORT PERIMETER FENCE
SHELTER SITE PLAN
LEGEND
EXISTING GROUND SYSTEM HANDHOLE
(TO REMAIN)
TEMPORARY ABOVEGROUND CONDUIT
AND CABLES
EXISTING LOCALIZER SHELTER POWER
CABLES TO BE REMOVED BY FAA
PRIOR TO START OF DEMOLITION
RUNWAY SAFETY AREA
(DO NOT ENTER)
TEMPORARY
22 LOC/FOTS
SHELTER
ABANDONED PVC CONDUITS TO LOCALIZER ANTENNA
(CABLES REMOVED BY FAA)
CUT ABANDONED CONDUITS TO RU-8 MAST
(CABLES REMOVED BY FAA)
ABOVEGROUND 2" FLEXIBLE LIQUIDTITE METAL CONDUIT
(CONDUITS MARKED WITH CONES AND ELEVATED
CAUTION TAPE)
'-0
STAGING/PARKING AREA
(15' X 50')
DUMPSTER AREA
(20' X 25')
CUT ABANDONED CONDUITS TO HANDHOLE
(CABLES REMOVED BY FAA)
UNDERGROUND CONDUIT TO
DECOMISSIONED
LDA ANTENNA
REMOVE POWER CONDUIT
BETWEEN HANDHOLE AND
SHELTER
JOSEPH C HENN Digitally signed by JOSEPH C HENN Date: 2026.03.10 14:39:57 -04'00'
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
EASTERN SERVICE AREA – NEW YORK TECHNICAL SUPPORT CENTER
LOC
REPLACEMENT OF THE RUNWAY 22 LOCALIZER SHELTER
DEMOLITION PLAN (PHASE 3A)
FLUSHING LA GUARDIA AIRPORT NY
DWG NO REV
URD-D-DEMO
SHEET C003DATE
01/08/2026
NOTES:
1. PRIOR TO DEMOLITION OF THE SHELTER, THE CONTRACTOR SHALL PERFORM TCLP TESTING, PREPARE AN ASBESTOS ABATEMENT DESIGN/WORK PLAN AND PREPARE A DEMOLITION AND DISPOSAL/RECYCLING PLAN. DISPOSAL OF ALL ASBESTOS CONTAINING MATERIAL, OBJECTS COATED WITH LEAD BASED PAINT AND C & D WASTE SHALL BE IN
ACCORDANCE WITH ALL APPLICABLE REGULATIONS.
2. DEMOLITION OF THE SHELTER ROOF AND EXTERIOR WALLS SHALL OCCUR DURING A RUNWAY 4-22 CLOSURE
(MIDNIGHT SHIFT).
3. CONTRACTOR SHALL SEPARATE HAZARDOUS WASTE, RECYCLABLE MATERIAL, GENERAL WASTE AND C&D WASTE.
ALL WASTE CONTAINERS MUST BECOVERED WHEN NOT IN USE AND IMMEDIATELY REMOVED FROM THE AOA UPON
COMPLETION OF THE DEMOLITION.
4. FAA TO REMOVE THROUGH WALL AC UNITS AND RECOVER FREON FROM MINI-SPLIT UNITS PRIOR TO START OF
DEMOLITION
5. FAA TO DISCONNECT POWER TO THE SHLETER AND REMOVE POWER CABLES.
REMOVE OB LIGHT AND TURN
OVER TO FAA (TYP)
FOUNDATION DEMOLITION (BY FAA)
DEMOLISH STAIRS CONCRETE FOUNDATION TO A
MINIMUM OF 1' BELOW GRADE
RECYCLE STEEL HOOD (LEAD BASED PAINT)
RECYCLE STEEL HOOD (LEAD BASED PAINT)
REMOVE FIBER CEMENT SIDING, INSULATION, FURRING STRIPS AND
WEATHER WRAP TO EXPOSE SHELTER PAINTED WALL PANELS (LEAD
PAINT) AS REQUIRED TO PERFORM TCIP TESTING. REPAIR WALL AS
NECESSARY TO KEEP SHELTER WATERTITE
'-6
RECYCLE STEEL HOOD (LEAD BASED PAINT)
RECYCLE STEEL STAIRS (LEAD PAINT)
CUT CONDUIT A MINIMUM OF 1'
BELOW GRADE
SIDE VIEW
FRONT VIEW
REMOVE OB LIGHT
36'-0"
JB
JB
'-6
RECYCLE STEEL STAIRS (LEAD PAINT)
ASBESTOS CONTAINING LOWER SKIRT EXCAVATE AS
NECESSARY TO REMOVE PANELS
REMOVE AND DISPOSE OF ALL CABLES TO DECOMISSIONED ANTENNA AND CUT
CONDUITS A MINIMUM OF 1' BELOW GRADE
CUT CONDUIT A MINIMUM OF 1' BELOW GRADE
(FAA TO REMOVE CABLES)
CUT CONDUIT AND CAP
AT EG BUILDING
CUT CONDUIT A MINIMUM OF 1' BELOW GRADE
RECYCLE METAL Z FLASHING
( LEAD BASED PAINT)
REMOVE EXTERIOR LIGHT AND TURN
OVER TO FAA (TYP)
20'-0"
ABATE ASBESTOS CONTAINING LOWER SKIRT
EXCAVATE AS NECESSARY TO REMOVE PANELS
SIDE VIEW
RECYCLE METAL Z FLASHING
(LEAD BASED PAINT)
REAR VIEW
NOTE 4 NOTE 4
NOTEN J
B
'-0
NOTE 4
CUT RU CONDUIT TO 1' BELOW GRADE
(FAA TO DISCONNECT RF CABLES)
ABATE ASBESTOS CONTAINING LOWER
SKIRT HAND EXCAVATE AS NECESSARY TO
REMOVE PANELS
CUT CONDUIT A MINIMUM OF 1' BELOW GRADE
CUT RU CONDUIT TO 1' BELOW GRADE
REMOVE OB LIGHTS AND
TURN OVER TO FAA (TYP)
PAINTED FIBER CEMENT LAP SIDING (HARDIE BOARD)
EXISTING CONCRETE PIERS TO BE DEMOLISHED BY FAA IN
PHASE 3B AND BACKFILLED WITH EXCESS SOIL FROM NEW
FOUNDATION EXCAVATION
DEMOLISH STAIRS CONCRETE FOUNDATION TO A
MINIMUM OF 1' BELOW GRADE
REMOVE LIGHTNING PROTECTION SYSTEM AND CUT DOWN
CONDUCTOR 12" BELOW GRADE
REMOVE LIGHTNING PROTECTION SYSTEM AND CUT
DOWN CONDUCTOR 12" BELOW GRADE
SEE REFERENCE DRAWINGS FOR EXISTING SHELTER
CONSTRUCTION AND FOUNDATION DETAILS
INTERIOR LAYOUT
PAINTED WALL PANEL
(LEAD CONTAINING PAINT)
PAINTED SHEETROCK WALL
(LEAD CONTAINING PAINT)
VINYL TILE OVER CONCRETE FLOOR
(MASTIC CONTAINS <1% ACM)
REMOVE CONDUIT
VINYL TILE OVER CONCRETE FLOOR
(MASTIC CONTAINS <1% ACM)
RECYCLE STEEL DOOR
RECYCLE STEEL DOOR
RECYCLE STEEL HOOD (LEAD BASED PAINT)
RECYCLE STEEL HOOD (LEAD BASED PAINT)
RECYCLE STEEL HOOD
(LEAD BASED PAINT)
RECYCLE STEEL HOOD (LEAD BASED PAINT)
RECYCLE STEEL HOOD (LEAD BASED PAINT)
REMOVE FIBER CEMENT SIDING, INSULATION, FURRING
STRIPS AND WEATHER WRAP TO EXPOSE SHELTER
PAINTED WALL PANELS (LEAD PAINT) AS REQUIRED TO
PERFORM TCIP TESTING. REPAIR WALL AS NECESSARY TO
KEEP SHELTER WATERTITE
PAINTED FIBER CEMENT LAP SIDING (HARDIE BOARD)
JOSEPH C HENN
Digitally signed by JOSEPH C
Date: 2026.03.10 14:40:29 -04'00'
File details come from the government source that posted it. Updated .