This file is a set of architectural drawings for the Unaccompanied Personnel Housing (UPH) Building 760 refresh project at Camp Zama, Japan. The drawings provide detailed technical specifications and layouts for the repair and renovation work planned for this military residential facility. The documents establish the design parameters and spatial configurations that will guide the upcoming Design-Bid-Build procurement process, enabling potential contractors to understand the scope of construction and renovation requirements for the building refresh initiative.
The drawings serve as a foundational document for the pre-solicitation market research phase, allowing the U.S. Army Corps of Engineers, Japan District to gather industry feedback on feasibility and contractor capability before issuing the formal solicitation. These design documents will inform cost estimates, project scheduling, and technical requirements that will ultimately be incorporated into the competitive bid package for local sources physically located and licensed to conduct business in Japan.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HOKKAIDO
HONSHU
SHIKOKU
OKINAWA
KYUSHU CAMP ZAMA
AR-397 PH-3
RIDGWAY ROAD
PLAY GROUND
174S .T.
S.T.187
(JGSDF)
NON ARMY P
ROPERTY
T-2
-2T-2
-3
S -10
0 -1
S -10
09-1
S-10
-1
S-1
-1
S-1
6-1
S-1005 -1
S-1004-1
S-1 003-1 S-1002-1
S-1001-1
60-H1
GATE
G A
T E
GATE
ELECTRIC
ANTENNA
ANTENNA
TENNIS
S.T.
"L " S
T R
E E
T
"K " S
T R
E E
T
"I " S
TR
E E T
4T H A
VEN
UE
5TH A
VEN
UE
"H " S
T R
E E
T
1ST A
VENUE
H .Q
. R O
A D
4TH A
VEN
UE
5TH AVENUE
2ND A
VE
NUE
S
T A
V E
N U
E
"C " S
T R
E E
T
4TH
A
VEN
UE
RA
N
G E
R O
AD
CLIFF DRIVE
5T H
A V
E N
U E
4T H A
VE
N
U E
NO. 1
N O
. 2
N O
. 3
N O
. 1
N O
. 1
N O
. 4
NO
. 6
N O
. 7
NO. 8
N O
. 1
N O
. 1
NO. 17
NO. 16
NO. 12
NO. 1
E L.195.83B .M.
O.T
A /C
T.B .
A /C
A /C
L.P .G
B O
W M
A N
R O
A D
B O
W M
A N
R O
A D
T.B
O .T
T.B
T.B
A/C
O .T
O.T.
CLAR
K LO
O P
O.T.
T.B .S.T.
S.T.532
O .T
8-
TR
TR
A /C
C H
E S T
N U
T D
R
IV
E
HIGHLAND DRIVE
O.T.9-5
TR
TR
2-5
36-5
PINE TREE ROAD
S.T
35H5
34-5
581-1
MOUNTAIN ROAD
A / C
TR O
T
-5
TR
TR
TR
US ARMY KASTNER AIRFIELD
GATE NO.4
1045-1
TEN
NIS
C
OURT
104-1
70 1
72 1
J-1
J-7
J-3
J-2
P-13
P -9
SHED
P-2
O.T
S-152
S-153
S-1
101H1
S-109
SENTRY B
OX
GATE N
O.6
S-160
S-106
S -69
S-116
S -5
S -99
S -99
S -9
268-1
DUGOUT
DUGOUT
S -28
S -9
S-3 16T-3
16-
S -3
S -3
T-325
C A
R W
A S
H E
R
S-3
332-S
S-333-1
S -337
341-S
S -34
S -40
283-1
S -20
S-3
S-3
-2
S-3
S -37
S -37
S -378
S -376
S-3
S-3
S -383
S -68
T-675T-684
S -64
S-35
S-
S-34
S-36
1 2
3 4
2 3
S -5
S -50
S-502
S-512
S -2
S-3
S-4
S-15
S-98
S3-2
S-43
55-5 S-55
S-54
S-53
53-5
S-
S-
S
- 5
T-593
S-37
1 4
S-40
S-39
S-8
S-7
S -792
S-99
S -7
S -81
S-809
S-661
S -72
S -724
S-7
S -732
S -731
S -6
S-6
S -625
S-607
S-6 21-1
S-65
M
OTO
R P
OO
L A
REA
400M
RUNNING TRA
CK
S-916
S -99
6T-996-1
T-996-2
S-953
S-82
S
S1008
S100
S1000 S1001
S1002
S1003 S1004
S1005
S100
2 1
T-1020-1
S-1023
1032-1
1032-2
1030-1
1045-2
S-1048
1042-1
1042-2
S-634
-1
T-6
-1 T- 694
-2
S-787
102H2
S-100 S-5
S-6
S -1
T-1
S-312
S-1
S-1
S-1
MO
NUMENT
S-221
S-3 16T-3
16-
T-325
S -337
341-S
S-21
1 2
3 4
2 3
T-571
1 4
S-99
S-8
S-733
P-27
T-6
S -601
989-2
T-608
SUB-S
TATIO
N
S -1
SAGAMIHARA CITY
ZAMA CITY
CITY BOUNDARY
SAGAMIHARA CITY
ZAMA CITY
S-280
S-2
S-5
S-5
T-3
J-6
J-5
1ST AVENUE
S-9
3 9
S -621
OFFIC
ER R
OAD
S-198 FENCE
1ST A
VENUE
S726
S-1027
S-737-1
S-737-2
7 3
H5
T-
JN.C
D
B.M
S-107
S -34
S -723
S-825
S-851
S-1086
WIND SOCK
AUTO MATIC WIND METER
-2
506-1
510-1
2 1
O.T
S-3
-3
S1
S-587
287-2
T-784
FOOTBALL FIELD
PLAY
G R
O U
N D
FISH POND
286-1
BASEBALL F
IE
LD
SOFTBALL F
IE
LD
S-2
33PARADE F
IE
LD
SOCCER F
IE
LD
(S -1
99)
(S-2 95)
GATE NO.1
GATE NO.2
P -3
P -10
P -12
GATE NO.7 852
T-1050-2
FLAG
P
OLE
S
TENNIS COURT
287-1
T E N
N
IS
C O
U R
T
M
IN
I G O
LF
S .T.
S-26
J-4
0-1
S K A
T E R
IN
K
312-1
SWIMM
ING POOL
S318
G A T E N
O .3
SEPARATOR
OIL
WASH RANP
600-1
615BRIDG
E
O.T.
W.T
832-2
W.T
832-1
PLAY GROUND
CARPORT
S-7
1092-1
PLAYGROUND
1094-1
PLAYGROUND
S-1024
M
ECH
x;
B
A
SK
E
TB
AL
L
C O
U R
T
0-1
P
LA
Y G
R O
U N
D
989-1
W.T.
PLAY
GROUND
S-7
S-1024-2
S-1083
S-802
S-1050-1
S-856
T -7
GOLF DRIVING RANGE
T.B
807-1
T-450 -3
S -603
S -64
T-8
GOLF COURSE
PLAY
G
RO
U
ND
1-
201-1
8- 1
C
AR
W
AS
H A
R
EA
S-406-1
S-4 50-2
S -601-1
S-6 21-3
S-69 4-3
S-704 -1
T-7 04-3
1018-1
102H1
1032-5
1043-1
-2
-3
-4
PLAY
GROUND
1065-1
S-5011
S .T
PLAYGROUND18-H3
PLA
Y G
D
P
LA
Y G R
O U N D
"B " S
TR
E
E T
.31
.33
T-1
314-H
M U
LTI P
U
R P
O S
E C
O U
R T
GATE NO.1
T
- 831
9 2 .5
9 5
9 8 .5
9 6 .0
9 6 .2
9 8 .5
9 3 .7
9 8 .5
9 5 .2
9 7 .2
9 5
9 5 .5
9 4 .5
9 7 .5
9 5
9 5 .6
9 6 .9
9 4 .0
9 3 .1
9 3 .0
9 3 .8
.7 0
.9 2
.0 1
.5 5
.8 8
.2 6
.7 0
.6 6
.1 9
.1 7
858 9
.9
.1
.2
.9
.3
.2
.1
1022-1
S-7
W A
TER
ST
O
RA
GE
TAN
K
T -205-H1
A-00-138
T-715-1
T-7
-2
T-53-H6
T-6 45-1
T-234
S -227
1039-1
"D " S
T R
E E
T
581-3
GATE
G A
T E
G A
T E
G A
T E
G A T E
T-58
T-6 42-1
T-6 45-2
T A
Y L O
R R
O A
D
MAC ARTHUR DRIVE
MAC ARTHUR DRIVE
H U
LL
R
O A
D
S-6 x; ST OP x; ST OP T-1095-1
T -5
-1 T
-5
-2
CONC DITH
C O
N C
D
IT
H
CONC DITH
C O
N C
D I T
H
CONC DITH
CONC DITH
C O
N C
D
IT
H
C O
N C
D I T
H
CONC DITH
PLAY GROUND
T-741-10
T-7
-1
T-741-1
J-1
1024-1
910-1
CAR
W
ASH
ER
123H -1
XX
X X
X
X
X X
X
X
X
X
X
X
S-997
XFMR
X F
M R
T -7
1024-5
314 -H
S-795-1
T-795-2
S -5
5-
T-585-2
1042-3
-1
T-694-4 T-694-5
GATE
715H2
T-984-H1
552-H 1 T
-1
4-
G A
TE
DO
G
T R
AIN
IN
G A
RE
A
CONC DITH
PLAY GD
GATE
HIGHLAND DRIVE
U.S.T
PGCH1
ANTENA
GATE
GATE
G .T
W
IT
H O
.T
683H
04-H
T- 791
H4 H5
H3
H6 H7
H8 H9
S -998
3-
H3
H3
0-H
-H
341-H
341-H
563-H1
1-H
782-H1
1-
H1
3-
H
EAGLES NEST
CO
O
MER D
RIV
E
3RD A
VEN
UE
E S T R E E
T
E S
T R
E E
T
S -685-1
3R D
A
VE
N U
E
3RD AVENUE
R
D A
V E
N U
E
3RD A
VEN
UE
T-6 25H
T-10 42-4
333H2
704H4
G E
N
X F
M R
T.R
GATE
O.T
UNDER CONSTRUCTION
LAKE 1
LAKE 2
N O
S-8
-H
314- H4
314-H5
314-H6 314-H7
N O
. 1
N O
. 9
GA
TE
621H 4621H
S-3 79-1
.3
.8
.4
.3
OW2.6
OW14
O W
D V5.5
D V .6
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
F
IL
E N
A M
E
IS
S
U E
D A
T E
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C O
N T
R A
C T
N O
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C H
IC
A
G O
IL
w w w .e xp F e d e ra l.
c o m p ro j.
n o
P A
C -2
-A
A
E X
P F
E D
E R
A L
US Army Corps of Engineers ®
S O
L
IC
IT
A
T
IO
N N
O
ARCHITECTURECIVIL
MECHANICAL/PLUMBING
ELECTRICAL
INTERIOR DESIGN
ENVIRONMENTAL
TELECOM
205 N. MICHIGAN AVE.
SUITE 3800
CHICAGO, IL 60601
www.expFederal.com proj. no.: US Army Corps of Engineers ®
CONTRACT NO.:
ISSUE DATE:
SOLICITATION NO.:
JAPAN ENGINEER DISTRICT
A
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
J A
P A
N D
IS
T
R
IC
T
U N
IT
A
P O
A P
-5
FIRE PROTECTION
THIS WORK WAS PREPARED BY ME OR
UNDER MY SUPERVISION
C A
M P
Z A
M A
J A
P A
N
F Y
R
E P
A
IR
U P
H B
L D
G
D
E S
IG
N
R E
F R
E S
H
C O
V E
R S
H E
E T
G-001
B
A C
K C
H E
C K
D E
S
IG
N S
U B
M
IT
T A
L
N O
T F
O R
C O
N S
T R
U C
T
IO
N
B C
A R
IN
O
B C
A R
IN
O
D K
A N
E S
H
IG
E
J A
N U
A R
Y
B R
G
E N
.r v t-
CAMP ZAMA, JAPAN
FY26 REPAIR UPH BLDG 760 DESIGN REFRESH
PAC-25008780-A0
JANUARY 2026
UPH BUILDING 760
N O
R T H
VICINITY MAP
MAP OF JAPAN
NORTH
DR
AF
T
SHEET
NUMBER
SHEET NAME
GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX
GI001 LIFE SAFETY CODE ANALYSIS
GI100 CODE COMPLIANCE SITE PLAN
GI101 FIRST LEVEL LIFE SAFETY PLAN
GI102 SECOND LEVEL LIFE SAFETY PLAN
GI103 THIRD LEVEL LIFE SAFETY PLAN
ENVIRONMENTAL
H-101 HAZMAT ABATEMENT
CIVIL
C-001 ABBREVIATIONS, GENERAL NOTES AND LEGEND
C-002 TEMPORARY CONTRACTOR'S LAYDOWN AREA PLAN
C-003 CONTRACTOR'S HAUL ROUTE
CD101 DEMOLITION PLAN
CU101 SURVEY CONTROL POINTS INFORMATION AND UTILITIES PLAN
CU201 FIRE WATER LINE PROFILE AND LAYOUT
C-501 WATER LINE DETAILS
C-502 MISCELLANEOUS DETAILS - 1
C-503 MISCELLANEOUS DETAILS - 2
ARCHITECTURAL
AD001 ARCHITECTURAL REMOVAL SCOPE OF WORK, REMOVAL SCOPE MATRIX
AD100 FLOOR REMOVAL PLAN - OVERVIEW
AD101 FIRST FLOOR REMOVAL PLAN
AD102 SECOND FLOOR REMOVAL PLAN
AD103 THIRD FLOOR REMOVAL PLAN
AD104 FIRST FLOOR REFLECTED CEILING REMOVAL PLAN
AD105 SECOND FLOOR REFLECTED REMOVAL CEILING PLAN
AD106 THIRD FLOOR REFLECTED REMOVAL CEILING PLAN
AD200 REMOVAL ELEVATIONS
AD201 REMOVAL INTERIOR ELEVATION - FIRST FLOOR CORRIDOR - 1
AD202 REMOVAL INTERIOR ELEVATION - FIRST FLOOR CORRIDOR - 2
AD203 REMOVAL INTERIOR ELEVATION -TYPICAL O3 LIVING UNIT
AD204 REMOVAL INTERIOR ELEVATION -TYPICAL O2 LIVING UNIT
AD205 REMOVAL INTERIOR ELEVATION - TYPICAL LAUNDRY
AD301 BUILDING REMOVAL SECTION
AD400 REMOVAL SECTION DETAIL
AD401 REMOVAL PLAN DETAIL - 1
AD402 REMOVAL PLAN DETAIL - 2
A-001 ARCHITECTURAL NEW SCOPE OF WORK, NEW SCOPE MATRIX
A-100 FLOOR NEW PLAN - OVERVIEW
A-101 FIRST FLOOR NEW PLAN
A-102 SECOND FLOOR NEW PLAN
A-103 THIRD FLOOR NEW PLAN
A-104 FIRST FLOOR REFLECTED CEILING NEW PLAN
A-105 SECOND FLOOR REFLECTED CEILING NEW PLAN
A-106 THIRD FLOOR REFLECTED CEILING NEW PLAN
A-107 NEW DOOR & WINDOW KEY PLAN
A-200 NEW ELEVATIONS
A-201 NEW INTERIOR ELEVATION - FIRST FLOOR CORRIDOR - 1
A-202 NEW INTERIOR ELEVATION - FIRST FLOOR CORRIDOR - 2
A-203 NEW INTERIOR ELEVATION - TYPICAL O3 LIVING UNIT
A-204 NEW INTERIOR ELEVATION - TYPICAL O2 LIVING UNIT
A-205 NEW INTERIOR ELEVATION - TYPICAL LAUNDRY
A-301 BUILDING NEW SECTION
A-400 NEW SECTION DETAIL
A-401 NEW PLAN DETAIL - 1
A-402 NEW PLAN DETAIL - 2
A-403 WALL SECTION
A-404 FIRE ENTRY ENCLOSURE PLAN AND DETAILS
A-405 FIRE ENTRY ENCLOSURE PLAN AND DETAILS
A-406 FIRE ENTRY ENCLOSURE PLAN AND DETAILS
A-500 FLOOR & WALL DETAILS
A-501 CEILING DETAILS
A-502 DOOR DETAILS
A-503 WINDOW DETAILS
A-504 CLOSET & PANTRY DETAILS
A-600 DOOR & WINDOW SCHEDULE AND TYPES
INTERIOR DESIGN
I-101 FIRST FLOOR INTERIOR ELEMENTS PLAN
I-102 SECOND FLOOR INTERIOR ELEMENTS PLAN
I-103 THIRD FLOOR INTERIOR ELEMENTS PLAN
I-401 TYPICAL ENLARGED INTERIOR ELEMENTS PLAN
I-402 TYPICAL ENLARGED INTERIOR ELEMENTS PLAN
I-501 MILLWORK ELEVATIONS
I-601 MILLWORK DETAILS
I-602 MILLWORK DETAILS
IN101 FIRST FLOOR FINISH PLAN
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
F
IL
E N
A M
E
IS
S
U E
D A
T E
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C O
N T
R A
C T
N O
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C H
IC
A
G O
IL
w w w .e xp F e d e ra l.
c o m p ro j.
n o
P A
C -2
-A
A
E X
P F
E D
E R
A L
US Army Corps of Engineers ®
S O
L
IC
IT
A
T
IO
N N
O
A
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SE
A L
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
J A
P A
N D
IS
T
R
IC
T
U N
IT
A
P O
A P
-5
C A
M P
Z A
M A
J A
P A
N
F Y
R
E P
A
IR
U P
H B
L D
G
D
E S
IG
N
R E
F R
E S
H
S H
E E
T I
N D
E X
G-002
B
A C
K C
H E
C K
D E
S
IG
N S
U B
M
IT
T A
L
N O
T F
O R
C O
N S
T R
U C
T
IO
N
B C
A R
IN
O
B C
A R
IN
O
D K
A N
E S
H
IG
E
J A
N U
A R
Y
B R
G
E N
.r v t-
SHEET
NUMBER
SHEET NAME
IN102 SECOND FLOOR FINISH PLAN
IN103 THIRD FLOOR FINISH PLAN
IN601 FIRST FLOOR ROOM FINISH SCHEDULE
IN602 SECOND FLOOR ROOM FINISH SCHEDULE
IN603 THIRD FLOOR ROOM FINISH SCHEDULE
IN604 INTERIOR LEGENDS
IG501 SIGNAGE DETAILS
IG601 ROOM SIGNAGE SCHEDULE
FIRE PROTECTION
FA001 FIRE ALARM/MNS GENERAL NOTES, ABBREVIATIONS AND LEGEND
FD101 FIRE ALARM DEMOLITION PLAN
FA101 FIRST LEVEL FIRE/MNS ALARM PLAN
FA102 SECOND LEVEL FIRE ALARM/MNS PLAN
FA103 THIRD LEVEL FIRE ALARM/MNS PLAN
FA500 FIRE ALARM/MNS DETAILS
FA700 FIRE ALARM/MNS INPUT/OUTPUT MATRIX
FA701 FIRE ALARM /MNS RISER DIAGRAM
FX001 FIRE SPRINKLER GENERAL NOTES AND DETAILS
FD102 FIRE SPRINKLER DEMOLITION PLAN
FX101 FIRST LEVEL FIRE SPRINKLER PLAN
FX102 SECOND LEVEL FIRE SPRINKLER PLAN
FX103 THIRD LEVEL FIRE SPRINKLER PLAN
FX500 FIRE SPRINKLER DETAILS
FX501 FIRE SPRINKLER RISER DETAILS
PLUMBING
P-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
PD110 DEMOLITION FIRST FLOOR PLAN - OVERALL
PD120 DEMOLITION SECOND FLOOR PLAN - OVERALL
PD130 DEMOLITION THIRD FLOOR PLAN - OVERALL
P-110 FIRST FLOOR PLAN - OVERALL
P-120 SECOND FLOOR PLAN - OVERALL
P-130 THIRD FLOOR PLAN - OVERALL
P-401 ENLARGED FLOOR PLANS
P-402 ENLARGED FLOOR PLANS
P-403 ENLARGED FLOOR PLANS
P-601 SCHEDULES
MECHANICAL
M-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
MD101 FIRST FLOOR DEMOLITION PLAN - OVERALL
MD102 SECOND FLOOR DEMOLITION PLAN - OVERALL
MD103 THIRD FLOOR DEMOLITION PLAN - OVERALL
M-101 FIRST FLOOR PLAN - OVERALL
M-102 SECOND FLOOR PLAN - OVERALL
M-103 THIRD FLOOR PLAN - OVERALL
M-601 SCHEDULES
ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS
E-002 ABBREVIATIONS, GENERAL NOTES AND REFERENCES
ES101 SITE PLAN
E-101 FIRST FLOOR COMPOSITE PLAN
E-102 SECOND FLOOR COMPOSITE PLAN
E-103 THIRD FLOOR COMPOSITE PLAN
ED101 FIRST FLOOR LIGHTING DEMOLITION PLAN - AREA A
ED102 FIRST FLOOR LIGHTING DEMOLITION PLAN - AREA B
ED103 SECOND FLOOR LIGHTING DEMOLITION PLAN - AREA A
ED104 SECOND FLOOR LIGHTING DEMOLITION PLAN - AREA B
ED105 THIRD FLOOR LIGHTING DEMOLITION PLAN - AREA A
ED106 THIRD FLOOR LIGHTING DEMOLITION PLAN - AREA B
ED111 FIRST FLOOR POWER DEMOLITION PLAN - AREA A
ED112 FIRST FLOOR POWER DEMOLITION PLAN - AREA B
ED113 SECOND FLOOR POWER DEMOLITION PLAN - AREA A
ED114 SECOND FLOOR POWER DEMOLITION PLAN - AREA B
ED115 THIRD FLOOR POWER DEMOLITION PLAN - AREA A
ED116 THIRD FLOOR POWER DEMOLITION PLAN - AREA B
ED121 FIRST FLOOR EQUIP PWR DEMOLITION PLAN - AREA A
ED122 FIRST FLOOR EQUIP PWR DEMOLITION PLAN - AREA B
ED123 SECOND FLOOR EQUIP PWR DEMOLITION PLAN - AREA A
ED124 SECOND FLOOR EQUIP PWR DEMOLITION PLAN - AREA B
ED125 THIRD FLOOR EQUIP PWR DEMOLITION PLAN - AREA A
ED126 THIRD FLOOR EQUIP PWR DEMOLITION PLAN - AREA B
ED601 DEMOLITION ONE LINE DIAGRAM
EL101 FIRST FLOOR LIGHTING PLAN - AREA A
EL102 FIRST FLOOR LIGHTING PLAN - AREA B
EL103 SECOND FLOOR LIGHTING PLAN - AREA A
EL104 SECOND FLOOR LIGHTING PLAN - AREA B
EL105 THIRD FLOOR LIGHTING PLAN - AREA A
EL106 THIRD FLOOR LIGHTING PLAN - AREA B
EL501 DETAILS
SHEET
NUMBER
SHEET NAME
EL511 DETAILS
EL701 LIGHTING FIXTURE SCHEDULE
EL702 LIGHTING CONTROL SCHEDULE
EP101 FIRST FLOOR POWER PLAN - AREA A
EP102 FIRST FLOOR POWER PLAN - AREA B
EP103 SECOND FLOOR POWER PLAN - AREA A
EP104 SECOND FLOOR POWER PLAN - AREA B
EP105 THIRD FLOOR POWER PLAN - AREA A
EP106 THIRD FLOOR POWER PLAN - AREA B
EP121 FIRST FLOOR EQUIPMENT POWER PLAN - AREA A
EP122 FIRST FLOOR EQUIPMENT POWER PLAN - AREA B
EP123 SECOND FLOOR EQUIPMENT POWER PLAN - AREA A
EP124 SECOND FLOOR EQUIPMENT POWER PLAN - AREA B
EP125 THIRD FLOOR EQUIPMENT POWER PLAN - AREA A
EP126 THIRD FLOOR EQUIPMENT POWER PLAN - AREA B
EP501 DETAILS
EP601 ONE LINE DIAGRAM
EP701 PANEL SCHEDULES
EP702 PANEL SCHEDULES
EP703 PANEL SCHEDULES
EP704 PANEL SCHEDULES
EP705 PANEL SCHEDULES
EP706 PANEL SCHEDULES
TELECOMMUNICATIONS
T-001 TELECOM LEGEND AND ABBREVIATIONS
TD101 FIRST FLOOR TELECOM DEMOLITION PLAN
TD102 SECOND FLOOR TELECOM DEMOLITION PLAN
TD103 THIRD FLOOR TELECOM DEMOLITION PLAN
T-101 FIRST FLOOR TELECOM PLAN
T-102 SECOND FLOOR TELECOM PLAN
T-103 THIRD FLOOR TELECOM PLAN
T-501 TELECOM DETAILS
T-601 ONE LINE DIAGRAM
DR
BUILDING USE DESCRIPTION
1. THE EXISTING UNACCOMPANIED PERSONNEL HOUSING (UPH) IS AN EXISTING 3-STORY
BUILDING OF APPROXIMATELY 1,738 SQUARE METERS. IT IS AN APARTMENT BUILDING
(CONTAINS INDIVIDUAL COOKING FACILITY IN BEDROOMS) USED BY MILITARY PERSONNEL.
THE PROJECT INVOLVES REVITALIZATION OF THE EXISTING BUILDING.
APPLICABLE CODES, STANDARDS AND CRITERIA
1. INTERNATIONAL BUILDING CODE (IBC); 2024
2. NFPA 1, FIRE CODE; 2024 EDITION
3. NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS; 2026 EDITION
4. NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS; 2025 EDITION
5. NFPA 13R, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS IN LOW-RISE
RESIDENTIAL OCCUPANCIES; 2025
6. NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR
APPURTENANCES; 2025 EDITION
7. NFPA 70, NATIONAL ELECTRICAL CODE; 2026 EDITION
8. NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE; 2025 EDITION
9. NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES; 2025
10. NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING
SYSTEMS; 2024 EDITION
11. NFPA 101, LIFE SAFETY CODE; 2024 EDITION
12. NFPA 291, RECOMMENDED PRACTICE FOR WATER FLOW TESTING AND MARKING OF
HYDRANTS; 2025
13. UFC 1-200-01, DOD BUILDING CODE (GENERAL BUILDING REQUIREMENTS); CHANGE 4, 17 DEC
14. UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES; CHANGE 6, 6 MAY 2021
15. UFC 4-010-01, DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, CHANGE 3, 24 MAY
16. UFC 4-021-01 - DESIGN AND O&M: MASS NOTIFICATION SYSTEM: CHANGE 1, JANUARY 2010
17. USACE ECB 2018-17 NEW REQUIREMENTS FOR VISUAL NOTIFICATION FOR MASS NOTIFICATION
SYSTEMS, 26 MARCH 2025
18. JED DESIGN GUIDE V9, APRIL 2025
USE AND OCCUPANCY CLASSIFICATION (UFC 3-600-01)
1. IBC SHALL BE UTILIZED TO DETERMINE THE OCCUPANCY CLASSIFICATION AS IT RELATES TO
ALLOWABLE CONSTRUCTION TYPE, BUILDING HEIGHT, BUILDING AREA, BUILDING SEPARATION
DISTANCE, OCCUPANCY SEPARATION AND ASSOCIATED REQUIREMENTS [§3-2.1.2]
2. NFPA 101 MUST BE UTILIZED TO DETERMINE THE OCCUPANCY CLASSIFICATION AS IT RELATES
TO FIRE/SMOKE RESISTANCE RATING OF INTERIOR NON-LOAD BEARING PARTITIONS, MEANS
OF EGRESS, INTERIOR FINISH, FEATURES OF FIRE PROTECTION AND ASSOCIATED
REQUIREMENTS [§3-3.1.1]
A. COMPLY WITH NFPA 101 FOR ALL COMPONENTS AND FEATURES RELATED TO MEANS
OF EGRESS. IBC MUST NOT BE USED FOR ANY MEANS OF EGRESS FEATURES [§10-1.1]
FIRE PROTECTION SYSTEMS
1. FIRE SPRINKLER SYSTEM - GENERAL
A. SUPERVISED AUTOMATIC FIRE SPRINKLER SYSTEM PROVIDED THROUGHOUT THE
BUILDING, IN ACCORDANCE WITH UFC 3-600-01 AND NFPA 13R. EXCEPTIONS AS
FOLLOWS:
a. CLOSETS WITHING DWELLING UNITS LESS THAN 2.2 M2
b. BATHROOMS WITHIN DWELLING UNITS LESS THAN 5.1 M2
2. STANDPIPE SYSTEMS - GENERAL
A. STANDPIPE SYSTEM IS NOT REQUIRED AS THE BUILDING IS LESS THAN FOUR STORIES
IN HEIGHT PER UFC 3-600-01, SECTION 9-10.2.1.
3. PORTABLE FIRE EXTINGUISHERS - GENERAL
A. PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED WHERE REQUIRED BY NFPA 101
AND INSTALLED IN ACCORDANCE WITH NFPA 10. [UFC 3-600-01 §9-17].
B. PORTABLE FIRE EXTINGUISHERS ARE NOT REQUIRED IN FULLY SPRINKLERED
APARTMENT OCCUPANCY PER NFPA 101. HOWEVER, CAMP ZAMA FIRE DEPARTMENT
REQUIRES PORTABLE FIRE EXTINGUISHERS PER FIRE REGULATION USAG JAPAN
420-90. ACCORDINGLY, FIRE EXTINGUISHERS SHALL BE PROVIDED IN ACCORDANCE
WITH NFPA 10.
FIRE ALARM AND MASS NOTIFICATION SYSTEMS
1. EXISTING FIRE ALARM SYSTEM
A. DEMOLITION OF THE EXISTING FIRE ALARM SYSTEM INCLUDING PANELS, DEVICES,
WIRING AND CONDUIT.
2. FIRE DETECTION/ALARM SYSTEMS - GENERAL
A. NEW ADDRESSABLE FIRE ALARM SYSTEM PROVIDED THROUGHOUT THE BUILDING.
3. NOTIFICATION
A. NOTIFICATION DEVICES PROVIDED THROUGHOUT THE BUILDING IN ALL AREAS WHERE
REQUIRED BY NFPA 101 AND UFC 3-600-01 AND NFPA 72.
4. DETECTION
A. PROVIDE AUTOMATIC SMOKE DETECTION ABOVE FIRE ALARM PANELS
B. PROVIDE SMOKE DETECTORS IN ALL SLEEPING AREAS.
5. MANUAL FIRE ALARM ACTIVATION
A. PROVIDE A MANUAL FIRE ALARM PULL STATION AT ALL EXITS REGARDLESS OF
OCCUPANCY PER UFC 3-600-01, 9-18.7.4.1.
6. MASS NOTIFICATION SYSTEM
A. MASS NOTIFICATION SYSTEM PROVIDED THROUGHOUT COMBINED WITH THE BUILDING
FIRE ALARM SYSTEM IN ACCORDANCE WITH UFC 4-021-01.
WATER SUPPLIES AND FIRE FLOW CALCULATIONS
1. REFER TO FIRE PROTECTION DRAWING FX001 FOR WATER SUPPLY INFORMATION. FIRE FLOW
FOR SPRINKLERED FACILITIES SHALL BE IN ACCORDANCE WITH NFPA 1 OR 3,785 LPM AT 1.38
BAR, WHICHEVER IS GREATER.
A. NFPA 1 FIRE FLOW REQUIREMENTS FOR SPRINKLERED FACILITIES FOR TYPE II (000)
BETWEEN 1,709-2,025 M2 IS 11,355 LPM. THIS IS PERMITTED TO BE REDUCED BY 75%
FOR SPRINKLERED FACILITIES WHICH EQUATES TO 2,839 LPM.
B. BASED ON THE ANALYSIS ABOVE, THE FIRE FLOW REQUIREMENT IS 3,785 LPM AT 1.38
BAR
C. WATERLINE A - AVAILABLE FLOW AT 1.38 BAR IS 12,976 LPM
D. WATERLINE B - AVAILABLE FLOW AT 1.38 BAR IS 4,141 LPM
FIRE DEPARTMENT ACCESS
1. EXISTING FIRE DEPARTMENT ACCESS TO REMAIN.
FIRE HYDRANTS
1. EXISTING FIRE HYDRANTS PROVIDE SUFFICIENT COVERAGE AROUND THE BUILDING SUCH
THAT ALL PARTS OF THE FACILITY EXTERIOR IS WITHIN 106 METERS OF A HYDRANT WITH
CONSIDERATION GIVEN TO ACCESSIBILITY AND OBSTRUCTIONS.
2. EXISTING FIRE HYDRANT IS LOCATED WITHING 45 M OF THE FIRE DEPARTMENT CONNECTION.
FIRE DEPARTMENT CONNECTION AND POST INDICATOR VALVE LOCATION
1. FDC IS LOCATED ON THE EXTERIOR WALL OF THE NEW FIRE RISER ENCLOSURE.
2. PIV IS NOT REQUIRED AS AN INDICATING CONTROL VALVE IS INSTALLED IN A FIRE-RATED
ROOM ACCESSIBLE FROM THE EXTERIOR IN ACCORDANCE WITH NFPA 24, 6.2.9.
OCCUPANCY CLASSIFICATION
BUILDING HEIGHT AND AREA SUMMARY
BUILDING CONSTRUCTION TYPE
SPRINKLER SYSTEM
IIB
YES, SM (NFPA 13R SYSTEM)
BUILDING HEIGHT
ACTUAL MAXIMUM ALLOWED
10.55 M 18.29 M*
NUMBER OF STORIES 3 STORIES 4 STORIES*
TABULAR FLOOR AREA PER STORY 1,486 SM
BUILDING AREA ANALYSIS
FRONTAGE AREA FACTOR INCREASE NOT REQUIRED
FLOOR AREA PER STORY W/ FRONTAGE ACTUAL MAXIMUM ALLOWED
1,486 SMFIRST LEVEL
1,486 SMSECOND LEVEL
579.4 SM
TOTAL BUILDING AREA 4,458 SM1,738 SM
IBC CODE COMPLIANT YES
STRUCTURAL FIRE RESISTANCE RATING [TABLE 601 AND TABLE 602]
REQUIRED STRUCTURAL FIRE RESISTANCE RATING SUMMARY - TYPE IIB
STRUCTURAL ELEMENT
BEARING WALLS
FIRE RESISTANCE
RATING
EXTERIOR
INTERIOR
NON-LOAD
BEARING WALLS
EXTERIOR: ≥ 9.14 M SEPARATION
INTERIOR
PRIMARY STRUCTURAL MEMBERS
FLOOR CONSTRUCTION AND ASSOCIATED SECONDARY MEMBERS
ROOF CONSTRUCTION AND ASSOCIATED SECONDARY STRUCTURAL
MEMBERS
0-HOUR
0-HOUR
PER NFPA 101
0-HOUR
0-HOUR
0-HOUR
MAXIMUM AREA OF EXTERIOR WALL OPENINGS (UNPROTECTED / SPRINKLERED) [TABLE 705.9]
1. FIRE SEPARATION DISTANCE GREATER THAN 6 METERS - UNLIMITED
OCCUPANCY CLASSIFICATION BY FLOOR - IBC
FLOOR
FIRST LEVEL
SECOND LEVEL
RESIDENTIAL R-2
OCCUPANCY CLASSIFICATION ACCESSORY OCCUPANCY
TYPE OF CONSTRUCTION
1. TYPE IIB
OCCUPANCY SEPARATION
1. OCCUPANCY SEPARATION IS NOT REQUIRED BETWEEN MAIN OCCUPANCY AND ACCESSORY
OCCUPANCIES
BUILDING HEIGHT AND AREA ANALYSIS [TABLE 504.3, TABLE 504.4, AND TABLE 506.2]
HAZARDOUS AREA PROTECTION
1. ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL
OCCUPANCY SHALL BE PROTECTED BY ONE OF THE FOLLOWING MEANS: [§8.7.1.1]
A. SEPARATING THE AREA FROM OTHER PARTS OF THE BUILDING WITH A 1-HOUR FIRE
BARRIER AND WITHOUT WINDOWS.
B. PROTECTING THE AREA WITH AUTOMATIC SPRINKLER SYSTEMS.
C. BOTH 1-HOUR FIRE BARRIER AND SPRINKLER SYSTEM WHERE THE HAZARD IS SEVERE
D. IN NEW CONSTRUCTION, AUTOMATIC SPRINKLER SYSTEMS WITH SMOKE PARTITIONS.
OPENING PROTECTIVES [TABLE 8.3.3.2.2]
VERTICAL OPENINGS AND EXIT ENCLOSURES REQUIRED FIRE BARRIER
VERTICAL OPENINGS REQUIRED FIRE BARRIER
SHAFTS CONNECTING LESS THAN 3 STORIES 1-HOUR [§8.6.5(2)]
EXIT ENCLOSURES
EXIT ENCLOSURES CONNECTING LESS THAN 4 STORIES 1-HOUR [§7.1.3.2.1(1)]
COMPONENT WALL &
PARTITIONS
FIRE DOOR
ASSEMBLIES
MINIMUM FIRE-RATED WINDOWS RATING
FIRE PROTECTION FIRE RESISTANCE
VERTICAL
SHAFTS
1-HOUR 1-HOUR 1-HOURNOT PERMITTED
FIRE
BARRIERS
1/2-HOUR 1/3-HOUR 1/3-HOUR1/3-HOUR
INTERIOR FINISH ANALYSIS W/ SPRINKLER PROTECTION [NFPA 101, 30.3.3.2]
MEANS OF EGRESS GENERAL
1. OCCUPANT LOAD FACTOR [TABLE 7.3.1.2 / UFC 3-600-01 TABLE 10-1]
A. ASSEMBLY USE (GENERAL): 1.4 NSM/PERSON
B. BUSINESS USE: 14 SM/PERSON
C. RESIDENTIAL USE: 18.6 SM/PERSON
D. MECH,ELEC, BUILDING EQUIP. USE: 46.5 SM/PERSON
E. STORAGE ROOMS: 46.5 SM/PERSON
2. CAPACITY OF MEANS OF EGRESS
A. EGRESS WIDTH REQUIRED PER PERSON [TABLE 7.3.3.1]
a. HORIZONTAL EGRESS TRAVEL: 5 MM/PERSON
b. VERTICAL EGRESS TRAVEL: 7.6 MM/PERSON
3. MINIMUM EGRESS WIDTH OUTSIDE DWELLING UNIT REQUIRED / PROVIDED [NFPA
101, 7.3.4]
A. CORRIDORS W/ OCCUPANT LOAD 50 OR MORE: 1120 MM / 1670 MM
B. CLEAR WIDTH DOOR OPENINGS: 810 MM / 900 MM
4. MINIMUM EGRESS WIDTH WITHIN DWELLING UNIT REQUIRED / PROVIDED [NFPA
101, 30.2.1.2 AND 24.2]
A. DOORS: 710 MM / 750 MM
B. DOORS SERVING ROOM NOT EXCEEDING 6.5 SM: 610 MM / 750 MM
C. BATHROOM DOORS: 610 MM / 700 MM
D. MINIMUM DOOR HEIGHT 1990 MM / 2100 MM
5. TOTAL OCCUPANT LOAD
A. FIRST FLOOR: 61 PERSONS
B. SECOND FLOOR: 36 PERSONS
C. THIRD FLOOR: 36 PERSONS
6. NUMBER OF EXITS REQUIRED / PROVIDED
A. FIRST FLOOR: 2 / 2+
B. SECOND FLOOR: 2 / 2+
C. THIRD FLOOR: 2 / 2+
7. EXIT CAPACITY REQUIRED / PROVIDED
A. FIRST FLOOR: 61 / 638 PERSONS
B. SECOND FLOOR: 36 / 504 PERSONS
C. THIRD FLOOR: 36 / 504 PERSONS
8. NUMBER AND ARRANGEMENT OF MEANS OF EGRESS, INCLUDING EXIT
DISCHARGE
A. SINGLE EXIT FROM ROOMS AND AREAS WITH LIMITED OCCUPANT LOAD
AND HAVING COMMON PATH OF TRAVEL WITHIN THE ALLOWABLE LIMITS
[§7.4.1.1]
B. MINIMUM TWO EXITS NOT COMPLYING WITH ABOVE §7.4.1.1]
9. ARRANGEMENT OF EXITS
A. WHERE 2 OR MORE EXITS ARE REQUIRED, THEY MUST BE SPACED APART
A MINIMUM OF 1/3 THE LENGTH OF THE MAXIMUM DIAGONAL OF THE
BUILDING OR AREA BEING SERVED [§7.5.1.3.3]
a. WHERE MORE THAN TWO EXITS OR EXIT ACCESS DOORS ARE
REQUIRED, AT LEAST TWO OF THE REQUIRED EXITS OR EXIT
ACCESS DOORS ARE TO BE ARRANGED TO COMPLY WITH THE
MINIMUM SEPARATION DISTANCE REQUIREMENTS DEFINED
ABOVE. THE OTHER EXITS OR EXIT ACCESS DOORS ARE TO BE
LOCATED SO THAT IF ONE BECOMES BLOCKED, THE OTHERS
REMAIN AVAILABLE [§7.5.1.3.1]
EXIT DISCHARGE [NFPA 101, 30.2.7]
1. EXIT DISCHARGE SHALL COMPLY WITH SECTION 7.7 - PROVIDED
ILLUMINATION OF MEANS OF EGRESS [NFPA 101, 30.2.8]
1. MEANS OF EGRESS SHALL BE ILLUMINATED IN ACCORDANCE WITH SECTION 7.8
IN DESIGNATED STAIRS, AISLES, CORRIDORS, RAMPS, AND PASSAGEWAYS
LEADING TO AN EXIT - PROVIDED
EMERGENCY LIGHTING [NFPA 101, 30.2.9]
1. EMERGENCY LIGHTING SHALL BE PROVIDED IN ACCORDANCE WITH SECTION
7.9 - PROVIDED
MARKING OF MEANS OF EGRESS [NFPA 101, 30.2.10]
1. MEANS OF EGRESS SHALL HAVE SIGNS IN ACCORDANCE WITH SECTION 7.10 -
PROVIDED
OCCUPANCY CLASSIFICATION
FLOOR LEVEL
FIRST LEVEL
SECOND LEVEL
OCCUPANCY CLASSIFICATION INCIDENTAL OCCUPANCY
EXISTING APARTMENT ORDINARY HAZARD STORAGE
STORAGE S-1
CODE ANALYSIS GENERAL CODE ANALYSIS - IBC CODE ANALYSIS - LIFE SAFETY CODE (NFPA 101)
THIRD LEVEL
EXISTING APARTMENT
EXISTING APARTMENT
ORDINARY HAZARD STORAGE
ORDINARY HAZARD STORAGE
THIRD LEVEL
RESIDENTIAL R-2
RESIDENTIAL R-2
STORAGE S-1
STORAGE S-1
1,486 SMTHIRD LEVEL
579.4 SM
579.4 SM
*NFPA 13R SPRINKLER SYSTEM LIMITATION
0-HOUR
TABLE 30.3.2.2.2 HAZARDOUS AREA PROTECTION
BOILER ROOM SERVING MORE THAN ONE DWELLING UNIT
LAUNDRIES > 9.3 SM OUTIDE OF DWELLING UNITS
1 HOUR AND SPRINKLERS
STORAGE ROOMS OUTSIDE OF DWELLING UNITS
1 HOUR AND SPRINKLERS
1 HOUR OR SPRINKLERS
• MECHANICAL ROOMS (NO BOILER) AND STORAGE ROOMS SHALL BE PROTECTED BY SMOKE
PARTITION. HOWEVER, DUE TO NFPA 13R REQUIREMENT BELOW, MINIMUM 1/2-HOUR FIRE
BARRIER SHALL BE PROVIDED
• LAUNDRY ROOMS DO NOT REQUIRE ANY FIRE RATING AS THE FLOOR AREA DOES NOT
EXCEED 9.3 SM.
CORRIDOR FIRE RATING REQUIREMENTS [NFPA 101, 30.3.6]
IN BUILDINGS PROTECTED THROUGHOUT BY SPRINKLER SYSTEMS, CORRIDOR WALLS SHALL HAVE
A MINIMUM 1/2-HOUR FIRE RESISTANCE RATING.
SUBDIVISION OF BUILDING SPACES [NFPA 101, 30.3.7]
IN BUILDINGS PROTECTED THROUGHOUT BY SPRINKLER SYSTEMS, DWELLING UNITS SHALL BE
SEPARATED FROM EACH OTHER BY WALLS AND FLOORS CONSTRUCTED AS FIRE BARRIERS HAVING
A MINIMUM 1/2-HOUR FIRE RESISTANCE RATING.
NFPA 13R ORDINARY HAZARD SPACES OUTSIDE DWELLING UNITS [NFPA 13R, 7.2.4.1]
ORDINARY HAZARD SPACES SUCH AS MECHANICAL ROOM, ELECTRICAL ROOM, STORAGE ROOM,
AND SIMILAR SPACES SHALL BE PROTECTED BY MINIMUM 1/2-HOUR FIRE BARRIER.
OCCUPANCY
NEW APARTMENT
EXIT EXIT ACCESS
CORRIDORS
OTHER SPACES
CLASS A OR B CLASS A, B, OR C CLASS A, B, OR C
INTERIOR FLOOR FINISH REQUIREMENT
INTERIOR FLOOR FINISH IN EXIT ENCLOSURES AND EXIT ACCESS CORRIDORS AND SPACES NOT SEPARATED FROM THEM BY WALLS COMPLYING WITH 30.3.3.3.2 SHALL BE NOT LESS THAN CLASS II.
THE MINIMUM CRITICAL RADIANT FLUX SHALL BE 0.1 W/CM2
EXISTING BUILDING & WORK CLASSIFICATIONS [UFC 3-600-01, 34-1 & NFPA 101 CH. 43
1. DESIGN AND CONSTRUCTION PROJECTS IN EXISTING BUILDINGS SHALL COMPLY WITH NFPA
101 BUILDING REHABILITATION CHAPTER EXCEPT AS SPECIFIED IN UFC 3-600-01. AREAS OF
THE FACILITY WHERE NO WORK IS BEING PERFORMED MUST AT A MINIMUM MEET EXISTING
OCCUPANCY CHAPTER OF NFPA 101.
2. THE SCOPE OF WORK INCLUDES RENOVATIONS, MODIFICATIONS, AND EXTENSIVE
MODIFICATIONS.
3. FLOOR PLAN RECONFIGURATIONS THAT EXCEED 50 PERCENT OF THE AREA OF A FLOOR
REQUIRE THAT THE ENTIRE FLOOR BE BROUGHT UP TO THE RQEUIREMENTS FOR NEW
CONSTRUCTION IN THIS UFC AND NFPA 101. OR IF THE PROJECT COST EXCEEDS 50 PERCENT
OF THE BUILDING REPLACEMENT VALUE, THEN THE ENTIRE BUILDING MUST BE BROUGHT UP
TO THE REQUIREMENTS FOR NEW CONSTRUCTION.
A. FLOOR PLAN RECONFIGURATION EXCEED 50 PERCENT OF THE AREA OF A FLOOR. THE
ENTIRE FLOOR SHALL BE BROUGHT UP TO THE REQUIREMENTS FOR NEW
CONSTRUCTION.
DOORS IN SMOKE PARTITIONS SHALL NOT INCLUDE LOUVERS AND SHALL BE SELF OR AUTOMATIC
CLOSING.
DOORS THAT OPEN ONTO EXIT ACCESS CORRIDORS SHALL BE SELF-CLOSING AND SELF-LATCHING.
TRANSOMS, LOUVERS, OR TRANSFER GRILLES SHALL BE PROHIBITED IN WALLS OR DOORS OF EXIT
ACCESS CORRIDORS. [NFPA 101, 30.3.6.2]
AIR TRANSFER OPENING SHALL BE PERMITTED IN WALLS OR DOORS FROM TOILET ROOMS,
BATHROOMS, SHOWER ROOMS, SINK CLOSETS, AND SIMILAR AUXILIARY SPACES OPENING
DIRECTLY ONTO THE EGRESS CORRIDOR. [NFPA 90A, 5.10.1.3.1]
THROUGH PENETRATION REQUIREMENTS [NFPA 101, 8.3.4]
PIPES, CONDUITS, CABLETS, ETC. THAT PENETRATE FIRE-RATED WALLS OR FLOORS SHALL BE
PROTECTED BY UL LISTED FIRESTOPPING WITH RATING EQUAL OR GREATER THAN THE
PENETRATED WALL.
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
F
IL
E N
A M
E
IS
S
U E
D A
T E
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C O
N T
R A
C T
N O
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C H
IC
A
G O
IL
w w w
.e xp
F e d e ra l.
c o m p ro j.
n o
P A
C -2
-A
A
E X
P F
E D
E R
A L
US Army Corps of Engineers ®
S O
L
IC
IT
A
T
IO
N N
O
A
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
S E A L
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
J A
P A
N D
IS
T
R
IC
T
U N
IT
A
P O
A P
-5
C A
M P
Z A
M A
J A
P A
N
F Y
R
E P
A
IR
U P
H B
L D
G
D
E S
IG
N
R E
F R
E S
H
L
IF
E S
A F
E T
Y C
O D
E A
N A
L Y
S
IS
GI001
B A
C K
C H
E C
K D
E S
IG
N
S U
B M
IT
T
A L
N
O T
F O
R C
O N
S T
R U
C T
IO
N
Y K
IM
B K
IM
Y K
IM
J A
N U
A R
Y
B R
F
P .r v t
DR
M M
W W
W
W
W
W
(E) FHY 717
FW
F W
F W
(N) 150MM
FIRE WATER
LINE
(N) GATE VALVE
LEGENDGENERAL NOTES
ALL INFORMATION SHOWN ON THIS SHEET
IS FOR INFORMATION ONLY TO SHOW CODE
COMPLIANCE IN ACCORDANCE WITH UFC
3-600-01. REFER TO CIVIL DRAWING FOR
CIVIL SITE AND UTILITY INFORMATION.
(N) NEW
(E) EXISTING
FHY FIRE HYDRANT
DISTANCE TO FDC
DISTANCE TO BUILDING
UPH 761
(E) TRANSFORMER
(E) STEAM PIT
(E) SHEDS
UPH 760
36M
77.6M
84.5M
FDC
FIRE DEPARTMENT
MAIN ENTRANCE
TO FACILITY
FW FIRE WATERLINE
(N) FIRE ENTRY
ENCLOSURE
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
F
IL
E N
A M
E
IS
S
U E
D A
T E
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C O
N T
R A
C T
N O
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C H
IC
A
G O
IL
w w w
.e xp
F e d e ra l.
c o m p ro j.
n o
P A
C -2
-A
A
E X
P F
E D
E R
A L
US Army Corps of Engineers ®
S O
L
IC
IT
A
T
IO
N N
O
A
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
S E A L
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
J A
P A
N D
IS
T
R
IC
T
U N
IT
A
P O
A P
-5
C A
M P
Z A
M A
J A
P A
N
F Y
R
E P
A
IR
U P
H B
L D
G
D
E S
IG
N
R E
F R
E S
H
C O
D E
C O
M P
L
IA
N C
E S
IT
E
P L A
N
GI100
B A
C K
C H
E C
K D
E S
IG
N
S U
B M
IT
T
A L
N
O T
F O
R C
O N
S T
R U
C T
IO
N
Y K
IM
B K
IM
Y K
IM
J A
N U
A R
Y
B R
F
P .r v t
SCALE: 1 : 200
G1
CODE COMPLIANCE SITE PLAN
0 10 m
1:200
SCALE
W W W W W
(E) FHY 716
0M
M W
A T
E R
L
IN
E B
W W
W W
W
W
W
W W
W
W
W
W
W
PLAN NORTHPLAN NORTHDR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
A
B
C
D
47.55 m² 3
R18.58 m²
BEDROOM
58.04 m² 4
R18.58 m²
BEDROOM
47.38 m² 3
R18.58 m²
BEDROOM
47.55 m² 3
R18.58 m²
BEDROOM
47.95 m² 3
R18.58 m²
BEDROOM
48.12 m² 3
R18.58 m²
BEDROOM
14.37 m² 1
S46.45 m²
STORAGE
14.37 m² 1
M46.45 m²
M01
MECH
ROOM A
M01
14.37 m² 1
M46.45 m²
M02
MECH
ROOM B
M02
10.14 m² 1
S46.45 m²
STORAGE
14.42 m² 1
S46.45 m²
STORAGE
10.14 m² 1
S46.45 m²
STORAGE
24.48 m² 18
AU1.39 m²
ACTIVITY
ROOM
10.14 m² 1
S46.45 m²
STORAGE
7.86 m² 1
R18.60 m²
LAUNDRY
2.73 m² 1
S46.45 m²
108A
JANITOR
108A
5.03 m² 1
R18.58 m²
VENDING
5.07 m² 4
AU1.39 m²
107A
LOUNGE
TOILET
107A
23.19 m² 2
R18.58 m²
S01
STAIR
S01
55.01 m² 3
R18.58 m²
C101
CORRIDOR
C101
23.57 m² 2
R18.58 m²
S02
STAIR
S02
30.99 m² 2
R18.58 m²
C102
CORRIDOR
C102
276 181
7.6
STAIR 02 276 181
7.6
STAIR 01
CP:7.8M
TD:11.4M
TD:23.1M TD:5M
TD:9M
EXIT1
FIRE
RISER RM
4.3 m2 1
46.5 m2 M
FEC FEC
TRAVEL DISTANCE
COMMON PATH OF TRAVEL
EXIT
DOOR EXIT CAPACITY
(1) DOOR CLEAR WIDTH (MM)
(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)
(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)
DEAD END
LIFE SAFETY ROOM TAG
(A) ROOM AREA (SM)
(B) OCCUPANT LOAD FACTOR (SM/PERSON)
(C) OCCUPANTS (PERSONS)
(D) OCCUPANCY USE
EXIT SIGN WITH DIRECTIONAL ARROWS
STAIR/DOOR EXIT CAPACITY
(1) DOOR CLEAR WIDTH (MM)
(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)
(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)
(4) STAIR CLEAR WIDTH (MM)
(5) STAIR OCCUPANT LOAD FACTOR (MM/PERSONS)
(6) STAIR OCCUPANT LOAD CAPACITY (PERSONS)
DIST.
DIST.
DIST.
(1)
(2)
(3)
EX/DR #
(1)
(2)
(3)
(4)
(5)
(6)
DR #
A C
DB
ROOM
NAME
LIFE SAFETY LEGEND
P P SMOKE PARTITION WALL
1-HR FIRE RATED BARRIER WALL
0.5 HR FIRE RATED BARRIER WALL
FEC SURFACE MOUNTED FIRE EXTINGUISHER CABINET
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
F
IL
E N
A M
E
IS
S
U E
D A
T E
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C O
N T
R A
C T
N O
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C H
IC
A
G O
IL
w w w
.e xp
F e d e ra l.
c o m p ro j.
n o
P A
C -2
-A
A
E X
P F
E D
E R
A L
US Army Corps of Engineers ®
S O
L
IC
IT
A
T
IO
N N
O
A
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
S E A L
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
J A
P A
N D
IS
T
R
IC
T
U N
IT
A
P O
A P
-5
C A
M P
Z A
M A
J A
P A
N
F Y
R
E P
A
IR
U P
H B
L D
G
D
E S
IG
N
R E
F R
E S
H
F
IR
S T
L E
V E
L L
IF
E
S A
F E
T Y
P L A
N
GI101
B A
C K
C H
E C
K D
E S
IG
N
S U
B M
IT
T
A L
N
O T
F O
R C
O N
S T
R U
C T
IO
N
Y K
IM
B K
IM
Y K
IM
J A
N U
A R
Y
B R
F
P .r v t
SCALE: 1 : 100
C1
FIRST LEVEL LIFE SAFETY PLAN
OCCUPANT LOAD SCHEDULE - FIRST FLOOR
NUMBER ROOM NAME AREA OCCUPANCY USE
OCCUPANCY
LOAD
FACTOR(PER
PERSON)
OCCUPANT
LOAD
101 BEDROOM 58.04 m² RESIDENTIAL (NFPA 101) 18.58 m² 4
102 BEDROOM 47.38 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
103 BEDROOM 47.95 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
104 BEDROOM 48.12 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
105 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
106 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
107 ACTIVITY ROOM 24.48 m² ASSEMBLY - UNCONCENTRATED (NFPA 101) 1.39 m² 18
107A LOUNGE TOILET 5.07 m² ASSEMBLY - UNCONCENTRATED (NFPA 101) 1.39 m² 4
108 LAUNDRY 7.86 m² RESIDENTIAL (NFPA 101) 18.60 m² 1
108A JANITOR 2.73 m² STORAGE (NFPA 101) 46.45 m² 1
109 VENDING 5.03 m² RESIDENTIAL (NFPA 101) 18.58 m² 1
110 STORAGE 10.14 m² STORAGE (NFPA 101) 46.45 m² 1
111 STORAGE 10.14 m² STORAGE (NFPA 101) 46.45 m² 1
112 STORAGE 14.42 m² STORAGE (NFPA 101) 46.45 m² 1
113 STORAGE 10.14 m² STORAGE (NFPA 101) 46.45 m² 1
114 STORAGE 14.37 m² STORAGE (NFPA 101) 46.45 m² 1
C101 CORRIDOR 55.01 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
C102 CORRIDOR 30.99 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
M01 MECH ROOM A 14.37 m² MECHANICAL, ELECTRICAL, AND OTHER
BUILDING EQUIPMENT SPACES (UFC)
46.45 m² 1
M02 MECH ROOM B 14.37 m² MECHANICAL, ELECTRICAL, AND OTHER
BUILDING EQUIPMENT SPACES (UFC)
46.45 m² 1
S01 STAIR 23.19 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
S02 STAIR 23.57 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
0 5 m
1:100
SCALE
MEANS OF EGRESS LIMITATION
OCCUPANCY COMMON PATH (M) TRAVEL DISTANCE (M)
NEW APARTMENT 15 38/61 *
* TRAVEL DISTANCE WITHIN A SLEEPING ROOM TO A
CORRIDOR DOOR SHALL NOT EXCEED 38 METERS. TRAVEL
DISTANCE FROM THE CORRIDOR DOOR TO THE NEAREST EXIT
SHALL NOT EXCEED 61 METERS.
GENERAL NOTES
1. REFER TO GI001 FOR LIFE SAFETY CODE ANALYSIS.
2. ALL INFORMATION SHOWN ON THIS SHEET IS FOR
INFORMATION ONLY TO DEMONSTRATE CODE
COMPLIANCE.
3. REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR FIRE EXINGUISHER REQUIREMENTS.
4. REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS
FOR EXIT SIGN REQUIREMENTS.
151 FIRE RISER RM 4.3 m2 MECHANICAL, ELECTRICAL, AND OTHER
BUILDING EQUIPMENT SPACES (UFC)
46.5 m2 1
EXIT CAPACITY SUMMARY
TOTAL EGRESS CAPACITY
TOTAL OCCUPANT LOAD
PLAN NORTHDR
B
C
D
47.55 m² 3
R18.58 m²
BEDROOM
48.95 m² 3
R18.58 m²
BEDROOM
47.55 m² 3
R18.58 m²
BEDROOM
47.95 m² 3
R18.58 m²
BEDROOM
48.12 m² 3
R18.58 m²
BEDROOM
34.71 m² 1
S46.45 m²
BEDROOM
10.14 m² 1
S46.45 m²
STORAGE
7.85 m² 1
R18.60 m²
LAUNDRY
2.73 m² 1
S46.45 m²
211A
JANITOR
211A
23.19 m² 2
R18.58 m²
S01
STAIR
S01
55.01 m² 3
R18.58 m²
C201
CORRIDOR
C201
23.57 m² 2
R18.58 m²
S02
STAIR
S02
30.99 m² 2
R18.58 m²
C202
CORRIDOR
C202
47.94 m² 3
R18.58 m²
BEDROOM
51.55 m² 3
R18.58 m²
BEDROOM
34.67 m² 2
R18.58 m²
BEDROOM
276 181
7.6
STAIR 02
276 142
7.6
STAIR2W
276 181
7.6
STAIR 01
TD:9.4M
TD:10.7M
TD:7.2M
TD:9.2M
TD:20.4M
TD:9.1M
FEC FEC
TRAVEL DISTANCE
COMMON PATH OF TRAVEL
EXIT
DOOR EXIT CAPACITY
(1) DOOR CLEAR WIDTH (MM)
(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)
(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)
DEAD END
LIFE SAFETY ROOM TAG
(A) ROOM AREA (SM)
(B) OCCUPANT LOAD FACTOR (SM/PERSON)
(C) OCCUPANTS (PERSONS)
(D) OCCUPANCY USE
EXIT SIGN WITH DIRECTIONAL ARROWS
STAIR/DOOR EXIT CAPACITY
(1) DOOR CLEAR WIDTH (MM)
(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)
(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)
(4) STAIR CLEAR WIDTH (MM)
(5) STAIR OCCUPANT LOAD FACTOR (MM/PERSONS)
(6) STAIR OCCUPANT LOAD CAPACITY (PERSONS)
DIST.
DIST.
DIST.
(1)
(2)
(3)
EX/DR #
(1)
(2)
(3)
(4)
(5)
(6)
DR #
A C
DB
ROOM
NAME
LIFE SAFETY LEGEND
P P SMOKE PARTITION WALL
1-HR FIRE RATED BARRIER WALL
0.5 HR FIRE RATED BARRIER WALL
FEC SURFACE MOUNTED FIRE EXTINGUISHER CABINET
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
F
IL
E N
A M
E
IS
S
U E
D A
T E
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C O
N T
R A
C T
N O
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C H
IC
A
G O
IL
w w w
.e xp
F e d e ra l.
c o m p ro j.
n o
P A
C -2
-A
A
E X
P F
E D
E R
A L
US Army Corps of Engineers ®
S O
L
IC
IT
A
T
IO
N N
O
A
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
S E A L
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
J A
P A
N D
IS
T
R
IC
T
U N
IT
A
P O
A P
-5
C A
M P
Z A
M A
J A
P A
N
F Y
R
E P
A
IR
U P
H B
L D
G
D
E S
IG
N
R E
F R
E S
H
S E
C O
N D
L E
V E
L L
IF
E
S A
F E
T Y
P L A
N
GI102
B A
C K
C H
E C
K D
E S
IG
N
S U
B M
IT
T
A L
N
O T
F O
R C
O N
S T
R U
C T
IO
N
Y K
IM
B K
IM
Y K
IM
J A
N U
A R
Y
B R
F
P .r v t
OCCUPANT LOAD SCHEDULE - SECOND FLOOR
NUMBER ROOM NAME AREA OCCUPANCY USE
OCCUPANCY
LOAD
FACTOR(PER
PERSON)
OCCUPANT
LOAD
201 BEDROOM 47.94 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
202 BEDROOM 34.67 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
203 BEDROOM 51.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
204 BEDROOM 48.95 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
205 BEDROOM 47.95 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
206 BEDROOM 48.12 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
207 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
208 BEDROOM 34.71 m² STORAGE (NFPA 101) 46.45 m² 1
209 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
210 STORAGE 10.14 m² STORAGE (NFPA 101) 46.45 m² 1
211 LAUNDRY 7.85 m² RESIDENTIAL (NFPA 101) 18.60 m² 1
211A JANITOR 2.73 m² STORAGE (NFPA 101) 46.45 m² 1
C201 CORRIDOR 55.01 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
C202 CORRIDOR 30.99 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
S01 STAIR 23.19 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
S02 STAIR 23.57 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
SCALE: 1 : 100
C1
SECOND LEVEL LIFE SAFETY PLAN
0 5 m
1:100
SCALE
MEANS OF EGRESS LIMITATION
OCCUPANCY COMMON PATH (M) TRAVEL DISTANCE (M)
NEW APARTMENT 15 38/61 *
* TRAVEL DISTANCE WITHIN A SLEEPING ROOM TO A
CORRIDOR DOOR SHALL NOT EXCEED 38 METERS. TRAVEL
DISTANCE FROM THE CORRIDOR DOOR TO THE NEAREST EXIT
SHALL NOT EXCEED 61 METERS.
GENERAL NOTES
1. REFER TO GI001 FOR LIFE SAFETY CODE ANALYSIS.
2. ALL INFORMATION SHOWN ON THIS SHEET IS FOR
INFORMATION ONLY TO DEMONSTRATE CODE
COMPLIANCE.
3. REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR FIRE EXINGUISHER REQUIREMENTS.
4. REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS
FOR EXIT SIGN REQUIREMENTS.
EXIT CAPACITY SUMMARY
TOTAL EGRESS CAPACITY
TOTAL OCCUPANT LOAD
PLAN NORTHDR
B
C
D
47.55 m² 3
R18.58 m²
BEDROOM
48.95 m² 3
R18.58 m²
BEDROOM
47.55 m² 3
R18.58 m²
BEDROOM
47.95 m² 3
R18.58 m²
BEDROOM
48.12 m² 3
R18.58 m²
BEDROOM
34.71 m² 1
S46.45 m²
BEDROOM
10.14 m² 1
S46.45 m²
STORAGE
7.81 m² 1
R18.60 m²
LAUNDRY
2.73 m² 1
S46.45 m²
311A
JANITOR
311A
23.19 m² 2
R18.58 m²
S01
STAIR
S01
55.01 m² 3
R18.58 m²
C301
CORRIDOR
C301
23.57 m² 2
R18.58 m²
S02
STAIR
S02
30.99 m² 2
R18.58 m²
C302
CORRIDOR
C302
47.94 m² 3
R18.58 m²
BEDROOM
51.55 m² 3
R18.58 m²
BEDROOM
303 34.67 m² 2
R18.58 m²
BEDROOM
276 181
7.6
STAIR 02
276 142
7.6
STAIR2W
276 181
7.6
STAIR 01
TD:9.4M
TD:10.7M TD:7.2M
TD:9.2M
TD:20.4M
TD:5.5M
TD:9.1M
FEC FEC
TRAVEL DISTANCE
COMMON PATH OF TRAVEL
EXIT
DOOR EXIT CAPACITY
(1) DOOR CLEAR WIDTH (MM)
(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)
(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)
DEAD END
LIFE SAFETY ROOM TAG
(A) ROOM AREA (SM)
(B) OCCUPANT LOAD FACTOR (SM/PERSON)
(C) OCCUPANTS (PERSONS)
(D) OCCUPANCY USE
EXIT SIGN WITH DIRECTIONAL ARROWS
STAIR/DOOR EXIT CAPACITY
(1) DOOR CLEAR WIDTH (MM)
(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)
(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)
(4) STAIR CLEAR WIDTH (MM)
(5) STAIR OCCUPANT LOAD FACTOR (MM/PERSONS)
(6) STAIR OCCUPANT LOAD CAPACITY (PERSONS)
DIST.
DIST.
DIST.
(1)
(2)
(3)
EX/DR #
(1)
(2)
(3)
(4)
(5)
(6)
DR #
A C
DB
ROOM
NAME
LIFE SAFETY LEGEND
P P SMOKE PARTITION WALL
1-HR FIRE RATED BARRIER WALL
0.5 HR FIRE RATED BARRIER WALL
FEC SURFACE MOUNTED FIRE EXTINGUISHER CABINET
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
F
IL
E N
A M
E
IS
S
U E
D A
T E
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
C O
N T
R A
C T
N O
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C H
IC
A
G O
IL
w w w
.e xp
F e d e ra l.
c o m p ro j.
n o
P A
C -2
-A
A
E X
P F
E D
E R
A L
US Army Corps of Engineers ®
S O
L
IC
IT
A
T
IO
N N
O
A
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
S E A L
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
J A
P A
N D
IS
T
R
IC
T
U N
IT
A
P O
A P
-5
C A
M P
Z A
M A
J A
P A
N
F Y
R
E P
A
IR
U P
H B
L D
G
D
E S
IG
N
R E
F R
E S
H
T H
IR
D
L E
V E
L L
IF
E
S A
F E
T Y
P L A
N
GI103
B A
C K
C H
E C
K D
E S
IG
N
S U
B M
IT
T
A L
N
O T
F O
R C
O N
S T
R U
C T
IO
N
Y K
IM
B K
IM
Y K
IM
J A
N U
A R
Y
B R
F
P .r v t
OCCUPANT LOAD SCHEDULE - THIRD FLOOR
NUMBER ROOM NAME AREA OCCUPANCY USE
OCCUPANCY
LOAD
FACTOR(PER
PERSON)
OCCUPANT
LOAD
301 BEDROOM 47.94 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
302 BEDROOM 34.67 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
303 BEDROOM 51.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
304 BEDROOM 48.95 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
305 BEDROOM 47.95 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
306 BEDROOM 48.12 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
307 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
308 BEDROOM 34.71 m² STORAGE (NFPA 101) 46.45 m² 1
309 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
310 STORAGE 10.14 m² STORAGE (NFPA 101) 46.45 m² 1
311 LAUNDRY 7.81 m² RESIDENTIAL (NFPA 101) 18.60 m² 1
311A JANITOR 2.73 m² STORAGE (NFPA 101) 46.45 m² 1
C301 CORRIDOR 55.01 m² RESIDENTIAL (NFPA 101) 18.58 m² 3
C302 CORRIDOR 30.99 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
S01 STAIR 23.19 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
S02 STAIR 23.57 m² RESIDENTIAL (NFPA 101) 18.58 m² 2
SCALE: 1 : 100
C1
THIRD LEVEL LIFE SAFETY PLAN
0 5 m
1:100
SCALE
MEANS OF EGRESS LIMITATION
OCCUPANCY COMMON PATH (M) TRAVEL DISTANCE (M)
NEW APARTMENT 15 38/61 *
* TRAVEL DISTANCE WITHIN A SLEEPING ROOM TO A
CORRIDOR DOOR SHALL NOT EXCEED 38 METERS. TRAVEL
DISTANCE FROM THE CORRIDOR DOOR TO THE NEAREST EXIT
SHALL NOT EXCEED 61 METERS.
GENERAL NOTES
1. REFER TO GI001 FOR LIFE SAFETY CODE ANALYSIS.
2. ALL INFORMATION SHOWN ON THIS SHEET IS FOR
INFORMATION ONLY TO DEMONSTRATE CODE
COMPLIANCE.
3. REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR FIRE EXINGUISHER REQUIREMENTS.
4. REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS
FOR EXIT SIGN REQUIREMENTS.
EXIT CAPACITY SUMMARY
TOTAL EGRESS CAPACITY
TOTAL OCCUPANT LOAD
PLAN NORTHDR
UP
D
C
B
A
1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 178
DN
D
C
B
A
1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 178
D
C
B
A
1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 178
FIRST FLOOR HAZMAT ABATEMENTA1 SCALE: NTS
SECOND FLOOR HAZMAT ABATEMENTB1 SCALE: NTS
THIRD FLOOR HAZMAT ABATEMENTC1 SCALE: NTS
103 102 101
104 105 106
205 204
206 207
203 202
1 2
305 304
303 302 301
308 309
LOUNGE
LAUNDRY
STORAGE
A
MECH ROOM
A
MECH ROOM
B STORAGE
E
STORAGE
B
STORAGE
C
STORAGE
D
STORAGE
F
LAUNDRY
STORAGE
G
LAUNDRY
GENERAL NOTES
1. IN THE EVENT PCB BALLASTS ARE OBSERVED, THE
BALLASTS SHALL BE REMOVED AND DISPOSED OF IN
ACCORDANCE WITH SECTION 02 84 16 HANDLING OF
LIGHTING BALLASTS AND LAMPS CONTAINING PCBS AND
MERCURY.
2. FLUORESCENT LIGHT TUBES SHALL BE RECYCLED IN
ACCORDANCE WITH THE JEGS AND GOVERNMENT OF
JAPAN REGULATIONS.
3. CONTAINING SMOKE DETECTORS SHALL BE COLLECTED
AND DISPOSED OF IN ACCORDANCE WITH THE JEGS AND
GOVERNMENT OF JAPAN REGULATIONS.
1. ADHERE TO SECTION 02 82 00 ASBESTOS REMEDIATION
AND THE CONTRACTOR APPROVED WORK PLAN.
2. CONTRACTOR SHALL VERIFY THE EXISTING LOCATIONS,
QUANTITIES, CONDITION, LAYERS AND THICKNESS OF
ALL MATERIAL PRIOR TO COMMENCEMENT OF ANY
WORK.
3. NO EXCESSIVE USE OF WATER OR LIQUID WILL BE
ALLOWED. DAMAGE RESULTING FROM THE USE OF
EXCESSIVE WATER OR LIQUID WILL BE REPAIRED OR
REPLACED BY THE CONTRACTOR AT NO ADDITIONAL
COST TO THE GOVERNMENT.
4. CONTRACTOR TO COORDINATE ALL WORK WITH THE
CONTRACTING OFFICER AND GENERAL CONTRACTOR.
5. EXTERIOR CONCRETE WORK IS LIMITED TO THE EXTENT
NECESSARY TO ALLOW FOR THE INSTALLATION OF
EQUIPMENT.
6. ASSUME ALL ROOF MATERIALS ROOF CONTAIN
ASBESTOS.
1. ADHERE TO SECTION 02 83 00 LEAD REMEDIATION AND
THE CONTRACTORS APPROVED WORK PLAN.
2. LEAD/CADMIUM/CHROMIUM WORK MAY BE LIMITED TO
THE SPOT REMOVAL OF LEAD PAINT, THE REMOVAL OF
MATERIALS WITH LEAD/CADMIUM/CHROMIUM PAINT, OR
THE REMOVAL OF LOSE AND FLAKING PAINT TO A SOLID
ADHESION.
3. THE CONTRACTOR SHALL CONDUCT SELECTIVE
DEMOLITION OF THE BUILDING COMPONENTS WITH
LEAD/CADMIUM/CHROMIUM PAINT.
ASBESTOS SHEET KEYNOTES
1 GRAY MASTIC UNDER BEIGE 300 X 300MM FLOOR TILE
2 GRAY ADHESIVE UNDER BROWN VINYL BASE BOARD
3 BLACK SINK UNDERCOATING
4 WHITE VIBRATION DAMPENER
5 BROWN/RED FLANGE GASKET
6 EXTERIOR TEXTURED WALL COATING
7 DARK GRAY PIPE PENETRATION SEALANT
8 GYPSUM BOARD SKIMCOAT/JOINT COMPOUND
LEAD/CADMIUM/CHROMIUM SHEET KEYNOTES
9 BROWN PAINTED EXTERIOR METAL DOOR AND DOOR
FRAME
10 BROWN PAINTED WOOD WINDOW FRAME
11 BEIGE OVER YELLOW PAINTED METAL DOOR AND
DOOR FRAME
12 BLUE PAINTED METAL HANDRAIL
13 BROWN PAINTED METAL DOOR AND DOOR FRAME
14 RED PAINTED METAL FIRE CABINET
15 BEIGE PAINTED METAL ELECTRICAL CABINET
ASBESTOS ABATEMENT
LEAD/CADMIUM/CHROMIUM ABATEMENT
8 11 2 7 8 11 14 15
2 8 13
2 8 10 13 13 2
3 2 8 10 2 8 10
2 8 10 13 13
2 8 10
2 12
2 8 13
2 11 14 15
2 8 10
2 8 13
2 8 10 13
2 8 13
2 8 10
2 8 10 2 8 10 13 7 13
2 3
2 8 10 13
7 11 14 1582
2 8
10 13 2 8 10 13
2 3
2 8
10 13 2 8 10
3 2 8 10 13
2 8 13
11 14 1582
2 12
2 8 10 13
2 8 13
2 8 10
1 2
8 11 2 7 8 11 14 15
2 8 13
2 8 10 13 13 2
3 2 8 10 2 8 10
2 8 10 13 13
2 8 10
2 12
2 8 13
2 11 14 15
2 8 10
2 8 13
2 8 10 13
2 8 13
2 8 10
2 8 10 2 8 10 13 7 13
2 3
2 8 10 13
7 11 14 1582
2 8
10 13 2 8 10 13
2 3
2 8
10 13 2 8 10
3 2 8 10 13
2 8 13
11 14 1582
2 12
2 8 10 13
2 8 13
2 8 10
2 8 13
2 8 13
1 2
8 11 2 7 8 11 14 15
2 8 13
2 8 10 13 13 2
3 2
2 8 10 13 13
2 8 13
8 10
2 8 10 1 2 13
2 8 10 13
2 11 14 15
2 8 10 13
2 12 13 14
2 8 13
2 8 10
1 2
8 13
2 8 13
1 2
8 132 8 131 2 8 10
2 8 13
2 8 10 13
2 12 13 14
2 8 11 14 15
2 8 10 13
2 8 13
2 8 101 2 8 134 9 135 9 132 8 10
32 8 10
2 7 8 11 14 15
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
: P
AC
-2
0-
A0
A1EX
P
FE
D
ER
AL
US Army Corps of Engineers ®
SO
LI
C
IT
AT
IO
N N
O
A
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
SEAL
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
JA
PA
N D
IS
TR
IC
T
U N
IT
, A
PO
A P
3-
0%
B
AC
KC
H
EC
K
D
ES
IG
N
S U
BM
IT
TA
L
(N O
T
FO
R C
O N
ST
R
U C
TI
O
N
L.
A
W
AD
A
K.
K
AN
ES
H
IR
O
L.
G
AR
C
IA
H
AZ
M
AT
A
BA
TE
M
EN
T
H-101
JA
N
U
AR
Y
C Z_
B7
_H
AZ
_H -1
.d w g
C
AM
P
ZA
M A, J
AP
AN
FY
R
EP
AI
R U
PH
B
LD
G
D
ES
IG
N
R
EF
R
ES
H
PLAN NORTHPLAN NORTH
G1
B1
L1
THIRD FLOOR HAZMAT ABATEMENT
SCALE: NTS
SECOND FLOOR HAZMAT ABATEMENT
SCALE: NTS
FIRST FLOOR HAZMAT ABATEMENT
SCALE: NTS DR
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
C O
N
TR
AC
T
N O
N . M
IC
H
IG
AN
A
VE
SU
IT
E
C
H
IC
AG
O
, I L w w w
.e xp
Fe de ra l.c om pr oj . n o.
: P
AC
-2
0-
A0
A1EX
P
FE
D
ER
AL
US Army Corps of Engineers ®
SO
LI
C
IT
AT
IO
N N
O
A
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
SEAL
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
JA
PA
N D
IS
TR
IC
T
U N
IT
, A
PO
A P
3-
L.
S
AB
AD
O
L.
M
AL
AB
AN
AN
K.
N
AK
AM
U R
A
JA
N
U
AR
Y
0%
B
AC
KC
H
EC
K
D
ES
IG
N
S U
BM
IT
TA
L
(N O
T
FO
R C
O N
ST
R
U C
TI
O
N
C
AM
P
ZA
M A, J
AP
AN
FY
R
EP
AI
R U
PH
B
U
IL
D
IN
G
D
ES
IG
N R
EF
R
ES
H
1. ALL CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE APPLICABLE
FEDERAL AND LOCAL LAWS, CODES, ORDINANCES, AND ANY STANDARDS AS
SPECIFICALLY REQUIRED WITHIN CAMP ZAMA.
2. THE CONTRACTOR SHALL REVIEW THE PLANS AND SPECIFICATIONS AND NOTIFY THE
CONTRACTING OFFICER IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND BEFORE
PROCEEDING WITH THE WORK.
3. ALL DISTANCES AND DIMENSIONS SHOWN ARE IN THE METRIC SYSTEM UNLESS
OTHERWISE INDICATED.
4. WHETHER SHOWN OR NOT SHOWN ON DRAWINGS, ALL EXISTING UTILITIES AND
STRUCTURES THAT ARE DISTURBED DURING TRENCHING WORK SHALL BE RESTORED TO
THEIR ORIGINAL CONDITIONS. ANY ACCIDENTAL DAMAGE TO UTILITIES AND STRUCTURES
THAT ARE INDICATED TO REMAIN SHALL BE REPAIRED AND RESTORED TO THEIR ORIGINAL
CONDITIONS AT NO COST TO THE GOVERNMENT.
5. THE CONTRACTOR SHALL CONDUCT CONSTRUCTION OPERATIONS WITH MINIMAL
INTERFERENCE TO NEARBY ROADS AND PARKING AREAS, ADJOINING SIDEWALKS, AND
OTHER PEDESTRIAN AND VEHICULAR ROUTES. THE CONTRACTOR SHALL USE BEST
EFFORTS TO PROVIDE CONTINUOUS TRAFFIC MOVEMENTS IN ALL DIRECTIONS AT ALL
TIMES.
6. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN EXCAVATING IN AREAS
THAT ARE KNOWN TO HAVE UNDERGROUND UTILITIES. HAND EXCAVATION IS REQUIRED
WITHIN 0.90 METER OF ANY EXISTING UTILITIES. IN CASES WHERE THE DEPTH OR
ELEVATION ARE NOT INDICATED ON THE PLANS, THE CONTRACTOR SHALL PROCEED WITH
CAUTION AND SHALL BE RESPONSIBLE FOR ANY DAMAGES INCURRED DURING THE
EXCAVATION ACTIVITIES.
7. THE CONTRACTOR SHALL PROVIDE SHORING FOR TRENCH EXCAVATION WORK THAT
EXCEEDS 1.50 METERS IN DEPTH.
8. CONTRACTOR TO INSTALL TEMPORARY SILT FENCES AND OTHER EROSION CONTROL
DEVICES PRIOR TO START OF CONSTRUCTION TO PREVENT THE OUTFLOW OF
SOIL-CONTAMINATED RUNOFF INTO DRAINAGE INLETS OR NEARBY OPEN WATERWAYS.
9. AN ACTUAL TOPOGRAPHIC SURVEY WAS NOT CONDUCTED FOR THE UPH 760 PROJECT
AREA. THE EXISTING UTILITY LINES AND MANHOLES AS REFLECTED ON DRAWINGS WERE
TAKEN FROM AVAILABLE AS-BUILT DRAWINGS DATED 1955 AND 1988 WITH
CROSS-REFERENCING TO OTHER BASE MAPS ISSUED AS PART OF THE
GOVERNMENT-FURNISHED INFORMATION (GFI) PACKAGE. SEE ALSO RELEVANT NOTES ON
TOPOGRAPHIC SURVEY DATA IN DWG CU201.
10. THE EXISTING SIDEWALKS, FENCE ENCLOSURE, OUTDOOR SUPPORT FACILITIES, AND
OTHER ABOVEGROUND SITE FEATURES AS SHOWN ON PLANS ARE BASED ON SITE
CONDITIONS FOUND DURING FIELD INVESTIGATION.
11. THE REMOVAL AND REPLACEMENT OF EXTERIOR UTILITY CONNECTIONS SHALL
GENERALLY TERMINATE WITHIN 1.5 METERS FROM BUILDING WALLS. FOR SANITARY
SEWER AND STORM SEWER LINES, REPLACEMENT SHALL INCLUDE PIPES FROM THE
BUILDING WALLS TO THE NEAREST EXISTING EXTERIOR MANHOLES OR LATERAL LINES
THAT ARE CLOSEST TO THE 1.5-METER CONSTRUCTION LIMITS.
12. THERE MAY BE EXISTING UTILITY BUILDING CONNECTIONS THAT ARE NOT SHOWN ON
DRAWINGS. THESE IF THESE LINES ARE FOUND, THE CONTRACTING OFFICER SHALL BE
NOTIFIED IMMEDIATELY FOR DIRECTION PRIOR TO PROCEEDING WITH WORK.
13. THE TRENCHING WORK FOR THE INSTALLATION OF THE NEW FIRE WATER LINE SHALL BE
CONDUCTED WITH EXTREME CAUTION IN CONSIDERATION OF OTHER UNDERGROUND
UTILITY LINES THAT MAY BE PRESENT AND NOT REFLECTED ON DRAWINGS. PROMPT
COORDINATION WITH THE CONTRACTING OFFICER IS NECESSARY FOR ANY EXISTING
PIPELINES OR CABLES THAT MAY CONFLICT WITH THE ALIGNMENT OF THE NEW FIRE
WATER LINE.
14. THE NARROW STRIP BETWEEN THE BUILDING AND THE CONCRETE BOUNDARY BLOCK IS
INTENDED TO BE A GRAVEL GROUNDCOVER BUT CURRENTLY APPEARED TO BE A BARREN
GROUND SURFACE WITH FEW TURFING AND SHRUBBERY. THIS PROJECT WILL INCLUDE
THE RESTORATION OF THE GRAVEL SURFACING BUT ONLY ALONG THE SECTIONS
DISTURBED BY THE UTILITY REPLACEMENT WORK. THE CONTRACTOR SHALL COORDINATE
WITH THE CONTRACTING OFFICER FOR ANY DEVIATION THAT MAY BE DIRECTED DURING
ACTUAL CONSTRUCTION WORK.
15. ALL SODDED SURFACES DISTURBED BY THE UTILITY TRENCHING WORK AND THOSE
DAMAGED BY MOVEMENTS OF CONSTRUCTION EQUIPMENT SHALL BE RESTORED TO
MATCH THE EXISTING CONDITION.
BUILDING / STRUCTURE
CONCRETE SIDEWALK
CONCRETE STEPS WITH HANDRAILS
STORM DRAINAGE LINE
STORM DRAINAGE MANHOLE
CONCRETE DITCH
SPLASH BLOCK AND DOWNSPOUT
UPH 760
SD
SD SD
DMH
DS DS
CONCRETE BLOCK STOPPER
KENCHI BLOCK RETAINING WALL
CHAIN LINK FENCE ENCLOSURE
SODDING
GRAVEL GROUNDCOVER
EXISTING DEMOLITION NEW DESCRIPTION
POTABLE WATER LINE AND GATE VALVEW
FIRE WATER SUPPLY LINE AND GATE VALVEFW
GV
GV
FIRE DEPARTMENT CONNECTION
FDC
FIRE HYDRANT WITH GATE VALVE
SANITARY SEWER LINE AND SURFACE CLEANOUT
SANITARY SEWER MANHOLE
WATER METER
FHY
SS SS
SMH
SCO SCO
GV
AC ASPHALT CONCRETE
BLDG BUILDING
CI CAST IRON
CJ CONTRACTION JOINT
CONC CONCRETE
DMH DRAINAGE MANHOLE
DIP DUCTILE IRON PIPE
DS DOWNSPOUT
EJ EXPANSION JOINT
EXP EXPANSION
EXST EXISTING
FDC FIRE DEPARTMENT CONNECTION
FFE FINISH FLOOR ELEVATION
FHY FIRE HYDRANT
GFI GOVERNMENT-FURNISHED INFORMATION
GL GRADE LINE
GV GATE VALVE
H HEIGHT
L LENGTH
M METER
MIN MINIMUM
MM MILLIMETER
N/mm2 NEWTON PER SQUARE MILLIMETER
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
POC POINT OF CONNECTION
PVC POLYVINYL CHLORIDE
SCO SURFACE CLEANOUT
S SLOPE
SI SURFACE INLET
SMH SEWER MANHOLE
THK THICK
TYP TYPICAL
UPH UNACCOMPANIED PERSONNEL HOUSING
W WIDTH
° DEGREES
Ø DIAMETER
# NUMBER
% PERCENT
CIVIL GENERAL NOTES CIVIL LEGENDCIVIL ABBREVIATIONS
DOWNSPOUT CONNECTIONSD
SYSTEMS
0 - GENERAL
1 - SITE PLANS
2 - UTILITY PROFILES
3 - GRADING SECTIONS
4 - ENLARGED PLANS
5 - DETAILS
SHEET ID STRUCTURE
C S 0 0 0
SHEET SEQUENCE
NUMBER
SYSTEMDISCIPLINE
DESIGNATOR
PROJECT LIMITS
SILT FENCE
GRAVEL FILTER
SF
5-FT (1.52-M) LINE FROM BLDG WALL
FIRE RISER
ENCLOSURE
TBM TEMPORARY BENCH MARK
C
IV
IL
AB
BR
EV
IA
TI
O N
S, G
EN
ER
AL
N
O
TE
S
AN
D L
EG
EN
D
C-001
C -0
.d w g
DR
AF
T
AutoCAD SHX Text M
0 15000mm5000
CON…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .