DRAFT_CP ZAMA UPH B760 REFRESH_DRAWINGS.pdf

PDF 18 MB Posted

Attached to
Repair Unaccompanied Personnel Housing (UPH) Building 760 and Repair UPH Building 581, Camp Zama, Japan
Solicitation number
W912HV26Z0010
Issued by

About this file

This file is a set of architectural drawings for the Unaccompanied Personnel Housing (UPH) Building 760 refresh project at Camp Zama, Japan. The drawings provide detailed technical specifications and layouts for the repair and renovation work planned for this military residential facility. The documents establish the design parameters and spatial configurations that will guide the upcoming Design-Bid-Build procurement process, enabling potential contractors to understand the scope of construction and renovation requirements for the building refresh initiative.

The drawings serve as a foundational document for the pre-solicitation market research phase, allowing the U.S. Army Corps of Engineers, Japan District to gather industry feedback on feasibility and contractor capability before issuing the formal solicitation. These design documents will inform cost estimates, project scheduling, and technical requirements that will ultimately be incorporated into the competitive bid package for local sources physically located and licensed to conduct business in Japan.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HOKKAIDO

HONSHU

SHIKOKU

OKINAWA

KYUSHU CAMP ZAMA

AR-397 PH-3

RIDGWAY ROAD

PLAY GROUND

174S .T.

S.T.187

(JGSDF)

NON ARMY P

ROPERTY

T-2

-2T-2

-3

S -10

0 -1

S -10

09-1

S-10

-1

S-1

-1

S-1

6-1

S-1005 -1

S-1004-1

S-1 003-1 S-1002-1

S-1001-1

60-H1

GATE

G A

T E

GATE

ELECTRIC

ANTENNA

ANTENNA

TENNIS

S.T.

"L " S

T R

E E

T

"K " S

T R

E E

T

"I " S

TR

E E T

4T H A

VEN

UE

5TH A

VEN

UE

"H " S

T R

E E

T

1ST A

VENUE

H .Q

. R O

A D

4TH A

VEN

UE

5TH AVENUE

2ND A

VE

NUE

S

T A

V E

N U

E

"C " S

T R

E E

T

4TH

A

VEN

UE

RA

N

G E

R O

AD

CLIFF DRIVE

5T H

A V

E N

U E

4T H A

VE

N

U E

NO. 1

N O

. 2

N O

. 3

N O

. 1

N O

. 1

N O

. 4

NO

. 6

N O

. 7

NO. 8

N O

. 1

N O

. 1

NO. 17

NO. 16

NO. 12

NO. 1

E L.195.83B .M.

O.T

A /C

T.B .

A /C

A /C

L.P .G

B O

W M

A N

R O

A D

B O

W M

A N

R O

A D

T.B

O .T

T.B

T.B

A/C

O .T

O.T.

CLAR

K LO

O P

O.T.

T.B .S.T.

S.T.532

O .T

8-

TR

TR

A /C

C H

E S T

N U

T D

R

IV

E

HIGHLAND DRIVE

O.T.9-5

TR

TR

2-5

36-5

PINE TREE ROAD

S.T

35H5

34-5

581-1

MOUNTAIN ROAD

A / C

TR O

T

-5

TR

TR

TR

US ARMY KASTNER AIRFIELD

GATE NO.4

1045-1

TEN

NIS

C

OURT

104-1

70 1

72 1

J-1

J-7

J-3

J-2

P-13

P -9

SHED

P-2

O.T

S-152

S-153

S-1

101H1

S-109

SENTRY B

OX

GATE N

O.6

S-160

S-106

S -69

S-116

S -5

S -99

S -99

S -9

268-1

DUGOUT

DUGOUT

S -28

S -9

S-3 16T-3

16-

S -3

S -3

T-325

C A

R W

A S

H E

R

S-3

332-S

S-333-1

S -337

341-S

S -34

S -40

283-1

S -20

S-3

S-3

-2

S-3

S -37

S -37

S -378

S -376

S-3

S-3

S -383

S -68

T-675T-684

S -64

S-35

S-

S-34

S-36

1 2

3 4

2 3

S -5

S -50

S-502

S-512

S -2

S-3

S-4

S-15

S-98

S3-2

S-43

55-5 S-55

S-54

S-53

53-5

S-

S-

S

- 5

T-593

S-37

1 4

S-40

S-39

S-8

S-7

S -792

S-99

S -7

S -81

S-809

S-661

S -72

S -724

S-7

S -732

S -731

S -6

S-6

S -625

S-607

S-6 21-1

S-65

M

OTO

R P

OO

L A

REA

400M

RUNNING TRA

CK

S-916

S -99

6T-996-1

T-996-2

S-953

S-82

S

S1008

S100

S1000 S1001

S1002

S1003 S1004

S1005

S100

2 1

T-1020-1

S-1023

1032-1

1032-2

1030-1

1045-2

S-1048

1042-1

1042-2

S-634

-1

T-6

-1 T- 694

-2

S-787

102H2

S-100 S-5

S-6

S -1

T-1

S-312

S-1

S-1

S-1

MO

NUMENT

S-221

S-3 16T-3

16-

T-325

S -337

341-S

S-21

1 2

3 4

2 3

T-571

1 4

S-99

S-8

S-733

P-27

T-6

S -601

989-2

T-608

SUB-S

TATIO

N

S -1

SAGAMIHARA CITY

ZAMA CITY

CITY BOUNDARY

SAGAMIHARA CITY

ZAMA CITY

S-280

S-2

S-5

S-5

T-3

J-6

J-5

1ST AVENUE

S-9

3 9

S -621

OFFIC

ER R

OAD

S-198 FENCE

1ST A

VENUE

S726

S-1027

S-737-1

S-737-2

7 3

H5

T-

JN.C

D

B.M

S-107

S -34

S -723

S-825

S-851

S-1086

WIND SOCK

AUTO MATIC WIND METER

-2

506-1

510-1

2 1

O.T

S-3

-3

S1

S-587

287-2

T-784

FOOTBALL FIELD

PLAY

G R

O U

N D

FISH POND

286-1

BASEBALL F

IE

LD

SOFTBALL F

IE

LD

S-2

33PARADE F

IE

LD

SOCCER F

IE

LD

(S -1

99)

(S-2 95)

GATE NO.1

GATE NO.2

P -3

P -10

P -12

GATE NO.7 852

T-1050-2

FLAG

P

OLE

S

TENNIS COURT

287-1

T E N

N

IS

C O

U R

T

M

IN

I G O

LF

S .T.

S-26

J-4

0-1

S K A

T E R

IN

K

312-1

SWIMM

ING POOL

S318

G A T E N

O .3

SEPARATOR

OIL

WASH RANP

600-1

615BRIDG

E

O.T.

W.T

832-2

W.T

832-1

PLAY GROUND

CARPORT

S-7

1092-1

PLAYGROUND

1094-1

PLAYGROUND

S-1024

M

ECH

x;

B

A

SK

E

TB

AL

L

C O

U R

T

0-1

P

LA

Y G

R O

U N

D

989-1

W.T.

PLAY

GROUND

S-7

S-1024-2

S-1083

S-802

S-1050-1

S-856

T -7

GOLF DRIVING RANGE

T.B

807-1

T-450 -3

S -603

S -64

T-8

GOLF COURSE

PLAY

G

RO

U

ND

1-

201-1

8- 1

C

AR

W

AS

H A

R

EA

S-406-1

S-4 50-2

S -601-1

S-6 21-3

S-69 4-3

S-704 -1

T-7 04-3

1018-1

102H1

1032-5

1043-1

-2

-3

-4

PLAY

GROUND

1065-1

S-5011

S .T

PLAYGROUND18-H3

PLA

Y G

D

P

LA

Y G R

O U N D

"B " S

TR

E

E T

.31

.33

T-1

314-H

M U

LTI P

U

R P

O S

E C

O U

R T

GATE NO.1

T

- 831

9 2 .5

9 5

9 8 .5

9 6 .0

9 6 .2

9 8 .5

9 3 .7

9 8 .5

9 5 .2

9 7 .2

9 5

9 5 .5

9 4 .5

9 7 .5

9 5

9 5 .6

9 6 .9

9 4 .0

9 3 .1

9 3 .0

9 3 .8

.7 0

.9 2

.0 1

.5 5

.8 8

.2 6

.7 0

.6 6

.1 9

.1 7

858 9

.9

.1

.2

.9

.3

.2

.1

1022-1

S-7

W A

TER

ST

O

RA

GE

TAN

K

T -205-H1

A-00-138

T-715-1

T-7

-2

T-53-H6

T-6 45-1

T-234

S -227

1039-1

"D " S

T R

E E

T

581-3

GATE

G A

T E

G A

T E

G A

T E

G A T E

T-58

T-6 42-1

T-6 45-2

T A

Y L O

R R

O A

D

MAC ARTHUR DRIVE

MAC ARTHUR DRIVE

H U

LL

R

O A

D

S-6 x; ST OP x; ST OP T-1095-1

T -5

-1 T

-5

-2

CONC DITH

C O

N C

D

IT

H

CONC DITH

C O

N C

D I T

H

CONC DITH

CONC DITH

C O

N C

D

IT

H

C O

N C

D I T

H

CONC DITH

PLAY GROUND

T-741-10

T-7

-1

T-741-1

J-1

1024-1

910-1

CAR

W

ASH

ER

123H -1

XX

X X

X

X

X X

X

X

X

X

X

X

S-997

XFMR

X F

M R

T -7

1024-5

314 -H

S-795-1

T-795-2

S -5

5-

T-585-2

1042-3

-1

T-694-4 T-694-5

GATE

715H2

T-984-H1

552-H 1 T

-1

4-

G A

TE

DO

G

T R

AIN

IN

G A

RE

A

CONC DITH

PLAY GD

GATE

HIGHLAND DRIVE

U.S.T

PGCH1

ANTENA

GATE

GATE

G .T

W

IT

H O

.T

683H

04-H

T- 791

H4 H5

H3

H6 H7

H8 H9

S -998

3-

H3

H3

0-H

-H

341-H

341-H

563-H1

1-H

782-H1

1-

H1

3-

H

EAGLES NEST

CO

O

MER D

RIV

E

3RD A

VEN

UE

E S T R E E

T

E S

T R

E E

T

S -685-1

3R D

A

VE

N U

E

3RD AVENUE

R

D A

V E

N U

E

3RD A

VEN

UE

T-6 25H

T-10 42-4

333H2

704H4

G E

N

X F

M R

T.R

GATE

O.T

UNDER CONSTRUCTION

LAKE 1

LAKE 2

N O

S-8

-H

314- H4

314-H5

314-H6 314-H7

N O

. 1

N O

. 9

GA

TE

621H 4621H

S-3 79-1

.3

.8

.4

.3

OW2.6

OW14

O W

D V5.5

D V .6

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

F

IL

E N

A M

E

IS

S

U E

D A

T E

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C O

N T

R A

C T

N O

N

M

IC

H

IG

A

N A

V E

S U

IT

E

C H

IC

A

G O

IL

w w w .e xp F e d e ra l.

c o m p ro j.

n o

P A

C -2

-A

A

E X

P F

E D

E R

A L

US Army Corps of Engineers ®

S O

L

IC

IT

A

T

IO

N N

O

ARCHITECTURECIVIL

MECHANICAL/PLUMBING

ELECTRICAL

INTERIOR DESIGN

ENVIRONMENTAL

TELECOM

205 N. MICHIGAN AVE.

SUITE 3800

CHICAGO, IL 60601

www.expFederal.com proj. no.: US Army Corps of Engineers ®

CONTRACT NO.:

ISSUE DATE:

SOLICITATION NO.:

JAPAN ENGINEER DISTRICT

A

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

J A

P A

N D

IS

T

R

IC

T

U N

IT

A

P O

A P

-5

FIRE PROTECTION

THIS WORK WAS PREPARED BY ME OR

UNDER MY SUPERVISION

C A

M P

Z A

M A

J A

P A

N

F Y

R

E P

A

IR

U P

H B

L D

G

D

E S

IG

N

R E

F R

E S

H

C O

V E

R S

H E

E T

G-001

B

A C

K C

H E

C K

D E

S

IG

N S

U B

M

IT

T A

L

N O

T F

O R

C O

N S

T R

U C

T

IO

N

B C

A R

IN

O

B C

A R

IN

O

D K

A N

E S

H

IG

E

J A

N U

A R

Y

B R

G

E N

.r v t-

CAMP ZAMA, JAPAN

FY26 REPAIR UPH BLDG 760 DESIGN REFRESH

PAC-25008780-A0

JANUARY 2026

UPH BUILDING 760

N O

R T H

VICINITY MAP

MAP OF JAPAN

NORTH

DR

AF

T

SHEET

NUMBER

SHEET NAME

GENERAL

G-001 COVER SHEET

G-002 SHEET INDEX

GI001 LIFE SAFETY CODE ANALYSIS

GI100 CODE COMPLIANCE SITE PLAN

GI101 FIRST LEVEL LIFE SAFETY PLAN

GI102 SECOND LEVEL LIFE SAFETY PLAN

GI103 THIRD LEVEL LIFE SAFETY PLAN

ENVIRONMENTAL

H-101 HAZMAT ABATEMENT

CIVIL

C-001 ABBREVIATIONS, GENERAL NOTES AND LEGEND

C-002 TEMPORARY CONTRACTOR'S LAYDOWN AREA PLAN

C-003 CONTRACTOR'S HAUL ROUTE

CD101 DEMOLITION PLAN

CU101 SURVEY CONTROL POINTS INFORMATION AND UTILITIES PLAN

CU201 FIRE WATER LINE PROFILE AND LAYOUT

C-501 WATER LINE DETAILS

C-502 MISCELLANEOUS DETAILS - 1

C-503 MISCELLANEOUS DETAILS - 2

ARCHITECTURAL

AD001 ARCHITECTURAL REMOVAL SCOPE OF WORK, REMOVAL SCOPE MATRIX

AD100 FLOOR REMOVAL PLAN - OVERVIEW

AD101 FIRST FLOOR REMOVAL PLAN

AD102 SECOND FLOOR REMOVAL PLAN

AD103 THIRD FLOOR REMOVAL PLAN

AD104 FIRST FLOOR REFLECTED CEILING REMOVAL PLAN

AD105 SECOND FLOOR REFLECTED REMOVAL CEILING PLAN

AD106 THIRD FLOOR REFLECTED REMOVAL CEILING PLAN

AD200 REMOVAL ELEVATIONS

AD201 REMOVAL INTERIOR ELEVATION - FIRST FLOOR CORRIDOR - 1

AD202 REMOVAL INTERIOR ELEVATION - FIRST FLOOR CORRIDOR - 2

AD203 REMOVAL INTERIOR ELEVATION -TYPICAL O3 LIVING UNIT

AD204 REMOVAL INTERIOR ELEVATION -TYPICAL O2 LIVING UNIT

AD205 REMOVAL INTERIOR ELEVATION - TYPICAL LAUNDRY

AD301 BUILDING REMOVAL SECTION

AD400 REMOVAL SECTION DETAIL

AD401 REMOVAL PLAN DETAIL - 1

AD402 REMOVAL PLAN DETAIL - 2

A-001 ARCHITECTURAL NEW SCOPE OF WORK, NEW SCOPE MATRIX

A-100 FLOOR NEW PLAN - OVERVIEW

A-101 FIRST FLOOR NEW PLAN

A-102 SECOND FLOOR NEW PLAN

A-103 THIRD FLOOR NEW PLAN

A-104 FIRST FLOOR REFLECTED CEILING NEW PLAN

A-105 SECOND FLOOR REFLECTED CEILING NEW PLAN

A-106 THIRD FLOOR REFLECTED CEILING NEW PLAN

A-107 NEW DOOR & WINDOW KEY PLAN

A-200 NEW ELEVATIONS

A-201 NEW INTERIOR ELEVATION - FIRST FLOOR CORRIDOR - 1

A-202 NEW INTERIOR ELEVATION - FIRST FLOOR CORRIDOR - 2

A-203 NEW INTERIOR ELEVATION - TYPICAL O3 LIVING UNIT

A-204 NEW INTERIOR ELEVATION - TYPICAL O2 LIVING UNIT

A-205 NEW INTERIOR ELEVATION - TYPICAL LAUNDRY

A-301 BUILDING NEW SECTION

A-400 NEW SECTION DETAIL

A-401 NEW PLAN DETAIL - 1

A-402 NEW PLAN DETAIL - 2

A-403 WALL SECTION

A-404 FIRE ENTRY ENCLOSURE PLAN AND DETAILS

A-405 FIRE ENTRY ENCLOSURE PLAN AND DETAILS

A-406 FIRE ENTRY ENCLOSURE PLAN AND DETAILS

A-500 FLOOR & WALL DETAILS

A-501 CEILING DETAILS

A-502 DOOR DETAILS

A-503 WINDOW DETAILS

A-504 CLOSET & PANTRY DETAILS

A-600 DOOR & WINDOW SCHEDULE AND TYPES

INTERIOR DESIGN

I-101 FIRST FLOOR INTERIOR ELEMENTS PLAN

I-102 SECOND FLOOR INTERIOR ELEMENTS PLAN

I-103 THIRD FLOOR INTERIOR ELEMENTS PLAN

I-401 TYPICAL ENLARGED INTERIOR ELEMENTS PLAN

I-402 TYPICAL ENLARGED INTERIOR ELEMENTS PLAN

I-501 MILLWORK ELEVATIONS

I-601 MILLWORK DETAILS

I-602 MILLWORK DETAILS

IN101 FIRST FLOOR FINISH PLAN

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

F

IL

E N

A M

E

IS

S

U E

D A

T E

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C O

N T

R A

C T

N O

N

M

IC

H

IG

A

N A

V E

S U

IT

E

C H

IC

A

G O

IL

w w w .e xp F e d e ra l.

c o m p ro j.

n o

P A

C -2

-A

A

E X

P F

E D

E R

A L

US Army Corps of Engineers ®

S O

L

IC

IT

A

T

IO

N N

O

A

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SE

A L

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

J A

P A

N D

IS

T

R

IC

T

U N

IT

A

P O

A P

-5

C A

M P

Z A

M A

J A

P A

N

F Y

R

E P

A

IR

U P

H B

L D

G

D

E S

IG

N

R E

F R

E S

H

S H

E E

T I

N D

E X

G-002

B

A C

K C

H E

C K

D E

S

IG

N S

U B

M

IT

T A

L

N O

T F

O R

C O

N S

T R

U C

T

IO

N

B C

A R

IN

O

B C

A R

IN

O

D K

A N

E S

H

IG

E

J A

N U

A R

Y

B R

G

E N

.r v t-

SHEET

NUMBER

SHEET NAME

IN102 SECOND FLOOR FINISH PLAN

IN103 THIRD FLOOR FINISH PLAN

IN601 FIRST FLOOR ROOM FINISH SCHEDULE

IN602 SECOND FLOOR ROOM FINISH SCHEDULE

IN603 THIRD FLOOR ROOM FINISH SCHEDULE

IN604 INTERIOR LEGENDS

IG501 SIGNAGE DETAILS

IG601 ROOM SIGNAGE SCHEDULE

FIRE PROTECTION

FA001 FIRE ALARM/MNS GENERAL NOTES, ABBREVIATIONS AND LEGEND

FD101 FIRE ALARM DEMOLITION PLAN

FA101 FIRST LEVEL FIRE/MNS ALARM PLAN

FA102 SECOND LEVEL FIRE ALARM/MNS PLAN

FA103 THIRD LEVEL FIRE ALARM/MNS PLAN

FA500 FIRE ALARM/MNS DETAILS

FA700 FIRE ALARM/MNS INPUT/OUTPUT MATRIX

FA701 FIRE ALARM /MNS RISER DIAGRAM

FX001 FIRE SPRINKLER GENERAL NOTES AND DETAILS

FD102 FIRE SPRINKLER DEMOLITION PLAN

FX101 FIRST LEVEL FIRE SPRINKLER PLAN

FX102 SECOND LEVEL FIRE SPRINKLER PLAN

FX103 THIRD LEVEL FIRE SPRINKLER PLAN

FX500 FIRE SPRINKLER DETAILS

FX501 FIRE SPRINKLER RISER DETAILS

PLUMBING

P-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

PD110 DEMOLITION FIRST FLOOR PLAN - OVERALL

PD120 DEMOLITION SECOND FLOOR PLAN - OVERALL

PD130 DEMOLITION THIRD FLOOR PLAN - OVERALL

P-110 FIRST FLOOR PLAN - OVERALL

P-120 SECOND FLOOR PLAN - OVERALL

P-130 THIRD FLOOR PLAN - OVERALL

P-401 ENLARGED FLOOR PLANS

P-402 ENLARGED FLOOR PLANS

P-403 ENLARGED FLOOR PLANS

P-601 SCHEDULES

MECHANICAL

M-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS

MD101 FIRST FLOOR DEMOLITION PLAN - OVERALL

MD102 SECOND FLOOR DEMOLITION PLAN - OVERALL

MD103 THIRD FLOOR DEMOLITION PLAN - OVERALL

M-101 FIRST FLOOR PLAN - OVERALL

M-102 SECOND FLOOR PLAN - OVERALL

M-103 THIRD FLOOR PLAN - OVERALL

M-601 SCHEDULES

ELECTRICAL

E-001 LEGEND AND ABBREVIATIONS

E-002 ABBREVIATIONS, GENERAL NOTES AND REFERENCES

ES101 SITE PLAN

E-101 FIRST FLOOR COMPOSITE PLAN

E-102 SECOND FLOOR COMPOSITE PLAN

E-103 THIRD FLOOR COMPOSITE PLAN

ED101 FIRST FLOOR LIGHTING DEMOLITION PLAN - AREA A

ED102 FIRST FLOOR LIGHTING DEMOLITION PLAN - AREA B

ED103 SECOND FLOOR LIGHTING DEMOLITION PLAN - AREA A

ED104 SECOND FLOOR LIGHTING DEMOLITION PLAN - AREA B

ED105 THIRD FLOOR LIGHTING DEMOLITION PLAN - AREA A

ED106 THIRD FLOOR LIGHTING DEMOLITION PLAN - AREA B

ED111 FIRST FLOOR POWER DEMOLITION PLAN - AREA A

ED112 FIRST FLOOR POWER DEMOLITION PLAN - AREA B

ED113 SECOND FLOOR POWER DEMOLITION PLAN - AREA A

ED114 SECOND FLOOR POWER DEMOLITION PLAN - AREA B

ED115 THIRD FLOOR POWER DEMOLITION PLAN - AREA A

ED116 THIRD FLOOR POWER DEMOLITION PLAN - AREA B

ED121 FIRST FLOOR EQUIP PWR DEMOLITION PLAN - AREA A

ED122 FIRST FLOOR EQUIP PWR DEMOLITION PLAN - AREA B

ED123 SECOND FLOOR EQUIP PWR DEMOLITION PLAN - AREA A

ED124 SECOND FLOOR EQUIP PWR DEMOLITION PLAN - AREA B

ED125 THIRD FLOOR EQUIP PWR DEMOLITION PLAN - AREA A

ED126 THIRD FLOOR EQUIP PWR DEMOLITION PLAN - AREA B

ED601 DEMOLITION ONE LINE DIAGRAM

EL101 FIRST FLOOR LIGHTING PLAN - AREA A

EL102 FIRST FLOOR LIGHTING PLAN - AREA B

EL103 SECOND FLOOR LIGHTING PLAN - AREA A

EL104 SECOND FLOOR LIGHTING PLAN - AREA B

EL105 THIRD FLOOR LIGHTING PLAN - AREA A

EL106 THIRD FLOOR LIGHTING PLAN - AREA B

EL501 DETAILS

SHEET

NUMBER

SHEET NAME

EL511 DETAILS

EL701 LIGHTING FIXTURE SCHEDULE

EL702 LIGHTING CONTROL SCHEDULE

EP101 FIRST FLOOR POWER PLAN - AREA A

EP102 FIRST FLOOR POWER PLAN - AREA B

EP103 SECOND FLOOR POWER PLAN - AREA A

EP104 SECOND FLOOR POWER PLAN - AREA B

EP105 THIRD FLOOR POWER PLAN - AREA A

EP106 THIRD FLOOR POWER PLAN - AREA B

EP121 FIRST FLOOR EQUIPMENT POWER PLAN - AREA A

EP122 FIRST FLOOR EQUIPMENT POWER PLAN - AREA B

EP123 SECOND FLOOR EQUIPMENT POWER PLAN - AREA A

EP124 SECOND FLOOR EQUIPMENT POWER PLAN - AREA B

EP125 THIRD FLOOR EQUIPMENT POWER PLAN - AREA A

EP126 THIRD FLOOR EQUIPMENT POWER PLAN - AREA B

EP501 DETAILS

EP601 ONE LINE DIAGRAM

EP701 PANEL SCHEDULES

EP702 PANEL SCHEDULES

EP703 PANEL SCHEDULES

EP704 PANEL SCHEDULES

EP705 PANEL SCHEDULES

EP706 PANEL SCHEDULES

TELECOMMUNICATIONS

T-001 TELECOM LEGEND AND ABBREVIATIONS

TD101 FIRST FLOOR TELECOM DEMOLITION PLAN

TD102 SECOND FLOOR TELECOM DEMOLITION PLAN

TD103 THIRD FLOOR TELECOM DEMOLITION PLAN

T-101 FIRST FLOOR TELECOM PLAN

T-102 SECOND FLOOR TELECOM PLAN

T-103 THIRD FLOOR TELECOM PLAN

T-501 TELECOM DETAILS

T-601 ONE LINE DIAGRAM

DR

BUILDING USE DESCRIPTION

1. THE EXISTING UNACCOMPANIED PERSONNEL HOUSING (UPH) IS AN EXISTING 3-STORY

BUILDING OF APPROXIMATELY 1,738 SQUARE METERS. IT IS AN APARTMENT BUILDING

(CONTAINS INDIVIDUAL COOKING FACILITY IN BEDROOMS) USED BY MILITARY PERSONNEL.

THE PROJECT INVOLVES REVITALIZATION OF THE EXISTING BUILDING.

APPLICABLE CODES, STANDARDS AND CRITERIA

1. INTERNATIONAL BUILDING CODE (IBC); 2024

2. NFPA 1, FIRE CODE; 2024 EDITION

3. NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS; 2026 EDITION

4. NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS; 2025 EDITION

5. NFPA 13R, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS IN LOW-RISE

RESIDENTIAL OCCUPANCIES; 2025

6. NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR

APPURTENANCES; 2025 EDITION

7. NFPA 70, NATIONAL ELECTRICAL CODE; 2026 EDITION

8. NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE; 2025 EDITION

9. NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES; 2025

10. NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING

SYSTEMS; 2024 EDITION

11. NFPA 101, LIFE SAFETY CODE; 2024 EDITION

12. NFPA 291, RECOMMENDED PRACTICE FOR WATER FLOW TESTING AND MARKING OF

HYDRANTS; 2025

13. UFC 1-200-01, DOD BUILDING CODE (GENERAL BUILDING REQUIREMENTS); CHANGE 4, 17 DEC

14. UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES; CHANGE 6, 6 MAY 2021

15. UFC 4-010-01, DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, CHANGE 3, 24 MAY

16. UFC 4-021-01 - DESIGN AND O&M: MASS NOTIFICATION SYSTEM: CHANGE 1, JANUARY 2010

17. USACE ECB 2018-17 NEW REQUIREMENTS FOR VISUAL NOTIFICATION FOR MASS NOTIFICATION

SYSTEMS, 26 MARCH 2025

18. JED DESIGN GUIDE V9, APRIL 2025

USE AND OCCUPANCY CLASSIFICATION (UFC 3-600-01)

1. IBC SHALL BE UTILIZED TO DETERMINE THE OCCUPANCY CLASSIFICATION AS IT RELATES TO

ALLOWABLE CONSTRUCTION TYPE, BUILDING HEIGHT, BUILDING AREA, BUILDING SEPARATION

DISTANCE, OCCUPANCY SEPARATION AND ASSOCIATED REQUIREMENTS [§3-2.1.2]

2. NFPA 101 MUST BE UTILIZED TO DETERMINE THE OCCUPANCY CLASSIFICATION AS IT RELATES

TO FIRE/SMOKE RESISTANCE RATING OF INTERIOR NON-LOAD BEARING PARTITIONS, MEANS

OF EGRESS, INTERIOR FINISH, FEATURES OF FIRE PROTECTION AND ASSOCIATED

REQUIREMENTS [§3-3.1.1]

A. COMPLY WITH NFPA 101 FOR ALL COMPONENTS AND FEATURES RELATED TO MEANS

OF EGRESS. IBC MUST NOT BE USED FOR ANY MEANS OF EGRESS FEATURES [§10-1.1]

FIRE PROTECTION SYSTEMS

1. FIRE SPRINKLER SYSTEM - GENERAL

A. SUPERVISED AUTOMATIC FIRE SPRINKLER SYSTEM PROVIDED THROUGHOUT THE

BUILDING, IN ACCORDANCE WITH UFC 3-600-01 AND NFPA 13R. EXCEPTIONS AS

FOLLOWS:

a. CLOSETS WITHING DWELLING UNITS LESS THAN 2.2 M2

b. BATHROOMS WITHIN DWELLING UNITS LESS THAN 5.1 M2

2. STANDPIPE SYSTEMS - GENERAL

A. STANDPIPE SYSTEM IS NOT REQUIRED AS THE BUILDING IS LESS THAN FOUR STORIES

IN HEIGHT PER UFC 3-600-01, SECTION 9-10.2.1.

3. PORTABLE FIRE EXTINGUISHERS - GENERAL

A. PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED WHERE REQUIRED BY NFPA 101

AND INSTALLED IN ACCORDANCE WITH NFPA 10. [UFC 3-600-01 §9-17].

B. PORTABLE FIRE EXTINGUISHERS ARE NOT REQUIRED IN FULLY SPRINKLERED

APARTMENT OCCUPANCY PER NFPA 101. HOWEVER, CAMP ZAMA FIRE DEPARTMENT

REQUIRES PORTABLE FIRE EXTINGUISHERS PER FIRE REGULATION USAG JAPAN

420-90. ACCORDINGLY, FIRE EXTINGUISHERS SHALL BE PROVIDED IN ACCORDANCE

WITH NFPA 10.

FIRE ALARM AND MASS NOTIFICATION SYSTEMS

1. EXISTING FIRE ALARM SYSTEM

A. DEMOLITION OF THE EXISTING FIRE ALARM SYSTEM INCLUDING PANELS, DEVICES,

WIRING AND CONDUIT.

2. FIRE DETECTION/ALARM SYSTEMS - GENERAL

A. NEW ADDRESSABLE FIRE ALARM SYSTEM PROVIDED THROUGHOUT THE BUILDING.

3. NOTIFICATION

A. NOTIFICATION DEVICES PROVIDED THROUGHOUT THE BUILDING IN ALL AREAS WHERE

REQUIRED BY NFPA 101 AND UFC 3-600-01 AND NFPA 72.

4. DETECTION

A. PROVIDE AUTOMATIC SMOKE DETECTION ABOVE FIRE ALARM PANELS

B. PROVIDE SMOKE DETECTORS IN ALL SLEEPING AREAS.

5. MANUAL FIRE ALARM ACTIVATION

A. PROVIDE A MANUAL FIRE ALARM PULL STATION AT ALL EXITS REGARDLESS OF

OCCUPANCY PER UFC 3-600-01, 9-18.7.4.1.

6. MASS NOTIFICATION SYSTEM

A. MASS NOTIFICATION SYSTEM PROVIDED THROUGHOUT COMBINED WITH THE BUILDING

FIRE ALARM SYSTEM IN ACCORDANCE WITH UFC 4-021-01.

WATER SUPPLIES AND FIRE FLOW CALCULATIONS

1. REFER TO FIRE PROTECTION DRAWING FX001 FOR WATER SUPPLY INFORMATION. FIRE FLOW

FOR SPRINKLERED FACILITIES SHALL BE IN ACCORDANCE WITH NFPA 1 OR 3,785 LPM AT 1.38

BAR, WHICHEVER IS GREATER.

A. NFPA 1 FIRE FLOW REQUIREMENTS FOR SPRINKLERED FACILITIES FOR TYPE II (000)

BETWEEN 1,709-2,025 M2 IS 11,355 LPM. THIS IS PERMITTED TO BE REDUCED BY 75%

FOR SPRINKLERED FACILITIES WHICH EQUATES TO 2,839 LPM.

B. BASED ON THE ANALYSIS ABOVE, THE FIRE FLOW REQUIREMENT IS 3,785 LPM AT 1.38

BAR

C. WATERLINE A - AVAILABLE FLOW AT 1.38 BAR IS 12,976 LPM

D. WATERLINE B - AVAILABLE FLOW AT 1.38 BAR IS 4,141 LPM

FIRE DEPARTMENT ACCESS

1. EXISTING FIRE DEPARTMENT ACCESS TO REMAIN.

FIRE HYDRANTS

1. EXISTING FIRE HYDRANTS PROVIDE SUFFICIENT COVERAGE AROUND THE BUILDING SUCH

THAT ALL PARTS OF THE FACILITY EXTERIOR IS WITHIN 106 METERS OF A HYDRANT WITH

CONSIDERATION GIVEN TO ACCESSIBILITY AND OBSTRUCTIONS.

2. EXISTING FIRE HYDRANT IS LOCATED WITHING 45 M OF THE FIRE DEPARTMENT CONNECTION.

FIRE DEPARTMENT CONNECTION AND POST INDICATOR VALVE LOCATION

1. FDC IS LOCATED ON THE EXTERIOR WALL OF THE NEW FIRE RISER ENCLOSURE.

2. PIV IS NOT REQUIRED AS AN INDICATING CONTROL VALVE IS INSTALLED IN A FIRE-RATED

ROOM ACCESSIBLE FROM THE EXTERIOR IN ACCORDANCE WITH NFPA 24, 6.2.9.

OCCUPANCY CLASSIFICATION

BUILDING HEIGHT AND AREA SUMMARY

BUILDING CONSTRUCTION TYPE

SPRINKLER SYSTEM

IIB

YES, SM (NFPA 13R SYSTEM)

BUILDING HEIGHT

ACTUAL MAXIMUM ALLOWED

10.55 M 18.29 M*

NUMBER OF STORIES 3 STORIES 4 STORIES*

TABULAR FLOOR AREA PER STORY 1,486 SM

BUILDING AREA ANALYSIS

FRONTAGE AREA FACTOR INCREASE NOT REQUIRED

FLOOR AREA PER STORY W/ FRONTAGE ACTUAL MAXIMUM ALLOWED

1,486 SMFIRST LEVEL

1,486 SMSECOND LEVEL

579.4 SM

TOTAL BUILDING AREA 4,458 SM1,738 SM

IBC CODE COMPLIANT YES

STRUCTURAL FIRE RESISTANCE RATING [TABLE 601 AND TABLE 602]

REQUIRED STRUCTURAL FIRE RESISTANCE RATING SUMMARY - TYPE IIB

STRUCTURAL ELEMENT

BEARING WALLS

FIRE RESISTANCE

RATING

EXTERIOR

INTERIOR

NON-LOAD

BEARING WALLS

EXTERIOR: ≥ 9.14 M SEPARATION

INTERIOR

PRIMARY STRUCTURAL MEMBERS

FLOOR CONSTRUCTION AND ASSOCIATED SECONDARY MEMBERS

ROOF CONSTRUCTION AND ASSOCIATED SECONDARY STRUCTURAL

MEMBERS

0-HOUR

0-HOUR

PER NFPA 101

0-HOUR

0-HOUR

0-HOUR

MAXIMUM AREA OF EXTERIOR WALL OPENINGS (UNPROTECTED / SPRINKLERED) [TABLE 705.9]

1. FIRE SEPARATION DISTANCE GREATER THAN 6 METERS - UNLIMITED

OCCUPANCY CLASSIFICATION BY FLOOR - IBC

FLOOR

FIRST LEVEL

SECOND LEVEL

RESIDENTIAL R-2

OCCUPANCY CLASSIFICATION ACCESSORY OCCUPANCY

TYPE OF CONSTRUCTION

1. TYPE IIB

OCCUPANCY SEPARATION

1. OCCUPANCY SEPARATION IS NOT REQUIRED BETWEEN MAIN OCCUPANCY AND ACCESSORY

OCCUPANCIES

BUILDING HEIGHT AND AREA ANALYSIS [TABLE 504.3, TABLE 504.4, AND TABLE 506.2]

HAZARDOUS AREA PROTECTION

1. ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL

OCCUPANCY SHALL BE PROTECTED BY ONE OF THE FOLLOWING MEANS: [§8.7.1.1]

A. SEPARATING THE AREA FROM OTHER PARTS OF THE BUILDING WITH A 1-HOUR FIRE

BARRIER AND WITHOUT WINDOWS.

B. PROTECTING THE AREA WITH AUTOMATIC SPRINKLER SYSTEMS.

C. BOTH 1-HOUR FIRE BARRIER AND SPRINKLER SYSTEM WHERE THE HAZARD IS SEVERE

D. IN NEW CONSTRUCTION, AUTOMATIC SPRINKLER SYSTEMS WITH SMOKE PARTITIONS.

OPENING PROTECTIVES [TABLE 8.3.3.2.2]

VERTICAL OPENINGS AND EXIT ENCLOSURES REQUIRED FIRE BARRIER

VERTICAL OPENINGS REQUIRED FIRE BARRIER

SHAFTS CONNECTING LESS THAN 3 STORIES 1-HOUR [§8.6.5(2)]

EXIT ENCLOSURES

EXIT ENCLOSURES CONNECTING LESS THAN 4 STORIES 1-HOUR [§7.1.3.2.1(1)]

COMPONENT WALL &

PARTITIONS

FIRE DOOR

ASSEMBLIES

MINIMUM FIRE-RATED WINDOWS RATING

FIRE PROTECTION FIRE RESISTANCE

VERTICAL

SHAFTS

1-HOUR 1-HOUR 1-HOURNOT PERMITTED

FIRE

BARRIERS

1/2-HOUR 1/3-HOUR 1/3-HOUR1/3-HOUR

INTERIOR FINISH ANALYSIS W/ SPRINKLER PROTECTION [NFPA 101, 30.3.3.2]

MEANS OF EGRESS GENERAL

1. OCCUPANT LOAD FACTOR [TABLE 7.3.1.2 / UFC 3-600-01 TABLE 10-1]

A. ASSEMBLY USE (GENERAL): 1.4 NSM/PERSON

B. BUSINESS USE: 14 SM/PERSON

C. RESIDENTIAL USE: 18.6 SM/PERSON

D. MECH,ELEC, BUILDING EQUIP. USE: 46.5 SM/PERSON

E. STORAGE ROOMS: 46.5 SM/PERSON

2. CAPACITY OF MEANS OF EGRESS

A. EGRESS WIDTH REQUIRED PER PERSON [TABLE 7.3.3.1]

a. HORIZONTAL EGRESS TRAVEL: 5 MM/PERSON

b. VERTICAL EGRESS TRAVEL: 7.6 MM/PERSON

3. MINIMUM EGRESS WIDTH OUTSIDE DWELLING UNIT REQUIRED / PROVIDED [NFPA

101, 7.3.4]

A. CORRIDORS W/ OCCUPANT LOAD 50 OR MORE: 1120 MM / 1670 MM

B. CLEAR WIDTH DOOR OPENINGS: 810 MM / 900 MM

4. MINIMUM EGRESS WIDTH WITHIN DWELLING UNIT REQUIRED / PROVIDED [NFPA

101, 30.2.1.2 AND 24.2]

A. DOORS: 710 MM / 750 MM

B. DOORS SERVING ROOM NOT EXCEEDING 6.5 SM: 610 MM / 750 MM

C. BATHROOM DOORS: 610 MM / 700 MM

D. MINIMUM DOOR HEIGHT 1990 MM / 2100 MM

5. TOTAL OCCUPANT LOAD

A. FIRST FLOOR: 61 PERSONS

B. SECOND FLOOR: 36 PERSONS

C. THIRD FLOOR: 36 PERSONS

6. NUMBER OF EXITS REQUIRED / PROVIDED

A. FIRST FLOOR: 2 / 2+

B. SECOND FLOOR: 2 / 2+

C. THIRD FLOOR: 2 / 2+

7. EXIT CAPACITY REQUIRED / PROVIDED

A. FIRST FLOOR: 61 / 638 PERSONS

B. SECOND FLOOR: 36 / 504 PERSONS

C. THIRD FLOOR: 36 / 504 PERSONS

8. NUMBER AND ARRANGEMENT OF MEANS OF EGRESS, INCLUDING EXIT

DISCHARGE

A. SINGLE EXIT FROM ROOMS AND AREAS WITH LIMITED OCCUPANT LOAD

AND HAVING COMMON PATH OF TRAVEL WITHIN THE ALLOWABLE LIMITS

[§7.4.1.1]

B. MINIMUM TWO EXITS NOT COMPLYING WITH ABOVE §7.4.1.1]

9. ARRANGEMENT OF EXITS

A. WHERE 2 OR MORE EXITS ARE REQUIRED, THEY MUST BE SPACED APART

A MINIMUM OF 1/3 THE LENGTH OF THE MAXIMUM DIAGONAL OF THE

BUILDING OR AREA BEING SERVED [§7.5.1.3.3]

a. WHERE MORE THAN TWO EXITS OR EXIT ACCESS DOORS ARE

REQUIRED, AT LEAST TWO OF THE REQUIRED EXITS OR EXIT

ACCESS DOORS ARE TO BE ARRANGED TO COMPLY WITH THE

MINIMUM SEPARATION DISTANCE REQUIREMENTS DEFINED

ABOVE. THE OTHER EXITS OR EXIT ACCESS DOORS ARE TO BE

LOCATED SO THAT IF ONE BECOMES BLOCKED, THE OTHERS

REMAIN AVAILABLE [§7.5.1.3.1]

EXIT DISCHARGE [NFPA 101, 30.2.7]

1. EXIT DISCHARGE SHALL COMPLY WITH SECTION 7.7 - PROVIDED

ILLUMINATION OF MEANS OF EGRESS [NFPA 101, 30.2.8]

1. MEANS OF EGRESS SHALL BE ILLUMINATED IN ACCORDANCE WITH SECTION 7.8

IN DESIGNATED STAIRS, AISLES, CORRIDORS, RAMPS, AND PASSAGEWAYS

LEADING TO AN EXIT - PROVIDED

EMERGENCY LIGHTING [NFPA 101, 30.2.9]

1. EMERGENCY LIGHTING SHALL BE PROVIDED IN ACCORDANCE WITH SECTION

7.9 - PROVIDED

MARKING OF MEANS OF EGRESS [NFPA 101, 30.2.10]

1. MEANS OF EGRESS SHALL HAVE SIGNS IN ACCORDANCE WITH SECTION 7.10 -

PROVIDED

OCCUPANCY CLASSIFICATION

FLOOR LEVEL

FIRST LEVEL

SECOND LEVEL

OCCUPANCY CLASSIFICATION INCIDENTAL OCCUPANCY

EXISTING APARTMENT ORDINARY HAZARD STORAGE

STORAGE S-1

CODE ANALYSIS GENERAL CODE ANALYSIS - IBC CODE ANALYSIS - LIFE SAFETY CODE (NFPA 101)

THIRD LEVEL

EXISTING APARTMENT

EXISTING APARTMENT

ORDINARY HAZARD STORAGE

ORDINARY HAZARD STORAGE

THIRD LEVEL

RESIDENTIAL R-2

RESIDENTIAL R-2

STORAGE S-1

STORAGE S-1

1,486 SMTHIRD LEVEL

579.4 SM

579.4 SM

*NFPA 13R SPRINKLER SYSTEM LIMITATION

0-HOUR

TABLE 30.3.2.2.2 HAZARDOUS AREA PROTECTION

BOILER ROOM SERVING MORE THAN ONE DWELLING UNIT

LAUNDRIES > 9.3 SM OUTIDE OF DWELLING UNITS

1 HOUR AND SPRINKLERS

STORAGE ROOMS OUTSIDE OF DWELLING UNITS

1 HOUR AND SPRINKLERS

1 HOUR OR SPRINKLERS

• MECHANICAL ROOMS (NO BOILER) AND STORAGE ROOMS SHALL BE PROTECTED BY SMOKE

PARTITION. HOWEVER, DUE TO NFPA 13R REQUIREMENT BELOW, MINIMUM 1/2-HOUR FIRE

BARRIER SHALL BE PROVIDED

• LAUNDRY ROOMS DO NOT REQUIRE ANY FIRE RATING AS THE FLOOR AREA DOES NOT

EXCEED 9.3 SM.

CORRIDOR FIRE RATING REQUIREMENTS [NFPA 101, 30.3.6]

IN BUILDINGS PROTECTED THROUGHOUT BY SPRINKLER SYSTEMS, CORRIDOR WALLS SHALL HAVE

A MINIMUM 1/2-HOUR FIRE RESISTANCE RATING.

SUBDIVISION OF BUILDING SPACES [NFPA 101, 30.3.7]

IN BUILDINGS PROTECTED THROUGHOUT BY SPRINKLER SYSTEMS, DWELLING UNITS SHALL BE

SEPARATED FROM EACH OTHER BY WALLS AND FLOORS CONSTRUCTED AS FIRE BARRIERS HAVING

A MINIMUM 1/2-HOUR FIRE RESISTANCE RATING.

NFPA 13R ORDINARY HAZARD SPACES OUTSIDE DWELLING UNITS [NFPA 13R, 7.2.4.1]

ORDINARY HAZARD SPACES SUCH AS MECHANICAL ROOM, ELECTRICAL ROOM, STORAGE ROOM,

AND SIMILAR SPACES SHALL BE PROTECTED BY MINIMUM 1/2-HOUR FIRE BARRIER.

OCCUPANCY

NEW APARTMENT

EXIT EXIT ACCESS

CORRIDORS

OTHER SPACES

CLASS A OR B CLASS A, B, OR C CLASS A, B, OR C

INTERIOR FLOOR FINISH REQUIREMENT

INTERIOR FLOOR FINISH IN EXIT ENCLOSURES AND EXIT ACCESS CORRIDORS AND SPACES NOT SEPARATED FROM THEM BY WALLS COMPLYING WITH 30.3.3.3.2 SHALL BE NOT LESS THAN CLASS II.

THE MINIMUM CRITICAL RADIANT FLUX SHALL BE 0.1 W/CM2

EXISTING BUILDING & WORK CLASSIFICATIONS [UFC 3-600-01, 34-1 & NFPA 101 CH. 43

1. DESIGN AND CONSTRUCTION PROJECTS IN EXISTING BUILDINGS SHALL COMPLY WITH NFPA

101 BUILDING REHABILITATION CHAPTER EXCEPT AS SPECIFIED IN UFC 3-600-01. AREAS OF

THE FACILITY WHERE NO WORK IS BEING PERFORMED MUST AT A MINIMUM MEET EXISTING

OCCUPANCY CHAPTER OF NFPA 101.

2. THE SCOPE OF WORK INCLUDES RENOVATIONS, MODIFICATIONS, AND EXTENSIVE

MODIFICATIONS.

3. FLOOR PLAN RECONFIGURATIONS THAT EXCEED 50 PERCENT OF THE AREA OF A FLOOR

REQUIRE THAT THE ENTIRE FLOOR BE BROUGHT UP TO THE RQEUIREMENTS FOR NEW

CONSTRUCTION IN THIS UFC AND NFPA 101. OR IF THE PROJECT COST EXCEEDS 50 PERCENT

OF THE BUILDING REPLACEMENT VALUE, THEN THE ENTIRE BUILDING MUST BE BROUGHT UP

TO THE REQUIREMENTS FOR NEW CONSTRUCTION.

A. FLOOR PLAN RECONFIGURATION EXCEED 50 PERCENT OF THE AREA OF A FLOOR. THE

ENTIRE FLOOR SHALL BE BROUGHT UP TO THE REQUIREMENTS FOR NEW

CONSTRUCTION.

DOORS IN SMOKE PARTITIONS SHALL NOT INCLUDE LOUVERS AND SHALL BE SELF OR AUTOMATIC

CLOSING.

DOORS THAT OPEN ONTO EXIT ACCESS CORRIDORS SHALL BE SELF-CLOSING AND SELF-LATCHING.

TRANSOMS, LOUVERS, OR TRANSFER GRILLES SHALL BE PROHIBITED IN WALLS OR DOORS OF EXIT

ACCESS CORRIDORS. [NFPA 101, 30.3.6.2]

AIR TRANSFER OPENING SHALL BE PERMITTED IN WALLS OR DOORS FROM TOILET ROOMS,

BATHROOMS, SHOWER ROOMS, SINK CLOSETS, AND SIMILAR AUXILIARY SPACES OPENING

DIRECTLY ONTO THE EGRESS CORRIDOR. [NFPA 90A, 5.10.1.3.1]

THROUGH PENETRATION REQUIREMENTS [NFPA 101, 8.3.4]

PIPES, CONDUITS, CABLETS, ETC. THAT PENETRATE FIRE-RATED WALLS OR FLOORS SHALL BE

PROTECTED BY UL LISTED FIRESTOPPING WITH RATING EQUAL OR GREATER THAN THE

PENETRATED WALL.

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

F

IL

E N

A M

E

IS

S

U E

D A

T E

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C O

N T

R A

C T

N O

N

M

IC

H

IG

A

N A

V E

S U

IT

E

C H

IC

A

G O

IL

w w w

.e xp

F e d e ra l.

c o m p ro j.

n o

P A

C -2

-A

A

E X

P F

E D

E R

A L

US Army Corps of Engineers ®

S O

L

IC

IT

A

T

IO

N N

O

A

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

S E A L

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

J A

P A

N D

IS

T

R

IC

T

U N

IT

A

P O

A P

-5

C A

M P

Z A

M A

J A

P A

N

F Y

R

E P

A

IR

U P

H B

L D

G

D

E S

IG

N

R E

F R

E S

H

L

IF

E S

A F

E T

Y C

O D

E A

N A

L Y

S

IS

GI001

B A

C K

C H

E C

K D

E S

IG

N

S U

B M

IT

T

A L

N

O T

F O

R C

O N

S T

R U

C T

IO

N

Y K

IM

B K

IM

Y K

IM

J A

N U

A R

Y

B R

F

P .r v t

DR

M M

W W

W

W

W

W

(E) FHY 717

FW

F W

F W

(N) 150MM

FIRE WATER

LINE

(N) GATE VALVE

LEGENDGENERAL NOTES

ALL INFORMATION SHOWN ON THIS SHEET

IS FOR INFORMATION ONLY TO SHOW CODE

COMPLIANCE IN ACCORDANCE WITH UFC

3-600-01. REFER TO CIVIL DRAWING FOR

CIVIL SITE AND UTILITY INFORMATION.

(N) NEW

(E) EXISTING

FHY FIRE HYDRANT

DISTANCE TO FDC

DISTANCE TO BUILDING

UPH 761

(E) TRANSFORMER

(E) STEAM PIT

(E) SHEDS

UPH 760

36M

77.6M

84.5M

FDC

FIRE DEPARTMENT

MAIN ENTRANCE

TO FACILITY

FW FIRE WATERLINE

(N) FIRE ENTRY

ENCLOSURE

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

F

IL

E N

A M

E

IS

S

U E

D A

T E

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C O

N T

R A

C T

N O

N

M

IC

H

IG

A

N A

V E

S U

IT

E

C H

IC

A

G O

IL

w w w

.e xp

F e d e ra l.

c o m p ro j.

n o

P A

C -2

-A

A

E X

P F

E D

E R

A L

US Army Corps of Engineers ®

S O

L

IC

IT

A

T

IO

N N

O

A

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

S E A L

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

J A

P A

N D

IS

T

R

IC

T

U N

IT

A

P O

A P

-5

C A

M P

Z A

M A

J A

P A

N

F Y

R

E P

A

IR

U P

H B

L D

G

D

E S

IG

N

R E

F R

E S

H

C O

D E

C O

M P

L

IA

N C

E S

IT

E

P L A

N

GI100

B A

C K

C H

E C

K D

E S

IG

N

S U

B M

IT

T

A L

N

O T

F O

R C

O N

S T

R U

C T

IO

N

Y K

IM

B K

IM

Y K

IM

J A

N U

A R

Y

B R

F

P .r v t

SCALE: 1 : 200

G1

CODE COMPLIANCE SITE PLAN

0 10 m

1:200

SCALE

W W W W W

(E) FHY 716

0M

M W

A T

E R

L

IN

E B

W W

W W

W

W

W

W W

W

W

W

W

W

PLAN NORTHPLAN NORTHDR

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

A

B

C

D

47.55 m² 3

R18.58 m²

BEDROOM

58.04 m² 4

R18.58 m²

BEDROOM

47.38 m² 3

R18.58 m²

BEDROOM

47.55 m² 3

R18.58 m²

BEDROOM

47.95 m² 3

R18.58 m²

BEDROOM

48.12 m² 3

R18.58 m²

BEDROOM

14.37 m² 1

S46.45 m²

STORAGE

14.37 m² 1

M46.45 m²

M01

MECH

ROOM A

M01

14.37 m² 1

M46.45 m²

M02

MECH

ROOM B

M02

10.14 m² 1

S46.45 m²

STORAGE

14.42 m² 1

S46.45 m²

STORAGE

10.14 m² 1

S46.45 m²

STORAGE

24.48 m² 18

AU1.39 m²

ACTIVITY

ROOM

10.14 m² 1

S46.45 m²

STORAGE

7.86 m² 1

R18.60 m²

LAUNDRY

2.73 m² 1

S46.45 m²

108A

JANITOR

108A

5.03 m² 1

R18.58 m²

VENDING

5.07 m² 4

AU1.39 m²

107A

LOUNGE

TOILET

107A

23.19 m² 2

R18.58 m²

S01

STAIR

S01

55.01 m² 3

R18.58 m²

C101

CORRIDOR

C101

23.57 m² 2

R18.58 m²

S02

STAIR

S02

30.99 m² 2

R18.58 m²

C102

CORRIDOR

C102

276 181

7.6

STAIR 02 276 181

7.6

STAIR 01

CP:7.8M

TD:11.4M

TD:23.1M TD:5M

TD:9M

EXIT1

FIRE

RISER RM

4.3 m2 1

46.5 m2 M

FEC FEC

TRAVEL DISTANCE

COMMON PATH OF TRAVEL

EXIT

DOOR EXIT CAPACITY

(1) DOOR CLEAR WIDTH (MM)

(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)

(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)

DEAD END

LIFE SAFETY ROOM TAG

(A) ROOM AREA (SM)

(B) OCCUPANT LOAD FACTOR (SM/PERSON)

(C) OCCUPANTS (PERSONS)

(D) OCCUPANCY USE

EXIT SIGN WITH DIRECTIONAL ARROWS

STAIR/DOOR EXIT CAPACITY

(1) DOOR CLEAR WIDTH (MM)

(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)

(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)

(4) STAIR CLEAR WIDTH (MM)

(5) STAIR OCCUPANT LOAD FACTOR (MM/PERSONS)

(6) STAIR OCCUPANT LOAD CAPACITY (PERSONS)

DIST.

DIST.

DIST.

(1)

(2)

(3)

EX/DR #

(1)

(2)

(3)

(4)

(5)

(6)

DR #

A C

DB

ROOM

NAME

LIFE SAFETY LEGEND

P P SMOKE PARTITION WALL

1-HR FIRE RATED BARRIER WALL

0.5 HR FIRE RATED BARRIER WALL

FEC SURFACE MOUNTED FIRE EXTINGUISHER CABINET

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

F

IL

E N

A M

E

IS

S

U E

D A

T E

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C O

N T

R A

C T

N O

N

M

IC

H

IG

A

N A

V E

S U

IT

E

C H

IC

A

G O

IL

w w w

.e xp

F e d e ra l.

c o m p ro j.

n o

P A

C -2

-A

A

E X

P F

E D

E R

A L

US Army Corps of Engineers ®

S O

L

IC

IT

A

T

IO

N N

O

A

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

S E A L

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

J A

P A

N D

IS

T

R

IC

T

U N

IT

A

P O

A P

-5

C A

M P

Z A

M A

J A

P A

N

F Y

R

E P

A

IR

U P

H B

L D

G

D

E S

IG

N

R E

F R

E S

H

F

IR

S T

L E

V E

L L

IF

E

S A

F E

T Y

P L A

N

GI101

B A

C K

C H

E C

K D

E S

IG

N

S U

B M

IT

T

A L

N

O T

F O

R C

O N

S T

R U

C T

IO

N

Y K

IM

B K

IM

Y K

IM

J A

N U

A R

Y

B R

F

P .r v t

SCALE: 1 : 100

C1

FIRST LEVEL LIFE SAFETY PLAN

OCCUPANT LOAD SCHEDULE - FIRST FLOOR

NUMBER ROOM NAME AREA OCCUPANCY USE

OCCUPANCY

LOAD

FACTOR(PER

PERSON)

OCCUPANT

LOAD

101 BEDROOM 58.04 m² RESIDENTIAL (NFPA 101) 18.58 m² 4

102 BEDROOM 47.38 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

103 BEDROOM 47.95 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

104 BEDROOM 48.12 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

105 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

106 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

107 ACTIVITY ROOM 24.48 m² ASSEMBLY - UNCONCENTRATED (NFPA 101) 1.39 m² 18

107A LOUNGE TOILET 5.07 m² ASSEMBLY - UNCONCENTRATED (NFPA 101) 1.39 m² 4

108 LAUNDRY 7.86 m² RESIDENTIAL (NFPA 101) 18.60 m² 1

108A JANITOR 2.73 m² STORAGE (NFPA 101) 46.45 m² 1

109 VENDING 5.03 m² RESIDENTIAL (NFPA 101) 18.58 m² 1

110 STORAGE 10.14 m² STORAGE (NFPA 101) 46.45 m² 1

111 STORAGE 10.14 m² STORAGE (NFPA 101) 46.45 m² 1

112 STORAGE 14.42 m² STORAGE (NFPA 101) 46.45 m² 1

113 STORAGE 10.14 m² STORAGE (NFPA 101) 46.45 m² 1

114 STORAGE 14.37 m² STORAGE (NFPA 101) 46.45 m² 1

C101 CORRIDOR 55.01 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

C102 CORRIDOR 30.99 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

M01 MECH ROOM A 14.37 m² MECHANICAL, ELECTRICAL, AND OTHER

BUILDING EQUIPMENT SPACES (UFC)

46.45 m² 1

M02 MECH ROOM B 14.37 m² MECHANICAL, ELECTRICAL, AND OTHER

BUILDING EQUIPMENT SPACES (UFC)

46.45 m² 1

S01 STAIR 23.19 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

S02 STAIR 23.57 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

0 5 m

1:100

SCALE

MEANS OF EGRESS LIMITATION

OCCUPANCY COMMON PATH (M) TRAVEL DISTANCE (M)

NEW APARTMENT 15 38/61 *

* TRAVEL DISTANCE WITHIN A SLEEPING ROOM TO A

CORRIDOR DOOR SHALL NOT EXCEED 38 METERS. TRAVEL

DISTANCE FROM THE CORRIDOR DOOR TO THE NEAREST EXIT

SHALL NOT EXCEED 61 METERS.

GENERAL NOTES

1. REFER TO GI001 FOR LIFE SAFETY CODE ANALYSIS.

2. ALL INFORMATION SHOWN ON THIS SHEET IS FOR

INFORMATION ONLY TO DEMONSTRATE CODE

COMPLIANCE.

3. REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR FIRE EXINGUISHER REQUIREMENTS.

4. REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS

FOR EXIT SIGN REQUIREMENTS.

151 FIRE RISER RM 4.3 m2 MECHANICAL, ELECTRICAL, AND OTHER

BUILDING EQUIPMENT SPACES (UFC)

46.5 m2 1

EXIT CAPACITY SUMMARY

TOTAL EGRESS CAPACITY

TOTAL OCCUPANT LOAD

PLAN NORTHDR

B

C

D

47.55 m² 3

R18.58 m²

BEDROOM

48.95 m² 3

R18.58 m²

BEDROOM

47.55 m² 3

R18.58 m²

BEDROOM

47.95 m² 3

R18.58 m²

BEDROOM

48.12 m² 3

R18.58 m²

BEDROOM

34.71 m² 1

S46.45 m²

BEDROOM

10.14 m² 1

S46.45 m²

STORAGE

7.85 m² 1

R18.60 m²

LAUNDRY

2.73 m² 1

S46.45 m²

211A

JANITOR

211A

23.19 m² 2

R18.58 m²

S01

STAIR

S01

55.01 m² 3

R18.58 m²

C201

CORRIDOR

C201

23.57 m² 2

R18.58 m²

S02

STAIR

S02

30.99 m² 2

R18.58 m²

C202

CORRIDOR

C202

47.94 m² 3

R18.58 m²

BEDROOM

51.55 m² 3

R18.58 m²

BEDROOM

34.67 m² 2

R18.58 m²

BEDROOM

276 181

7.6

STAIR 02

276 142

7.6

STAIR2W

276 181

7.6

STAIR 01

TD:9.4M

TD:10.7M

TD:7.2M

TD:9.2M

TD:20.4M

TD:9.1M

FEC FEC

TRAVEL DISTANCE

COMMON PATH OF TRAVEL

EXIT

DOOR EXIT CAPACITY

(1) DOOR CLEAR WIDTH (MM)

(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)

(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)

DEAD END

LIFE SAFETY ROOM TAG

(A) ROOM AREA (SM)

(B) OCCUPANT LOAD FACTOR (SM/PERSON)

(C) OCCUPANTS (PERSONS)

(D) OCCUPANCY USE

EXIT SIGN WITH DIRECTIONAL ARROWS

STAIR/DOOR EXIT CAPACITY

(1) DOOR CLEAR WIDTH (MM)

(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)

(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)

(4) STAIR CLEAR WIDTH (MM)

(5) STAIR OCCUPANT LOAD FACTOR (MM/PERSONS)

(6) STAIR OCCUPANT LOAD CAPACITY (PERSONS)

DIST.

DIST.

DIST.

(1)

(2)

(3)

EX/DR #

(1)

(2)

(3)

(4)

(5)

(6)

DR #

A C

DB

ROOM

NAME

LIFE SAFETY LEGEND

P P SMOKE PARTITION WALL

1-HR FIRE RATED BARRIER WALL

0.5 HR FIRE RATED BARRIER WALL

FEC SURFACE MOUNTED FIRE EXTINGUISHER CABINET

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

F

IL

E N

A M

E

IS

S

U E

D A

T E

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C O

N T

R A

C T

N O

N

M

IC

H

IG

A

N A

V E

S U

IT

E

C H

IC

A

G O

IL

w w w

.e xp

F e d e ra l.

c o m p ro j.

n o

P A

C -2

-A

A

E X

P F

E D

E R

A L

US Army Corps of Engineers ®

S O

L

IC

IT

A

T

IO

N N

O

A

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

S E A L

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

J A

P A

N D

IS

T

R

IC

T

U N

IT

A

P O

A P

-5

C A

M P

Z A

M A

J A

P A

N

F Y

R

E P

A

IR

U P

H B

L D

G

D

E S

IG

N

R E

F R

E S

H

S E

C O

N D

L E

V E

L L

IF

E

S A

F E

T Y

P L A

N

GI102

B A

C K

C H

E C

K D

E S

IG

N

S U

B M

IT

T

A L

N

O T

F O

R C

O N

S T

R U

C T

IO

N

Y K

IM

B K

IM

Y K

IM

J A

N U

A R

Y

B R

F

P .r v t

OCCUPANT LOAD SCHEDULE - SECOND FLOOR

NUMBER ROOM NAME AREA OCCUPANCY USE

OCCUPANCY

LOAD

FACTOR(PER

PERSON)

OCCUPANT

LOAD

201 BEDROOM 47.94 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

202 BEDROOM 34.67 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

203 BEDROOM 51.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

204 BEDROOM 48.95 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

205 BEDROOM 47.95 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

206 BEDROOM 48.12 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

207 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

208 BEDROOM 34.71 m² STORAGE (NFPA 101) 46.45 m² 1

209 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

210 STORAGE 10.14 m² STORAGE (NFPA 101) 46.45 m² 1

211 LAUNDRY 7.85 m² RESIDENTIAL (NFPA 101) 18.60 m² 1

211A JANITOR 2.73 m² STORAGE (NFPA 101) 46.45 m² 1

C201 CORRIDOR 55.01 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

C202 CORRIDOR 30.99 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

S01 STAIR 23.19 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

S02 STAIR 23.57 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

SCALE: 1 : 100

C1

SECOND LEVEL LIFE SAFETY PLAN

0 5 m

1:100

SCALE

MEANS OF EGRESS LIMITATION

OCCUPANCY COMMON PATH (M) TRAVEL DISTANCE (M)

NEW APARTMENT 15 38/61 *

* TRAVEL DISTANCE WITHIN A SLEEPING ROOM TO A

CORRIDOR DOOR SHALL NOT EXCEED 38 METERS. TRAVEL

DISTANCE FROM THE CORRIDOR DOOR TO THE NEAREST EXIT

SHALL NOT EXCEED 61 METERS.

GENERAL NOTES

1. REFER TO GI001 FOR LIFE SAFETY CODE ANALYSIS.

2. ALL INFORMATION SHOWN ON THIS SHEET IS FOR

INFORMATION ONLY TO DEMONSTRATE CODE

COMPLIANCE.

3. REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR FIRE EXINGUISHER REQUIREMENTS.

4. REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS

FOR EXIT SIGN REQUIREMENTS.

EXIT CAPACITY SUMMARY

TOTAL EGRESS CAPACITY

TOTAL OCCUPANT LOAD

PLAN NORTHDR

B

C

D

47.55 m² 3

R18.58 m²

BEDROOM

48.95 m² 3

R18.58 m²

BEDROOM

47.55 m² 3

R18.58 m²

BEDROOM

47.95 m² 3

R18.58 m²

BEDROOM

48.12 m² 3

R18.58 m²

BEDROOM

34.71 m² 1

S46.45 m²

BEDROOM

10.14 m² 1

S46.45 m²

STORAGE

7.81 m² 1

R18.60 m²

LAUNDRY

2.73 m² 1

S46.45 m²

311A

JANITOR

311A

23.19 m² 2

R18.58 m²

S01

STAIR

S01

55.01 m² 3

R18.58 m²

C301

CORRIDOR

C301

23.57 m² 2

R18.58 m²

S02

STAIR

S02

30.99 m² 2

R18.58 m²

C302

CORRIDOR

C302

47.94 m² 3

R18.58 m²

BEDROOM

51.55 m² 3

R18.58 m²

BEDROOM

303 34.67 m² 2

R18.58 m²

BEDROOM

276 181

7.6

STAIR 02

276 142

7.6

STAIR2W

276 181

7.6

STAIR 01

TD:9.4M

TD:10.7M TD:7.2M

TD:9.2M

TD:20.4M

TD:5.5M

TD:9.1M

FEC FEC

TRAVEL DISTANCE

COMMON PATH OF TRAVEL

EXIT

DOOR EXIT CAPACITY

(1) DOOR CLEAR WIDTH (MM)

(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)

(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)

DEAD END

LIFE SAFETY ROOM TAG

(A) ROOM AREA (SM)

(B) OCCUPANT LOAD FACTOR (SM/PERSON)

(C) OCCUPANTS (PERSONS)

(D) OCCUPANCY USE

EXIT SIGN WITH DIRECTIONAL ARROWS

STAIR/DOOR EXIT CAPACITY

(1) DOOR CLEAR WIDTH (MM)

(2) DOOR OCCUPANT LOAD FACTOR (MM/PERSONS)

(3) DOOR OCCUPANT LOAD CAPACITY (PERSONS)

(4) STAIR CLEAR WIDTH (MM)

(5) STAIR OCCUPANT LOAD FACTOR (MM/PERSONS)

(6) STAIR OCCUPANT LOAD CAPACITY (PERSONS)

DIST.

DIST.

DIST.

(1)

(2)

(3)

EX/DR #

(1)

(2)

(3)

(4)

(5)

(6)

DR #

A C

DB

ROOM

NAME

LIFE SAFETY LEGEND

P P SMOKE PARTITION WALL

1-HR FIRE RATED BARRIER WALL

0.5 HR FIRE RATED BARRIER WALL

FEC SURFACE MOUNTED FIRE EXTINGUISHER CABINET

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

F

IL

E N

A M

E

IS

S

U E

D A

T E

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C O

N T

R A

C T

N O

N

M

IC

H

IG

A

N A

V E

S U

IT

E

C H

IC

A

G O

IL

w w w

.e xp

F e d e ra l.

c o m p ro j.

n o

P A

C -2

-A

A

E X

P F

E D

E R

A L

US Army Corps of Engineers ®

S O

L

IC

IT

A

T

IO

N N

O

A

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

S E A L

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

J A

P A

N D

IS

T

R

IC

T

U N

IT

A

P O

A P

-5

C A

M P

Z A

M A

J A

P A

N

F Y

R

E P

A

IR

U P

H B

L D

G

D

E S

IG

N

R E

F R

E S

H

T H

IR

D

L E

V E

L L

IF

E

S A

F E

T Y

P L A

N

GI103

B A

C K

C H

E C

K D

E S

IG

N

S U

B M

IT

T

A L

N

O T

F O

R C

O N

S T

R U

C T

IO

N

Y K

IM

B K

IM

Y K

IM

J A

N U

A R

Y

B R

F

P .r v t

OCCUPANT LOAD SCHEDULE - THIRD FLOOR

NUMBER ROOM NAME AREA OCCUPANCY USE

OCCUPANCY

LOAD

FACTOR(PER

PERSON)

OCCUPANT

LOAD

301 BEDROOM 47.94 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

302 BEDROOM 34.67 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

303 BEDROOM 51.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

304 BEDROOM 48.95 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

305 BEDROOM 47.95 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

306 BEDROOM 48.12 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

307 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

308 BEDROOM 34.71 m² STORAGE (NFPA 101) 46.45 m² 1

309 BEDROOM 47.55 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

310 STORAGE 10.14 m² STORAGE (NFPA 101) 46.45 m² 1

311 LAUNDRY 7.81 m² RESIDENTIAL (NFPA 101) 18.60 m² 1

311A JANITOR 2.73 m² STORAGE (NFPA 101) 46.45 m² 1

C301 CORRIDOR 55.01 m² RESIDENTIAL (NFPA 101) 18.58 m² 3

C302 CORRIDOR 30.99 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

S01 STAIR 23.19 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

S02 STAIR 23.57 m² RESIDENTIAL (NFPA 101) 18.58 m² 2

SCALE: 1 : 100

C1

THIRD LEVEL LIFE SAFETY PLAN

0 5 m

1:100

SCALE

MEANS OF EGRESS LIMITATION

OCCUPANCY COMMON PATH (M) TRAVEL DISTANCE (M)

NEW APARTMENT 15 38/61 *

* TRAVEL DISTANCE WITHIN A SLEEPING ROOM TO A

CORRIDOR DOOR SHALL NOT EXCEED 38 METERS. TRAVEL

DISTANCE FROM THE CORRIDOR DOOR TO THE NEAREST EXIT

SHALL NOT EXCEED 61 METERS.

GENERAL NOTES

1. REFER TO GI001 FOR LIFE SAFETY CODE ANALYSIS.

2. ALL INFORMATION SHOWN ON THIS SHEET IS FOR

INFORMATION ONLY TO DEMONSTRATE CODE

COMPLIANCE.

3. REFER TO ARCHITECTURAL DRAWINGS AND

SPECIFICATIONS FOR FIRE EXINGUISHER REQUIREMENTS.

4. REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS

FOR EXIT SIGN REQUIREMENTS.

EXIT CAPACITY SUMMARY

TOTAL EGRESS CAPACITY

TOTAL OCCUPANT LOAD

PLAN NORTHDR

UP

D

C

B

A

1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 178

DN

D

C

B

A

1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 178

D

C

B

A

1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 178

FIRST FLOOR HAZMAT ABATEMENTA1 SCALE: NTS

SECOND FLOOR HAZMAT ABATEMENTB1 SCALE: NTS

THIRD FLOOR HAZMAT ABATEMENTC1 SCALE: NTS

103 102 101

104 105 106

205 204

206 207

203 202

1 2

305 304

303 302 301

308 309

LOUNGE

LAUNDRY

STORAGE

A

MECH ROOM

A

MECH ROOM

B STORAGE

E

STORAGE

B

STORAGE

C

STORAGE

D

STORAGE

F

LAUNDRY

STORAGE

G

LAUNDRY

GENERAL NOTES

1. IN THE EVENT PCB BALLASTS ARE OBSERVED, THE

BALLASTS SHALL BE REMOVED AND DISPOSED OF IN

ACCORDANCE WITH SECTION 02 84 16 HANDLING OF

LIGHTING BALLASTS AND LAMPS CONTAINING PCBS AND

MERCURY.

2. FLUORESCENT LIGHT TUBES SHALL BE RECYCLED IN

ACCORDANCE WITH THE JEGS AND GOVERNMENT OF

JAPAN REGULATIONS.

3. CONTAINING SMOKE DETECTORS SHALL BE COLLECTED

AND DISPOSED OF IN ACCORDANCE WITH THE JEGS AND

GOVERNMENT OF JAPAN REGULATIONS.

1. ADHERE TO SECTION 02 82 00 ASBESTOS REMEDIATION

AND THE CONTRACTOR APPROVED WORK PLAN.

2. CONTRACTOR SHALL VERIFY THE EXISTING LOCATIONS,

QUANTITIES, CONDITION, LAYERS AND THICKNESS OF

ALL MATERIAL PRIOR TO COMMENCEMENT OF ANY

WORK.

3. NO EXCESSIVE USE OF WATER OR LIQUID WILL BE

ALLOWED. DAMAGE RESULTING FROM THE USE OF

EXCESSIVE WATER OR LIQUID WILL BE REPAIRED OR

REPLACED BY THE CONTRACTOR AT NO ADDITIONAL

COST TO THE GOVERNMENT.

4. CONTRACTOR TO COORDINATE ALL WORK WITH THE

CONTRACTING OFFICER AND GENERAL CONTRACTOR.

5. EXTERIOR CONCRETE WORK IS LIMITED TO THE EXTENT

NECESSARY TO ALLOW FOR THE INSTALLATION OF

EQUIPMENT.

6. ASSUME ALL ROOF MATERIALS ROOF CONTAIN

ASBESTOS.

1. ADHERE TO SECTION 02 83 00 LEAD REMEDIATION AND

THE CONTRACTORS APPROVED WORK PLAN.

2. LEAD/CADMIUM/CHROMIUM WORK MAY BE LIMITED TO

THE SPOT REMOVAL OF LEAD PAINT, THE REMOVAL OF

MATERIALS WITH LEAD/CADMIUM/CHROMIUM PAINT, OR

THE REMOVAL OF LOSE AND FLAKING PAINT TO A SOLID

ADHESION.

3. THE CONTRACTOR SHALL CONDUCT SELECTIVE

DEMOLITION OF THE BUILDING COMPONENTS WITH

LEAD/CADMIUM/CHROMIUM PAINT.

ASBESTOS SHEET KEYNOTES

1 GRAY MASTIC UNDER BEIGE 300 X 300MM FLOOR TILE

2 GRAY ADHESIVE UNDER BROWN VINYL BASE BOARD

3 BLACK SINK UNDERCOATING

4 WHITE VIBRATION DAMPENER

5 BROWN/RED FLANGE GASKET

6 EXTERIOR TEXTURED WALL COATING

7 DARK GRAY PIPE PENETRATION SEALANT

8 GYPSUM BOARD SKIMCOAT/JOINT COMPOUND

LEAD/CADMIUM/CHROMIUM SHEET KEYNOTES

9 BROWN PAINTED EXTERIOR METAL DOOR AND DOOR

FRAME

10 BROWN PAINTED WOOD WINDOW FRAME

11 BEIGE OVER YELLOW PAINTED METAL DOOR AND

DOOR FRAME

12 BLUE PAINTED METAL HANDRAIL

13 BROWN PAINTED METAL DOOR AND DOOR FRAME

14 RED PAINTED METAL FIRE CABINET

15 BEIGE PAINTED METAL ELECTRICAL CABINET

ASBESTOS ABATEMENT

LEAD/CADMIUM/CHROMIUM ABATEMENT

8 11 2 7 8 11 14 15

2 8 13

2 8 10 13 13 2

3 2 8 10 2 8 10

2 8 10 13 13

2 8 10

2 12

2 8 13

2 11 14 15

2 8 10

2 8 13

2 8 10 13

2 8 13

2 8 10

2 8 10 2 8 10 13 7 13

2 3

2 8 10 13

7 11 14 1582

2 8

10 13 2 8 10 13

2 3

2 8

10 13 2 8 10

3 2 8 10 13

2 8 13

11 14 1582

2 12

2 8 10 13

2 8 13

2 8 10

1 2

8 11 2 7 8 11 14 15

2 8 13

2 8 10 13 13 2

3 2 8 10 2 8 10

2 8 10 13 13

2 8 10

2 12

2 8 13

2 11 14 15

2 8 10

2 8 13

2 8 10 13

2 8 13

2 8 10

2 8 10 2 8 10 13 7 13

2 3

2 8 10 13

7 11 14 1582

2 8

10 13 2 8 10 13

2 3

2 8

10 13 2 8 10

3 2 8 10 13

2 8 13

11 14 1582

2 12

2 8 10 13

2 8 13

2 8 10

2 8 13

2 8 13

1 2

8 11 2 7 8 11 14 15

2 8 13

2 8 10 13 13 2

3 2

2 8 10 13 13

2 8 13

8 10

2 8 10 1 2 13

2 8 10 13

2 11 14 15

2 8 10 13

2 12 13 14

2 8 13

2 8 10

1 2

8 13

2 8 13

1 2

8 132 8 131 2 8 10

2 8 13

2 8 10 13

2 12 13 14

2 8 11 14 15

2 8 10 13

2 8 13

2 8 101 2 8 134 9 135 9 132 8 10

32 8 10

2 7 8 11 14 15

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

: P

AC

-2

0-

A0

A1EX

P

FE

D

ER

AL

US Army Corps of Engineers ®

SO

LI

C

IT

AT

IO

N N

O

A

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SEAL

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

JA

PA

N D

IS

TR

IC

T

U N

IT

, A

PO

A P

3-

0%

B

AC

KC

H

EC

K

D

ES

IG

N

S U

BM

IT

TA

L

(N O

T

FO

R C

O N

ST

R

U C

TI

O

N

L.

A

W

AD

A

K.

K

AN

ES

H

IR

O

L.

G

AR

C

IA

H

AZ

M

AT

A

BA

TE

M

EN

T

H-101

JA

N

U

AR

Y

C Z_

B7

_H

AZ

_H -1

.d w g

C

AM

P

ZA

M A, J

AP

AN

FY

R

EP

AI

R U

PH

B

LD

G

D

ES

IG

N

R

EF

R

ES

H

PLAN NORTHPLAN NORTH

G1

B1

L1

THIRD FLOOR HAZMAT ABATEMENT

SCALE: NTS

SECOND FLOOR HAZMAT ABATEMENT

SCALE: NTS

FIRST FLOOR HAZMAT ABATEMENT

SCALE: NTS DR

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

C O

N

TR

AC

T

N O

N . M

IC

H

IG

AN

A

VE

SU

IT

E

C

H

IC

AG

O

, I L w w w

.e xp

Fe de ra l.c om pr oj . n o.

: P

AC

-2

0-

A0

A1EX

P

FE

D

ER

AL

US Army Corps of Engineers ®

SO

LI

C

IT

AT

IO

N N

O

A

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SEAL

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

B

C

D

E

F

G

H

J

K

L

M

N

P

Q

R

JA

PA

N D

IS

TR

IC

T

U N

IT

, A

PO

A P

3-

L.

S

AB

AD

O

L.

M

AL

AB

AN

AN

K.

N

AK

AM

U R

A

JA

N

U

AR

Y

0%

B

AC

KC

H

EC

K

D

ES

IG

N

S U

BM

IT

TA

L

(N O

T

FO

R C

O N

ST

R

U C

TI

O

N

C

AM

P

ZA

M A, J

AP

AN

FY

R

EP

AI

R U

PH

B

U

IL

D

IN

G

D

ES

IG

N R

EF

R

ES

H

1. ALL CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE APPLICABLE

FEDERAL AND LOCAL LAWS, CODES, ORDINANCES, AND ANY STANDARDS AS

SPECIFICALLY REQUIRED WITHIN CAMP ZAMA.

2. THE CONTRACTOR SHALL REVIEW THE PLANS AND SPECIFICATIONS AND NOTIFY THE

CONTRACTING OFFICER IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND BEFORE

PROCEEDING WITH THE WORK.

3. ALL DISTANCES AND DIMENSIONS SHOWN ARE IN THE METRIC SYSTEM UNLESS

OTHERWISE INDICATED.

4. WHETHER SHOWN OR NOT SHOWN ON DRAWINGS, ALL EXISTING UTILITIES AND

STRUCTURES THAT ARE DISTURBED DURING TRENCHING WORK SHALL BE RESTORED TO

THEIR ORIGINAL CONDITIONS. ANY ACCIDENTAL DAMAGE TO UTILITIES AND STRUCTURES

THAT ARE INDICATED TO REMAIN SHALL BE REPAIRED AND RESTORED TO THEIR ORIGINAL

CONDITIONS AT NO COST TO THE GOVERNMENT.

5. THE CONTRACTOR SHALL CONDUCT CONSTRUCTION OPERATIONS WITH MINIMAL

INTERFERENCE TO NEARBY ROADS AND PARKING AREAS, ADJOINING SIDEWALKS, AND

OTHER PEDESTRIAN AND VEHICULAR ROUTES. THE CONTRACTOR SHALL USE BEST

EFFORTS TO PROVIDE CONTINUOUS TRAFFIC MOVEMENTS IN ALL DIRECTIONS AT ALL

TIMES.

6. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN EXCAVATING IN AREAS

THAT ARE KNOWN TO HAVE UNDERGROUND UTILITIES. HAND EXCAVATION IS REQUIRED

WITHIN 0.90 METER OF ANY EXISTING UTILITIES. IN CASES WHERE THE DEPTH OR

ELEVATION ARE NOT INDICATED ON THE PLANS, THE CONTRACTOR SHALL PROCEED WITH

CAUTION AND SHALL BE RESPONSIBLE FOR ANY DAMAGES INCURRED DURING THE

EXCAVATION ACTIVITIES.

7. THE CONTRACTOR SHALL PROVIDE SHORING FOR TRENCH EXCAVATION WORK THAT

EXCEEDS 1.50 METERS IN DEPTH.

8. CONTRACTOR TO INSTALL TEMPORARY SILT FENCES AND OTHER EROSION CONTROL

DEVICES PRIOR TO START OF CONSTRUCTION TO PREVENT THE OUTFLOW OF

SOIL-CONTAMINATED RUNOFF INTO DRAINAGE INLETS OR NEARBY OPEN WATERWAYS.

9. AN ACTUAL TOPOGRAPHIC SURVEY WAS NOT CONDUCTED FOR THE UPH 760 PROJECT

AREA. THE EXISTING UTILITY LINES AND MANHOLES AS REFLECTED ON DRAWINGS WERE

TAKEN FROM AVAILABLE AS-BUILT DRAWINGS DATED 1955 AND 1988 WITH

CROSS-REFERENCING TO OTHER BASE MAPS ISSUED AS PART OF THE

GOVERNMENT-FURNISHED INFORMATION (GFI) PACKAGE. SEE ALSO RELEVANT NOTES ON

TOPOGRAPHIC SURVEY DATA IN DWG CU201.

10. THE EXISTING SIDEWALKS, FENCE ENCLOSURE, OUTDOOR SUPPORT FACILITIES, AND

OTHER ABOVEGROUND SITE FEATURES AS SHOWN ON PLANS ARE BASED ON SITE

CONDITIONS FOUND DURING FIELD INVESTIGATION.

11. THE REMOVAL AND REPLACEMENT OF EXTERIOR UTILITY CONNECTIONS SHALL

GENERALLY TERMINATE WITHIN 1.5 METERS FROM BUILDING WALLS. FOR SANITARY

SEWER AND STORM SEWER LINES, REPLACEMENT SHALL INCLUDE PIPES FROM THE

BUILDING WALLS TO THE NEAREST EXISTING EXTERIOR MANHOLES OR LATERAL LINES

THAT ARE CLOSEST TO THE 1.5-METER CONSTRUCTION LIMITS.

12. THERE MAY BE EXISTING UTILITY BUILDING CONNECTIONS THAT ARE NOT SHOWN ON

DRAWINGS. THESE IF THESE LINES ARE FOUND, THE CONTRACTING OFFICER SHALL BE

NOTIFIED IMMEDIATELY FOR DIRECTION PRIOR TO PROCEEDING WITH WORK.

13. THE TRENCHING WORK FOR THE INSTALLATION OF THE NEW FIRE WATER LINE SHALL BE

CONDUCTED WITH EXTREME CAUTION IN CONSIDERATION OF OTHER UNDERGROUND

UTILITY LINES THAT MAY BE PRESENT AND NOT REFLECTED ON DRAWINGS. PROMPT

COORDINATION WITH THE CONTRACTING OFFICER IS NECESSARY FOR ANY EXISTING

PIPELINES OR CABLES THAT MAY CONFLICT WITH THE ALIGNMENT OF THE NEW FIRE

WATER LINE.

14. THE NARROW STRIP BETWEEN THE BUILDING AND THE CONCRETE BOUNDARY BLOCK IS

INTENDED TO BE A GRAVEL GROUNDCOVER BUT CURRENTLY APPEARED TO BE A BARREN

GROUND SURFACE WITH FEW TURFING AND SHRUBBERY. THIS PROJECT WILL INCLUDE

THE RESTORATION OF THE GRAVEL SURFACING BUT ONLY ALONG THE SECTIONS

DISTURBED BY THE UTILITY REPLACEMENT WORK. THE CONTRACTOR SHALL COORDINATE

WITH THE CONTRACTING OFFICER FOR ANY DEVIATION THAT MAY BE DIRECTED DURING

ACTUAL CONSTRUCTION WORK.

15. ALL SODDED SURFACES DISTURBED BY THE UTILITY TRENCHING WORK AND THOSE

DAMAGED BY MOVEMENTS OF CONSTRUCTION EQUIPMENT SHALL BE RESTORED TO

MATCH THE EXISTING CONDITION.

BUILDING / STRUCTURE

CONCRETE SIDEWALK

CONCRETE STEPS WITH HANDRAILS

STORM DRAINAGE LINE

STORM DRAINAGE MANHOLE

CONCRETE DITCH

SPLASH BLOCK AND DOWNSPOUT

UPH 760

SD

SD SD

DMH

DS DS

CONCRETE BLOCK STOPPER

KENCHI BLOCK RETAINING WALL

CHAIN LINK FENCE ENCLOSURE

SODDING

GRAVEL GROUNDCOVER

EXISTING DEMOLITION NEW DESCRIPTION

POTABLE WATER LINE AND GATE VALVEW

FIRE WATER SUPPLY LINE AND GATE VALVEFW

GV

GV

FIRE DEPARTMENT CONNECTION

FDC

FIRE HYDRANT WITH GATE VALVE

SANITARY SEWER LINE AND SURFACE CLEANOUT

SANITARY SEWER MANHOLE

WATER METER

FHY

SS SS

SMH

SCO SCO

GV

AC ASPHALT CONCRETE

BLDG BUILDING

CI CAST IRON

CJ CONTRACTION JOINT

CONC CONCRETE

DMH DRAINAGE MANHOLE

DIP DUCTILE IRON PIPE

DS DOWNSPOUT

EJ EXPANSION JOINT

EXP EXPANSION

EXST EXISTING

FDC FIRE DEPARTMENT CONNECTION

FFE FINISH FLOOR ELEVATION

FHY FIRE HYDRANT

GFI GOVERNMENT-FURNISHED INFORMATION

GL GRADE LINE

GV GATE VALVE

H HEIGHT

L LENGTH

M METER

MIN MINIMUM

MM MILLIMETER

N/mm2 NEWTON PER SQUARE MILLIMETER

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

POC POINT OF CONNECTION

PVC POLYVINYL CHLORIDE

SCO SURFACE CLEANOUT

S SLOPE

SI SURFACE INLET

SMH SEWER MANHOLE

THK THICK

TYP TYPICAL

UPH UNACCOMPANIED PERSONNEL HOUSING

W WIDTH

° DEGREES

Ø DIAMETER

# NUMBER

% PERCENT

CIVIL GENERAL NOTES CIVIL LEGENDCIVIL ABBREVIATIONS

DOWNSPOUT CONNECTIONSD

SYSTEMS

0 - GENERAL

1 - SITE PLANS

2 - UTILITY PROFILES

3 - GRADING SECTIONS

4 - ENLARGED PLANS

5 - DETAILS

SHEET ID STRUCTURE

C S 0 0 0

SHEET SEQUENCE

NUMBER

SYSTEMDISCIPLINE

DESIGNATOR

PROJECT LIMITS

SILT FENCE

GRAVEL FILTER

SF

5-FT (1.52-M) LINE FROM BLDG WALL

FIRE RISER

ENCLOSURE

TBM TEMPORARY BENCH MARK

C

IV

IL

AB

BR

EV

IA

TI

O N

S, G

EN

ER

AL

N

O

TE

S

AN

D L

EG

EN

D

C-001

C -0

.d w g

DR

AF

T

AutoCAD SHX Text M

0 15000mm5000

CON…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .