Draft CLIN Structure.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Tank and Pump Systems (TPS) Federal contract opportunity
Solicitation number
70FB8024I00000001
Issued by
Federal Emergency Management Agency Community Survivor Assistance Section

About this file

This document provides a draft CLIN structure for a federal contract solicitation from the Federal Emergency Management Agency for tank and pump systems. The solicitation will include CLINs for the procurement of new external and internal tank and pump systems in various unit quantities. Additional CLINs cover pre-refurbishment inspections, refurbishment of tank and pump systems from various manufacturers, and maintenance, enhancement and replacement parts. Further CLINs encompass labor for inspections, enhancements, repairs, refurbishment and field support. Additional CLINs are specified for travel expenses according to federal regulations, delivery of tank and pump systems, and miscellaneous expenses. Response to the solicitation number 70FB8024I00000001 will provide tank and pump systems and related services to support the Federal Emergency Management Agency's Community Survivor Assistance Section.

View the file

Other files for this federal contract opportunity

Other files attached to Tank and Pump Systems (TPS), newest first.
File Type Posted
Amendment 1 Request for Information TPS.pdf PDF
RFI Questionnaire.docx DOCX document
Request for Information TPS.pdf PDF
DRAFT TPS Statement of Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN Description

CLINDescription
Complete Tank and Pump Systems
0001AAEXTERNAL Tank and Pump System (1 - 500 units)
0001ABEXTERNAL Tank and Pump System (501- 1000 units)
0001ACEXTERNAL Tank and Pump System (>1,000 units)
0.00.0
0001BAINTERNAL Tank and Pump System (1 - 500 units)
0001BBINTERNAL Tank and Pump System (501- 1000 units)
0001BCINTERNAL Tank and Pump System (>1,000 units)
0.00.0
Refurbishment
0002CAPre-Refurbishment Inspection and Cost Estimate
0.00.0
0002AARefurbish Darley External TPS
0002ABRefurbish General Air External TPS
0002ACRefurbish Talco External TPS
0002ADRefurbish New Vendor External TPS
0.00.0
0002BARefurbish Darley Internal TPS
0002BBRefurbish General Air Internal TPS
0002BCRefurbish Talco Internal TPS
0002BDRefurbish New Vendor Internal TPS
0.00.0
Maintenance, Enhancement and Refurbishment Parts
0003AAExternal TPS Hose Assembly
0003ABExternal TPS Primary AC Electrical Cable
0003ACExternal TPS Pump & Motor
0003ADInstallation Parts Kit for External TPS
0003AEProgrammable Logic Controller for External TPS
0003AFControls for External TPS
0003AGParts for Repair of External TPS enclosure
0.00.0
0003BAInternal TPS Hose
0003BBInternal TPS Primary AC Electrical Cable
0003BCInternal TPS Pump & Motor
0003BDInstallation Parts Kit for Internal TPS
0003BEProgrammable Logic Controller for Internal TPS
0003BFControls for Internal TPS
0.00.0
0003CAMisc. Replacement Parts
0003CBParts for TPS Enhancement
0.00.0
Labor
0004CATPS Inspection Multiple
0004CBTPS Enhancement
0004CCTPS Repair
0004CDRefurbishment
0004CEField Support (Labor for days working from location.)
0004CFTravel - (Labor to or from a location.)
0.00.0
Travel0.0
0005CATravel Expense - MI&E + Hotel, Rental Car & Other Non-Labor Expenses
0005CBG&A and Ovrhd for Travel Expense in CLIN 0005CA ( %)
0.00.0
Delivery
0006CADelivery of Trailer Load of External TPS to CONUS Location
0006CBDelivery of Trailer Load of Internal TPS to CONUS Location
0006CCLess Than Load (LTL) - Unit Delivery (Priced for Individual TPS)
0006CDDelivery of material for repair or refurbishment
0.00.0
0006CEMonthly rental of Trailer for delivery of Internal Tank & Pump directly to MHU production factory.
0.00.0
Miscellaneous
0007AAMiscellaneous

CLIN Type and Description

CLINCLIN NameDescriptionUnit of MeasureCLIN TypeBase YearOption 1Option 2Option 3Option 4
Complete Tank and Pump SystemsThese CLINS are for new complete tank and pump systems
0001AAEXTERNAL Tank and Pump System (1 - 500 units)Complete Tank and Pump System (TPS) including all accessories; the water connection, heat trace, insulation and electrical connection. (Contractor Designed Enclosure)EAFixed Price
0001ABEXTERNAL Tank and Pump System (501- 1000 units)Complete Tank and Pump System (TPS) including all accessories; the water connection, heat trace, insulation and electrical connection. (Contractor Designed Enclosure)EAFixed Price
0001ACEXTERNAL Tank and Pump System (>1,000 units)Complete Tank and Pump System (TPS) including all accessories; the water connection, heat trace, insulation and electrical connection. (Contractor Designed Enclosure)EAFixed Price
0001BAINTERNAL Tank and Pump System (1 - 500 units)Complete Tank and Pump System (TPS) including all accessories, water connection and electrical connection.EAFixed Price
0001BBINTERNAL Tank and Pump System (501- 1000 units)Complete Tank and Pump System (TPS) including all accessories, water connection and electrical connection.EAFixed Price
0001BCINTERNAL Tank and Pump System (>1,000 units)Complete Tank and Pump System (TPS) including all accessories, water connection and electrical connection.EAFixed Price
RefurbishmentThese CLINs are for refurbishment of TPS units that have been deployed in the field and are being recycled for re-use. Includes new or replacement parts and labor to perform this work.
0002CAPre-Refurbishment Inspection and Cost EstimateThis CLIN includes the labor, equipment, and materials required to inspect a TPS unit to determine what materials and labor is required to returned that unit to full compliance with the ARD.EAFixed Price (Priced at time of order since this depends on the repairs required that are determined during Pre-Refurbishment Inspection and Cost Estimate.)
0002AARefurbish Darley External TPSThis CLIN is for the material and labor to return a TPS to full conformance with the ARD. This work includes cleaning as necessary, replacement of consumable parts, repairs as needed, testing and recertification of the unit, complete draining, and packaging for shipping. Includes Installation Parts Kit and new O&M Manuals.EAFixed Price (Priced at time of order since this depends on the repairs required that are determined during Pre-Refurbishment Inspection and Cost Estimate.)
0002ABRefurbish General Air External TPSThis CLIN is for the material and labor to return a TPS to full conformance with the ARD. This work includes cleaning as necessary, replacement of consumable parts, repairs as needed, testing and recertification of the unit, complete draining, and packaging for shipping. Includes Installation Parts Kit and new O&M Manuals.EAFixed Price (Priced at time of order since this depends on the repairs required that are determined during Pre-Refurbishment Inspection and Cost Estimate.)
0002ACRefurbish Talco External TPSThis CLIN is for the material and labor to return a TPS to full conformance with the ARD. This work includes cleaning as necessary, replacement of consumable parts, repairs as needed, testing and recertification of the unit, complete draining, and packaging for shipping. Includes Installation Parts Kit and new O&M Manuals.EAFixed Price (Priced at time of order since this depends on the repairs required that are determined during Pre-Refurbishment Inspection and Cost Estimate.)
0002ADRefurbish New Vendor External TPSThis CLIN is for the material and labor to return a TPS to full conformance with the ARD. This work includes cleaning as necessary, replacement of consumable parts, repairs as needed, testing and recertification of the unit, complete draining, and packaging for shipping. Includes Installation Parts Kit and new O&M Manuals.EAFixed Price (Priced at time of order since this depends on the repairs required that are determined during Pre-Refurbishment Inspection and Cost Estimate.)
0002BARefurbish Darley Internal TPSThis CLIN is for the material and labor to return a TPS to full conformance with the ARD. This work includes cleaning as necessary, replacement of consumable parts, repairs as needed, testing and recertification of the unit, complete draining, and packaging for shipping. Includes Installation Parts Kit and new O&M Manuals.EAFixed Price (Priced at time of order since this depends on the repairs required that are determined during Pre-Refurbishment Inspection and Cost Estimate.)
0002BBRefurbish General Air Internal TPSThis CLIN is for the material and labor to return a TPS to full conformance with the ARD. This work includes cleaning as necessary, replacement of consumable parts, repairs as needed, testing and recertification of the unit, complete draining, and packaging for shipping. Includes Installation Parts Kit and new O&M Manuals.EAFixed Price (Priced at time of order since this depends on the repairs required that are determined during Pre-Refurbishment Inspection and Cost Estimate.)
0002BCRefurbish Talco Internal TPSThis CLIN is for the material and labor to return a TPS to full conformance with the ARD. This work includes cleaning as necessary, replacement of consumable parts, repairs as needed, testing and recertification of the unit, complete draining, and packaging for shipping. Includes Installation Parts Kit and new O&M Manuals.EAFixed Price (Priced at time of order since this depends on the repairs required that are determined during Pre-Refurbishment Inspection and Cost Estimate.)
0002BDRefurbish New Vendor Internal TPSThis CLIN is for the material and labor to return a TPS to full conformance with the ARD. This work includes cleaning as necessary, replacement of consumable parts, repairs as needed, testing and recertification of the unit, complete draining, and packaging for shipping. Includes Installation Parts Kit and new O&M Manuals.EAFixed Price (Priced at time of order since this depends on the repairs required that are determined during Pre-Refurbishment Inspection and Cost Estimate.)
Maintenance, Enhancement and Refurbishment PartsThese CLINS are for the material for replacement parts required for repair, maintenance or refurbishment of the TPS
0003AAExternal TPS Hose AssemblyThis CLIN is for the material for a complete replacement water supply hose assembly including the water supply hose, connection/fittings, insulation and heat trace for connecting the External TPS unit to the MHU.EAFixed Price
0003ABExternal TPS Primary AC Electrical CableThis CLIN is for the material for replacement of the electrical cable connecting the TPS to the MHU, including connector(s).EAFixed Price
0003ACExternal TPS Pump & MotorThis CLIN is for the material for replacement of the water pump and drive motor.EAFixed Price
0003ADInstallation Parts Kit for External TPSThis CLIN is for the material and parts that comprise the installation parts kit provided with a new TPS. If the only a minimum number of items from the installation parts kit is needed please use the miscellaneous replacement parts CLIN.EAFixed Price
0003AEProgrammable Logic Controller for External TPSThis CLIN includes the PLC or other control device(s) that may be required to allow the TPS to achieve the functional capability required in an updated controls logic requirement. If this CLIN is used the contractor shall provide a cost estimate including material and labor for approval prior to any work being started.EAFixed Price
0003AFControls for External TPSThis CLIN is for all material and parts required to upgrade or update the programming and control sequences to the most recent controls logic approved for that TPS. This CLIN includes the timers, switches, or other control devices that may be required to allow the TPS to achieve the functional capability required in an updated controls logic requirement. If this CLIN is used the contractor shall provide a cost estimate including material and labor for approval prior to any work being started. Miscellaneous replacement parts are to be identified as part of TPS inspection. This CLIN does not include the cost of other like-for-like replacement parts, which are covered under Misc. Replacement Parts.EAFixed Price
0003AGParts for Repair of External TPS enclosureThis CLIN is for all the parts and materials required to repair the enclosure of the External TPS. If this CLIN is used the contractor shall provide a cost estimate including material and labor for approval prior to any work being started. Enclosure replacement parts are to be identified as part of TPS inspectionEAFixed Price (Priced at time of order since this depends on the repairs required that are determined during Pre-Refurbishment Inspection and Cost Estimate.)
0003BAInternal TPS HoseThis CLIN is for the material for a replacement water supply hose for connecting the Internal TPS to the MHU.EAFixed Price
0003BBInternal TPS Primary AC Electrical CableThis CLIN is for the material for replacement of the electrical cable connecting the TPS to the MHU, including connector(s).EAFixed Price
0003BCInternal TPS Pump & MotorThis CLIN is for the material for replacement of the water pump and drive motor.EAFixed Price
0003BDInstallation Parts Kit for Internal TPSThis CLIN is for the material and parts that comprise the installation parts kit provided with a new TPS. If the only a minimum number of items from the installation parts kit is needed please use the miscellaneous replacement parts CLIN.EAFixed Price
0003BEProgrammable Logic Controller for Internal TPSThis CLIN includes the PLC or other control device(s) that may be required to allow the TPS to achieve the functional capability required in an updated controls logic requirement. If this CLIN is used the contractor shall provide a cost estimate including material and labor for approval prior to any work being started.EAFixed Price
0003BFControls for Internal TPSThis CLIN is for all material and parts required to upgrade or update the programming and control sequences to the most recent controls logic approved for that TPS. This CLIN includes the timers, switches, or other control devices that may be required to allow the TPS to achieve the functional capability required in an updated controls logic requirement. If this CLIN is used the contractor shall provide a cost estimate including material and labor for approval prior to any work being started. Miscellaneous replacement parts are to be identified as part of TPS inspection. This CLIN does not include the cost of other like-for-like replacement parts, which are covered under Misc. Replacement Parts.EAFixed Price
0003CAMisc. Replacement PartsThis CLIN is for all other material needed for the repair or refurbishment of the TPS. If this CLIN is used the contractor shall provide a cost estimate including material and labor for approval prior to any work being started. Miscellaneous replacement parts are to be identified as part of TPS inspection.EAFixed Price (Priced at time of order, TBD)
0003CBParts for TPS EnhancementThis CLIN is for all material needed for the enhancement of a TPS. If this CLIN is used the contractor shall provide a cost estimate including material for approval prior to any work being started. Miscellaneous replacement parts are to be identified as part of TPS inspectionEAFixed Price
LaborThese CLINS are for the labor to preform repair, maintenance or refurbishment of the TPS
0004CATPS Inspection MultipleThis CLIN is for the labor for the inspection of multiple TPS’ at the same location. (This CLIN is typically used at a location where more than a single TPS available. This CLIN is typically used at a FEMA storage or staging site. This CLIN (for inspection) is not reimbursed if it is determined that the TPS requires maintenance.)EAFixed Price
0004CBTPS EnhancementThis CLIN is for the labor to make modifications to the TPS. Enhancement are based on FEMA’s request to the TPS vendor to add additional capabilities that improve the operational or performance characteristics of the TPS.
(This CLIN is used to upgrade the TPS at FEMA's request. During the operational life of a TPS FEMA may determine that the TPS needs to be enhanced to improve it. Work for enhancing a TPS can occur at a storage or staging site and may occur after TPS are installed in conjunction with an MHU.)EAFixed Price (Priced at time of order since this depends on the enhancement that is TBD.)
0004CCTPS RepairThis CLIN is for the labor associated with making repairs to a damaged TPS. Repair damage is defined as damage which is caused by others and not as a result of a defect caused by the design or manufacture of the TPS.

(This CLIN is used when the TPS has been damaged in transportation, installation or use through no fault of the TPS vendor.)

EAFixed Price
0004CDRefurbishmentThis CLIN is for the labor to restoration of a TPS to full operational capability in accordance with the design and operational specifications as well as include any enhancements previously incorporated.
(This CLIN is used when the TPS has been returned to FEMA storage or staging after it has been installed and used in conjunction with a MHU. TPS may or may not have been activated during the deployment.)EAFixed Price
0004CEField Support (Labor for days working from location.)This CLIN is for the labor to provide one qualified technician to provide field support in the area where disaster response is ongoing.
LHLabor Hour (Not To Exceed Amount)
0004CFTravel - (Labor to or from a location.)This CLIN is used to pay for labor associated with travel to perform Inspection, Repair, Maintenance, Field Support or any work that needs to occur in the Field.
Cost (Not To Exceed Amount)
TravelThese CLINS are used for travel expenses incurred to complete a task order. Travel expenses are required to comply with Federal travel regulations.
0005CATravel Expense - MI&E + Hotel, Rental Car & Other Non-Labor ExpensesThis CLIN pays for the TPS vendor to travel expenses incurred when performing Inspection, Repair, Maintenance, Enhancement, Refurbishment, or Field Support. Travel expenses to comply with Federal Travel guidance as stated in the FAR.Actual costs based on Federal Travel Regulations.COST
0005CBG&A and Ovrhd for Travel Expense in CLIN 0005CA ( %)G&A and Overhead for Travel Expense in CLIN 0005CA (Will be represented as a %)TBDCOST
DeliveryThese CLINS are used for the delivery expenses of TPS units.
0006CADelivery of Trailer Load of External TPS to CONUS LocationShipping of TPS. Can be used for delivery of new, enhanced, or refurbished TPS units or return of TPS units from field.
Per Trailer Load
0006CBDelivery of Trailer Load of Internal TPS to CONUS LocationShipping of TPS. Can be used for delivery of new, enhanced, or refurbished TPS units or return of TPS units from field.
Per Trailer Load
0006CCLess Than Load (LTL) - Unit Delivery (Priced for Individual TPS)Delivery of TPS. Can be used for delivery of new, enhanced, or refurbished TPS units or return of TPS units from field.Per Trailer Load
0006CDDelivery of material for repair or refurbishment

0006CE Monthly rental of Trailer for delivery of Internal Tank & Pump directly to MHU production factory. Trailer to be used as storage of TPS units at the MUH factory. (30 day rental rate) Per Trailer

MiscellaneousThese CLINS are used for the delivery expenses of TPS units.
0007AAMiscellaneousMisc expenses not covered in other parts of CLIN table or SOW. Contractor shall develop a cost proposal for all work to be carried out as part of this assignment.COST (Priced at time of order.Not To Exceed Amount)

&"Times New Roman,Bold"HSFE80-15-R-0010 Attachment 2 Price/ Cost Schedule

Note:

CLIN numbering: The 0001 relates to bar heading for the type of product or service.

First letter relates to the type of TPS - A for External TPS, B for Internal TPS, C for either TPS type.

Second letter is for sequential identification within a grouping.

File details come from the government source that posted it. Updated .