DRAFT CDRLs DD Form 1423_STEP 3kW EMD.pdf
PDF 462 KB Posted
- Attached to
- DRAFT RFP - Small Tactical Electric Power 3-Kilowatt Tactical Power Source (STEP 3kW TPS)
- Solicitation number
- W909MY21R0008
About this file
This draft request for proposals (RFP) and associated documents outline requirements for the Small Tactical Electric Power 3-Kilowatt Tactical Power Source (STEP 3kW TPS) program. The U.S. Army Contracting Command - Aberdeen Proving Ground is seeking feedback on the draft RFP documents through August 13, 2021. Key information includes the Army's need for a 3-kilowatt tactical power source to support expeditionary forces. The solicitation will utilize best value tradeoff source selection and award a single fixed-price contract for prototype design, development, test, and evaluation in three phases. The U.S. Army Product Director Small Expeditionary Power Sources will oversee the program. Interested offerors should submit any questions on the draft RFP documents using the provided template to ensure a timely government response.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Original Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC
20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM X OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
STEP 3KW
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C001 Critical Design Review (CDR) Presentation
Material
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-MISC-80711 SOO Para 5 & 7.2 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
NA Twice See Block 16 b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
N/A 1st Use See Block 16
Rag
Repro
16. REMARKS:
Block 12: Submit first submission at least 14 calendar days prior to prototype
CDR review meeting.
Block 13: Submit second submission 7 calendar days following CDR review.
DISTRIBUTION STATEMENT C. Approved for release to U.S. Government
Agencies and their contractors.
SFAE-CSS-E2-S
ACO
CCAP-CCV
FCDD-ISN
Blk 14: ELECTRONIC SUBMITTAL:
SFAE-CSS-E2-S: terrence.p.wichersk@mail.mil
SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil
FCDD-ISN: debra.l.bowman6.civ@mail.mil.
CCAP-CCV: darbye.t.rivera.civ@mail.mil; and
CCAP-CCV: tifphany.n.cantey.civ@mail.mil.
15. TOTAL 6 6 0
G. PREPARED BY
Terrence Wicherski
APM, PD SEPS
COMM: (703) 664-5331
H. DATE
7 Jul 21
I. APPROVED BY
Chenxi Dong-O’Malley
Product Director
SFAE-CSS-E2-S
COMM: (703) 664-5338
J. DATE
Based upon DD Form 1423-1, 1 Jun 90
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the
Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
STEP 3KW
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE
GROUP
C002 Product Drawings and Associated Lists
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
18.
ESTIMATED
TOTAL PRICE
DI-SESS-81000B SOO PARA 5.1 & 7.2 SFAE-CSS-E2-S
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
SECT. B
NA C Twice See Block 16
b. COPIES*
8. APP CODE
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
NA 1st use See Block 16
Reg
16. REMARKS
Contractor should propose format to Government for approval.
Block 10: Submit an interim report at the end of phase 1 & 2 a final report upon conclusion on Phase 3.
Block 12: Submit first submission 7 calendar days following CDR review.
Block 13: Submit second submission no later than 14 calendar days prior to the end of the second phase.
Blk 14: CD-ROM SUBMITTAL:
SFAE-CSS-E2-S:
Bldg 324
5850 Delafield Rd
Ft Belvoir, VA 22060
Attn: Terrence Wicherski, 703-664-5352
SFAE-CSS-E2-S
ACO
CCAP-CCV
FCDD-ISN
15. TOTAL 0 6
G. PREPARED BY
Terrence Wicherski
APM, PD SEPS
Chenxi Dong-O’Malley
Product Director
SFAE-CSS-E2-S
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC
20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM X OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
STEP 3KW
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C003 Quality Control Plan
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-MGMT-82184 SOO Para 6 & 7.2 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
NA Once See Block 16 b. COPIES SECT. B
8. APP CODE A 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
N/A 1st Use AS REQ
Block 4: Delete requirement Section 2 of DI-MGMT-82184. Content shall be include current contractor plan. Days required are in working days
Block 12: Submit draft plan 90 days after contract award. The government requires 30 days for review/comment.
Block 13: Submit final 30 days after government comments incorporated or upon approval of draft.
DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.
CCAP-CCV
FCDD-ISN
SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil
FCDD-ISN: debra.l.bowman6.civ@mail.mil.
CCAP-CCV: darbye.t.rivera.civ@mail.mil; and
CCAP-CCV: tifphany.n.cantey.civ@mail.mil.
15. TOTAL 6 6 0
G. PREPARED BY
Terrence Wicherski
APM, PD SEPS
Chenxi Dong-O’Malley
Product Director
SFAE-CSS-E2-S
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC
20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP X TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
STEP 3KW
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C004 Electronic Technical Manual (ETM)
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-MISC-80711, & MIL-STD 400051-2C SOO Para 7, 7.1 & 7.2 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
N/A Three times See Block 16 b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
Block 4: For each change, the contractor shall deliver digital files for the
ETM revision and/or change package developed under this contract. The contractor shall provide a complete set of all integrated text and graphics files
(with graphics embedded) unless otherwise approved by the Government
Acceptance Office. The integrated copy must appear on screen and print exactly as printed final. Final delivery is also required as non-integrated native files containing editable text and resizable graphics. All digital files shall be provided both by electronic submission, e.g., e-mail, etc., as approved by the requiring office, and by CD, readable by computers running current
Government utilized Microsoft Operating System.
Block 12: Submit 1st draft (30%) 150-days days prior to the end of Phase 1.
Block 13: Submit 2nd draft (70%) 45-days prior to the end of Phase 1.
Submit final draft 30-days prior to the conclusion of Phase 3.
DISTRIBUTION STATEMENT C. Approved for release to U.S. Government
Agencies and their contractors.
SFAE-CSS-E2-S
ACO
CCAP-CCV
SFAE-CSS-E2-S: casey.h.steigar.civ@mail.milFCDD-ISN:
debra.l.bowman6.civ@mail.mil.
CCAP-CCVdarbye.t.rivera.civ@mail.mil; and
CCAP-CCV: tifphany.n.cantey.civ@mail.mil.
15. TOTAL 6 6 0
G. PREPARED BY
Terrence Wicherski
APM, PD SEPS
Chenxi Dong-O’Malley
Product Director
SFAE-CSS-E2-S
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC
20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM X OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
STEP 3KW
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C005 Failure Modes, Effects, and Criticality
Analysis (FMECA) Report
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-SESS-81495 SOO Para 7.1 & 7.2 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
NA Once See Block 16 b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
N/A 1st Use N/A
Block 12: Submit no later than 14 calendar days prior to the end of phase 1.
CCAP-CCV
FCDD-ISN
SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil
FCDD-ISN: debra.l.bowman6.civ@mail.mil.
CCAP-CCV: darbye.t.rivera.civ@mail.mil; and
CCAP-CCV: tifphany.n.cantey.civ@mail.mil.
15. TOTAL 6 6 0
G. PREPARED BY
Terrence Wicherski
APM, PD SEPS
Chenxi Dong-O’Malley
Product Director
SFAE-CSS-E2-S
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC
20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM X OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
STEP 3KW
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C006 Maintenance Analysis Report
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-MISC-80711 SOO Para 7.1 & 7.2 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
NA Once See Block 16 b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
Block 12: Submit no later than 14 calendar days prior to the end of phase 2.
CCAP-CCV
FCDD-ISN
SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil
FCDD-ISN: debra.l.bowman6.civ@mail.mil.
CCAP-CCV: darbye.t.rivera.civ@mail.mil; and
CCAP-CCV: tifphany.n.cantey.civ@mail.mil.
15. TOTAL 6 6 0
G. PREPARED BY
Terrence Wicherski
APM, PD SEPS
Chenxi Dong-O’Malley
Product Director
SFAE-CSS-E2-S
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC
20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM X OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
STEP 3KW
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C007 Engineering Data for Provisioning (EDFP)
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-SESS-81874 SOO Para 7.1 & 7.2 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
NA Once See Block 16 b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
Block 12: Submit no later than 14 calendar days prior to the end of phase 2.
CCAP-CCV
FCDD-ISN
0 2
SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil
FCDD-ISN: debra.l.bowman6.civ@mail.mil.
CCAP-CCV: darbye.t.rivera.civ@mail.mil; and
CCAP-CCV: tifphany.n.cantey.civ@mail.mil.
15. TOTAL 0 6 0
G. PREPARED BY
Terrence Wicherski
APM, PD SEPS
Chenxi Dong-O’Malley
Product Director
SFAE-CSS-E2-S
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC
20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM X OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
STEP 3KW
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C008 Kick Off Meeting Presentation Materials
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-MISC-80711 SOO Para 7.2 & 8 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
NA Once See Block 16 b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
Block 12: Submit 30 calendar days after contract award.
ACO
CCAP-CCV
FCDD-ISN
SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil
FCDD-ISN: debra.l.bowman6.civ@mail.mil.
CCAP-CCV: darbye.t.rivera.civ@mail.mil; and
CCAP-CCV: tifphany.n.cantey.civ@mail.mil.
15. TOTAL 6 6 0
G. PREPARED BY
Terrence Wicherski
APM, PD SEPS
Chenxi Dong-O’Malley
Product Director
SFAE-CSS-E2-S
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of
Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in
Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM X OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
STEP 3KW
1. DATA ITEM
NO.
2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C009 Bi-Monthly Progress Report
4. AUTHORITY (Data Acquisition
Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-ADMN-80447A SOO Para 7.2 & 8 SFAE-CSS-E2-S INSERT
7. DD 250
REQ
9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF
FIRST
SUBMISSION
14. DISTRIBUTION IN
NA Bi-monthly See Block 16 b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
Blocks 12 & 13: First submission shall be submitted at the end of the second calendar month after award and subsequent submissions at the end of every other month throughout each awarded phase. Reports which coincide with an End of
Phase report do not need to be submitted separately.
SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil
FCDD-ISN: debra.l.bowman6.civ@mail.mil.
CCAP-CCV: darbye.t.rivera.civ@mail.mil; and
CCAP-CCV: tifphany.n.cantey.civ@mail.mil.
CCAP-CCV
FCDD-ISN
0 2
15. TOTAL
0 6 0
Terrence Wicherski
APM, PD SEPS
Chenxi Dong-O’Malley
Product Director
SFAE-CSS-E2-S
mailto:lena.v.plummer-milindez.civ@mail.mil
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC
20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM X OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
STEP 3KW
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
C010 End of Phase Report
4. AUTHORITY (Data Acquisition Document
No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATE
D TOTAL
PRICE
DI-ADMN-80447A SOO Para 7.2 & 8 SFAE-CSS-E2-S INSERT
7. DD 250 REQ 9.DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
NA Twice See Block 16 b. COPIES SECT. B
8. APP CODE C 11. AS OF DATE 13. DATE OF
SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
Block 12 & 13: Submit no later than 14 calendar days prior to the end of phases 1 & 2.
SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil
FCDD-ISN: debra.l.bowman6.civ@mail.mil.
CCAP-CCVdarbye.t.rivera.civ@mail.mil; and
CCAP-CCV: tifphany.n.cantey.civ@mail.mil.
SFAE-CSS-E2-S
ACO
CCAP-CCV
FCDD-ISN
15. TOTAL 6 6 0
Terrence Wicherski
APM, PD SEPS
Chenxi Dong-O’Malley
Product Director
SFAE-CSS-E2-S
File details come from the government source that posted it. Updated .