DRAFT CDRLs DD Form 1423_STEP 3kW EMD.pdf

PDF 462 KB Posted

Attached to
DRAFT RFP - Small Tactical Electric Power 3-Kilowatt Tactical Power Source (STEP 3kW TPS)
Solicitation number
W909MY21R0008
Issued by

About this file

This draft request for proposals (RFP) and associated documents outline requirements for the Small Tactical Electric Power 3-Kilowatt Tactical Power Source (STEP 3kW TPS) program. The U.S. Army Contracting Command - Aberdeen Proving Ground is seeking feedback on the draft RFP documents through August 13, 2021. Key information includes the Army's need for a 3-kilowatt tactical power source to support expeditionary forces. The solicitation will utilize best value tradeoff source selection and award a single fixed-price contract for prototype design, development, test, and evaluation in three phases. The U.S. Army Product Director Small Expeditionary Power Sources will oversee the program. Interested offerors should submit any questions on the draft RFP documents using the provided template to ensure a timely government response.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Original Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC

20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM X OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

STEP 3KW

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

C001 Critical Design Review (CDR) Presentation

Material

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATE

D TOTAL

PRICE

DI-MISC-80711 SOO Para 5 & 7.2 SFAE-CSS-E2-S INSERT

7. DD 250 REQ 9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

NA Twice See Block 16 b. COPIES SECT. B

8. APP CODE C 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

N/A 1st Use See Block 16

Rag

Repro

16. REMARKS:

Block 12: Submit first submission at least 14 calendar days prior to prototype

CDR review meeting.

Block 13: Submit second submission 7 calendar days following CDR review.

DISTRIBUTION STATEMENT C. Approved for release to U.S. Government

Agencies and their contractors.

SFAE-CSS-E2-S

ACO

CCAP-CCV

FCDD-ISN

Blk 14: ELECTRONIC SUBMITTAL:

SFAE-CSS-E2-S: terrence.p.wichersk@mail.mil

SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil

FCDD-ISN: debra.l.bowman6.civ@mail.mil.

CCAP-CCV: darbye.t.rivera.civ@mail.mil; and

CCAP-CCV: tifphany.n.cantey.civ@mail.mil.

15. TOTAL 6 6 0

G. PREPARED BY

Terrence Wicherski

APM, PD SEPS

COMM: (703) 664-5331

H. DATE

7 Jul 21

I. APPROVED BY

Chenxi Dong-O’Malley

Product Director

SFAE-CSS-E2-S

COMM: (703) 664-5338

J. DATE

Based upon DD Form 1423-1, 1 Jun 90

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the

Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

X TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

STEP 3KW

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

17. PRICE

GROUP

C002 Product Drawings and Associated Lists

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

18.

ESTIMATED

TOTAL PRICE

DI-SESS-81000B SOO PARA 5.1 & 7.2 SFAE-CSS-E2-S

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

SECT. B

NA C Twice See Block 16

b. COPIES*

8. APP CODE

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

NA 1st use See Block 16

Reg

16. REMARKS

Contractor should propose format to Government for approval.

Block 10: Submit an interim report at the end of phase 1 & 2 a final report upon conclusion on Phase 3.

Block 12: Submit first submission 7 calendar days following CDR review.

Block 13: Submit second submission no later than 14 calendar days prior to the end of the second phase.

Blk 14: CD-ROM SUBMITTAL:

SFAE-CSS-E2-S:

Bldg 324

5850 Delafield Rd

Ft Belvoir, VA 22060

Attn: Terrence Wicherski, 703-664-5352

SFAE-CSS-E2-S

ACO

CCAP-CCV

FCDD-ISN

15. TOTAL 0 6

G. PREPARED BY

Terrence Wicherski

APM, PD SEPS

Chenxi Dong-O’Malley

Product Director

SFAE-CSS-E2-S

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC

20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM X OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

STEP 3KW

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

C003 Quality Control Plan

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATE

D TOTAL

PRICE

DI-MGMT-82184 SOO Para 6 & 7.2 SFAE-CSS-E2-S INSERT

7. DD 250 REQ 9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

NA Once See Block 16 b. COPIES SECT. B

8. APP CODE A 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

N/A 1st Use AS REQ

Block 4: Delete requirement Section 2 of DI-MGMT-82184. Content shall be include current contractor plan. Days required are in working days

Block 12: Submit draft plan 90 days after contract award. The government requires 30 days for review/comment.

Block 13: Submit final 30 days after government comments incorporated or upon approval of draft.

DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited.

CCAP-CCV

FCDD-ISN

SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil

FCDD-ISN: debra.l.bowman6.civ@mail.mil.

CCAP-CCV: darbye.t.rivera.civ@mail.mil; and

CCAP-CCV: tifphany.n.cantey.civ@mail.mil.

15. TOTAL 6 6 0

G. PREPARED BY

Terrence Wicherski

APM, PD SEPS

Chenxi Dong-O’Malley

Product Director

SFAE-CSS-E2-S

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC

20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP X TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

STEP 3KW

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

C004 Electronic Technical Manual (ETM)

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATE

D TOTAL

PRICE

DI-MISC-80711, & MIL-STD 400051-2C SOO Para 7, 7.1 & 7.2 SFAE-CSS-E2-S INSERT

7. DD 250 REQ 9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

N/A Three times See Block 16 b. COPIES SECT. B

8. APP CODE C 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

Block 4: For each change, the contractor shall deliver digital files for the

ETM revision and/or change package developed under this contract. The contractor shall provide a complete set of all integrated text and graphics files

(with graphics embedded) unless otherwise approved by the Government

Acceptance Office. The integrated copy must appear on screen and print exactly as printed final. Final delivery is also required as non-integrated native files containing editable text and resizable graphics. All digital files shall be provided both by electronic submission, e.g., e-mail, etc., as approved by the requiring office, and by CD, readable by computers running current

Government utilized Microsoft Operating System.

Block 12: Submit 1st draft (30%) 150-days days prior to the end of Phase 1.

Block 13: Submit 2nd draft (70%) 45-days prior to the end of Phase 1.

Submit final draft 30-days prior to the conclusion of Phase 3.

DISTRIBUTION STATEMENT C. Approved for release to U.S. Government

Agencies and their contractors.

SFAE-CSS-E2-S

ACO

CCAP-CCV

SFAE-CSS-E2-S: casey.h.steigar.civ@mail.milFCDD-ISN:

debra.l.bowman6.civ@mail.mil.

CCAP-CCVdarbye.t.rivera.civ@mail.mil; and

CCAP-CCV: tifphany.n.cantey.civ@mail.mil.

15. TOTAL 6 6 0

G. PREPARED BY

Terrence Wicherski

APM, PD SEPS

Chenxi Dong-O’Malley

Product Director

SFAE-CSS-E2-S

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC

20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM X OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

STEP 3KW

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

C005 Failure Modes, Effects, and Criticality

Analysis (FMECA) Report

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATE

D TOTAL

PRICE

DI-SESS-81495 SOO Para 7.1 & 7.2 SFAE-CSS-E2-S INSERT

7. DD 250 REQ 9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

NA Once See Block 16 b. COPIES SECT. B

8. APP CODE C 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

N/A 1st Use N/A

Block 12: Submit no later than 14 calendar days prior to the end of phase 1.

CCAP-CCV

FCDD-ISN

SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil

FCDD-ISN: debra.l.bowman6.civ@mail.mil.

CCAP-CCV: darbye.t.rivera.civ@mail.mil; and

CCAP-CCV: tifphany.n.cantey.civ@mail.mil.

15. TOTAL 6 6 0

G. PREPARED BY

Terrence Wicherski

APM, PD SEPS

Chenxi Dong-O’Malley

Product Director

SFAE-CSS-E2-S

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC

20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM X OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

STEP 3KW

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

C006 Maintenance Analysis Report

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATE

D TOTAL

PRICE

DI-MISC-80711 SOO Para 7.1 & 7.2 SFAE-CSS-E2-S INSERT

7. DD 250 REQ 9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

NA Once See Block 16 b. COPIES SECT. B

8. APP CODE C 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

Block 12: Submit no later than 14 calendar days prior to the end of phase 2.

CCAP-CCV

FCDD-ISN

SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil

FCDD-ISN: debra.l.bowman6.civ@mail.mil.

CCAP-CCV: darbye.t.rivera.civ@mail.mil; and

CCAP-CCV: tifphany.n.cantey.civ@mail.mil.

15. TOTAL 6 6 0

G. PREPARED BY

Terrence Wicherski

APM, PD SEPS

Chenxi Dong-O’Malley

Product Director

SFAE-CSS-E2-S

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC

20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM X OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

STEP 3KW

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

C007 Engineering Data for Provisioning (EDFP)

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATE

D TOTAL

PRICE

DI-SESS-81874 SOO Para 7.1 & 7.2 SFAE-CSS-E2-S INSERT

7. DD 250 REQ 9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

NA Once See Block 16 b. COPIES SECT. B

8. APP CODE C 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

Block 12: Submit no later than 14 calendar days prior to the end of phase 2.

CCAP-CCV

FCDD-ISN

0 2

SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil

FCDD-ISN: debra.l.bowman6.civ@mail.mil.

CCAP-CCV: darbye.t.rivera.civ@mail.mil; and

CCAP-CCV: tifphany.n.cantey.civ@mail.mil.

15. TOTAL 0 6 0

G. PREPARED BY

Terrence Wicherski

APM, PD SEPS

Chenxi Dong-O’Malley

Product Director

SFAE-CSS-E2-S

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC

20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM X OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

STEP 3KW

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

C008 Kick Off Meeting Presentation Materials

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATE

D TOTAL

PRICE

DI-MISC-80711 SOO Para 7.2 & 8 SFAE-CSS-E2-S INSERT

7. DD 250 REQ 9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

NA Once See Block 16 b. COPIES SECT. B

8. APP CODE C 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

Block 12: Submit 30 calendar days after contract award.

ACO

CCAP-CCV

FCDD-ISN

SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil

FCDD-ISN: debra.l.bowman6.civ@mail.mil.

CCAP-CCV: darbye.t.rivera.civ@mail.mil; and

CCAP-CCV: tifphany.n.cantey.civ@mail.mil.

15. TOTAL 6 6 0

G. PREPARED BY

Terrence Wicherski

APM, PD SEPS

Chenxi Dong-O’Malley

Product Director

SFAE-CSS-E2-S

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for

Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of

Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in

Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM X OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

STEP 3KW

1. DATA ITEM

NO.

2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

C009 Bi-Monthly Progress Report

4. AUTHORITY (Data Acquisition

Document No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATE

D TOTAL

PRICE

DI-ADMN-80447A SOO Para 7.2 & 8 SFAE-CSS-E2-S INSERT

7. DD 250

REQ

9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF

FIRST

SUBMISSION

14. DISTRIBUTION IN

NA Bi-monthly See Block 16 b. COPIES SECT. B

8. APP CODE C 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

Blocks 12 & 13: First submission shall be submitted at the end of the second calendar month after award and subsequent submissions at the end of every other month throughout each awarded phase. Reports which coincide with an End of

Phase report do not need to be submitted separately.

SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil

FCDD-ISN: debra.l.bowman6.civ@mail.mil.

CCAP-CCV: darbye.t.rivera.civ@mail.mil; and

CCAP-CCV: tifphany.n.cantey.civ@mail.mil.

CCAP-CCV

FCDD-ISN

0 2

15. TOTAL

0 6 0

Terrence Wicherski

APM, PD SEPS

Chenxi Dong-O’Malley

Product Director

SFAE-CSS-E2-S

mailto:lena.v.plummer-milindez.civ@mail.mil

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to

Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC

20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM X OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

STEP 3KW

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

C010 End of Phase Report

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATE

D TOTAL

PRICE

DI-ADMN-80447A SOO Para 7.2 & 8 SFAE-CSS-E2-S INSERT

7. DD 250 REQ 9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

NA Twice See Block 16 b. COPIES SECT. B

8. APP CODE C 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft

Final

Block 12 & 13: Submit no later than 14 calendar days prior to the end of phases 1 & 2.

SFAE-CSS-E2-S: casey.h.steigar.civ@mail.mil

FCDD-ISN: debra.l.bowman6.civ@mail.mil.

CCAP-CCVdarbye.t.rivera.civ@mail.mil; and

CCAP-CCV: tifphany.n.cantey.civ@mail.mil.

SFAE-CSS-E2-S

ACO

CCAP-CCV

FCDD-ISN

15. TOTAL 6 6 0

Terrence Wicherski

APM, PD SEPS

Chenxi Dong-O’Malley

Product Director

SFAE-CSS-E2-S

File details come from the government source that posted it. Updated .